Appendix B Service Repair Order.xls
XLS spreadsheet 42 KB Posted
- Solicitation number
- N4008524B2505
About this file
This is a Service Repair Order (SRO) template form for use under contract N40085-XX-D-XXXX at NSA Mechanicsburg. The template includes fields for basic order information like contract details, location, customer references, and line items for labor, materials and equipment costs with associated pricing columns. The template contains standard safety requirements referencing U.S. Army Corps of Engineers Safety and Health Requirements Manual EM-385-1-1 and requires submission of Activity Hazard Analysis for work involving hand tools, construction equipment and PPE. The form indicates work is to be performed during regular working hours with a completion timeline measured in calendar days after award.
This template appears to be an administrative form used to document individual repair orders but does not specify any particular products or services to be provided. It is a standardized form meant to capture order details, pricing, and safety requirements for future task orders under the referenced contract.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SRO Pg1
| Service Repair Order | Page: | 1 | of | 1 | |||||
| Date: | Contract Number: | N40085-XX-D-XXXX | |||||||
| Contract: | Contractor: | ||||||||
| Location: | NSA Mechanicsburg | T.O.#: | TBD | Command: | |||||
| Location on Site: | Customer Ref #: | ||||||||
| Job Title: | e-Projects #: | ||||||||
| FMS Name: | FMS Phone #: | Prepared By: | |||||||
| Location POC: | POC Phone #: | Preparers Phone #: | |||||||
| ELIN | Item Description | Unit of Issue | Quantity | Unit Cost | ELIN Total | ||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| $0.00 | |||||||||
| TOTAL of ELINs | $0.00 | ||||||||
| Scope of Work | |||||||||
| The Contractor Shall provide all Labor, Material, Equipment, and Supervision to accomplish the following: | |||||||||
| Safety Info: | |||||||||
| Safety Info: | All work shall be completed in accordance with the U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1. | ||||||||
| AHA Info: | Submit completed Activity Hazard Analysis (If required) prior to starting work. | ||||||||
| AHA Required for: | Use of Hand Tools, Construction equipment & PPE | ||||||||
| Other Info: | |||||||||
| Work to be scheduled and performed during regular working hours. | |||||||||
| Contractor shall complete all work within | XX | Calendar Days after Award |
File details come from the government source that posted it. Updated .