About this file

This solicitation requests design-build and design-bid-build construction services through multiple award indefinite delivery/indefinite quantity contracts at Naval Support Activity Crane in Indiana. The solicitation seeks general construction services and includes all applicable attachments. Responses are due by the date and time specified in the solicitation. The Department of the Navy Naval Facilities Engineering Command will award contracts to various qualified contractors to complete construction projects on an as-needed basis over the period of performance. Pricing will be established through task orders issued against the contracts.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.

THIS PAGE LEFT INTENTIONALLY BLANK

Building 3235 Battery Testing Area Upgrades Work Order No.: 1649838 NSA Crane, Indiana

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 07 02/15 SEALS PAGE

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 14 00 11/22 WORK RESTRICTIONS

01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL

CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 91 00.15 05/16 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 08/22 [DEMOLITION][ AND ][DECONSTRUCTION]

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

DI VI SI ON 03 - CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DI VI SI ON 05 - METALS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 09 - FI NI SHES

PROJECT TABLE OF CONTENTS Page 1

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 51 00 08/20 ACOUSTICAL CEILINGS

09 90 00 02/21 PAINTS AND COATINGS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 01.00 20 04/06 TESTING INDUSTRIAL VENTILATION SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 33 56 02/09 SELF-ACTING BLAST VALVES

23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23.00 20 02/10 COMPUTER ROOM AIR CONDITIONING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS Fire & life safety

25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS Utility monitoring & control systems

DI VI SI ON 26 - ELECTRI CAL

26 05 19.10 10 05/16 INSULATED WIRE AND CABLE

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

PROJECT TABLE OF CONTENTS Page 2

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 33 - UTI LI TI ES

33 71 01.00 40 11/14, CHG 1: 02/17 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 60 00 05/20 PROCESS CONTROL

DI VI SI ON 42 - PROCESS HEATI NG, COOLI NG, AND DRYI NG EQUI PMENT

42 22 16.00 40 08/17 RECIPROCATING PROCESS CHILLERS AND

COOLERS

DI VI SI ON 44 - POLLUTI ON AND WASTE CONTROL EQUI PMENT

44 10 00 11/22 AIR POLLUTION CONTROL

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 00 01 07

SEALS PAGE

02/15

PART 1 SUMMARY

1.1 SEALS AND SIGNATURES

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of North Carolina.

License No. 26042.

Expiration Date: 01/31/2024.

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of North Carolina.

License No. 046014.

Expiration Date: 12/31/2023.

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the Commonwealth of Virginia.

License No. 26777.

Expiration Date: 12/31/2023.

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the District of Columbia

License No. PE8229

Expiration Date: 8/31/2024.

-- End of Section --

Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the Commonwealth of Virginia.

License No. 26777.

Expiration Date: 12/31/2023.

Building 3235 Battery Area Upgrade NSWC Crane, Indiana eProject No. 1649838

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 - GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114 and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services.

This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

e. "Construction Representative" (CR): Government personnel assigned as Contracting Officer's Representatives to perform Quality Assurance evaluation, coordinate construction, and to record and document their findings.

f. "Contracting Officer's Representative" (COR): Person(s) designated in writing by the Contracting Officer to be his/her authorized representative, such as the Contract Specialist, Project Manager, or Construction Representative. As Contracting Officer's representatives, their authority is limited to specific actions.

g. "Contractor" refers to both the prime Contractor and any Subcontractors. The Contractor will be responsible for ensuring that Subcontractors comply with the provisions of this contract.

SECTION 01 11 00 Page 1 eProject No. 1649838

h. "The Contractor Representative" is a foreman, superintendent, manager, or subcontractor (distinct from the Base Superintendent) assigned in writing who has authority to act for the prime contractor.

i. "Contract Discrepancy Reports" (CDRs): Contract Discrepancy Reports (CDRs) may be issued by the Administrative Contracting Office (ACO) to identify and document cases of poor Contractor performance. The CDR requires the Contractor to explain in writing why performance is unsatisfactory, how performance will be returned to satisfactory levels, and how recurrence of the problem will be prevented in the future.

j. "Contract Specialist": (CS) The individual assigned by the Contracting Officer to conduct negotiations with the Contractor.

k. The "Customer" is the functional element at a Government activity which benefits from the services provided by the Contractor. A customer may be any of the divisions within NAVFAC or another component at the Base. Customer responsibilities include establishing requirements and assisting specification development. The customer has no authority to direct the contractor. If the contractor takes direction from the customer, the contractor does so at their own risk with full knowledge that the Government is under no obligation to pay for work so directed.

l. "Quality Assurance" (QA): The method used by the Government to provide some measure of control over the quality of purchased goods and services received.

m. "Quality Assurance Evaluator" (QAE): The Government employee designated by the COR or Contracting Officer to monitor contractor performance.

n. "Quality Control" (QC): A method used by the Contractor to control the quality of goods and or services provided.

o. "Contractor Quality Control" (CQC) representative: A person designated by the Contractor to monitor and control the quality of purchased goods and services received. The designated person shall not be the crew leader, equipment operator, laborer, mechanic, or other person engaged in the work. The CQC representative shall report directly to an officer of the firm and shall not be subordinate to another person of the firm such as the project manager or the jobsite superintendent.

p. Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be understood that reference is made to the drawings accompanying this specification unless stated otherwise.

q. Where "as directed", "as required", "as permitted", "approval", "acceptance", or words of similar import are used, it shall be understood that direction, requirement, permission, approval, or acceptance of the COR is intended unless stated otherwise.

r. BOD is the date the customer can expect to receive useful occupancy of the facility or construction work. Although all construction efforts at the construction site may not be completed (for example, punch-list items and other minor construction activities may still be required for construction to be considered complete), and the Government may need to continue administering the final stages of the project construction

SECTION 01 11 00 Page 2 eProject No. 1649838 contract until such completion, the user may begin to occupy all or agreed upon parts of the facility and use it for its intended purpose.

Liquidated damages no longer will be assessed and the warranty period begins on the contract. BOD may occur with or without deficiencies.

This term is synonymous with the term "Substantial Completion." BOD occurs before the completion date.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals shall be submitted in accordance with Section 01 33 00

SUBMITTAL PROCEDURES.

All work will be inspected in accordance with the submittals as approved.

When submittal deviations are approved, the manufacturer's recommendations will apply.

The Contractor shall provide all labor, supervision, tools, materials, equipment, transportation, safety, quality control, design and management necessary to provide construction, alteration, repair and demolition of Government facilities.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

Building 3235 is located at Naval Support Activity Crane at Crane, Indiana.

Building 3235 is a single-story facility comprising approximately 27,000 square feet. The building was originally constructed in the early 1990s.

The building is utilized to test batteries under varying pressure and temperature conditions. The building is divided into Zones, 1, 2, and 3.

Zone 1 consists of office and other related spaces. Zone 2 consists of nondestructive testing labs, storage rooms, and support spaces. Destructive testing occurs in Zone 3. Zone 3 has a total of 10 concrete test cells.

Destructive testing occurs within these cells. These test cells have been designed to withstand sustained pressures ranging from 10 to 30 psig. The test cells are surrounded by occupied “runway areas that are used by personnel as workspace. In Zone 3, site personnel have witnessed gases from battery testing leaking from the supply and exhaust systems. This project replaces the process ventilation systems in Zone 3 to correct these deficiencies, replaces some HVAC systems and chilled water systems for Zones 2 and 3, replaces fire detection and suppression systems for Zones 1, 2 and 3, includes structural modifications to the test cells in Zone 3 to accommodate process ventilation upgrades.

Due to the nature of the previous operations that have been conducted in Zone 3 of Building 3235 for destructive battery testing, the surfaces and air filters could be contaminated with residues. The contractor shall protect their personnel from potential contamination when disturbing any surfaces or filters in Zone 3 of Building 3235. The contractor may want to consider consulting with an industrial hygienist to determine the proper level of protection for personnel. Refer to Section 02 41 00. The government has provided some industrial hygiene monitoring results from past government cleaning operations in cell. They are attached to the end of this Section. The government also has sample data of contaminants extracted from the scrubber liquor filters that are attached to the end of this Section. Zone 1 of the building will be occupied throughout the project. Refer to drawings for phasing requirements.

SECTION 01 11 00 Page 3 eProject No. 1649838

The Contractor is responsible for coordination and payment of all permits and fees necessary for the execution of all work included.

1.4.2 Changes to the Contract

No oral statement of any person shall in any manner or degree modify or otherwise affect the terms of this contract. All changes must be in writing, and must come from the Contracting officer.

1.4.3 Government Representatives

a. The work will be under the general direction of the Contracts Specialist or the COR and designated in block 6 of DD Form 1155.

b. Except in connection with the Disputes Clause (found in clause 52.212-4 Contract Terms and Conditions-Commercial Items (d), of this contract), the Contracts Specialist or the COR will be the authorized representative of the Contracting Officer. The Contracting Officer (KO) will have complete charge of and exercise full supervision over the work so far as it affects the interests of the Government.

c. For the purposes of the Disputes Clause, the "Contracting Officer" is the Commander, Naval Facilities Engineering Command Midlant, the Acting Commander, their successors, or their representatives specially designated for this purpose.

1.4.4 Office Trailer

Temporary office or construction trailer shall be placed at location approved by the Contracting Officer. The Contractor shall arrange for required utilities and be held responsible for the cost thereof, including all costs associated with obtaining utilities. Arrangements for hookup to Government utilities shall be made with the Contracting Officer's Representative. See Section 01 50 00 TEMPORARY FACILITIES AND CONTROLS for more information.

