This solicitation requests proposals for an indefinite delivery/indefinite quantity multiple award construction contract for general construction services at the Naval Support Activity Crane in Indiana. The solicitation seeks to award multiple ID/IQ contracts for a one-year base period and four one-year options periods to provide construction, repair, alteration, and renovation services for facilities and infrastructure. Eligible contractors are invited to submit proposals by August 15, 2023, and awards will be made by September 30, 2023. The Naval Facilities Engineering Command is the contracting agency. Pricing will be established through individual task orders issued against the ID/IQ contracts on both a firm-fixed-price and cost-reimbursement basis.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
VICINITY MAP
BUILDING 3235
NAVAL SUPPORT ACTIVITY CRANE
BATTERY AREA UPGRADES
CRANE, IN
LOCATION MAP
13 DECEMBER 2022
FINAL SUBMITTAL
PROJECT
LOCATION
BUILDING 3235
DESIGN CONTRACT NUMBER: # N4008518D8728
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DESIGN CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
MIDWEST REGION
AutoCAD SHX Text
CRANE DETACHMENT
AutoCAD SHX Text
NAVAL SUPPORT ACTIVITY CRANE
AutoCAD SHX Text
CRANE, IN
AutoCAD SHX Text 1649838
AutoCAD SHX Text N40085-18-D-8728
AutoCAD SHX Text
AutoCAD SHX Text
PW7727
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
G-002
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
INDEX OF DRAWINGS
AutoCAD SHX Text
INDEX OF DRAWINGS
AutoCAD SHX Text
DB
AutoCAD SHX Text
AD
AutoCAD SHX Text
RU
AutoCAD SHX Text
NONE
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DESIGN CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
MIDWEST REGION
AutoCAD SHX Text
CRANE DETACHMENT
AutoCAD SHX Text
NAVAL SUPPORT ACTIVITY CRANE
AutoCAD SHX Text
CRANE, IN
AutoCAD SHX Text 1649838
AutoCAD SHX Text N40085-18-D-8728
AutoCAD SHX Text
AutoCAD SHX Text
PW7727
AutoCAD SHX Text
SHEET NO
AutoCAD SHX Text
DRAWING NO
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
AutoCAD SHX Text G-001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
AutoCAD SHX Text G-002
AutoCAD SHX Text
INDEX OF DRAWINGS
AutoCAD SHX Text E-001
AutoCAD SHX Text
ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ELECTRICAL SYMBOLS
AutoCAD SHX Text E-002
AutoCAD SHX Text
ELECTRICAL DEMOLITION - ZONE 2 & 3 FLOOR PLAN
AutoCAD SHX Text
ED-101
AutoCAD SHX Text
ELECTRICAL DEMOLITION - MEZZANINE FLOOR PLAN
AutoCAD SHX Text
ED-102
AutoCAD SHX Text
ELECTRICAL ZONE 1 AND MEZZANINE FLOOR PLAN
AutoCAD SHX Text E-101
AutoCAD SHX Text E-102
AutoCAD SHX Text
ELECTRICAL ONE-LINE DIAGRAM
AutoCAD SHX Text E-601
AutoCAD SHX Text S-001
AutoCAD SHX Text
STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
AutoCAD SHX Text
STRUCTURAL
AutoCAD SHX Text
SD-101
AutoCAD SHX Text
STRUCTURAL GROUND FLOOR DEMOLITION PLAN
AutoCAD SHX Text
SD-102
AutoCAD SHX Text
STRUCTURAL TEST CELL ROOF DEMOLITION PLAN
AutoCAD SHX Text S-101
AutoCAD SHX Text
STRUCTURAL GROUND FLOOR PLAN
AutoCAD SHX Text S-501
AutoCAD SHX Text
STRUCTURAL DETAILS
AutoCAD SHX Text
ELECTRICAL DEMOLITION - ONE-LINE
AutoCAD SHX Text
ED-601
AutoCAD SHX Text
ELECTRICAL ZONE 2 & 3 FLOOR PLAN
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
FA001
AutoCAD SHX Text
FA100
AutoCAD SHX Text
FX501
AutoCAD SHX Text
FA101
AutoCAD SHX Text
FX001
AutoCAD SHX Text
FX100
AutoCAD SHX Text
FX101
AutoCAD SHX Text
LS001
AutoCAD SHX Text
FA501
AutoCAD SHX Text
LS100
AutoCAD SHX Text
LS101
AutoCAD SHX Text
FIRE ALARM AND MASS NOTIFICATION SYMBOLS, LEGEND, AND ABBREVIATIONS
AutoCAD SHX Text
FIRE ALARM AND MASS NOTIFICATION OVERALL PLAN
AutoCAD SHX Text
FIRE ALARM AND MASS NOTIFICATION MEZZANINE LEVEL PLAN
AutoCAD SHX Text
FIRE ALARM AND MASS NOTIFICATION DETAILS
AutoCAD SHX Text
FIRST FLOOR FIRE SUPPRESSION PLAN
AutoCAD SHX Text
FIRE SUPPRESSION DETAILS
AutoCAD SHX Text
MEZZANINE FIRE SUPPRESSION PLAN
AutoCAD SHX Text
FIRE SUPPRESSION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
AutoCAD SHX Text
BUILDING CODE ANALYSIS
AutoCAD SHX Text
MEZZANINE LIFE SAFETY FLOOR PLAN
AutoCAD SHX Text
FIRST FLOOR LIFE SAFETY OVERALL PLAN
AutoCAD SHX Text
ELECTRICAL SITE PLAN
AutoCAD SHX Text
ES-001
AutoCAD SHX Text
AutoCAD SHX Text
CS-101
AutoCAD SHX Text
CIVIL SITE PLAN
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
AutoCAD SHX Text A-101
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text A-102
AutoCAD SHX Text
SHEET NO
AutoCAD SHX Text
DRAWING NO
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text G-003
AutoCAD SHX Text
AutoCAD SHX Text M-001
AutoCAD SHX Text
MECHANICAL LEGEND
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text M-002
AutoCAD SHX Text
MECHANICAL GENERAL NOTES
AutoCAD SHX Text
MD-102
AutoCAD SHX Text
MECHANICAL DEMOLITION - MEZZANINE FLOOR PLAN
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M-602
AutoCAD SHX Text M-003
AutoCAD SHX Text
MECHANICAL SITE PLAN
AutoCAD SHX Text M-502
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-501
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-103
AutoCAD SHX Text
MECHANICAL ZONE 3 NORTH FLOOR PLAN
AutoCAD SHX Text
MD-101
AutoCAD SHX Text
MECHANICAL DEMOLITION - ZONE 2 & 3 FLOOR PLAN
AutoCAD SHX Text M-101
AutoCAD SHX Text
MECHANICAL ZONE 2 NORTH FLOOR PLAN
AutoCAD SHX Text M-102
AutoCAD SHX Text
MECHANICAL ZONE 2 SOUTH FLOOR PLAN
AutoCAD SHX Text M-603
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M-503
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-801
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-802
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-601
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M-504
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-402
AutoCAD SHX Text
MECHANICAL ENLARGED PLANS
AutoCAD SHX Text M-104
AutoCAD SHX Text M-105
AutoCAD SHX Text M-106
AutoCAD SHX Text
MECHANICAL ZONE 3 SOUTH FLOOR PLAN
AutoCAD SHX Text
MECHANICAL ZONE 3 NORTH MEZZANINE FLOOR PLAN
AutoCAD SHX Text
MECHANICAL ZONE 3 SOUTH MEZZANINE FLOOR PLAN
AutoCAD SHX Text M-604
AutoCAD SHX Text M-605
AutoCAD SHX Text M-606
AutoCAD SHX Text M-701
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text
MECHANICAL AIR BALANCE & OUTSIDE AIR TABLES
AutoCAD SHX Text
MECHANICAL DIAGRAMS
AutoCAD SHX Text M-803
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-804
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-805
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-806
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-807
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-808
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-820
AutoCAD SHX Text M-821
AutoCAD SHX Text
MECHANICAL PROCESS VENTILATION CONTROL DIAGRAM CELLS 045 TO 049
AutoCAD SHX Text M-822
AutoCAD SHX Text
MECHANICAL PROCESS VENTILATION CONTROL DIAGRAM CELLS 051 TO 056
AutoCAD SHX Text M-823
AutoCAD SHX Text
MECHANICAL PROCESS CONTROLS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES AND SYMBOLS
AutoCAD SHX Text
FD101
AutoCAD SHX Text
FIRE ALARM AND MASS NOTIFICATION FIRST FLOOR DEMOLITION OVERALL PLAN
AutoCAD SHX Text
REFLECTED CEILING PLAN ZONE 2 NORTH
AutoCAD SHX Text
REFLECTED CEILING PLAN ZONE 2 SOUTH
AutoCAD SHX Text
LS002
AutoCAD SHX Text
CODE COMPLIANCE SITE PLAN
AutoCAD SHX Text M-301
AutoCAD SHX Text
MECHANICAL SECTIONS
AutoCAD SHX Text
MECHANICAL SECTIONS
AutoCAD SHX Text M-302
AutoCAD SHX Text M-812
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-815
AutoCAD SHX Text M-816
AutoCAD SHX Text M-817
AutoCAD SHX Text
MECHANICAL PROCESS CONTROLS LEGEND
AutoCAD SHX Text M-824
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text
MECHANICAL PROCESS CONTROLS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S-102
AutoCAD SHX Text
STRUCTURAL EQUIPMENT PAD PLANS
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL DETAILS
AutoCAD SHX Text E-501
AutoCAD SHX Text
ELECTRICAL SCHEDULES
AutoCAD SHX Text E-602
AutoCAD SHX Text
AutoCAD SHX Text M-505
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M-506
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M-813
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-814
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-809
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text
AutoCAD SHX Text
MD-401
AutoCAD SHX Text
MECHANICAL DEMOLITION - MECHANICAL ENLARGED PLANS
AutoCAD SHX Text
AutoCAD SHX Text S-502
AutoCAD SHX Text
STRUCTURAL DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M-810
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text M-811
AutoCAD SHX Text
MECHANICAL CONTROLS
AutoCAD SHX Text P-101
AutoCAD SHX Text
PLUMBING ZONE 2 PARTIAL FLOOR PLANS
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
PLUMBING SCHEDULES AND DETAILS
AutoCAD SHX Text P-501
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G-003
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
SYMBOLS
VIEW TITLE
VIEW TITLE A#
LEGEND
PHASING NOTESCODE ANALYSIS
ASBESTOS MATERIALS NOTES
BUILDING 3235 ZONE KEY PLAN
GENERAL NOTES
AutoCAD SHX Text
GENERAL NOTES AND SYMBOLS
AutoCAD SHX Text
DB
AutoCAD SHX Text
AD
AutoCAD SHX Text
RU
AutoCAD SHX Text
NONE
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DESIGN CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 07 AUG 2018
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
PM/DM
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
MIDWEST REGION
AutoCAD SHX Text
CRANE DETACHMENT
AutoCAD SHX Text
NAVAL SUPPORT ACTIVITY CRANE
AutoCAD SHX Text
CRANE, IN
AutoCAD SHX Text 1649838
AutoCAD SHX Text N40085-18-D-8728
AutoCAD SHX Text
AutoCAD SHX Text
PW7727
AutoCAD SHX Text
NORTH ARROW
AutoCAD SHX Text
ELEVATION DATUM / BENCH MARK
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SHT. ON WHICH DETAIL IS SHOWN
AutoCAD SHX Text
SHT. ON WHICH INTERIOR ELEVATION IS SHOWN
AutoCAD SHX Text
INTERIOR ELEVATION SYMBOL
AutoCAD SHX Text (N, E, S, W)
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text A
AutoCAD SHX Text
FURNITURE / EQUIPMENT FINISH
AutoCAD SHX Text
REVISION DESIGNATION
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
INTERIOR ELEVATION DESIGNATION
AutoCAD SHX Text
DETAIL BOUNDARY
AutoCAD SHX Text
PLAN TITLE
AutoCAD SHX Text
OUTLINE OF OBJECT ABOVE
AutoCAD SHX Text
BREAK LINES
AutoCAD SHX Text
CENTER LINES
AutoCAD SHX Text
EL. 0'-0"
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
DETAIL/SECTION/ELEVATION TITLE
AutoCAD SHX Text X-#
AutoCAD SHX Text
AutoCAD SHX Text
EXTERIOR ELEVATION
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
COLUMN LINE GRID DESIGNATION
AutoCAD SHX Text ViewportScale
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text ViewportScale
AutoCAD SHX Text A-000
AutoCAD SHX Text
AutoCAD SHX Text A-000
AutoCAD SHX Text
AutoCAD SHX Text A-000
AutoCAD SHX Text
AutoCAD SHX Text A-000
AutoCAD SHX Text
AutoCAD SHX Text A-000
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEYNOTE (NUMBER DESIGNATION)
AutoCAD SHX Text
NEW WORK
AutoCAD SHX Text
DEMO WORK
AutoCAD SHX Text
AutoCAD SHX Text
SPECIALITY WORK
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
TRUE NORTH INDICATOR
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
NEW WORK
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text
SHT. ON WHICH DETAIL IS SHOWN
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text
SHT. ON WHICH DETAIL IS SHOWN
AutoCAD SHX Text
SCALE: 1/8''= 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text 15'
AutoCAD SHX Text 20'
AutoCAD SHX Text 25'
AutoCAD SHX Text 30'
AutoCAD SHX Text 35'
AutoCAD SHX Text
AutoCAD SHX Text
PARTITION TYPE SYMBOLS
AutoCAD SHX Text 1.
AutoCAD SHX Text
APPLICABLE CODES AND STANDARDS:
AutoCAD SHX Text INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2018 UFC 1-200-01, DOD BUILDING CODE, 8 OCTOBER 2019 UFC 1-200-02, HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 1-200-02, HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 1-200-02, HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 AND SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 SUSTAINABLE BUILDING REQUIREMENTS WITH CHANGE 4, 1 BUILDING REQUIREMENTS WITH CHANGE 4, 1 BUILDING REQUIREMENTS WITH CHANGE 4, 1 REQUIREMENTS WITH CHANGE 4, 1 REQUIREMENTS WITH CHANGE 4, 1 WITH CHANGE 4, 1 WITH CHANGE 4, 1 CHANGE 4, 1 CHANGE 4, 1 4, 1 4, 1 1 1 OCTOBER 2019 UFC 3-301-01, STRUCTURAL ENGINEERING, 1 OCTOBER 2019 UFC 3-400-02 DESIGN: ENGINEERING WEATHER DATA, 20 SEPTEMBER 2018 UFC 3-401-01, MECHANICAL ENGINEERING WITH CHANGE 1, 1 OCTOBER 2015 UFC 3-410-01 HVAC SYSTEMS, WITH CHANGE 6, 3 MARCH 2020 UFC 3-410-02 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE 3-410-02 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE 3-410-02 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE HVAC AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE AND OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE OTHER BUILDING CONTROL SYSTEMS, WITH CHANGE BUILDING CONTROL SYSTEMS, WITH CHANGE BUILDING CONTROL SYSTEMS, WITH CHANGE CONTROL SYSTEMS, WITH CHANGE CONTROL SYSTEMS, WITH CHANGE SYSTEMS, WITH CHANGE SYSTEMS, WITH CHANGE WITH CHANGE WITH CHANGE CHANGE CHANGE 1, 2 MARCH 2020 UFC 3-420-01 PLUMBING SYSTEMS, WITH CHANGE 11, 1 NOVEMBER 2019 UFC 3-450-01 NOISE AND VIBRATION CONTROL, 5 MAY 2003 UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018 ASHRAE 62.1-2016, VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY ASHRAE 90.1-2013, ENERGY STANDARD FOR BUILDINGS EXCEPT LOW RISE RESIDENTIAL BUILDINGS ASHRAE 135-2016, BACNET - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL 135-2016, BACNET - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL 135-2016, BACNET - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL BACNET - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL BACNET - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL - A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL A DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL DATA COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL COMMUNICATION PROTOCOL FOR BUILDING AUTOMATION AND CONTROL PROTOCOL FOR BUILDING AUTOMATION AND CONTROL PROTOCOL FOR BUILDING AUTOMATION AND CONTROL FOR BUILDING AUTOMATION AND CONTROL FOR BUILDING AUTOMATION AND CONTROL BUILDING AUTOMATION AND CONTROL BUILDING AUTOMATION AND CONTROL AUTOMATION AND CONTROL AUTOMATION AND CONTROL AND CONTROL AND CONTROL CONTROL CONTROL NETWORKS ASHRAE HANDBOOKS NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS 2018
AutoCAD SHX Text
1. THE CONTRACTOR SHALL NOT USE ANY ASBESTOS CONTAINING MATERIAL (ACM) AT ANY TIME DURING THE CONTRACTOR SHALL NOT USE ANY ASBESTOS CONTAINING MATERIAL (ACM) AT ANY TIME DURING CONSTRUCTION. THE CONTRACTOR SHALL VERIFY THAT ALL MATERIALS, INCLUDING THOSE SUPPLIED BY THIRD PARTIES, ARE ASBESTOS FREE. 2. A WRITTEN CERTIFICATION LETTER SHALL BE PROVIDED BY THE CONTRACTOR TO THE NAVY CERTIFYING A WRITTEN CERTIFICATION LETTER SHALL BE PROVIDED BY THE CONTRACTOR TO THE NAVY CERTIFYING THAT THE FINISHED WORK IS ASBESTOS FREE. A SIGNED LETTER ON COMPANY LETTERHEAD STATING, "TO THE BEST OF MY KNOWLEDGE, NO ACM WAS USED AS A BUILDING MATERIAL IN THE BUILDING." 3. THE CONTRACTOR SHALL SUBMIT SAFETY DATA SHEETS (SDS) FOR SUSPECT MATERIALS LISTED IN NAVFAC THE CONTRACTOR SHALL SUBMIT SAFETY DATA SHEETS (SDS) FOR SUSPECT MATERIALS LISTED IN NAVFAC P-502 ASBESTOS MANAGEMENT GUIDE, APPENDIX J TO THE PROJECT MANAGER FOR THE FACILITY MANAGER'S RECORDS.
AutoCAD SHX Text
1. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PREPARATION AND IMPLEMENTATION OF THE FINAL THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PREPARATION AND IMPLEMENTATION OF THE FINAL PHASING PLAN FOR THIS PROJECT. HE MUST ALSO BE RESPONSIBLE FOR ALL RISK ASSESSMENTS AND PREPARATION OF PLANS TO MANAGEMENT OF ALL RISKS FOR THE HEALTH AND SAFETY OF ALL PERSONNEL AND THE PROTECTION OF ALL ASSETS IN THE VICINITY OF BUILDING 3235. 2. THE PHASING PLAN MUST INCLUDE COORDINATION WITH BUILDING PERSONNEL, AND THE INCLUSION OF THE PHASING PLAN MUST INCLUDE COORDINATION WITH BUILDING PERSONNEL, AND THE INCLUSION OF ACTIVITIES REQUIRED OF THE BUILDING PERSONNEL TO REMOVE PORTABLE ITEMS AND TO ENCASE AND PROVIDE PROTECTIVE BARRIERS AROUND CRITICAL EQUIPMENT ITEMS THAT ARE DELICATE AND IMPRACTICAL TO BE MOVED. THE CONTRACTOR MUST BE AWARE OF THE BUILDING REMAINING CONTENTS AND MUST ATTAIN AGREEMENT REGARDING PROTECTIVE MEASURES TO BE TAKEN AROUND THEM. 3. ANY CHANGES TO THE CONTRACTOR'S WRITTEN PHASING PLAN MUST BE APPROVED IN WRITING BY THE ANY CHANGES TO THE CONTRACTOR'S WRITTEN PHASING PLAN MUST BE APPROVED IN WRITING BY THE PROJECT CONTRACTING OFFICER BEFORE IMPLEMENTATION. 4. THIS BUILDING 3235 PROJECT PROVIDES FOR THE REPLACEMENT OF PROCESS VENTILATION AND HVAC THIS BUILDING 3235 PROJECT PROVIDES FOR THE REPLACEMENT OF PROCESS VENTILATION AND HVAC SYSTEMS IN ZONE 3 AND ONE HVAC SYSTEM IN ZONE 2. THE MAIN AREAS OF CONCENTRATION OF WORK ARE THE FOLLOWING: a. PROCESS AIRFLOW SYSTEMS IN ZONE 3 (INCLUDING DEMOLITION, NEW EXHAUST, SCRUBBING AND PROCESS AIRFLOW SYSTEMS IN ZONE 3 (INCLUDING DEMOLITION, NEW EXHAUST, SCRUBBING AND MAKEUP AIR) b. HVAC SYSTEM RENOVATION FOR ZONE 2 IN ROOM 028 LABORATORY HVAC SYSTEM RENOVATION FOR ZONE 2 IN ROOM 028 LABORATORY c. HVAC SYSTEM RENOVATION FOR ZONE 3 HVAC SYSTEM RENOVATION FOR ZONE 3 d. PROCESS CHILLED WATER RENOVATIONS FOR ZONES 2 AND 3 PROCESS CHILLED WATER RENOVATIONS FOR ZONES 2 AND 3 e. FIRE DETECTION AND SUPPRESSION SYSTEMS FOR ZONES 1, 2 AND 3 FIRE DETECTION AND SUPPRESSION SYSTEMS FOR ZONES 1, 2 AND 3 f. STRUCTURAL MODIFICATIONS TO EXISTING CELLS TO ACCOMMODATE REVISED PROCESS AIRFLOW EXHAUST STRUCTURAL MODIFICATIONS TO EXISTING CELLS TO ACCOMMODATE REVISED PROCESS AIRFLOW EXHAUST AND MAKE-UP PENETRATIONS 5. WORK FOR THIS PROJECT MUST BE PHASED TO PERMIT THE ZONE 1 OFFICE AREA TO BE OCCUPIED WORK FOR THIS PROJECT MUST BE PHASED TO PERMIT THE ZONE 1 OFFICE AREA TO BE OCCUPIED WHILE THE ZONE 2 AND ZONE 3 TEST AREAS ARE RENOVATED DURING PHASE 1. WHILE WORK IS PHASE 1. WHILE WORK IS . WHILE WORK IS PERFORMED IN ZONES 2 AND 3, ZONE 1 OCCUPANTS MUST BE PROTECTED FROM ALL WORK ACTIVITY AND MUST NOT BE INTERRUPTED FROM THEIR ACTIVITIES. ALL CURRENT AMENITIES FOR ZONE 1 OCCUPANTS MUST BE MAINTAINED THROUGHOUT THE DURATION OF PHASE 1. 6. PROVIDE TEMPORARY BARRIERS BETWEEN THE OCCUPIED ZONE 1 AREA AND THE ZONE 2 AND 3 PROVIDE TEMPORARY BARRIERS BETWEEN THE OCCUPIED ZONE 1 AREA AND THE ZONE 2 AND 3 CONSTRUCTION AREAS DURING PHASE 1. ENSURE ALL EMERGENCY EGRESS PATHS ARE MAINTAINED AT ALL TIMES. 7. WORK REQUIRED IN ZONE 1 MUST BE PERFORMED DURING PHASE 2. PHASE 2 MUST NOT COMMENCE WORK REQUIRED IN ZONE 1 MUST BE PERFORMED DURING PHASE 2. PHASE 2 MUST NOT COMMENCE PHASE 2. PHASE 2 MUST NOT COMMENCE . PHASE 2 MUST NOT COMMENCE UNTIL ALL WORK IS COMPLETE AND ACCEPTED IN ZONES 2 AND 3. 8. CONTRACTOR MUST COORDINATE WITH BUILDING OCCUPANTS TO SCHEDULE PARTIAL OR FULL EVACUATION CONTRACTOR MUST COORDINATE WITH BUILDING OCCUPANTS TO SCHEDULE PARTIAL OR FULL EVACUATION OF ZONE 1 DURING PHASE 2 ACTIVITIES. EMERGENCY EGRESSES AND ALL CURRENT AMENITIES MUST BE MAINTAINED FOR ANY REMAINING PERSONNEL. 9. CURRENTLY BUILDING 3235 IS PROTECTED BY AN EXISTING FIRE ALARM AND FIRE SUPPRESSION SYSTEM. CURRENTLY BUILDING 3235 IS PROTECTED BY AN EXISTING FIRE ALARM AND FIRE SUPPRESSION SYSTEM. THESE SYSTEMS MUST BE MAINTAINED IN OPERATION WHENEVER THE BUILDING IS OCCUPIED, AND ALL PERSONNEL MUST BE PROTECTED. 10. THE CONTRACTOR MUST PREPARE AND SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT FOR REVIEW THE CONTRACTOR MUST PREPARE AND SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT FOR REVIEW AND ACCEPTANCE BY THE NAVFAC CONTRACTING OFFICER. 11. THE CONTRACTOR MUST BE RESPONSIBLE TO PROVIDE SECURITY FOR ALL OF HIS AREAS OF WORK. THE CONTRACTOR MUST BE RESPONSIBLE TO PROVIDE SECURITY FOR ALL OF HIS AREAS OF WORK. 12. UPON COMPLETION OF ANY PHASE, THE CONTRACTOR MUST REMOVE ALL TEMPORARY BARRIERS AND UPON COMPLETION OF ANY PHASE, THE CONTRACTOR MUST REMOVE ALL TEMPORARY BARRIERS AND RESTORE THE AREA TO PERMANENT FUNCTION. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR MUST REMOVE ALL REMAINING STAGING AND LAYDOWN AREAS AND MUST RESTORE THESE AREAS TO PERMANENT FUNCTION.
1. DUE TO THE NATURE OF PREVIOUS OPERATIONS THAT HAVE BEEN CONDUCTED IN ZONES 2 AND 3 OF DUE TO THE NATURE OF PREVIOUS OPERATIONS THAT HAVE BEEN CONDUCTED IN ZONES 2 AND 3 OF BUILDING 3235 FOR DESTRUCTIVE BATTERY TESTING, THE SURFACES COULD BE CONTAMINATED WITH RESIDUES. PROTECT PERSONNEL FROM POTENTIAL CONTAMINATION WHEN DISTURBING ANY SURFACES IN ZONE 3 OF BUILDING 3235.
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
W
W
W
W
W
W
W
W
W
W
W
W
E
P
E
P
E
P
E
P
E
P
W
W
W
W
Elec.
Box
AC
Elec.
Box
Elec.
Box
SH
SH
AC
AC
Elec.
Box
Elec.
Box
AC
Elec.
Box
Elec.
Box
Elec.
Box
AC
AC
SH
AC
AC
HC
HC
Elec.
Box
Elec.
Box
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
G
G
G
G
G
G
G
G
G
G
S
A
N
S
A
N
S
A
N
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
D
S
D
S
D
S
D
S
D
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
CP
FFE = 810.30'
FFE = 810.30'
CO
FFE = 810.47'
CO
D
CO
D
D
D
D
CP
FFE = 810.25'
FFE = 810.51'
D
CB
CATCH BASIN TC = 809.57'
E 4" CPP INV = 808.69'
BOTTOM OF
STRUCTURE = 807.40'
CB
FFE = 810.46'
D
D
FFE = 810.42'
FFE = 810.44'
FFE = 810.28'
FFE = 810.29'
FFE = 810.27'
FFE = 810.31'
FFE = 810.31'
D
FFE = 810.32'
D
Elec.
Box
E l e c
B o x
EM
Elec.
Box
E l e c
B o x
EM
E l e c
B o x
G
G
E
Elec.
Box
Elec.
Box
Elec.
Box
Elec.
Box
G
S
D
W
W
W
W
W
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E U G
E
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
X
X
X
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
FH
FH
CB
CB
CATCH BASIN TC = 805.92'
S 15" CONC INV = 802.72'
S
D
S
D
S
D
CB
S
A
N
S
A
N
6" CPP
INV = 803.12'
4" CPP
INV = 802.43'
4" CPP
INV = 802.33'
18" CONC.
INV = 801.56'
6" CPP
INV = 809.25'
6" CPP
INV = 809.06'
24" CONC.
INV = 804.77'
12" CPP
INV = 805.12'
E
P
E
P
E
P
E
P
W
W
T
W
W
T
W
W
T
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
T
T
G
E
N
U
G
E
U
G
E
U
G
E
P 809.50
G 809.0
P 809.10
G 808.6
P 809.30
G 808.8
MAX SLOPE 3H:1V
CONCRETE EQUIPMENT PAD
AND HOUSEKEEPING PADS
SEE STRUCTURAL PLANS
FOR DEMOLITION, DETAILS,
AND ADDITIONAL INFORMATION.
MATCH GRADE AT EXISTING
PAVEMENT FOR CONCRETE PAD.
RESET EXISTING DRAIN RIM
TO FINISHED GRADE
GAS SERVICE CONNECTION TO
BUILDING. SEE MECHANICAL
FOR ADDITIONAL INFORMATION
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
P 809.30
G 808.8
P 810.00
G 809.5
P 810.00
G 809.5
P 810.20
G 809.7
P 810.20
G 809.7
L
O
D
L
O
D
L
O
D
L
O
D
G 809.7
CS101
SHEET NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
Scale: 1"=20'
BUILDING 3235 - CIVIL SITE PLAN
KEY NOTES
UNDERGROUND NATURAL GAS PIPING.
CONNECT TO EXISTING UNDERGROUND NATURAL GAS, SEE M-003 FOR
DETAILS.
DOAS UNIT, SEE MECHANICAL PLANS FOR DETAILS.
UNDERGROUND ELECTRIC, SEE E-003 FOR DETAILS.
PRESERVE AND PROTECT EXISTING TRANSFORMER
750KVA PAD MOUNTED TRANSFORMER, SEE SHEET ES-001 FOR
DEMOLITION OF EXISTING GENERATOR AND OTHER DETAILS.
NOT USED.
NOT USED.
DRYWELL, SEE MECHANICAL PLANS FOR DETAILS.
LEGEND
CONCRETE
GAS LINE
UNDERGROUND ELECTRICAL LINE
SILT FENCE
LIMITS OF DISTURBANCE
(OFFSET FOR CLARITY)
LOD
1. SEE ELECTRICAL PLANS FOR ADDITIONAL INFORMATION AND
DETAILS REGARDING ELECTRICAL COMPONENTS.
2. SEE MECHANICAL PLANS FOR ADDITIONAL INFORMATION AND
DETAILS REGARDING UNDERGROUND NATURAL GAS, MAKEUP
AIR, AND DOAS UNITS.
3. IMPLEMENT SAME DAY CONSTRUCTION AND STABILIZATION
METHODS FOR UTILITY LINE INSTALLATION. INSTALL ONLY WHAT
CAN BE CONSTRUCTED AND BACKFILLED IN ONE DAY. STABILIZE
DISTURBED AREAS WITH SEEDING AS DESCRIBED IN
SUBSEQUENT NOTES BELOW.
4. INSTALL SILT FENCE PRIOR TO CONSTRUCTION OF EQUIPMENT
PADS.
5. PROVIDE PERMANENT SEEDING ON DISTURBED AREAS
IMMEDIATELY FOLLOWING WORK. PROVIDE TEMPORARY
SEEDING IF OUTSIDE OF ALLOWABLE TIME OF YEAR FOR
PERMANENT SEEDING. REPLACE TEMPORARY SEEDING WITH
PERMANENT AT THE NEXT AVAILABLE SEEDING SEASON.
6. WITHIN 30 DAYS AFTER CONSTRUCTION AND FOLLOWING
STABILIZATION OF UPSTREAM DISTURBED AREAS WITH
SEEDING, REMOVE SILT FENCE AND STABILIZE WITH SEEDING.
7. INSTALL EROSION AND SEDIMENT CONTROL MEASURES,
INCLUDING SEEDING AND SILT FENCE PER THE INDIANA
STORMWATER QUALITY MANUAL, CHAPTER 7.
8. EXISTING CONDITIONS SHOWN ARE BASED ON RECORD
DRAWINGS AND FIELD OBSERVATIONS AND DO NOT REPRESENT
FIELD SURVEY DATA. CONTRACTOR MUST VERIFY EXISTING
FIELD CONDITIONS.BUILDING 3235
GENERAL
1. MAINTAIN THE INTEGRITY OF THE STRUCTURE AND SAFETY OF WORKERS DURING CONSTRUCTION.
2. REVIEW AND VERIFY AS-BUILT CONDITIONS AND ACTUAL EQUIPMENT DIMENSIONS USING APPROVED
MANUFACTURER/VENDOR DRAWINGS THAT AFFECT CONSTRUCTION PRIOR TO SUBMISSION OF SHOP
DRAWINGS.
3. COORDINATE REVISIONS TO THE STRUCTURAL SYSTEM AS A RESULT OF ACCEPTANCE OF
CONTRACTOR-PROPOSED ALTERNATIVES OR SUBSTITUTIONS.
4. SCALES SHOWN ON THE DRAWINGS ARE FOR GENERAL INFORMATION ONLY. DIMENSIONAL INFORMATION
MUST NOT BE OBTAINED BY MEASURING OFF THE DRAWINGS.
5. DIMENSIONS INDICATED ON THE DRAWINGS ARE BASED ON EXISTING DRAWINGS. PRIOR TO
CONSTRUCTION, VERIFY DIMENSIONS AND LOCATIONS OF EXISTING STRUCTURAL SYSTEMS. IMMEDIATELY
REPORT ANY UNUSUAL CONDITIONS TO COR.
6. ALL DETAILS, SECTIONS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL
APPLY TO SIMILAR SITUATIONS, UON.
7. NO CHANGE IN SIZE, DIMENSION, OR POSITION OF STRUCTURAL ELEMENTS SHALL BE MADE WITHOUT THE
APPROVAL OF THE COR.
8. REFER TO CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWINGS
FOR DIMENSIONS AND LOCATIONS OF OPENINGS, INSERTS, DEPRESSIONS, EQUIPMENT PADS, DRIPS, REVEALS, FINISHES, AND OTHER SUCH PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS.
9. SUBMIT DIMENSIONED COORDINATED SHOP DRAWINGS SHOWING THE LOCATIONS OF ALL SLEEVES AND
OPENINGS REQUIRED BY ALL TRADES THROUGH STRUCTURAL ELEMENTS. ANY ADDITIONAL OPENINGS NOT
SHOWN ON SHOP DRAWINGS WILL REQUIRE WRITTEN APPROVAL OF THE COR.
10. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILED INFORMATION REGARDING FINISHES,
WATERPROOFING, LOCATIONS OF NON-LOAD BEARING PARTITIONS, EXTERIOR FACE OF BUILDING, ETC.
11. TAKE ALL MEASURES NECESSARY TO PROTECT EXISTING AND NEW UTILITIES, STRUCTURAL MEMBERS, FINISHES, ETC. ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE DURING CONSTRUCTION. RESTORATION
OF DAMAGED AREAS SHALL BE TO THE SATISFACTION OF THE GOVERNMENT, AT NO COST TO THE
GOVERNMENT.
12. DO NOT REPRODUCE ANY PORTION OF THE STRUCTURAL CONTRACT DRAWINGS FOR RESUBMITTAL AS
SHOP DRAWINGS. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND RETURNED.
EXISTING CONSTRUCTION
1. ALL INFORMATION SHOWN ON THESE DRAWINGS THAT RELATE TO THE EXISTING CONSTRUCTION IS BASED
ON THE AVAILABLE EXISTING DRAWINGS PREPARED BY LESTER B. KNIGHT & ASSOC., INC, DATED 21 MAY
2990, AND SUPPLEMENTED BY SITE OBSERVATIONS IN NOVEMBER 2022. HOWEVER, THE STRUCTURE MAY
HAVE BEEN MODIFIED SINCE THE ORIGINAL CONSTRUCTION. THE INFORMATION SHOWN HEREIN IS DEEMED
RELIABLE BUT ACTUAL FIELD CONDITIONS MAY VARY. THE CONTRACTOR MUST VERIFY ALL EXISTING
DIMENSIONS, ELEVATIONS AND MEMBER SIZES BEFORE PROCEEDING WITH THE WORK. IF THE EXISTING
CONDITIONS DIFFER FROM THAT SHOWN ON THESE DRAWINGS DISCONTINUE WORK AND OBTAIN
DIRECTION FROM THE COR.
2. DO NOT REMOVE OR CUT ANY SLABS, BEAMS, COLUMNS, WALLS OR OTHER BUILDING COMPONENTS
UNLESS INDICATED ON THESE DRAWINGS OR APPROVED BY THE COR IN WRITING.
DESIGN CODES AND STANDARDS
THE FOLLOWING CODES AND STANDARDS AS MODIFIED BY THE REFERENCED UFC PUBLICATIONS APPLY TO
THE DESIGN AND CONSTRUCTION OF THIS PROJECT.
1. UNIFIED FACILITIES CRITERIA (UFC) 1-200-01, DOD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), (NOV 1, 2019)
2. UNIFIED FACILITIES CRITERIA (UFC) 3-301-01, STRUCTURAL ENGINEERING (NOV 1, 2019)
3. UNIFIED FACILITIES CRITERIA (UFC) 3-340-02, STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL
EXPLOSIONS (SEP 1, 2014)
4. UNIFIED FACILITIES CRITERIA (UFC) 4-010-01, DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
(DEC 12, 2019)
5. INTERNATIONAL BUILDING CODE (IBC 2018).
6. INTERNATIONAL EXISTING BUILDING CODE (IEBC 2018)
7. AMERICAN SOCIETY OF CIVIL ENGINEERS MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES (ASCE 7-16)
8. AMERICAN CONCRETE INSTITUTE'S (ACI) "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
318-14.
9. THE MASONRY SOCIETY (TMS) "BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY
STRUCTURES" 402/602-16.
10. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.
DESIGN LOADS
1. RISK CATEGORY (FOR DETERMINATION OF LOADING PARAMETERS) II
2. LIVE LOADS
ROOF LIVE LOAD 20 PSF
TEST CELL CEILING 100 PSF
EXTERIOR EQUIPMENT SUPPORT PLATFORMS 60 PSF
3. TEST CELL DESIGN PRESSURES (ACTING TOWARD SURFACES):
CELLS 45-47 10 PSI
CELLS 48-49, 54-56 15 PSI
CELL 51 5 PSI
CELL 52 30 PSI
TEST CELL PRESSURE RATINGS MAY BE REDUCED PENDING RESULTS OF STRUCTURAL STUDY.
4. SNOW LOADS
GROUND SNOW LOAD, Pg 20 PSF
SNOW IMPORTANCE FACTOR, Is 1.0
SNOW THERMAL FACTOR, Ct 1.0
SNOW SLOPE FACTOR, Cs 1.0
SNOW EXPOSURE FACTOR, Ce 0.9
FLAT ROOF SNOW LOAD, Pf 13 PSF
MINIMUM SNOW LOAD 20 PSF
LEEWARD UNBALANCED SNOW LOAD 4 PSF
WINDWARD UNBALANCED SNOW LOAD 30 PSF
WIDTH OF UNBALANCED SNOW LOAD 16.1 FT
5. WIND LOAD PARAMETERS FOR NEW CONSTRUCTION:
BASIC WIND SPEED, V 106 MPH
WIND EXPOSURE CLASSIFICATION C
INTERNAL PRESSURE COEFFICIENT ±0.18
6. WIND LOAD PARAMETERS FROM EXISTING DRAWINGS:
WIND DESIGN VE
7. SEISMIC LOAD PARAMETERS FOR NEW CONSTRUCTION:
Ss 0.30g
S1 0.121g
SITE CLASS (ASSUMED) D
SEISMIC IMPORTANCE FACTOR, Ie 1.0
SDS 0.312g
SD1 0.190g
DESIGN CATEGORY C
8. SEISMIC LOAD PARAMETERS FROM EXISTING DRAWINGS:
SEISMIC ZONE 2
SEISMIC ZONE COEFFICIENT, Z 3/8
SEISMIC IMPORTANCE FACTOR, Ie 1.25
HORIZONTAL FORCE FACTOR, K 1
9. THE ALTERATIONS DO NOT SIGNIFICANTLY INCREASE THE DESIGN LATERAL LOADS, LESS THAN 10%, OR
MODIFY THE LATERAL LOAD RESISTING SYSTEM (LLRS). THEREFORE, IN ACCORDANCE WITH IEBC 2018, PARAGRAPH 805.3, THE EXISTING LLRS DOES NOT NEED TO BE ALTERED.
CONCRETE
1. CONCRETE MUST HAVE NORMAL WEIGHT COARSE AGGREGATES CONFORMING TO ASTM C150, TYPE
II OR I/II CEMENT, AND MUST HAVE MINIMUM COMPRESSIVE STRENGTH (f'c) OF 4,500 PSI AT 28 DAYS
UON. CONCRETE MUST HAVE A MAXIMUM NOMINAL COURSE AGGREGATE SIZE OF 3/4", TARGET AIR
CONTENT OF 6%, AND MAXIMUM WATER-CEMENTITIOUS MATERIAL RATIO OF 0.45.
2. DETAILING OF CONCRETE REINFORCEMENT BARS AND ACCESSORIES MUST CONFORM TO THE
RECOMMENDATIONS OF ACI 315 "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT" AND ACI
SP-66 "DETAILING MANUAL". PLACING OF REINFORCING BARS MUST CONFORM TO THE
RECOMMENDATIONS OF ACI 315R "MANUAL OF ENGINEERING AND PLACING DRAWINGS FOR
REINFORCED CONCRETE STRUCTURES" AND CRSI "MANUAL OF STANDARD PRACTICE".
3. MIXING, TRANSPORTING, AND PLACING OF CONCRETE MUST CONFORM TO ACI 301.
4. MINIMUM CONCRETE COVER PROTECTION FOR REINFORCEMENT BARS:
A. CONCRETE CAST AGAINST & PERMANENTLY EXPOSED TO EARTH 3 IN
B. EXPOSED TO EARTH OR WEATHER WHERE FORMS ARE USED:
NO. 6 BARS AND LARGER 2 IN
NO. 5 BARS AND SMALLER 1 1/2 IN
5. CONCRETE REINFORCEMENT BARS MUST BE ASTM A 615, GRADE 60, DEFORMED, UON.
6. LOCATE REINFORCING BEFORE CORING CONCRETE AND SHIFT LOCATION OF CORE UP TO 4 1/2"± TO
MINIMIZE THE NUMBER OF REINFORCING BARS CUT.
6. SPLICE REINFORCING BARS PER ACI 318 WITH CLASS B TENSION LAP SPLICES, UON. DEVELOPMENT
AND SPLICE LENGTHS ARE INDICATED IN TABLE 1.
STRUCTURAL AND MISCELLANEOUS STEEL
1. STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION MUST CONFORM TO THE AISC
"SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" AISC 360-16 AND THE AISC "CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES".
2. MATERIALS MUST CONFORM TO THE STANDARDS LISTED:
PLATES, ANGLES AND CHANNELS: ASTM A36
ANCHOR RODS: ASTM F1554, GRADE 36
STRUCTURAL BOLTS: ASTM F3125 GRADE A325
HSS TUBES: ASTM A500 GRADE C
3. WELDING MUST CONFORM TO THE AMERICAN WELDING SOCIETY STANDARD D1.1. ELECTRODES FOR
SHOP WELDS MUST BE LOW HYDROGEN AND HAVE MINIMUM 70 KSI TENSILE STRENGTH
4. DO NOT INSTALL MISFABRICATED OR MISALIGNED STRUCTURAL STEEL MEMBERS.
5. DO NOT CUT STRUCTURAL STEEL MEMBERS OR JOISTS UNLESS SO INDICATED IN THE DRAWINGS OR
AS APPROVED BY COR.
6. STEEL FRAMING AND CONNECTIONS MUST BE HOT DIP GALVANIZED. MINIMIZE FIELD WELDS TO THE
EXTENT PRACTICAL. APPLY TWO COATS OF A HIGH SOLIDS ZINC RICH PRIMER AT FIELD WELDS.
ABBREVIATIONS:
@ AT
& AND
℄ CENTER LINE
ACI AMERICAN CONCRTE INSTITUTE
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
BOT BOTTOM
CJ CONTRACTION JOINT
CLR CLEAR
CO CLEAR OPENING
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COR CONTRACTING OFFICER'S
REPRESENTATIVE
db DIAMETER OF BAR
DET DETAIL
DIA DIAMETER
DN DOWN
DWG DRAWING
DWL DOWEL
EA EACH
EF EACH FACE
EL ELEVATION
EMBED EMBEDMENT
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EX EXISTING
FDN FOUNDATION
FLR FLOOR
FTG FOOTING
HORZ HORIZONTAL
HP HIGH POINT
I MOMENT OF INERTIA
IBC INTERNATIONAL BUILDING CODE
IN INCH(ES)
Ld DEVELOPMENT LENGTH
LP LOW POINT
m METERS
MAX MAXIMUM
MIN MINIMUM
mm MILLIMETERS
OC ON CENTER
OPNG OPENING
REINF REINFORCEMENT
REQD REQUIRED
RO ROUGH OPENING
S SECTION MODULUS
SIM SIMILAR
SOG SLAB ON GROUND
T&B TOP AND BOTTOM
T/ TOP OF
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TYP TYPICAL
TOW TOP OF WALL
UFC UNIFIED FACILITIES CRITERIA
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
W/CM WATER/CEMENTITIOUS MATERIAL RATIO
W/O WITHOUT
WWF WELDED WIRE FABRIC
TABLE 1: REINFORCING BAR DEVELOPMENT LENGTHS (INCHES)
BAR SIZE
4000 PSI
TOP BARS OTHER BARS
CASE 1 CASE 2 CASE 1 CASE 2
#3 18 28 14 21
#4 25 37 19 28
#5 31 46 24 36
#6 37 55 28 43
#7 54 81 42 62
TABLE 1 NOTES:
1. TOP BARS IS DEFINED AS GREATER THAN 12 INCHES OF FRESH CONCRETE BENEATH THE BAR AND
OTHER BARS IS DEFINED AS LESS THAN 12 INCHES OF CONCRETE BENEATH THE BAR.
2. CASE 1: CLEAR SPACING OF BARS DEVELOPED OR SPLICED NOT LESS THAN db, CLEAR COVER NOT
LESS THAN db, AND STIRRUPS OR TIES THROUGHOUT Ld NOT LESS THAN THE CODE MINIMUM BARS
BEING DEVELOPED OR SPLICED NOT LESS THAN 2db AND CLEAR COVER NOT LESS THAN db.
3. CASE 2: BARS DEVELOPED OR SPLICED WITH CLEAR COVER AND/OR SPACING NOT MEETING THE
REQUIREMENTS OF CASE 1.
4. SPLICE LENGTHS:
a. CLASS A TENSION SPLICE = 1.0 Ld, 12 IN MIN
b. CLASS B TENSION SPLICE = 1.3 Ld, 12 IN MIN
c. COMPRESSION SPLICE = 30 db, 12 IN MIN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
S-001
MASONRY
1. CONCRETE MASONRY COMPONENTS AND ASSEMBLIES MUST BE AS FOLLOWS:
A. CONCRETE MASONRY UNITS: ASTM C90, LIGHTWEIGHT
B. MASONRY NET COMP STRENGTH: 2,000 PSI
C. GROUT: ASTM C476, f'c = 3,000 PSI
D. MASONRY DESIGN STRENGTH: f'm = 2,000 PSI
E. MORTAR: ASTM C270, TYPE S
2. REINFORCING BARS: ASTM A615, GRADE 60 UON
3. COORDINATE FIRE-RATED CONCRETE MASONRY ASSEMBLIES WITH ARCHITECTURE AND LIFE
SAFETY. PROVIDE UL LISTED UNITS THAT MEET FIRE-RATING AND STRUCTURAL REQUIREMENTS.
4. PLACE MASONRY UNITS IN A RUNNING BOND PATTERN, UON.
5. FILL-IN EXISTING WALL AT VOIDED OPENING TO MATCH EXISTING WALL ASSEMBLY. NEW FILL-IN WALL
TO BE FLUSH AT BOTH SIDES.
6. PROVIDE LINTELS, AS SHOWN ON DRAWING S-501, ABOVE ALL OPENINGS WIDER THAN 16".
LEGEND:
NEW WORK
EXISTING
CONCRETE DEMOLITION
EXISTING EQUIPMENT PAD
EQUIPMENT PAD
POST-INSTALLED ANCHORS
1. ANCHORS AND INSERTS EXPOSED TO EARTH OR WEATHER MUST BE STAINLESS STEEL, UON. AT
OTHER LOCATIONS PROVIDE CARBON STEEL ANCHORS WITH ZINC PLATING IN ACCORDANCE WITH
ASTM B 633, TYPE III Fe/Zn (SC1), UON. EMBEDDED DEFORMED REINFORCING BARS MUST BE
UNCOATED STEEL.
2. PROVIDE TYPE, SIZE, & EMBED INTO THE EXISTING CONCRETE AS INDICATED.
3. EXPANSION ANCHORS MUST BE WEDGE TYPE, TORQUE CONTROLLED.
4. ADHESIVE ANCHORS MUST CONSIST OF AN INSERT AND CARTRIDGE TYPE, TWO COMPONENT, EPOXY
OR HYBRID ADHESIVE DISPENSED AND MIXED THROUGH A STATIC MIXING NOZZLE PROVIDED BY THE
ADHESIVE MANUFACTURER.
5. ANCHORING TO CONCRETE:
A. MECHANICAL ANCHORS USED IN CONCRETE MUST HAVE BEEN TESTED AND PREQUALIFIED FOR
PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2 AND
ICC-ES AC193.
B. ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND PREQUALIFIED FOR PERFORMANCE IN
CRACKED AND UNCRACKED CONCRETE IN ACCORDANCE WITH ICC-ES AC308, INCLUDING
HORIZONTAL AND OVERHEAD INSTALLATIONS, AND LONG TERM CREEP AT ELEVATED
TEMPERATURES.
6. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING
HOLES FOR ANCHORS. EXERCISE CARE IN DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR
EMBEDDED ITEMS. NOTIFY THE COR IF REINFORCING STEEL OR OTHER EMBEDDED ITEMS ARE
ENCOUNTERED DURING DRILLING.
9. PROVIDE ANCHORS IN DRY HAMMER DRILLED HOLES IN ACCORDANCE WITH MANUFACTURER'S
PRINTED INSTRUCTIONS.
10. 3/4" POST-INSTALLED EXSPANSION ANCHORS MUST HAVE A MINIMUM FACTORED TENSILE STRENGTH
OF 18,034 LBS AND A MINIMUM FACTORED SHEAR STRENGTH OF 10,764 LBS.
11. 1/2" POST-INSTALLED EXPANSION ANCHORS MUST HAVE A MINIMUM FACTORED TENSILE STRENGTH
OF 8.430 LBS AND A MINIMUM FACTORED SHEAR STRENGTH OF 4,469 LBS.
DELEGATED DESIGN
1. EQUIPMENT SUPPORT PLATFORMS.
2. HANGERS FOR MATERIALS AND SYSTEMS WHERE THE DESIGN IS NOT SPECIFICALLY AND
COMPLETELY INDICATED IN THE CONSTRUCTION DOCUMENTS, INCLUDING BUT NOT LIMITED TO
DUCTS, PIPES, CONDUITS, AND CEILINGS.
ASPHALT PAVING DEMOLITION
SLAB ON GROUND
12/13/2022
C
D
4 109
B
E
86 75
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
SHEET NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO DEMOLITION.
2. COORDINATE WORK WITH OTHER DISCIPLINES, NOTIFY CONTRACTING
OFFICER'S REPRESENTATIVE OF DISCREPANCIES.
3. REFER TO S-001 FOR GENERAL NOTES AND ABBREVIATIONS.
4. REFER TO S-501 AND S-502 FOR STRUCTURAL DETAILS.
DEMOLITION KEY NOTES
REMOVE EXTERIOR EQUIPMENT PAD.
EXISTING TEST CELL WALL TO REMAIN. SEE SD102 FOR MORE
INFORMATION.
EXISTING TEST CELL DOORWAY TO REMAIN.
EXISTING BUILDING EXTERIOR WALL TO REMAIN.
EXISTING INTERIOR BUILDING WALL TO REMAIN.
EXISTING 10"± SLAB ON GROUND TO REMAIN OUTSIDE OF TEST CELLS.
EXISTING 8" SLAB ON GROUND TO REMAIN.
EXISTING DRAIN TO REMAIN.
EXISTING EXTERIOR STAIRS AND LANDING TO REMAIN. MAINTAIN
INTEGRITY OF STAIRS AND LANDING.
REMOVE EXISTING EQUIPMENT PADS AND 8" SLAB ON GROUND WITHIN
THIS AREA.
EXISTING SLAB ON GROUND TO REMAIN:
CELLS 51 AND 52 20" THK SLAB ON GROUND
OTHER CELLS 14" THK SLAB ON GROUND
EXISTING INTERIOR EQUIPMENT PAD TO REMAIN.
EXISTING EXTERIOR EQUIPMENT PAD TO REMAIN.
EXISTING EXTERIOR EQUIPMENT PAD TO REMAIN. VERIFY DIMENSIONS
IN FIELD.
REMOVE EXISTING PAVING AND BOLLARDS WITHIN THIS AREA.
EXISTING 8" SLAB ON GROUND TO REMAIN. VERIFY DIMENSIONS IN
FIELD.
Scale: 1/8" : 1'
ZONE 2 & 3 STRUCTURAL GROUND FLOOR DEMOLITION PLAN
A1
27' - 0" 3' - 0" 23'-8" 23'-8" 23' - 8"
5'-0" 19'-0" 9'-6"
7'-0"
TYP
TYP
TYP
TYP
TYP
SD101
26' - 0"
18'-0"
CELL 45
CELL 46
CELL 47
CELL 48
CELL 49
CELL 51
CELL 52
CELL 54
CELL 55
CELL 56
TYP
UP
UP
50'-0"
2'-0"
ZONE 3ZONE 2
A
E
B
754 9
D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
SHEET NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO DEMOLITION.
2. COORDINATE WORK WITH OTHER DISCIPLINES, NOTIFY CONTRACTING
OFFICER'S REPRESENTATIVE OF DISCREPANCIES.
3. REFER TO S-001 FOR GENERAL NOTES AND ABBREVIATIONS.
4. REFER TO S-501 AND S-502 FOR STRUCTURAL DETAILS.
5. DIMENSIONS ARE MEASURED TO CENTER OF PENETRATION.
6. TEST CELL ROOF ELEVATION, VERIFY IN FIELD:
TOC EL = 111'-2" CELLS 45, 48, 49, 54, 55, 56
TOC EL = 111'-8" CELLS 51, 52
TOC EL = 122'-2" CELL 46
TOC EL = 125'-2" CELL 47
DEMOLITION KEY NOTES
CORE DRILL 17"Ø (±1/2") PENETRATION INTO TEST CELL ROOF FOR
MECHANICAL DUCT. SEE MECHANICAL FOR STEEL PIPE SLEEVE, GROUT
AND SEAL INFORMATION. COORDINATE CORE DIAMETER WITH THE PIPE
SLEEVE OUTSIDE DIAMETER.
EXISTING REINFORCED CONCRETE CELL ROOF SLAB TO REMAIN:
CELLS 51 AND 52 20" THK SLAB WITH #9 @ 6" OC EW EF
OTHER CELLS 14" THK SLAB WITH #8 @ 9" OC EW EF
EXISTING REINFORCED CONCRETE CELL WALLS TO REMAIN:
CELLS 51 AND 52 20" THK WALL WITH #9 @ 6" OC EW EF
OTHER CELLS 14" THK WALL WITH #8 @ 9" OC EW EF
CORE DRILL 19"Ø (±1/2") PENETRATION THROUGH CELL WALL, CONCENTRIC
WITH EXISTING OPENING, TO ENLARGE EXISTING 12"Ø OPENING. REMOVE
EXISTING SLEEVE, PLATE AND ANCHORS. SEE MECHANICAL FOR STEEL
PIPE SLEEVE, GROUT AND SEAL INFORMATION. COORDINATE CORE
DIAMETER WITH THE PIPE SLEEVE OUTSIDE DIAMETER.
CORE DRILL 17"Ø (±1/2") PENETRATION THROUGH CELL WALL, SEE
MECHANICAL FOR PENETRATION ELEVATION, STEEL PIPE SLEEVE, GROUT
AND SEAL INFORMATION. COORDINATE CORE DIAMETER WITH THE PIPE
OUTSIDE DIAMETER.
EXISTING EXTERIOR BUILDING WALL TO REMAIN.
CELL 45
CELL 56
CELL 46
CELL 47
CELL 54
CELL 48
CELL 52
CELL 49
CELL 51
CELL 55
Scale: 1/8" : 1'
ZONE 3 STRUCTURAL TEST CELL CEILING DEMOLITION PLAN
A1
26' - 0" 27' - 0" 23'-8" 23'-8" 23' - 8"3' - 0"
8'-5" 11'-6"12'-7" 9'-4"
14'-8"
TYP
TYP
16 PLACES
TYP
TYP
4'-0"
11'-4" 3'-4"
SD102
3'-0"
6'-8"
11'-0"
ZONE 3ZONE 2
A
B
75 9
D
C
E
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
SHEET NOTES
1. COORDINATE WORK WITH OTHER DISCIPLINES, NOTIFY CONTRACTING
OFFICER'S REPRESENTATIVE OF DISCREPANCIES.
2. REFER TO S-001 FOR GENERAL NOTES AND ABBREVIATIONS.
3. REFER TO S-501 AND S-502 FOR STRUCTURAL DETAILS.
KEY NOTES
EXISTING TEST CELL WALL. SEE SD102 FOR MORE INFORMATION.
EXISTING TEST CELL DOORWAY.
EXISTING BUILDING EXTERIOR WALL.
EXISTING INTERIOR BUILDING WALL.
INTERIOR EQUIPMENT PAD, VERIFY GEOMETRY WITH MECHANICAL
AND EQUIPMENT MANUFACTURER, REFER TO DETAIL C1/S-501.
EXISTING ±10" SLAB ON GROUND OUTSIDE OF TEST CELLS.
EXISTING 8" SLAB ON GROUND.
EXISTING FLOOR DRAIN.
EXISTING SLAB ON GROUND. SEE SD102 FOR MORE INFORMATION.
EXISTING INTERIOR EQUIPMENT PAD.
EXISTING EXTERIOR EQUIPMENT PAD.
EQUIPMENT PAD. REFER TO DETAIL C3/S-502 FOR ADDITIONAL
INFORMATION. VERIFY GEOMETRY WITH ELECTRICAL, MECHANICAL
AND EQUIPMENT MANUFACTURER.
Scale: 1/8" : 1'
ZONE 2 & 3 STRUCTURAL GROUND FLOOR PLAN
A1
27' - 0" 3' - 0" 23'-8" 23'-8" 23' - 8"
17'-6"
26' - 0"30' - 0"
S-101
3'-2"
5'-4"1'-4"
2'-8"
3'-0" 7'-6"
TYP
TYP
TYP
TYP
TYP
CELL 46
CELL 47
CELL 48
CELL 49
CELL 45
CELL 51
CELL 52
CELL 54
CELL 55
CELL 56
TYP
UP
UP
16'-1"3'-11"
ZONE 3ZONE 2
E
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
SHEET NOTES
1. COORDINATE WORK WITH OTHER DISCIPLINES, NOTIFY CONTRACTING
OFFICER'S REPRESENTATIVE OF DISCREPANCIES.
2. REFER TO S-001 FOR GENERAL NOTES AND ABBREVIATIONS.
3. REFER TO S-501 AND S-502 FOR STRUCTURAL DETAILS.
KEY NOTES
EXISTING BUILDING 3235 FACE OF CONC WALL @ GRADE.
EXISTING EXTERIOR EQUIPMENT PAD. VERIFY DIMENSIONS IN FIELD.
CONCRETE SLAB ON GROUND CONTROL JOINT. REFER TO DETAIL
A1/S-502.
6" DIAMETER CONCRETE BOLLARDS AT MAXIMUM 6'-0" OC. REFER TO
DETAIL A4/S-501.
EXISTING EXTERIOR STAIRS AND LANDING. MAINTAIN INTEGRITY OF
STAIRS AND LANDING.
EQUIPMENT PAD, VERIFY GEOMETRY WITH ELECTRICAL, MECHANICAL
AND EQUIPMENT MANUFACTURER, REFER TO DETAIL C1/S-501.
8" THICK SLAB-ON-GROUND OVER 8" OF COMPACTED #57 ASTM C33
COURSE AGGREGATE. REFER TO DETAIL C3/S-501 FOR ADDITIONAL
INFORMATION. VERIFY GEOMETRY WITH ELECTRICAL, MECHANICAL
AND EQUIPMENT MANUFACTURER.
EXTERIOR EQUIPMENT PAD EXTENSION, VERIFY GEOMETRY WITH
MECHANICAL AND EQUIPMENT MANUFACTURER. REFER TO DETAIL
A3/S-501.
CONCRETE SLAB ON GROUND ISOLATION JOINT. REFER TO DETAIL
A3/S-502.
(2) #4 X 3'-0" LONG CORNER REINFORCING BARS @ 2" OC PLACED AT MID
DEPTH OF SLAB ON GROUND OR EQUIPMENT PAD.
SLAB ON GROUND EXTENSION, VERIFY GEOMETRY WITH MECHANICAL
AND EQUIPMENT MANUFACTURER, REFER TO DETAIL A3/S-501.
12" THICK EQUIPMENT PAD OVER 8" OF COMPACTED #57 ASTM C33
COURSE AGGREGATE. REFER TO DETAIL C3/S-502 FOR ADDITIONAL
INFORMATION. VERIFY GEOMETRY WITH ELECTRICAL, MECHANICAL
AND EQUIPMENT MANUFACTURER.
EXISTING EXTERIOR EQUIPMENT PAD.
EXISTING 8" SLAB ON GROUND. VERIFY DIMENSIONS IN FIELD.
S-102
Scale: 1/8" : 1'
EQUIPMENT PAD PLAN
B2
2'-0" TYP
T
Y P
2'-1"
8'-8"
18'-6"
22'-11"
5'-0" 3'-0"
UP
UP
19'-0" 4'-0"
2'-1"
1 2
1 2
10'-6"
2'-0"
19'-0"
2'-0"
8 9
2'-7"
8'-3" 7'-9"
10'-0"
ADHESIVE ANCHORS, REFER
TO EQUIP SHOP DRAWINGS
FOR TYPE, SIZE,
PROJECTION AND LOCATION.
MIN 3" EMBED INTO SLAB.
& APPLY BONDING AGENT
T/ SLAB EL
C
L R
T
Y P
M
I N
SEE NOTE BELOW
6"
MIN #3 @ 12" OC
NOTE: COORDINATE PAD LOCATIONS AND SIZE WITH MECHANICAL
DRAWINGS AND EQUIP MANUFACTURER'S RECOMMENDATIONS
3/4" CHAMFER, TYP
ROUGHEN TO 1/4" AMPLITUDE
S I Z
E
A
D
O C
A T
I O
N
O
F
R E
F
M
E C
H A
N I C
F
O R
O P
E N
I N
G
STEEL ANGLE
EXISTING CMU
#4 @ 12" OC EACH WAY T&B
ALIGN TOP OF SLAB WITH
EXISTING PAVEMENT
ELEVATION VARIES
(SEE CIVIL)
8" AGGREGATE BASE COURSE
COMPACTED SUBGRADE (95%
MAXIMUM DRY DENSITY IN
ACCORDANCE WITH ASTM D1557)
NOTE: COORDINATE SLAB LOCATION, SLAB SIZE, AND
LOCATIONS OF OPENINGS AND SLEEVES THROUGH SLAB
WITH EQUIPMENT SUPPLIERS OR MANUFACTURERS AND
MEP DRAWINGS.
SEE NOTE BELOW
1'-6"
ROUND OFF CONCRETE AND
SMOOTH SURFACE
6" DIA GALVANIZED STANDARD
SCHEDULE 40 WEIGHT STEEL PIPE
SAFETY YELLOW PAINTED, FILLED
WITH CONCRETE
SLOPE CONCRETE TO DRAIN
AWAY FROM BOLLARD
EXISTING PAVEMENT
CONCRETE FOOTING
12" LONG #6 STEEL ASTM A706
REBAR - TACK-WELDED IN PLACE
THROUGH BOLLARD
8" AGGREGATE BASE COURSE
EXISTING EQUIPMENT PAD
OR SLAB ON GROUND
EXISTING REINF OR WWF
#3 @ 12" OC AROUND PERIMETER
@ MIDDEPTH, PROVIDE WHERE
NEW CONCRETE ABUTS EXISTING
CONCRETE EQUIPMENT PAD OR
SLAB ON GROUND, EPOXY DOWEL
BARS 3" INTO EX CONCRETE
COMPACTED SUBGRADE (95%
MAXIMUM DRY DENSITY IN
ACCORDANCE WITH ASTM D1557)
1'-0"
ALIGN
SLAB ON GROUND EXTENSION W/
#4 @ 12" OC EACH WAY T&B, OR
EQUIPMENT PAD EXTENSION WITH
#3 @ 12" EW TOP
M A
T C
H
E
X
S
L A
B
NOTE: SLAB ON GROUND EXTENSION TO BE ON AGGREGATE BASE
COURSE AS SHOWN. EQUIPMENT PAD EXTENSION TO BE ON
CONCRETE SLAB ON GROUND SIM TO AS SHOWN IN DETAIL C1/S-501
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D A
TL
A
N
TI
C
BU
IL
DI
NG
- B
AT
TE
RY
A
RE
A
UP
G
RA
DE
S
111 CORNING ROAD
SUITE 200
CARY, NORTH CAROLINA 27518
919.859.5000
Scale: NTS
CONCRETE EQUIPMENT PAD
C1
Scale: NTS
EXTERIOR CONCRETE SLAB ON GROUND
C3
Scale: NTS
NON-LOAD BEARING MASONRY WALL LINTEL
A1
S-501
STRUCTURAL NOTES:
1. PROVIDE LOOSE LINTELS FOR…