B-455 Construction Specifications.pdf
PDF 9 MB Posted
- Solicitation number
- N4008523R2530
About this file
This solicitation is for renovation and repair work at Building BQ-455, located at Naval Submarine Base New London in Groton, Connecticut. Renovations include reconfiguring and repairing 100 berthing units, renovating lobby areas and offices, relocating laundry facilities, removing existing furniture, upgrading mechanical and electrical systems, removing hazardous materials, installing interior signage, and constructing sidewalks. Exterior work involves repairing and replacing the roof system, windows, doors, and curtain wall assemblies. The work also includes removing one existing elevator, modernizing another, and constructing a new elevator with an interior lobby and external hoistway. The solicitation requests pricing for five optional bid items. The closing date for proposals is March 15, 2023. The period of performance is 720 calendar days. The NAVFAC Engineering Command is the contracting agency.
This document provides the solicitation for renovation and repair work at Building BQ-455 located at Naval Submarine Base New London. It includes details on the scope of work, location of the project, period of performance, contracting agency, and optional bid items.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1 1
BQ455 PERMANENT PARTY REPAIRS
ADDENDUM #1
BQ455-Permanent Party Repairs
NAVSUBASE NEW LONDON, CT
FY21 Special Project Work Order No: 1632260
Prepared by:
NAVFAC MIDLANT NLON Design and Construction
Building 135 Grayling Avenue Groton, CT 06355
ADDENDUM #1 2
DATE: February 23, 2023
Addendum No. 1
TO: ALL PERSPECTIVE BIDDERS
PREPARED BY: Gerard J Wilkins
APPROVED BY: Candace Brodeur, P.E.
FINAL ELECTRONIC DOCUMENTS AVAILABLE UPON REQUEST
SUBJECT: BQ455 PERMANENT PARTY REPAIRS
NAVSUBASE NEW LONDON, CT
Scope of Work is to fully renovate the building interior, replace all bathroom and kitchen fixtures, add new elevator shaft and current code required car, replace the entire roofing system, replace the HVAC system, move the laundry services from basement to first floor and install new plumbing and appliances, replace all old network wiring and infrastructure with new wiring and connection hubs/switches, replace sprinkler system and fire seal all penetrations, as well as other life safety code requirements within the Building 455 envelope.
The following changes are made to the Project Documents:
1. No changes are made to the Project Bid Options – see contract line items:
Number Item 1 Provide Larger Kitchen per drawing sheet A-420.
2 Provide Full Height Wall tile at Bathroom walls in lieu of partial height wall tile.
3 Provide rigid sheet wall protection below corridor wall guards in lieu of knockdown finish.
4 Provide wood cabinets throughout project in lieu of plastic laminate cabinets.
5 Provide new electrical conduits and feeder cables from transformer to new switchboard complete in accordance with the drawings and specifications.
Ensure acknowledgement of ALL Bid Files and Amendments that includes the new updates are attached to the respective bid. A Bid not including Addendum #1 will be rejected as non-responsive.
ADDENDUM #1 3
The following changes are made to the Project Plans:
1. Change ALL Demolition Plan sheets from selective/mold removal of gypsum wall board to ALL gypsum wall board will be removed and replaced with new. ALL wall sound insulation will be replaced with new acoustic insulation. ALL areas and framing studs will be physically cleaned and sanitized for mold remediation in accordance with mold remediation procedures outlined in mold report. All electrical components within the additional wall demolition to receive new cover plates, receptacles, and switches as required with original wall demolition. Provide firestopping systems and smoke tight seals on all existing and new penetrations throughout the building in accordance with the Life Safety Code requirements.
2. Change ALL Plan sheets referring to selective window replacement to ALL windows will be replaced to match existing size, color, and style. ALL exterior metal panels between windows will be replaced as part of this change. Provide sufficient design/shop drawings to demonstrate compliance with the following:
Provide standard windows in compliance with American National Standards Institute/American Architectural Manufacturers Association/Window and Door Manufacturers Association (ANSI/AAMA/WDMA) 101, Steel Windows Institute (SWI) SWS, UFC 4-010- 01, and the design criteria of ASCE 7 for glazed windows to meet the Building Code.
Exterior windows design, dimension, and construction must meet or exceed the requirements for Anti Terrorism Force Protection requirements (UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings)
Exterior windows must meet or exceed Energy Star requirements. Windows must be fabricated by manufacturers normally involved in the manufacturing of windows and be of the current make and model. Do not use obsolete or discontinued windows. Provide weather stripping, STC and IIC rating, commensurate with the intended use of the facility. Submit catalog information and manufacturer's specifications for approval by Contracting Officer prior to purchase of windows.
Windows shall be inoperable and shall be aluminum. Exposed aluminum surfaces must be factory finished with an AA 45 anodic coating or an AAMA organic coating. Provide a minimum of architectural Class II anodized coating or a baked enamel finish conforming to AAMA 2604 for one- or two-family residential dwelling construction. Provide a minimum of architectural Class I anodized coating or a high-performance organic coating conforming to AAMA 2605 for all other construction. AAMA coatings must have a total dry film thickness of 1.2 mils.
All window assemblies must meet performance grade CW 60 minimum tested in accordance with AAMA/WDMA/CSA 101/I.S.2/A440-08 or most current edition of this standard.
ADDENDUM #1 4
Where windows separate conditioned spaces from non-conditioned spaces, provide windows bearing NFRC energy label indicating window exceeds current EnergyStar criteria. Provide windows exceeding requirements of ASHRAE 90.1, Table 5.5 for project climate zone.