1.5 OCCUPANCY OF PREMISES

Building(s) will not be occupied during performance of work under this Contract. Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.6 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

SECTION 01 11 00 Page 4 eProject No. 1649838

c. The construction contractor shall a provide temporary mobile pre-manufactured modular scaffolding system over the existing process equipment that must remain when there are mechanical systems above the process equipment that are being constructed, renovated, or demolished.

The scaffolding shall have an upper pre-manufactured solid platform system. Plastic sheeting shall be suspended from the scaffolding platform to form a “dome” of plastic sheeting over the equipment capable of shedding failing liquids. The contractor shall not walk or stand on the plastic. The contractor shall ensure that the power to the equipment is locked out prior to installing the plastic sheeting for safety and overheating purposes. Once in place the equipment protection shall be inspected by the customer and the NAVFAC construction manager. If the construction manager and the lab manager agree that the protection is sufficient, then it shall be documented by a field checklist signed by the customer, NAVFAC construction manager, and the construction contractor superintendent.

d. Hauling of Crushed Stone

(1) Loads of crushed stone in transit on Base shall be covered with tarpaulins or other approved covers to prevent discharge of stone aggregate.

(2) The contractor shall clean up any spilled materials from the roadways if it is deemed a road hazard or nuisance.

1.7 ASBESTOS REQUIREMENTS

If additional material which may contain asbestos is encountered and must be disturbed, do not touch the material. Notify the Contracting Officer in writing. See Section 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS for further information.

1.8 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.8.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

SECTION 01 11 00 Page 5 eProject No. 1649838

1.9 GOVERNMENT-INSTALLED WORK

Refer to Drawings for full list and locations of equipment provided and installed by the government.

1.10CONTRACTOR FURNISHED ITEMS

a. The contractor shall furnish all labor, facilities, equipment, materials, design, parts, supplies and tools necessary for the performance of the work of this contract unless otherwise specified.

b. Materials and supplies procured by the contractor shall meet the specifications, standards, and manuals listed in these specifications.

The Contracting Officer may require test data showing that any materials or supplies procured by the

c. contractor meets the specifications. The Contracting Officer may at any time require samples of materials to be used in work performed under this contract.

d. If the quality of an item is not specified, it shall be of acceptable industrial grade and quality, equal to or better than the manufacturer's original and will be compatible with existing systems.

e. Administrative supplies and equipment shall be furnished by the contractor.

1.11INTERRUPTIONS TO UTILITY OR STATION OPERATIONS

Approval of the Contracting Officer shall be received before any utility systems or station operations are interrupted.

Normal Base functions will remain in operation during the entire contract period and the Contractor shall conduct all operations so as to cause the least possible interference with the normal operations of the activity.

1.12OSHA/EPA REGULATIONS

a. See 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for further details.

b. During performance of all work under this contract, the Contractor shall strictly adhere to Environmental Agency Regulations (EPA), Federal Occupational Safety and Health Regulations (OSHA), Army Corp of Engineers EM-385-1-1 2014, or most current version, as well as all applicable federal, state and local regulations pertaining to water, air, solid waste, and noise pollution.

c. The Contractor shall provide and maintain during the life of the contract, environmental protective measures as required to control pollution that develops during normal construction practice.

d. All environmental protection matters shall be coordinated with the COR. The Contractor shall submit an Environmental Protection Plan to the COR prior to the start of work.

SECTION 01 11 00 Page 6 eProject No. 1649838

e. Inspection of any of the Contractor work sites may be accomplished by the Activity Environmental Protection Coordinator, or authorized officials on a no-notice basis during normal working hours.

f. The Contractor shall take immediate action to stop, minimize, control, and cleanup of any oil, or other environmentally damaging spills that result from the Contractor's operations or accident.

g. The Contractor shall comply with the instructions of the cognizant Navy Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel.

h. The work site(s) shall be cleaned-up on a daily basis. This refers to removal of daily trash, debris, or items posing a safety or environmental risk to the Base. All break and maintenance areas shall be policed and cans, bottles, paper, plastic wrap, and any container containing oil, hydraulic fluid, antifreeze, etc., shall be containerized and removed from the Base. Any maintenance area that is contaminated by oil, hydraulic, fluid, antifreeze, etc., shall be properly remediated.

i. No contractor personnel except the Janitorial Service are allowed to dump material in trash or metal containers assigned to buildings or areas.

1.13RESTRICTED OR HAZARDOUS AREAS

The Contractor shall note those areas designated as "restricted", "hazardous", "red flagged", or "radio frequency hazard" areas. At no time shall the Contractor enter these areas without the proper authorization from the Officer in Charge of Construction or the designated representative.

When the Contractor submits the schedule of work, the COR will re-emphasize those areas requiring authorization for entry and will brief the Contractor on the proper notification and entry procedures for the specific area.

Accordingly, the Contractor shall not deviate from the submitted and approved work schedule without the proper notification to, and approval from, the COR. This is an extremely important procedure requirement and is necessary for the safety and welfare of the Contractor and the occupant employees.

Specific information on permits to enter and work in explosive operations buildings can be found in 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and 01

14 00 WORK RESTRICTIONS.

1.14RADIO TRANSMITTER RESTRICTIONS

a. To preclude accidental actuation of sensitive electronic equipment or explosives, the Contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as delineated by the Contracting Officer.

b. All radio transmitters shall be approved by the Explosive Safety Office and properly marked. Under no circumstances shall transmitters, including Survey gear, be used without prior approval.

SECTION 01 11 00 Page 7 eProject No. 1649838

c. Pagers or cellular phones shall not be taken within the perimeter of ordnance operating areas/buildings unless they are turned "OFF". Also, none are allowed within 100 feet of any explosive loaded boxcar or magazine where their doors are open.

d. The Contractor shall ensure that all employees are aware of "Radio Frequency Hazard" areas when they are working within or close to them.

1.15SAFETY REQUIREMENTS AND REPORTING

a. See section See 01 35 26.05 20 GOVERNMENTAL SAFETY REQUIREMENTS for further details.

b. The Contractor shall submit a comprehensive Accident Prevention Plan (APP) to the COR for approval prior to commencing work. This Safety Plan may be required to be updated and re-submitted and approved as required for specific hazards.

c. The Contractor shall submit a complete Activity Hazard Analysis (AHA)to the COR for approval prior to commencing work. This Safety Plan shall be submitted and approved prior to commencing work.

d. Prior to commencing work, the Contractor shall meet in conference with the COR to discuss and develop mutual understandings relative to the administration of the Safety Program.

e. The Contractor's workspace may be inspected periodically for OSHA and Navy violations. The Contractor shall provide assistance to the Safety Office to escort any federal or state OSHA inspector if a complaint is filed. Any fines levied on the Contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly.

f. The Contractor shall report all emergencies immediately at the time of their occurrence. Emergency number "911" is in effect for all Base

g. land-line telephones or cell phones. Report the situation as soon as possible to the Contracts Office after the incident responders have been summoned.

h. The Contractor shall submit to the COR a full report of damage to Government property and/or equipment by Contractor employees. All damage reports shall be submitted to the COR within 24 hours of the occurrence.

i. The base will provide emergency transportation to the medical department or off station hospital in the event of life threating emergency but will not provide routine care or physical examinations.

j. All Contractor personnel employed for this contract shall be properly clothed during the execution of this contract including the wearing of shirts. Halter or half-shirts are not permitted.

k. The Contractor shall observe all regulations concerning protection of individuals including personnel protective and lifesaving equipment as required by the Occupational Safety and Health Act of 1970.

SECTION 01 11 00 Page 8 eProject No. 1649838

l. Provide traffic barricades and safety tape where pedestrian or driver safety is endangered in the area of maintenance or repair work. Notify the Contracting Officer prior to beginning such work.

1.16CONTRACTOR FIRE SAFETY PROGRAM

a. The Contractor shall provide a fire safety program, which complies with the requirements of Section 13 of ACOE EM 385-1-1.

b. The Contractor shall insure that all employees know how to turn in a fire alarm: "DIAL 911 on the Base's network landline or by cellular telephone". All fires, regardless of size, shall be reported to the Base's Fire Department. All incipient (small, beginning stage) fires shall be extinguished if possible but only if it can be safely performed.

c. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire in accordance with COR and the Base Fire Department instructions.

d. At all times for routine construction operations, the Contractor shall provide the following as a minimum:

(1) At least one fire extinguisher, dry chemical or C02, shall be installed on each large piece of construction equipment such as a tamper, ballast regulator, backhoe, loader, crew truck, or similar equipment.

(2) A fire extinguisher rated not less than 2A 80-B:C, (20 lbs.) dry chemical (UL approved), for all fire hazard operations, for each 3,000 square feet of project area and at a location not exceeding 100 feet from any point in the area.

(3) At least two (2) fire extinguishers rated not less than 2A 80-B:C, (20 lb.) dry chemical (UL approved)), within 50 feet of wherever flammable or combustible liquids are being used at the work site.

(4) Maintain unobstructed access to fire hydrants for fire-fighting equipment. NOTE: Hydrants painted black are out of service.

(5) Documentation indicating that training in first aid and firefighting conducted at intervals sufficient to ensure that Contractor personnel are familiar with and are capable of operating first aid and fire-fighting equipment required for this contract.

(6) Provide fire alarm reporting instructions to personnel (Per General Fire Bill Guidance) and conspicuously post the emergency telephone numbers and reporting instructions.

(7) For any fire hazard operation, such as welding, cutting, soldering, melting, grinding, torch cutting, abrasive sawing, CAD or THERMITE welding, or other spark or potential fire producing operation, (HOT WORK) the Contractor shall obtain a hot work Permit as described in section 01 35 26.05 20 GOVERNMENTAL SAFETY REQUIREMENTS and 01 14

00.05 2 WORK RESTRICTIONS.

1.17SMOKING AND OPEN FLAME REGULATIONS FOR BASE CONTRACTORS

SECTION 01 11 00 Page 9 eProject No. 1649838

a. The Base Fire Prevention Branch shall approve all open flame (hot work) permits. Additional approvals may be required from or NSWC explosive safety.

b. Smoking on-Base shall be in accordance with NSACRANEINST 5100.13 -smoking and tobacco use policy.

c. In general, smoking and smokeless tobacco shall only be used in existing designated areas outside of buildings and facilities.

d. Crew leaders or supervisors shall be responsible for enforcing all smoking and open flame regulations.

e. Disposal of debris by burning is not allowed.

1.18REGULATIONS FOR THE HAULING AND STORAGE OF GASOLINE OR OTHER FUEL

CONTAINERS

a. Approved Gasoline containers (UL Listed) shall be stored in an area clear of combustible material and 100 feet from explosive-loaded magazines, explosive-loading buildings, and explosive production areas.

b. "No Smoking" signs shall be posted in fueling areas.

c. All containers shall be properly marked as to their contents and ownership.

d. One 20-pound (2-A:80-B:C) dry chemical fire extinguisher shall be located at each fueling area.

e. All motors, lights, and radios shall be secured before refueling.

f. No refueling shall be done within 100 feet of explosive loaded buildings or explosive storage areas.

1.19QUANTITY SURVEYS

The Contractor shall make such surveys and computations as are necessary to determine the quantities of work performed or in place during each period for which a progress payment is to be made. All original field notes, computations, or other records completed for the purpose of such surveys shall be provided to the Contracting Office and used as needed to determine the proper amount of progress due the Contractor. Unless waived by the Contracting Officer in each specific case, quantity surveys made by the Contractor shall be made under the direction of the COR.

1.20PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a project that meets the functional program needs and incorporates the principles of sustainability.

Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.

SECTION 01 11 00 Page 10 eProject No. 1649838

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.20.1 Independent Verification

1.20.1.1 EPA Energy Performance Rating

Provide work consistent with drawings in order to meet Energy Star in accordance with design.

1.21SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 25 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

1.22EQUIPMENT AND MATERIALS

All equipment and materials required to complete the Work that is not readily available and in stock locally must be in the Contractor’s possession prior to the commencement of any and all work.

1.23HAULING OF CRUSHED STONE

Loads of crushed stone in transit on Base shall be covered with tarpaulins or other approved covers to prevent discharge of stone aggregate.

The contractor shall clean up any spilled materials from the roadways if it is deemed a road hazard or nuisance.

1.24WORK AREA TEMPERATURE CONTROL

SECTION 01 11 00 Page 11 eProject No. 1649838

All areas of work must be maintained at a minimum of 40 degrees F at all times using no direct fired space heating devices within the project site.

PART 2 - PRODUCTS

Equipment shall be commercially available and must have been listed in a catalog posted to the web for greater than or equal to two years prior to the solicitation.

PART 3 - EXECUTION

Not used.

SECTION 01 11 00 Page 12

PROCESS OPERATION

EVALUATED BY:

NO SIGNIFICANT

CHANGE

Any change/modification of process operation requires notification of the cognizant Industrial Hygienist at commercial (812)854-4324/4320 or DSN 482-4324/4320.Todd Dawkins

11 January 2019

IH______________

DATE____________

1-1

WORKPLACE MONITORING PLAN

NH 6260/11 (9-85) PROJECT NO. P19026

WORKPLACE INFORMATION (ID #0229)

ORGANIZATION

NSWC Crane, IN

BUILDING (Shop Priority 1)

SHOP/WORK CENTER

Code JXMN – Energy Systems Specialized Test &

Evaluation Br.

LOCATION:

Zone 3

SUPERVISOR

Jason Leonard

PHONE

NO. OF WORKERS

BASELINE EVALUATION:

YES NO X

SHOP OPERATIONS

HM/HW Handling & Cleanup, Handling/Cleanup Multiple Operations Batteries being tested vent inside test cells by either intentional or accidental means. Tests may be high heat (heat tape), crush, puncture resistance, etc. Non-lithium (e.g. silver/zinc, etc.) batteries may be hosed down with water. Cadmium, manganese and cobalt are also in the battery components.

Water from either the cell wash down or from the air scrubber (one of two 2400-gallon acid holding tanks) is treated by manually adding neutralizing agents as needed. The maximum electrolyte volume in any battery unit is typically < 1 liter.

Exposures to aerosols and dusts are limited to clean up operations when deposited material is removed. Acid gases may be released during the venting/failure of battery components. However, the SOP permits entry only after a prescribed wait time, allowing for exhaust ventilation to remove airborne contaminants.

NOTE: Sound level measurements were recorded from the vacuums used to clean the test cells and both are not noise hazardous see page four for details.

SIGNIFICANT CHANGE: New monitoring results for mercury were obtained. See page five for details.

HAZARDOUS MATERIALS USED/USAGE RATE:

Battery venting agents include hydrogen chloride (HCl) and sulfuric acid (H2SO4). Neutralizing agents - dry soda ash (sodium carbonate);

estimated up to 10 pounds per treatment, sodium hydroxide (NaOH), or HCl (rarely); <2 quarts per treatment, as needed.

EXISTING PPE & CONTROLS: Remote test monitoring (video, electronic, and temperature) with sealed cell doors. Testing and response Standard Operating Procedure, including a 2 hour minimum lag time prior to test cell entry (overnight if required). Chemical splash-proof goggles, face-shields, rubber gloves and chemical resistant aprons and boots available.

POTENTIAL HAZARD FREQUENCY/

DURATION

WORKERS

INVOLVED

REQUIRED CONTROLS

MALE FEMALE

Venting agents*:

HCl, H2SO4, and heavy metals such as nickel(R), cobalt, copper, aluminum, zinc oxide, & mercury

Monthly 1-2 hours

7 0 Continue using exhaust ventilation and the SOP entry times. Skin protection to include thick nitrile gloves. Eye protection to be determined by NSWC Safety Department.

For acid gas battery emissions, recommend direct reading gas monitoring prior to entry. For clean-up operations, where cobalt is a component of the battery, respirators that provide a minimum protection factor 50X and equipped with P-100 cartridges are required. Enrollment in the Respiratory Protection Program is required for respirator user.

Neutralizing agents: soda ash, NaOH, or HCl

Special Occasions/ 0-15 minutes

7 0 Skin protection to include thick nitrile gloves. Eye protection to be determined by NSWC Safety Department.

(R) Classified as a known occupational reproductive hazard in Chapter 29 OPNAVINST 5100.23G

(C) Classified as a known or suspected human carcinogen per ACGIH (A1 & A2) or OSHA

(Continued on page 2)

NO SIGNIFICANT

CHANGE

Any change/modification of process operation requires notification of the cognizant Industrial Hygienist at commercial (812)854-4324/4320 or DSN 482-4324/4320. Todd Dawkins

11 January 2019

IH______________

DATE____________

1-2

EXPOSURE ASSESSMENT/OBJECTIVE DATA/RATIONALE:

Health Risk Rating (HRR) = Exposure Rating x Health Effects Rating

Cobalt - UNACCEPTABLE EXPOSURE ASSESSMENT (HRR: 5X3=15). Monitoring results reveal that personal exposures routinely exceed the 0.02 mg/m3 8-Hour OEL. Additionally, the 1.0 mg/m3 95th percentile also exceeds the OEL. Additional monitoring will be performed.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

19007-15 20 Nov 18

Electronics Tech 95 <0.0069 0.00097 Clean-up of EP BA-5790 LiCFx-MnO2 battery ash

17053-01 18 May 2017

Electronics Tech 31 0.050 0.0032 Clean-up of Li-Ion batteries TC-55

17049-01 10 May 2017

Mechanical Engineer 75 0.72 0.11 Clean-up Li Ion batteries TC-52 batteries inside an old bomb case

16016-01 19 Feb 2016

Electronics Tech 136 0.467 0.135 Clean-up of Li-Ion batteries TC-55

160003 10 May 2015

Engineer 40 0.489 0.041 Clean-up of two JSF LI-ion batteries that caught on fire TC-52

04164082 09 Jun 2004

Electronics Tech 174 0.5670 0.2055 Clean-up of a high energy battery test in

TC-55

Nickel – ACCEPTABLE EXPOSURE ASSESSMENT (HRR 2X4=8). Monitoring results have documented employee exposures consistently below the 8-Hour TWA OEL of 1.5 mg/m3, additional monitoring will be performed in order to fully characterize exposures to nickel.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

17053-01 18 May 2017

Electronics Tech 31 0.028 0.0018 Clean-up of Li-Ion batteries TC-55

17049-01 10 May 2017

Mechanical Engineer 75 0.2 0.03125 Clean-up Li Ion batteries TC-52 batteries inside an old bomb case

16016-01 19 Feb 2016

Electronics Tech 136 0.0585 0.0166 Clean-up of Li-Ion batteries TC-55

160003 14 Oct 2015

Engineer 40 2.52 0.21 Clean-up of two JSF LI-ion batteries that caught on fire TC-52

04164082 09 Jun 2004

Electronics Tech 174 0.0425 0.015 Clean-up of a high energy battery test in

Copper - ACCEPTABLE EXPOSURE ASSESSMENT (HRR 2X2=4). Monitoring results have documented employee exposures consistently below the 1 mg/m3 8-Hour OEL additionally the 0.018 mg/m3 95th percentile is less than the OEL.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

19007-15 20 Nov 18

Electronics Tech 95 <0.0069 0.00097 Clean-up of EP BA-5790 LiCFx-MnO2 battery ash

17053-01 18 May 2017

Electronics Tech 31 <0.016 0.00073 Clean-up of Li-Ion batteries TC-55

17049-01 10 May 2017

Mechanical Engineer 75 0.011 0.00172 Clean-up Li Ion batteries TC-52 batteries inside an old bomb case

16016-01 19 Feb 2016

Electronics Tech 136 0.0956 0.0271 Clean-up of Li-Ion batteries TC-55

160003 14 Oct 2015

Engineer 40 0.022 0.0018 Clean-up of two JSF LI-ion batteries that caught on fire TC-52

04164082 09 Jun 2004

Electronics Tech 174 <0.0019 0.00049 Clean-up of a high energy battery test in

NO SIGNIFICANT

CHANGE

Any change/modification of process operation requires notification of the cognizant Industrial Hygienist at commercial (812)854-4324/4320 or DSN 482-4324/4320. Todd Dawkins

11 January 2019

1-3

Aluminum - ACCEPTABLE EXPOSURE ASSESSMENT (HRR 2X1=2). Monitoring results have documented employee exposures consistently below the 8-Hour TWA OEL of 1 mg/m3 for samples collected as a respirable fraction.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

17053-02 18 May 2017

Electronics Tech 31 <0.065

0.0030 Clean-up of Li-Ion batteries TC-55

17049-02 10 May 2017

Mechanical Engineer 75 <0.027

0.00298 Clean-up Li Ion batteries TC-52 batteries

inside an old bomb case.

Zinc Oxide - ACCEPTABLE EXPOSURE ASSESSMENT (HRR 2X3=6). Monitoring results have documented employee exposures consistently below the 8-Hour TWA OEL of 2 mg/m3 for samples collected as a respirable fraction. Additional monitoring will be performed in order to fully characterize exposures to zinc oxide.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

17053-02 18 May 2017

Electronics Tech 31 <0.065

0.0030 Clean-up of Li-Ion batteries TC-55

17049-02 10 May 2017

Mechanical Engineer 75 <0.027

0.0037 Clean-up Li Ion batteries TC-52 batteries

inside an old bomb case

Zinc oxide (Short Term Exposure Limit) - ACCEPTABLE EXPOSURE ASSESSMENT (HRR 2X3=6). Monitoring has documented employee exposure to be below the 15-Minute Short Term Exposure Limit OEL of 10 mg/m3 for samples collected as a respirable fraction.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

17053-03 5/18/17

Electronics Tech 15 <0.13

0.11 Clean-up of Li-Ion batteries TC-55

Hydrogen chloride - ACCEPTABLE EXPOSURE ASSESSMENT (HRR: 2x5=10). Based on personal monitoring during battery venting in a test cell, exposure is not expected to exceed the Ceiling Limit OEL of 2.98 mg/m3. Additional monitoring will be performed in order to fully characterize exposures to hydrogen chloride.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

15 (min) Ceiling Limit

(mg/m3)

WORK TASK

15164061 13 Apr 15

Engineer 15 <0.16 0.11 LiSO4-SAFT5598 battery exploded, checked wire leads, and cleaned floor

TC-56

Sulfuric acid (H2SO4) - ACCEPTABLE EXPOSURE ASSESSMENT (HRR: 2x5=10). Based on personal monitoring during battery venting in a test cell, exposure is not expected to exceed the 8-Hour TWA OEL of 1 mg/m3. An area sample did not detect any sulfuric acid at the supply vent adjacent to Test Cell 56.

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

15164061-02 13 Apr 15

Engineer 15 <0.16 0.004 LiSO4-SAFT5598 battery exploded, NO SIGNIFICANT

CHANGE

Any change/modification of process operation requires notification of the cognizant Industrial Hygienist at commercial (812)854-4324/4320 or DSN 482-4324/4320. Todd Dawkins

11 January 2019

1-4

Sulfuric acid (area)

SAMPLE #

DATE

JOB TITLE TIME

(min)

LAB

RESULT

(mg/m3)

8 HR TWA

(mg/m3)

WORK TASK

15164061-02 13 Apr 15

Engineer 234 <0.10 0.004 LiSO4-SAFT5598 battery exploded, Sodium hydroxide (neutralization) - ACCEPTABLE EXPOSURE ASSESSMENT (HRR: 2x3=6). Due to the brief/intermittent exposures, small quantities handled, and the method of application, exposures are not expected to exceed OEL’s.

Nuisance Particulates (dust, respirable fraction) – UNACCEPTABLE EXPOSURE ASSESSMENT (HRR: 4X4=16) One sample collected to date exceeded the OEL for of 3 mg/m3, additional monitoring will be performed in order to fully characterize exposures to nuisance particulates (dust, respirable fraction).

Sample #/ Date

Job Title Time (min)

LAB

RESULT

(mg/m3)

8-HR

TWA

(mg/m3)

WORK TASK

17053-02 5/18/17

Electronics Tech 31 <1.3 0.059 Clean-up of Li-Ion batteries TC-55

17049-02 5/10/17

Mechanical Engineer 75 22 3.4 Clean-up Li Ion batteries TC-52 batteries where inside an old bomb case.

16016 2/19/16

Electronics Tech 136 <0.294 0.0589 Clean-up of Li-Ion batteries TC-55

Nuisance Particulates (dust total) – ACCEPTABLE EXPOSURE ASSESSMENT (HERR: 2X4=8) Monitoring results have documented employee exposures consistently below the 8-Hour TWA OEL of 15 mg/m3.

Sample #/ Date

Job Title Time (min)

LAB

RESULT

(mg/m3)

8-HR TWA

(mg/m3)

WORK TASK

17053-02 5/18/17

Electronics Tech 31 <1.6 1.1 Clean-up of Li-Ion batteries TC-55

17049-02 5/10/17

Mechanical Engineer 75 17 2.7 Clean-up Li Ion batteries TC-52 batteries where inside an old bomb case.

16016 2/19/16

Electronics Tech 136 2.096 0.594 Clean-up of Li-Ion batteries TC-55

Mercury - ACCEPTABLE EXPOSURE ASSESSMENT (HRR: 2x4=8): Based on exposure monitoring results, if existing controls are maintained, exposures are not expected to exceed the 0.025 mg/m3 OEL, additional monitoring will be performed in order to fully characterize exposures to mercury.

Sample #/ Date

Job Title Time (min)

LAB

RESULT

(mg/m3)

8-HR

TWA

(mg/m3)

WORK TASK

18055-96 05 Apr 18

Electronics Tech 77 0.0053 0.00085 Functioning silver zinc batteries in

TC-48

18054-95 04 Apr 18

Electronics Tech 63 0.0042 0.00055 Functioning silver zinc batteries in

TC-48

17090-01 08 Aug 17

Engineering Tech 68 0.021 0.0030 Functioning silver zinc BLK-II Batteries in TC-49

NO SIGNIFICANT

CHANGE

Any change/modification of process operation requires notification of the cognizant Industrial Hygienist at commercial (812)854-4324/4320 or DSN 482-4324/4320. Todd Dawkins

11 January 2019

1-5

Sound Level Measurements

Sample # / Date

Equipment/Operation SPL1 (dB(A))

Hazardous Radius

(ft)

Labeled Noise

Hazardous

Comments

P19026-55 11 Jan 19

Dustless Vacuum / SN23388 81 N/A No Assessed during normal use

P19026-56 11 Jan 19

Dayton 25 gallon vacuum /

2RPD13

80 N/A No Assessed during normal use

Legend: “-” indicates not obtained, “N/A” indicates not applicable, * Measurements made with a Type I Sound Level Meter Measurements made with a Type II Sound Level Meter on Slow Response 1 Areas or equipment where the sound pressure levels are 85 dB (A)/140dB (P) or greater, but less than 96 dB (A)/165dB (P), must be labeled for, and must require the use of, single hearing protection. Areas or equipment where the sound pressure levels are 96 dB (A) / 165dB (P) or greater must be labeled for, and must require the use of, double hearing protection.

dB - Denotes decibels used to report impact/ impulse noise measurements.

SAMPLING REQUIRED: Annual assessment of the ventilation system is required. Additional monitoring is required during test cell cleanup operations. Since various batteries are tested at B3235, it is best to check with the process engineer to determine which of the potential hazards from the table below could be present.

Exposure Monitoring Plan:

Operation

Stressor

# of Samples per year

Sample Type

# of Sample Days / Year

Total Samples for Monitoring Plan

Ventilation system (Small & Large Scrubber)

By products of battery venting acid gas & metals

* Ventilation * *

Battery venting and testing Metals to include Al, Cu, Co, Ni, Zn, & Hg

* TWA * *

Battery venting and testing Hydrogen chloride & Sulfuric acid

* TWA & STEL * *

Notes: (*) These stressors may or may not be generated during testing conditions it just depends upon the type of batteries being tested. Often times test cells are cleaned a day after the test was performed so check with the engineer in charge to determine if one or more of the following stressors (hydrogen chloride or sulfuric acid) could be present.

(*) Complete 2018 – 2020 exposure monitoring plan.

Bulk Sample Results:

PROJECT 19007, BLDG. 3235, BULK SAMPLE RESULTS, 20 NOVEMBER 2018

Battery Type/Location

RESULT

STRESSOR

19007-16 EP BA-5790 LiCFx-MnO2 Battery Test Cell 55 FLOOR

4.4…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .