| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub-Total |
| Total Price |
| 0001 |
| BASE PRICE: Total Price for the entire work for Permanent Party Repairs BQ455 - Project |
Number: 1632260 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
| 0001A |
| Subtotal of Base Price for the entire work for BQ455 complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 0001B |
| Subtotal of Base Price for the entire project sitework outside the facility 5-foot line, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001C |
| Unit Price for replacing exterior windows at all locations, with exception to storefront at the building main entry. |
| 1 |
| Lump Sum |
| ____ |
| ________ |
| 0001D |
| Unit Price for replacing all gypsum wallboard throughout entire building. Steel studs will remain and be sprayed for mold remediation. |
| 1 |
| Lump Sum |
| ____ |
| ________ |
| 0001E |
| Subtotal of Base Price for Design of the replacement of all windows, complete, but excluding work provided in another line item. |
| 1 |
| EA |
The quantities in CLINS 0001F thru CLIN 0001I are for estimated work above and beyond those indicated in the contract drawings for CLINs 0001A thru 0001E. These items will only be performed at the direction of the Contracting Officer. The contractor will only receive payment for quantities actually performed and a deductive modification will be executed for quantities not performed.
| 0001F |
| Unit Price for providing Rock Excavation and Disposal complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 2500 |
| CF |
| ____ |
| ________ |
| 0001G |
| Unit Price for removal and disposal of asbestos containing pipe insulation complete in accordance with the drawings and specifications, but excluding work provided in another line item.. |
| 4000 |
| SF |
| ____ |
| ________ |
| 0001H |
| Unit Price for removal and disposal of asbestos containing floor tile complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 4000 |
| SF |
| ____ |
| ________ |
| 0001I |
| Unit Price for fire proofing existing penetrations complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 300 |
| EA |
| ____ |
| ________ |
| 0002 |
| Option Item No. 1: Price for providing all work in connection with providing a larger kitchen area; reference Contract Dwg. A-420 including all related construction activities, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 1 |
| EA |
| 0003 |
| Option Item No. 2: Price for providing Full Height Wall Tile at bathroom walls in lieu of Partial Height Wall Tile, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 1 |
| EA |
| 0004 |
| Option Item No. 3: Price for providing Rigid Sheet Wall protection below corridor wall guards in lieu of Knockdown Finish, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 0005 |
| Option Item No. 4: Price for providing Wood Cabinets throughout Project in lieu of Plastic Laminate Cabinets, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 0006 |
| Option Item No. 5: Price for providing New Electrical conduits and Feeder Cables from Transformer to New |
Switchboard complete, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.