3. Change ALL locations indicating 2x4 and 2x5 ceiling tiles to 2x2 grid and ceiling tile layout.
Adjust all new sprinkler heads to align within the center of the ceiling tile at their respective locations. Ventilation diffusers, returns, and sizing to align with the 2x2 ceiling grid.
These changes will be included in the Contract for this Project. It is understood that your Bid must and shall be submitted accordingly. It is understood that these changes listed in this Addendum #1 will be required to follow the respective Unified Facilities Criteria (UFC) design for each of the work as listed within the construction documents.
SPECIFICATION
Permanent Party Repairs BQ455 Project Number:1632260
At
NAVAL SUBASE
Groton, CT 06349
SUBMITTED BY:
Symmes Maini & McKee Associates
1000 Massachusetts Avenue
Cambridge, MA 02138
A/E Contract Number: N40085-18-D-8703
(Task Order Number: N40085-19-F-6081)
PREPARED BY:
Hazmat: Susan Cahalan, CDW Consultants, Inc.
Civil: Daniel Clasby, Symmes Maini & McKee
Structural: Jason Varney, Simpson Gumpertz & Heger
Architectural: Jennifer Hayes, Symmes Maini & McKee
Interior Design: Alyssa Tompkins, Symmes Maini & McKee
Fire Protection: Peter Mottola, Jensen Hughes
Plumbing: Luis Moreno, Symmes Maini & McKee
Mechanical: Anthony Castelline, Symmes Maini & McKee
Electrical: John Alfeo, Symmes Maini & McKee
Commissioning: Keith Sheldon, Hallam ICS
ISSUE FOR CONSTRUCTION -- 01/06/2023
THIS PAGE INTENTIONALLY LEFT BLANK
BQ-455 Permanent Party Repairs eProject #1632260
ISSUE FOR CONSTRUCTION - 01/06/2023
Cover Page 2
Permanent Party Repairs BQ455 Project Number:1632260
ISSUE FOR CONSTRUCTION
SEALS PAGE - REGISTERED PROFESSIONAL FOR DESIGN
1/6/2023
BQ-455 Permanent Party Repairs eProject #1632260
SEALS PAGE Page 1
SEALS PAGE Page 2
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 45 35.10 PERMANENT PARTY BERTHING MOCK-UP
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 85 00 MOLD REMEDIATION
DI VI SI ON 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 62 16 NON-METALLIC NON-SHRINK GROUTING
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
PROJECT TABLE OF CONTENTS Page 1
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 25 23 SPATTER/KNOCKDOWN PLASTER
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 SUSPENDED ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 11 - EQUI PMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
14 22 00 ELECTRIC TRACTION PASSENGER ELEVATORS - MODERNIZATION
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 05 00.01 COMMON WORK RESULTS FOR ELECTRICAL
26 05 74 SHORT CIRCUIT, PROTECTIVE DEVICE COORDINATION AND ARC
FLASH STUDY
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
PROJECT TABLE OF CONTENTS Page 3
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 26 23 EMERGENCY COMMUNICATIONS SYSTEMS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 16 19 CONCRETE SIDEWALKS
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 ADDITIONAL COMPULSORY DOCUMENTATION
See Paragragh 1.4 (This Section) for references and additional Contract Documetnation made available to the Contractor under separate cover.
1.3 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET NAVFAC # NAVSTA # SHEET NAME
GENERAL
G-000A 12835690 COVER - VOLUME 1
G-001A 12835691 INDEX OF DRAWINGS - VOLUME 1
LIFE SAFETY
LS000 12835692 LIFE SAFETY CODE SUMMARY AND SYMBOLS
LS001 12835693 LIFE SAFETY CODE COMPLIANCE SITE PLAN
LS100 12835694 LOWER LEVEL OVERALL LIFE SAFETY PLAN
LS100A 12835695 LOWER LEVEL LIFE SAFETY PLAN - PART A & B
LS101 12835696 1ST FLOOR OVERALL LIFE SAFETY PLAN
LS101A 12835697 1ST FLOOR LIFE SAFETY PLAN - PART A & B
LS102 12835698 2ND FLOOR OVERALL LIFE SAFETY PLAN
LS102A 12835699 2ND FLOOR LIFE SAFETY PLAN - PART A & B
LS103 12835700 3RD FLOOR OVERALL LIFE SAFETY PLAN
LS103A 12835701 3RD FLOOR LIFE SAFETY PLAN - PART A & B
DOCUMENT 00 01 15 Page 1
LS104 12835702 4TH FLOOR OVERALL LIFE SAFETY PLAN
LS104A 12835703 4TH FLOOR LIFE SAFETY PLAN - PART A & B
LS105 12835704 5TH FLOOR OVERALL LIFE SAFETY PLAN
LS105A 12835705 5TH FLOOR LIFE SAFETY PLAN - PART A & B
LS106 12835706 ROOF OVERALL LIFE SAFETY PLAN
LS106A 12835707 ROOF LIFE SAFETY PLAN - PART A & B
HAZMAT
H-000 12835708 HAZMAT NOTES, LEGENDS & ABBREVIATIONS
H-101 12835709 LOWER LEVEL HAZMAT PLAN
H-102 12835710 1ST FLOOR HAZMAT PLAN
H-103 12835711 2ND FLOOR HAZMAT PLAN
H-104 12835712 3RD FLOOR HAZMAT PLAN
H-105 12835713 4TH FLOOR HAZMAT PLAN
H-106 12835714 5TH FLOOR HAZMAT PLAN
H-107 12835715 ROOF HAZMAT PLAN
H-200 12835716 EXTERIOR HAZMAT ELEVATIONS - NORTH AND SOUTH
H-201 12835717 EXTERIOR HAZMAT ELEVATIONS - EAST AND WEST
CIVIL
C-101 12835718 EXISTING CONDITIONS PLAN
C-102 12835719 SITE PREPARATION PLAN
C-103 12835720 LAYOUT AND MATERIALS PLAN
C-104 12835721 GRADING AND UTILITIES PLAN
C-501 12835722 DETAILS I
C-502 12835723 DETAILS II
C-503 12835724 DETAILS III
DOCUMENT 00 01 15 Page 2
C-504 12835725 DETAILS IV
STRUCTURAL
S-000 12835726 GENERAL NOTES
S-001 12835727 GENERAL NOTES AND ABBREVIATIONS
SD-101 12835728 DEMOLITION PLANS - LOWER LEVEL AND 1ST FLOOR
SD-102 12835729 DEMOLITION PLANS - 2ND FLOOR AND 3RD FLOOR
SD-103 12835730 DEMOLITION PLANS - 4TH FLOOR AND 5TH FLOOR
SD-104 12835731 DEMOLITION PLANS - ROOF
SD-401 12835732 ENLARGED DEMOLITION PART PLAN - ELEVATOR
SD-402 12835733 ENLARGED DEMOLITION PART PLAN - LAUNDRY ROOM
SD-403 12835734 ENLARGED DEMOLITION PART PLAN - BERTHING UNITS
SD-501 12835735 DEMOLITION SECTIONS AND DETAILS
SD-502 12835736 DEMOLITION SECTIONS AND DETAILS
S-101 12835737 CONSTRUCTION PLANS - LOWER LEVEL AND 1ST FLOOR
S-102 12835738 CONSTRUCTION PLANS - 2ND FLOOR AND 3RD FLOOR
S-103 12835739 CONSTRUCTION PLANS - 4TH FLOOR AND 5TH FLOOR
S-104 12835740 CONSTRUCTION PLANS - ROOF
S-301 12835741 ELEVATOR HOISTWAY SECTIONS
S-401 12835742 ENLARGED ELEVATOR PLANS
S-402 12835743 ENLARGED ELEVATOR PLANS
S-403 12835744 ENLARGED ELEVATOR PLANS
S-404 12835745 ENLARGED ELEVATOR PLANS
S-405 12835746 ENLARGED LAUNDRY ROOM PLAN
S-406 12835747 ENLARGED BERTHING UNIT PLANS
S-500 12835748 TYPICAL CONCRETE DETAILS
S-501 12835749 TYPICAL CONCRETE DETAILS
DOCUMENT 00 01 15 Page 3
S-502 12835750 TYPICAL MASONRY DETAILS
S-503 12835751 TYPICAL MASONRY DETAILS
S-504 12835752 TYPICAL MASONRY AND STEEL DETAILS
S-505 12835753 TYPICAL MASONRY AND STEEL DETAILS
S-510 12835754 SECTIONS AND DETAILS
S-511 12835755 SECTIONS AND DETAILS
S-512 12835756 SECTIONS AND DETAILS
S-513 12835757 SECTIONS AND DETAILS
S-514 12835758 SECTIONS AND DETAILS
ARCHITECTURAL
A-001 12835759 LEGENDS, NOTES, ABBREVIATIONS
A-002 12835760 PARTITION TYPES
A-003 12835761 PARTITION TYPES
A-010 12835762 MOLD PLAN - LOWER LEVEL
A-011 12835763 MOLD PLAN - FIRST FLOOR
A-012 12835764 MOLD PLAN - SECOND FLOOR
A-013 12835765 MOLD PLAN - THIRD FLOOR
A-014 12835766 MOLD PLAN - FOURTH FLOOR
A-015 12835767 MOLD PLAN - FIFTH FLOOR
A-016 12835768 MOLD REFLECTED CEILING PLAN - LOWER LEVEL
A-017 12835769 MOLD REFLECTED CEILING PLAN - FIRST FLOOR
A-018 12835770 MOLD REFLECTED CEILING PLAN - SECOND FLOOR
A-019 12835771 MOLD REFLECTED CEILING PLAN - THIRD FLOOR
A-020 12835772 MOLD REFLECTED CEILING PLAN - FOURTH FLOOR
A-021 12835773 MOLD REFLECTED CEILING PLAN - FIFTH FLOOR
AD100 12835774 DEMOLITION NOTES AND LEGEND
DOCUMENT 00 01 15 Page 4
AD101 12835775 DEMOLITION PLAN - LOWER LEVEL
AD102 12835776 DEMOLITION PLAN - 1ST FLOOR
AD103 12835777 DEMOLITION PLAN - 2ND FLOOR
AD104 12835778 DEMOLITION PLAN - 3RD FLOOR
AD105 12835779 DEMOLITION PLAN - 4TH FLOOR
AD106 12835780 DEMOLITION PLAN - 5TH FLOOR
AD107 12835781 DEMOLITION PLAN - ROOF
AD108 12835782 DEMOLITION PLAN - UPPER ROOF
AD110 12835783 RCP DEMOLITION PLAN - LOWER LEVEL
AD111 12835784 RCP DEMOLITION PLAN - 1ST FLOOR
AD112 12835785 RCP DEMOLITION PLAN - 2ND FLOOR
AD113 12835786 RCP DEMOLITION PLAN - 3RD FLOOR
AD114 12835787 RCP DEMOLITION PLAN - 4TH FLOOR
AD115 12835788 RCP DEMOLITION PLAN - 5TH FLOOR
AD200 12835789 DEMOLITION EXTERIOR ELEVATIONS - NORTH AND SOUTH
AD201 12835790 DEMOLITION EXTERIOR ELEVATIONS - EAST AND WEST
AD401 12835791 ENLARGED DEMOLITION PLANS - BERTHING UNITS
AD402 12835792 ENLARGED DEMOLITION RCP PLANS - BERTHING UNITS
AD403 12835793 ENLARGED DEMOLITION PLANS - 1ST FLOOR
LAUNDRY/KITCHEN/OFFICES
AD404 12835794 ENLARGED DEMOLITION PLAN - LOWER LEVEL
LAUNDRY/MECHANICAL
AD405 12835795 ENLARGED DEMOLITION PLAN - LOWER LEVEL NORTHWEST
AD406 12835796 ENLARGED DEMOLITION PLAN - ELEVATOR LOBBY AND
MACHINE RM
AD407 12835797 DEMOLITION ELEVATIONS - INTERIOR
AD408 12835798 DEMOLITION ELEVATIONS - INTERIOR
AD500 12835799 DEMOLITION DETAILS
A-100 12835800 CONSTRUCTION PLAN GENERAL NOTES & LEGENDS
A-101 12835801 LOWER LEVEL CONSTRUCTION PLAN
DOCUMENT 00 01 15 Page 5
A-102 12835802 1ST FLOOR CONSTRUCTION PLAN
A-103 12835803 2ND FLOOR CONSTRUCTION PLAN
A-104 12835804 3RD FLOOR CONSTRUCTION PLAN
A-105 12835805 4TH FLOOR CONSTRUCTION PLAN
A-106 12835806 5TH FLOOR CONSTRUCTION PLAN
A-107 12835807 ROOF CONSTRUCTION PLAN
AR100 12835808 REFLECTED CEILING PLANS GENERAL NOTES AND LEGENDS
AR101 12835809 LOWER LEVEL REFLECTED CEILING PLAN
AR102 12835810 1ST FLOOR REFLECTED CEILING PLAN
AR103 12835811 2ND FLOOR REFLECTED CEILING PLAN
AR104 12835812 3RD FLOOR REFLECTED CEILING PLAN
AR105 12835813 4TH FLOOR REFLECTED CEILING PLAN
AR106 12835814 5TH FLOOR REFLECTED CEILING PLAN
A-200 12835815 EXTERIOR ELEVATIONS - NORTH AND SOUTH
A-201 12835816 EXTERIOR ELEVATIONS - EAST AND WEST
A-300 12835817 BUILDING SECTIONS
A-301 12835818 WALL SECTIONS
A-400 12835819 RESTROOM MOUNTING HEIGHTS & TOILET ACCESSORIES
SCHEDULE
A-401 12835820 BERTHING UNITS - ENLARGED CONSTRUCTION PLANS
A-402 12835821 BERTHING UNITS - ENLARGED RCP CONSTRUCTION PLANS
A-403 12835822 BERTHING UNITS - ENLARGED FINISH AND SIGNAGE
PLANS
A-404 12835823 BERTHING UNIT BATHROOMS/KITCHENS - ENLARGED PLANS
A-405 12835824 BERTHING UNIT BATHROOMS - INTERIOR ELEVATIONS
A-406 12835825 BERTHING UNIT KITCHENS - INTERIOR ELEVATIONS
A-407 12835826 LAUNDRY/OFFICES/KITCHEN - ENLARGED CONSTRUCTION
PLANS
A-408 12835827 LAUNDRY/OFFICES/KITCHEN - ENLARGED CONSTRUCTION
RCP
A-409 12835828 LAUNDRY/OFFICES/KITCHEN - ENLARGED FINISH AND
SIGNAGE PLAN
DOCUMENT 00 01 15 Page 6
A-410 12835829 LAUNDRY/OFFICES/KITCHEN - INTERIOR ELEVATIONS
A-411 12835830 LOBBY RESTROOM - INTERIOR ELEVATIONS
A-412 12835831 LOWER LEVEL MECHANICAL - ENLARGED PLANS
A-413 12835832 LOWER LEVEL MECHANICAL - ENLARGED RCP PLANS
A-414 12835833 ELEVATOR LOBBY - ENLARGED CONSTRUCTION PLAN & RCP
A-415 12835834 ELEVATOR LOBBY - ENLARGED FINISH AND SIGNAGE PLAN
A-416 12835835 ELEVATOR MACHINE ROOM - ENLARGED PLANS
A-417 12835836 INTERIOR ELEVATIONS
A-418 12835837 STAIRS - VERTICAL CIRCULATION
A-419 12835838 ELEVATOR - VERTICAL CIRCULATION
A-420 12835839 BID OPTIONS - ENLARGED CONSTRUCTION PLANS AND
ELEVATIONS
A-421 12835840 LOWER LEVEL - ENLARGED CONSTRUCTION PLAN
A-422 12835841 LAUNDRY COORDINATION PLAN
A-423 12835842 BID OPTIONS - BERTHING UNIT ELEVATIONS
A-424 12835843 INTERIOR ELEVATIONS
A-425 12835844 INTERIOR ELEVATIONS
A-551 12835845 INTERIOR DETAILS - CEILING AND CASEWORK
A-552 12835846 INTERIOR DETAILS - CASEWORK
A-553 12835847 INTERIOR DETAILS - CORRIDOR RAILING AND UNIT
BATHROOMS
A-554 12835848 INTERIOR DETAILS - SLAB AND CEILING
A-555 12835849 INTERIOR DETAILS - RAILING, WINDOW SILL AND
CURTAIN WALL
A-556 12835850 INTERIOR DETAILS - BID OPTION #4
A-557 12835851 INTERIOR DETAILS - ELEVATOR ADDITION
A-558 12835852 INTERIOR DETAILS - ELEVATOR ADDITION
A-601 12835853 DOOR SCHEDULE
A-602 12835854 DOOR, FRAME, GLAZING, WINDOW, LOUVER TYPES &
DETAILS
DOCUMENT 00 01 15 Page 7
INTERIORS
I-101 12835855 FINISHES NOTES & LEGEND
I-102 12835856 FINISH AND SIGNAGE PLANS - LOWER LEVEL
I-103 12835857 FINISH AND SIGNAGE PLANS - 1ST FLOOR
I-104 12835858 FINISH AND SIGNAGE PLANS - 2ND FLOOR
I-105 12835859 FINISH AND SIGNAGE PLANS - 3RD FLOOR
I-106 12835860 FINISH AND SIGNAGE PLANS - 4TH FLOOR
I-107 12835861 FINISH AND SIGNAGE PLANS - 5TH FLOOR
I-110 12835862 FINISH SCHEDULE LEGEND AND TRANSITION DETAILS
I-111 12835863 ROOM FINISH SCHEDULE
I-113 12835864 SIGNAGE SCHEDULE
I-114 12835865 SIGNAGE SCHEDULE
I-115 12835866 SIGNAGE DETAILS
I-801 12835867 FURNITURE LAYOUTS - BERTHING UNITS
I-802 12835868 FURNITURE LAYOUTS - KITCHEN, OFFICE, LOBBY
ARCHITECTURAL
ENVELOPE
AE100 12835869 ROOF PLAN
AE200 12835870 EXTERIOR ELEVATIONS - NORTH B
AE201 12835871 EXTERIOR ELEVATIONS - NORTH A
AE202 12835872 EXTERIOR ELEVATIONS - SOUTH A
AE203 12835873 EXTERIOR ELEVATIONS - SOUTH B
AE204 12835874 EXTERIOR ELEVATIONS - EAST AND WEST
AE205 12835875 EXTERIOR ELEVATIONS - PARTIAL PENTHOUSE
ELEVATIONS
AE500 12835876 EXTERIOR DETAILS AT BRICK FACADE
AE501 12835877 EXTERIOR WALL DETAILS AT BRICK FACADE
AE502 12835878 EXTERIOR DETAILS AT MISC. FACADE
DOCUMENT 00 01 15 Page 8
AE503 12835879 EXTERIOR DETAILS - CURTAIN WALL
AE504 12835880 EXTERIOR DETAILS - WINDOWS
AE505 12835881 EXTERIOR DETAILS - DOORS
AE506 12835882 EXTERIOR DETAILS - METAL PANEL
AE510 12835883 TYPICAL ROOF DETAILS
AE511 12835884 TYPICAL ROOF DETAILS
AE512 12835885 TYPICAL ROOF DETAILS
DRAWING INDEX
- VOLUME 2
SHEET NO. NAVFAC
DWG NO.
SHEET NAME
GENERAL
G-000B 12835887 COVER - VOLUME 2
G-001B 12835888 INDEX OF DRAWINGS - VOLUME 2
FIRE ALARM
FA000 12835888 FIRE ALARM NOTES & LEGEND
FA001 12835889 FIRE ALARM SEQUENCE OF OPERATIONS MATRIX & DETAIL
FA002 12835890 FIRE ALARM CONCEPTUAL RISER DIAGRAM
FAD100 12835891 FIRE ALARM LOWER LEVEL DEMOLITION PLAN
FAD101 12835892 FIRE ALARM 1ST FLOOR DEMOLITION PLAN
FAD102 12835893 FIRE ALARM 2ND FLOOR DEMOLITION PLAN
FAD103 12835894 FIRE ALARM 3RD FLOOR DEMOLITION PLAN
FAD104 12835895 FIRE ALARM 4TH FLOOR DEMOLITION PLAN
FAD105 12835896 FIRE ALARM 5TH FLOOR DEMOLITION PLAN
FAD106 12835897 FIRE ALARM ROOF LEVEL DEMOLITION PLAN
FA100 12835898 FIRE ALARM LOWER LEVEL CONSTRUCTION PLAN
DOCUMENT 00 01 15 Page 9
FA101 12835899 FIRE ALARM 1ST FLOOR CONSTRUCTION PLAN
FA102 12835900 FIRE ALARM 2ND FLOOR CONSTRUCTION PLAN
FA103 12835901 FIRE ALARM 3RD FLOOR CONSTRUCTION PLAN
FA104 12835902 FIRE ALARM 4TH FLOOR CONSTRUCTION PLAN
FA105 12835903 FIRE ALARM 5TH FLOOR CONSTRUCTION PLAN
FA106 12835904 FIRE ALARM ROOF LEVEL CONSTRUCTION PLAN
FIRE
PROTECTION
FP000 12835905 FIRE PROTECTION NOTES AND SYMBOLS
FP001 12835906 FIRE PROTECTION CONCEPTUAL RISER
FPD100 12835907 FIRE PROTECTION LOWER LEVEL DEMOLITION PLAN
FPD101 12835908 FIRE PROTECTION 1ST FLOOR DEMOLITION PLAN
FPD102 12835909 FIRE PROTECTION 2ND FLOOR DEMOLITION PLAN
FPD103 12835910 FIRE PROTECTION 3RD FLOOR DEMOLITION PLAN
FPD104 12835911 FIRE PROTECTION 4TH FLOOR DEMOLITION PLAN
FPD105 12835912 FIRE PROTECTION 5TH FLOOR DEMOLITION PLAN
FPD106 12835913 FIRE PROTECTION ROOF LEVEL DEMOLITION PLAN
FP100 12835914 FIRE PROTECTION LOWER LEVEL CONSTRUCTION PLAN
FP101 12835915 FIRE PROTECTION 1ST FLOOR CONSTRUCTION PLAN
FP102 12835916 FIRE PROTECTION 2ND FLOOR CONSTRUCTION PLAN
FP103 12835917 FIRE PROTECTION 3RD FLOOR CONSTRUCTION PLAN
FP104 12835918 FIRE PROTECTION 4TH FLOOR CONSTRUCTION PLAN
FP105 12835919 FIRE PROTECTION 5TH FLOOR CONSTRUCTION PLAN
FP106 12835920 FIRE PROTECTION ROOF LEVEL CONSTRUCTION PLAN
FP200 12835921 FIRE PROTECTION DETAILS PLAN
PLUMBING
DOCUMENT 00 01 15 Page 10
P-001 12835922 LEGENDS & NOTES
PD050 12835923 UNDERSLAB DEMOLITION PLAN
PD100 12835924 LOWER LEVEL DEMOLITION PLAN
PD101 12835925 1ST FLOOR DEMOLITION PLAN
PD102 12835926 2ND FLOOR DEMOLITION PLAN
PD103 12835927 3RD FLOOR DEMOLITION PLAN
PD104 12835928 4TH FLOOR DEMOLITION PLAN
PD105 12835929 5TH FLOOR DEMOLITION PLAN
PD106 12835930 ROOF DEMOLITION PLAN
PD401 12835931 ENLARGED DEMOLITION PLAN
PD701 12835932 DOMESTIC WATER DEMOLITION RISER DIAGRAMS I
PD702 12835933 DOMESTIC WATER DEMOLTION RISER DIAGRAMS II
PD703 12835934 DOMESTIC WATER DEMOLTION RISER DIAGRAM III
PD704 12835935 DOMESTIC WATER DEMOLITION RISER DIAGRAMS IV
PD710 12835936 SANITARY DEMOLTION RISER DIARAMS I
PD711 12835937 SANITARY DEMOLITION RISER DIAGRAMS II
PD712 12835938 SANITARY DEMOLITION RISER DIAGRAM III
PD713 12835939 SANITARY DEMOLITION RISER DIAGRAM IV
P-050 12835940 UNDERSLAB CONSTRUCTION PLAN
P-100 12835941 LOWER LEVEL CONSTRUCTION PLAN
P-101 12835942 1ST FLOOR CONSTRUCTION PLAN
P-102 12835943 2ND FLOOR CONSTRUCTION PLAN
P-103 12835944 3RD FLOOR CONSTRUCTION PLAN
P-104 12835945 4TH FLOOR CONSTRUCTION PLAN
P-105 12835946 5TH FLOOR CONSTRUCTION PLAN
P-106 12835947 ROOF CONSTRUCTION PLAN
P-401 12835948 ENLARGED PLANS
DOCUMENT 00 01 15 Page 11
P-500 12835949 DETAILS I
P-501 12835950 DETAILS II
P-502 12835951 DETAILS III
P-503 12835952 DETAILS IV
P-601 12835953 SCHEDULES
P-602 12835954 SCHEUDLE II
P-701 12835955 DOMESTIC WATER RISER DIAGRAMS
P-702 12835956 DOMESTIC WATER RISER DIAGRAMS II
P-703 12835957 DOMESTIC WATER RISER DIAGRAMS III
P-704 12835958 DOMESTIC WATER RISER DIAGRAMS IV
P-710 12835959 SANITARY RISER DIAGRAMS
P-711 12835960 SANITARY RISER DIAGRAMS II
P-712 12835961 SANITARY RISER DIAGRAM III
P-713 12835962 SANITARY RISER DIAGRAM IV
MECHANICAL
M-001 12835963 ABBREVIATIONS LEGEND
M-002 12835964 SYMBOLS LEGEND
MD100 12835965 LOWER LEVEL DEMOLITION PLAN
MD101 12835966 1ST FLOOR DEMOLITION PLAN
MD102 12835967 2ND FLOOR DEMOLITION PLAN
MD103 12835968 3RD FLOOR DEMOLITION PLAN
MD104 12835969 4TH FLOOR DEMOLITION PLAN
MD105 12835970 5TH FLOOR DEMOLITION PLAN
MD106 12835971 ROOF DEMOLITION PLAN
MD401 12835972 UNIT DEMO PLANS
MD402 12835973 UNIT DEMO PLANS
DOCUMENT 00 01 15 Page 12
MD403 12835974 1ST FLOOR DEMOLITION PART A ENLARGED PLAN
MD404 12835975 LOWER LEVEL MECHANICAL ROOM PART B ENLARGED
DEMOLITION PLAN
M-100 12835976 LOWER LEVEL CONSTRUCTION PLAN
M-101 12835977 1ST FLOOR CONSTRUCTION PLAN
M-102 12835978 2ND FLOOR CONSTRUCTION PLAN
M-103 12835979 3RD FLOOR CONSTRUCTION PLAN
M-104 12835980 4TH FLOOR CONSTRUCTION PLAN
M-105 12835981 5TH FLOOR CONSTRUCTION PLAN
M-106 12835982 ROOF CONSTRUCTION PLAN
M-301 12835983 SECTION VIEWS
M-401 12835984 UNIT CONSTRUCTION PLANS
M-402 12835985 UNIT CONSTRUCTION PLANS
M-403 12835986 1ST FLOOR CONSTRUCTION PART A ENLARGED PLAN
M-404 12835987 LOWER LEVEL MECHANICAL ROOM ENLARGED PLAN
M-405 12835988 LOWER LEVEL MECH ROOMS & 5TH FLOOR MECH ROOM
M-501 12835989 DETAILS
M-502 12835990 DETAILS
M-503 12835991 DETAILS
M-504 12835992 DETAILS
M-505 12835993 DETAILS
M-506 12835994 DETAILS
M-507 12835995 DETAILS
M-508 12835996 DETAILS
M-509 12835997 DETAILS
M-510 12835998 DETAILS
M-601 12835999 SCHEDULES
M-602 12836000 SCHEDULES
DOCUMENT 00 01 15 Page 13
M-701 12836001 FLOW DIAGRAMS
M-702 12836002 FLOW DIAGRAMS
M-703 12836003 CONTROLS
M-704 12836004 CONTROLS
M-705 12836005 CONTROLS
M-706 12836006 CONTROLS
M-707 12836007 CONTROLS/RISER DIAGRAM
M-801 12836008 RISER DIAGRAMS
M-802 12836009 RISER DIAGRAMS
M-803 12836010 RISER DIAGRAMS
ELECTRICAL
E-001 12836011 LEGEND AND NOTES
E-002 12836012 GENERAL NOTES
ED100 12836013 LOWER LEVEL DEMOLITION PLAN
ED101 12836014 1ST FLOOR DEMOLITION PLAN
ED102 12836015 2ND FLOOR DEMOLITION PLAN
ED103 12836016 3RD FLOOR DEMOLITION PLAN
ED104 12836017 4TH FLOOR DEMOLITION PLAN
ED105 12836018 5TH FLOOR DEMOLITION PLAN
ED106 12836019 ROOF DEMOLITION PLAN
ED401 12836020 TYPICAL BERTHING UNIT DEMO PLANS
EY100 12836021 LOWER LEVEL SECURITY PLAN
EY101 12836022 1ST FLOOR SECURITY PLAN
EY102 12836023 2ND FLOOR SECURITY PLAN
EY103 12836024 3RD FLOOR SECURITY PLAN
EY104 12836025 4TH FLOOR SECURITY PLAN
DOCUMENT 00 01 15 Page 14
EY105 12836026 5TH FLOOR SECURITY PLAN
EY106 12836027 ROOF SECURITY PLAN
EL100 12836028 LOWER LEVEL LIGHTING PLAN
EL101 12836029 1ST FLOOR LIGHTING PLAN
EL102 12836030 2ND FLOOR LIGHTING PLAN
EL103 12836031 3RD FLOOR LIGHTING PLAN
EL104 12836032 4TH FLOOR LIGHTING PLAN
EL105 12836033 5TH FLOOR LIGHTING PLAN
EP100 12836034 LOWER LEVEL POWER PLAN
EP101 12836035 1ST FLOOR POWER PLAN
EP102 12836036 2ND FLOOR POWER PLAN
EP103 12836037 3RD FLOOR POWER PLAN
EP104 12836038 4TH FLOOR POWER PLAN
EP105 12836039 5TH FLOOR POWER PLAN
EP106 12836040 ROOF POWER PLAN
EP107 12836041 LIGHTNING PROTECTION PLAN
ES101 12836042 SITE PLAN
E-401 12836043 TYPICAL BERTHING UNIT POWER PLANS
E-402 12836044 BID OPTION
E-403 12836045 PART PLANS
EL401 12836046 TYPICAL BERTHING UNIT LIGHTING PLANS
E-501 12836047 DETAILS
E-502 12836048 DETAILS
EL501 12836049 LIGHTING DETAILS
EL502 12836050 LIGHTING DETAILS
EL503 12836051 LIGHTING SCHEDULES
EL504 12836052 LIGHTING CONTROL DETAILS
DOCUMENT 00 01 15 Page 15
EL505 12836053 LIGHTING CONTROL DETAILS
ET501 12836054 TELECOMMUNICATIONS DETAILS
EP501 12836055 POWER SCHEDULES
EP601 12836056 EXISTING ONE-LINE DIAGRAM
EP602 12836057 POWER ONE-LINE DIAGRAM
EP603 12836058 PANEL SCHEDULES
EP604 12836059 PANEL SCHEDULES
EP605 12836060 PANEL SCHEDULES
EP606 12836061 PANEL SCHEDULES
EP607 12836062 PANEL SCHEDULES
EP608 12836063 PANEL SCHEDULES
EP609 12836064 PANEL SCHEDULES
ET601 12836065 TELECOMMUNICATIONS ONE-LINE DIAGRAM
ET603 12836066 TELECOMMUNICATIONS GROUNDING DIAGRAM
EY601 12836067 SECURITY ONE-LINE & DIAGRAMS
VERTICAL
TRANSPORTATION
VT001 12836068 GENERAL ELEVATOR INFORMATION
VT101 12836096 PLANS AND HOISTWAY SECTION ELEVATOR
1.4 ADDITIONAL COMPULSORY DOCUMENTATION
The following listed documents are part of this Contract Project Manual and made available to the Contractor under separate cover. The Contractor must incorporate the content of each document to the full intent of each document as related to this Project.
Thee following are referenced in their related Specification sections and are considered salient to the CONTRACT BID and AWARD sequence. See Section 00 20 13.00 20 SUPPLEMENTARY INSTRUCTION TO OFFERS, for Project scope of work and related project work schedules.
1.4.1 SUPPLEMENTAL HAZARDOUS MATERIALS SUMMARY REPORT
The Supplemental Hazardous Materials Summary Report(66 Pgs.). This report summarizes the findings of the supplemental hazardous materials (HAZMAT)
DOCUMENT 00 01 15 Page 16 survey of the Building BQ-455, Navy Submarine Base, Groton, Connecticut (06/2020). Potential hazardous materials samples collected include asbestos containing materials (ACM) and lead based paint (LBP). This survey presents anticipated elevated levels of HAZMAT material anticipated to be encountered by the Contractor during extension of contracted Work.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.2 MOLD INSPECTION REPORT
The Mold Inspection Report (149 Pgs.). This report provides a survey of BQ-455 mold determination (06/2020) including a visual inspection, moisture mapping, and air / tape lift sampling for the purpose of determining if elevated levels of mold spore activity and/or visible evidence exist within the specific areas sampled. This survey presents anticipated elevated levels of mold that may be encountered by the Contractor during extension of contracted Work.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.3 GEOTECHNICAL REPORT
Geotechnical Report: New London Naval Submarine Base, Building BQ455 Report (139 Pgs.). Report provides a geotechnical seismic evaluation and recommendations for the proposed renovation of the existing elevators as related to the renovation of Building BQ455, Naval Submarine Base in Groton, Connecticut.(12/2020). This report summarizes the results of a soil boring and test pits program as related to foundation recommendations for the elevator renovation.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.4 SUBASE New London Instruction 5090.27A (HWMP)
The Hazardous Waste Management Plan (HWMP); SUBASE New London Instruction 5090.27A; HAZARDOUS WASTE MANAGEMENT PLAN. The HWMP establishes the Navy Environmental Protection Plan and specifically requires Navy shore activities to develop hazardous waste management plans in compliance with all applicable federal, state and local regulations. The HWMP covers hazardous waste management operating procedures for collection, containerization, labeling, marking, recordkeeping, storage, transfer, disposal and training, all of which must be implemented and incorporatd in the Contractor's HAZMAT contract obligations; refer to Section 02 81 00 -
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS.
The Hazardous Waste Management Plan (HWMP)is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.5 DESIGN PHASE COMMISSIONING PLAN
The Design Phase Commissioning Plan Rev. 0; dated 1-15-2021 (23 Pgs.) is
DOCUMENT 00 01 15 Page 17 provided outlining US Navy intentions to commission Building BQ455 to ensure that the new and modified-existing systems are installed and operate as they are intended.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.6 BUILDING ENCLOSURE COMMISSIONING PLAN
The Building Enclosure Commissioning Plan; dated 1/15-/2021 (241 Pgs.) is provided outlining the minimum procedures for the commissioning of the building enclosure and to outline the performance tests that are specified.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
1.4.7 CONTRACT SUBMITTAL REGISTER
The Contract Submittal Register; dated 2/08/2021 (241 Pgs.) is provided, generated from the Final Submission Contract documentation.
This Report is made available under separate cover. Please refer to Section 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS, for additional instruction.
-- End of Document --
DOCUMENT 00 01 15 Page 18
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; S
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The project includes renovation and repairs to Permanent Bachelor Quarters (BQ455) on the NAVSUBASE New London, CT Campus. Building 455, is an approximately 78,000 GSF building built originally in 1978 and renovated in 1999. It is comprised of a rectangular five story tower with public access a the 1/3 Point and egress stair towers at opposite ends of the structure. The building will be unoccupied during construction. The project shall be constructed so that safe access is maintained to surrounding buildings, roads and parking and impacts to utilities are minimized.
The Bachelor Quarters 455 repairs and renovations shall include the following:
1. Reconfiguration of and repairs and new finishes to all (100) berthing units.
2. Renovation and repairs to lobby areas, corridors, offices and ancillary spaces including new finishes.
3. Relocation of existing Laundry facilities within the structure.
4. Removal and disposal of existing furniture.
5. Repairs and upgrades to mechanical, electrical, fire protection, fire alarm and plumbing systems and fixtures.
6. Removal and disposal of an existing elevator (1), the modernization of one elevator (1) and providing a new elevator; hoistway and elevator (1), including the construction of a new interior lobby and new external hoistway.
7. Mold removal and remediation.
8. Removal of hazardous materials as they relate to the renovation.
SECTION 01 11 00 Page 1
9. Interior building signage.
10. Construction of sidewalks.
11. Exterior building repairs and renovations including removal and replacement of roof insulation and roofing, repairs to windows, selected exterior door replacement, and repairs and replacement of curtain wall assemblies.
12. Improvements to site stormwater drainage and incidental related work.
The following items have been identified to be included as Options to the Base Bid:
1.2.2 Location
The work is located at the NAVSUBASE New London, CT, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) will not be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations
SECTION 01 11 00 Page 2 to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 10 miles of the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 11 00 Page 4
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
c. The The Navy Base - New London will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
d. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
SECTION 01 14 00 Page 1
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
SECTION 01 14 00 Page 2
1.3.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through Friday excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Occupied Buildings
The Contractor shall be working in an existing unoccupied building however in close proximity to existing buildings which are occupied. Do not enter the building without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the BQ455 during the construction period.
Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
The Government will remove other Government property in the areas of the building scheduled to receive work.
SECTION 01 14 00 Page 3
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph
WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 4
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.3 EARNED VALUE REPORT
1.3.1 Data Required
This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.
Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Earned Value…
This is the start of the file's text. The full file is on GovTribe.