CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

A001AA Service Orders, Spec Item 3.1 30 EA -$ A001AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$ A001AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA -$

A001AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

A001AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

A001AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

A001AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

EXHIBIT A -CLIN 0001

TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE

TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AA THROUGH A001AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AF THROUGH A001AG

CLIN 0002 NON-RECURRING/IDIQ - BASE YEAR

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - B002AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $5,000

20,000 EA $ -

B002AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

B002AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

B002AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

B002AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

B002AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

B002AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

B002AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

B002AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

B002AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

B002AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie.

400 EA $ -

B002AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

B002AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

B002AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

B002AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor.

200 EA $ -

B002AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

B002AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AA THROUGH B002AT

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

B002AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

B002AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

B002AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

B002AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

B002AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

B002BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

B002BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

B002BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

B002BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

B002BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

B002BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

B002BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AU THROUGH B002BG

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG

J-0200000-06

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

B002BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

B002BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

B002BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

B002BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

$ - TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002BH through B002BM

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002BH through B002BM

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG

TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002BH THROUGH B002BM

EXHIBIT LINE ITEM NUMBERS

J-0200000-06

TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT

CLIN 0003 RECURRING/FIRM-FIXED PRICE - FIRST OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

C003AA Service Orders, Spec Item 3.1 30 EA -$ C003AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$ C003AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA -$

C003AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

C003AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0003 RECURRING/FIRM-FIXED PRICE -FIRST OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

C003AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

C003AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

-$ TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG

TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

EXHIBIT C -CLIN 0003

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AA THROUGH C003AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AF THROUGH C003AG

CLIN 0004 NON-RECURRING/IDIQ - FIRST OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - D004AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $5,000

20,000 EA $ -

D004AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

D004AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

D004AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

D004AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

D004AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

D004AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

D004AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

D004AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

D004AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie.

400 EA $ -

D004AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

D004AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

D004AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

D004AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor.

200 EA $ -

D004AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

D004AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ - $ - TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AA THROUGH D004AT

EXHIBIT D -CLIN 0004

EXHIBIT LINE ITEM NUMBERS

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

D004AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

D004AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

D004AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

D004AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

D004AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

D004BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

D004BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

D004BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

D004BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

D004BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

D004BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

D004BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

EXHIBIT D -CLIN 0004

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AU THROUGH D004BG

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

D004BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

D004BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

D004BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

D004BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004BH THROUGH D004BM

EXHIBIT D -CLIN 0004

TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE

CLIN 0005 RECURRING/FIRM-FIXED PRICE -SECOND OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

E005AA Service Orders, Spec Item 3.1 30 EA -$ E005AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$ E005AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA -$

E005AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

E005AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0005 RECURRING/FIRM-FIXED PRICE - SECOND OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

E005AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

E005AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AA THROUGH E005AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AF THROUGH E005AG

TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT E -CLIN 0005

CLIN 0006 NON-RECURRING/IDIQ - SECOND OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - F006AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $5,000

20,000 EA $ -

F006AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

F006AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

F006AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

F006AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

F006AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

F006AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

F006AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

F006AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

F006AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie.

400 EA $ -

F006AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

F006AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

F006AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

F006AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor.

200 EA $ -

F006AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

F006AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ - $ - TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AA THROUGH F006AT

EXHIBIT F -CLIN 0006

J-0200000-06

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

F006AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

F006AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

F006AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

F006AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

F006AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

F006BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

F006BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

F006BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

F006BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

F006BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

F006BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

F006BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

$ - TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AU THROUGH F006BG

EXHIBIT F -CLIN 0006

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

F006BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

F006BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

F006BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

F006BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006BH THROUGH F006BM

TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE

EXHIBIT F -CLIN 0006

CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

G007AA Service Orders, Spec Item 3.1 30 EA -$ G007AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$ G007AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA -$

G007AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

G007AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

G007AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

G007AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AA THROUGH G007AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AF THROUGH G007AG

J-0200000-06

EXHIBIT G -CLIN 0007

TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG

TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE

CLIN 0008 NON-RECURRING/IDIQ - THIRD OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - H008AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $5,000

20,000 EA $ -

H008AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

H008AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

H008AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

H008AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

H008AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

H008AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

H008AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

H008AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

H008AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

H008AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie.

400 EA $ -

H008AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

H008AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

H008AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

H008AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor.

200 EA $ -

H008AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

H008AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

EXHIBIT H -CLIN 0008

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AA THROUGH H008AT

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT

J-0200000-06

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

H008AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

H008AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

H008AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

H008AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

H008AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

H008BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

H008BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

H008BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

H008BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

H008BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

H008BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

H008BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AU THROUGH H008BG

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

J-0200000-06

EXHIBIT H -CLIN 0008

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

H008BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

H008BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

H008BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

H008BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008BH THROUGH H008BM

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG

EXHIBIT H -CLIN 0008

TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H080BM

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H008BM

CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

J009AA Service Orders, Spec Item 3.1 30 EA -$ J009AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$ J009AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA -$

J009AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J009AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

J009 J009AF Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Items 3.3

12 EA -$

J009AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AA THROUGH J009AE

TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG

Railway, Spec Item 3

TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

EXHIBIT J -CLIN 0009

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AF THROUGH J009AG

CLIN 0010 NON-RECURRING/IDIQ - FOURTH OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

K010AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - K010AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $5,000

20,000 EA $ -

K010AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

K010AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

K010AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

K010AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

K010AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

K010AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

K010AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

K010AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

K010AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

K010AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie.

400 EA $ -

K010AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

K010AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

K010AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

K010AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor.

200 EA $ -

K010AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

K010AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ - $ - TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

J-0200000-06

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AA THROUGH K010AT

EXHIBIT K -CLIN 0010

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

K010AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

K010AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

K010AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

K010AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

K010AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

K010AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

K010BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

K010BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

K010BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

K010BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

K010BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

K010BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

K010BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT K -CLIN 0010

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AU THROUGH K010BG

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

K010BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

K010BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

K010BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

K010BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

K010BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT XXXXX-XX-X-XXXX

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010BH THROUGH K010BM

TOTAL CONTRACT VALUE (BASE, OPTION YEAR 1, OPTION YEAR 2, OPTION YEAR 3, OPTION YEAR 4)

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG

TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE

EXHIBIT K -CLIN 0010

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG