CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE)
Estimated
Quantity
Unit of Issue
Unit Price Total
A001AA Service Orders, Spec Item 3.1 30 EA -$
A001AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$
A001AC Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Item 3.3
12 EA -$
A001AD Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
A001AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$
CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
A001AF Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Items 3.3
12 EA -$
A001AG Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT A -CLIN 0001
TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE
TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AA THROUGH A001AE
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AF THROUGH A001AG
CLIN 0002 NON-RECURRING/IDIQ - BASE YEAR
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
B002AA Unit-Priced Labor - NTE 400 HRS 400 HR $ -
B002AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE
$50,000
50,000 EA $ -
B002AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.
10,000 TF $ -
B002AD Regage - Labor, material, equipment, & supervision to regage the track. Unit price is the price to perform per track foot.
200 TF $ -
B002AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.
200 TON $ -
B002AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.
20 EA $ -
B002AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot.
95 TF $ -
B002AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot.
20 TF $ -
B002AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.
35 EA $ -
B002AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.
4 EA $ -
B002AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
7000 EA $ -
B002AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT
ONLY)-Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
400 EA $ -
B002AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.
120 EA $ -
B002AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot.
200 TF $ -
B002AQ Install Rail - Labor, material, equipment, & supervision to install rail.
Unit price is the price to perform per track foot.
156 TF $ -
B002AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -
B002AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.
200 EA $ -
B002AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT B -CLIN 0002
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AA THROUGH
B002AT
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
B002AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.
100 EA $ -
B002AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar.
4 EA $ -
B002AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.
1 EA $ -
B002AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.
2 EA $ -
B002AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.
1 EA $ -
B002AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand.
4 EA $ -
B002BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.
4 EA $ -
B002BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.
2 EA $ -
B002BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.
1 EA $ -
B002BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.
2 EA $ -
B002BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.
20 CY $ -
B002BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.
40 TON $ -
B002BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.
20 TON $ -
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT B -CLIN 0002
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AU THROUGH
B002BG
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG
J-0200000-06
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
B002BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.
1 EA $ -
B002BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.
1 EA $ -
B002BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.
500 EA $ -
B002BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil.
200 CY $ -
B002BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.
24 EA $ -
J-0200000-06
TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG
TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG
EXHIBIT B -CLIN 0002
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002BH THROUGH
B002BM
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002BH through B002BM
TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002BH through B002BM
CLIN 0003 RECURRING/FIRM-FIXED PRICE - FIRST OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE)
Estimated
Quantity
Unit of Issue Unit Price Total
C003AA Service Orders, Spec Item 3.1 30 EA -$
C003AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$
C003AC Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Item 3.3
12 EA -$
C003AD Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
C003AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$
CLIN 0003 RECURRING/FIRM-FIXED PRICE -FIRST OPTION
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
C003AF Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Items 3.3
12 EA -$
C003AG Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT C -CLIN 0003
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AA THROUGH C003AE
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AF THROUGH C003AG
TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE
TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG
CLIN 0004 NON-RECURRING/IDIQ - FIRST OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
D004AA Unit-Priced Labor - NTE 400 HRS 400 HR $ -
D004AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE
$50,000
50,000 EA $ -
D004AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.
10,000 TF $ -
D004AD Regage - Labor, material, equipment, & supervision to regage the track. Unit price is the price to perform per track foot.
200 TF $ -
D004AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.
200 TON $ -
D004AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.
20 EA $ -
D004AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot.
95 TF $ -
D004AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot.
20 TF $ -
D004AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.
35 EA $ -
D004AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.
4 EA $ -
D004AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
7000 EA $ -
D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT
ONLY)-Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
400 EA $ -
D004AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.
120 EA $ -
D004AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot.
200 TF $ -
D004AQ Install Rail - Labor, material, equipment, & supervision to install rail.
Unit price is the price to perform per track foot.
156 TF $ -
D004AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -
D004AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.
200 EA $ -
D004AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
EXHIBIT D -CLIN 0004
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT
SOLICITATION/CONTRACT N40085-22-R-2527
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AA THROUGH
D004AT
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
D004AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.
100 EA $ -
D004AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar.
4 EA $ -
D004AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.
1 EA $ -
D004AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.
2 EA $ -
D004AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.
1 EA $ -
D004AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand.
4 EA $ -
D004BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.
4 EA $ -
D004BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.
2 EA $ -
D004BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.
1 EA $ -
D004BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.
2 EA $ -
D004BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.
20 CY $ -
D004BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.
40 TON $ -
D004BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.
20 TON $ -
SOLICITATION/CONTRACT N40085-22-R-2527
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
EXHIBIT D -CLIN 0004
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AU THROUGH
D004BG
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
D004BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.
1 EA $ -
D004BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.
1 EA $ -
D004BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.
500 EA $ -
D004BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil.
200 CY $ -
D004BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.
24 EA $ -
EXHIBIT D -CLIN 0004
SOLICITATION/CONTRACT N40085-22-R-2527
TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE
EXHIBIT LINE ITEM NUMBERS
TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004BH THROUGH
D004BM
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM
TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT
CLIN 0005 RECURRING/FIRM-FIXED PRICE -SECOND OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE)
Estimated
Quantity
Unit of Issue Unit Price Total
E005AA Service Orders, Spec Item 3.1 30 EA -$
E005AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$
E005AC Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Item 3.3
12 EA -$
E005AD Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
E005AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$
CLIN 0005 RECURRING/FIRM-FIXED PRICE - SECOND OPTION
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
E005AF Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Items 3.3
12 EA -$
E005AG Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
-$ TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT E -CLIN 0005
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AA THROUGH E005AE
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AF THROUGH E005AG
TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE
CLIN 0006 NON-RECURRING/IDIQ - SECOND OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
F006AA Unit-Priced Labor - NTE 400 HRS 400 HR $ -
F006AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE
$50,000
50,000 EA $ -
F006AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.
10,000 TF $ -
F006AD Regage - Labor, material, equipment, & supervision to regage the track. Unit price is the price to perform per track foot.
200 TF $ -
F006AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.
200 TON $ -
F006AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.
20 EA $ -
F006AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot.
95 TF $ -
F006AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot.
20 TF $ -
F006AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.
35 EA $ -
F006AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.
4 EA $ -
F006AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
7000 EA $ -
D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT
ONLY)-Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
400 EA $ -
F006AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.
120 EA $ -
F006AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot.
200 TF $ -
F006AQ Install Rail - Labor, material, equipment, & supervision to install rail.
Unit price is the price to perform per track foot.
156 TF $ -
F006AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -
F006AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.
200 EA $ -
F006AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT F -CLIN 0006
J-0200000-06
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AA THROUGH
F006AT
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
F006AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.
100 EA $ -
F006AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar.
4 EA $ -
F006AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.
1 EA $ -
F006AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.
2 EA $ -
F006AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.
1 EA $ -
F006AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand.
4 EA $ -
F006BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.
4 EA $ -
F006BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.
2 EA $ -
F006BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.
1 EA $ -
F006BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.
2 EA $ -
F006BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.
20 CY $ -
F006BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.
40 TON $ -
F006BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.
20 TON $ -
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG
SOLICITATION/CONTRACT N40085-22-R-2527
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AU THROUGH
F006BG
EXHIBIT F -CLIN 0006
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
F006BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.
1 EA $ -
F006BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.
1 EA $ -
F006BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.
500 EA $ -
F006BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil.
200 CY $ -
F006BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.
24 EA $ -
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006BH THROUGH
F006BM
TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG
TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE
EXHIBIT F -CLIN 0006
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM
TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM
CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE)
Estimated
Quantity
Unit of Issue Unit Price Total
G007AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$
G007AC Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Item 3.3
12 EA -$
G007AD Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
G007AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$
CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CHERRY POINT)
Estimated
Quantity
Unit of Issue Unit Price Total
G007AF Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Items 3.3
12 EA -$
G007AG Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT LINE ITEM NUMBERS
TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG
TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE
J-0200000-06
EXHIBIT G -CLIN 0007
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AA THROUGH G007AE
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AF THROUGH G007AG
CLIN 0008 NON-RECURRING/IDIQ - THIRD OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
H008AA Unit-Priced Labor - NTE 400 HRS 400 HR $ -
H008AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE
$50,000
50,000 EA $ -
H008AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.
10,000 TF $ -
H008AD Regage - Labor, material, equipment, & supervision to regage the track. Unit price is the price to perform per track foot.
200 TF $ -
H008AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.
200 TON $ -
H008AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.
20 EA $ -
H008AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot.
95 TF $ -
H008AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot.
20 TF $ -
H008AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.
35 EA $ -
H008AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.
4 EA $ -
H008AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
7000 EA $ -
H008AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT
ONLY)-Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
400 EA $ -
H008AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.
120 EA $ -
H008AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot.
200 TF $ -
H008AQ Install Rail - Labor, material, equipment, & supervision to install rail.
Unit price is the price to perform per track foot.
156 TF $ -
H008AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -
H008AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.
200 EA $ -
H008AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT H -CLIN 0008
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AA THROUGH
H008AT
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
H008AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.
100 EA $ -
H008AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar.
4 EA $ -
H008AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.
1 EA $ -
H008AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.
2 EA $ -
H008AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.
1 EA $ -
H008AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand.
4 EA $ -
H008BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.
4 EA $ -
H008BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.
2 EA $ -
H008BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.
1 EA $ -
H008BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.
2 EA $ -
H008BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.
20 CY $ -
H008BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.
40 TON $ -
H008BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.
20 TON $ -
SOLICITATION/CONTRACT N40085-22-R-2527
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
EXHIBIT H -CLIN 0008
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AU THROUGH
H008BG
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE & CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
H008BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.
1 EA $ -
H008BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.
1 EA $ -
H008BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.
500 EA $ -
H008BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil.
200 CY $ -
H008BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.
24 EA $ -
EXHIBIT H -CLIN 0008
TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H080BM
TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H008BM
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008BH THROUGH
H008BM
CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CAMP LEJEUNE)
Estimated
Quantity
Unit of Issue
Unit Price Total
J009AA Service Orders, Spec Item 3.1 30 EA -$
J009AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$
J009AC Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Item 3.3
12 EA -$
J009AD Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
J009AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$
CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION
ELIN/Sub
ELIN
Description -1502000 Facility Investment
Maintenance and Repair Railroad Trackage
(CHERRY POINT)
Estimated
Quantity
Unit of Issue
Unit Price Total
J009
J009AF Monthly Inspections and Associated Preventative Maintenance &
Repair, Spec Items 3.3
12 EA -$
J009AG Inspections and Associated Preventative Maintenance & Repair of
Crossing Signals, performed every two weeks, Spec Item 3.3.4.1
26 EA -$
J-0200000-06
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AF THROUGH J009AG
Railway, Spec Item 3
TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
EXHIBIT J -CLIN 0009
RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AA THROUGH J009AE
TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG
CLIN 0010 NON-RECURRING/IDIQ - FOURTH OPTION
ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total
K010AA Unit-Priced Labor - NTE 400 HRS 400 HR $ -
K010AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE
$50,000
50,000 EA $ -
K010AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.
10,000 TF $ -
K010AD Regage - Labor, material, equipment, & supervision to regage the track. Unit price is the price to perform per track foot.
200 TF $ -
K010AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.
200 TON $ -
K010AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.
20 EA $ -
K010AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot.
95 TF $ -
K010AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot.
20 TF $ -
K010AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.
35 EA $ -
K010AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.
4 EA $ -
K010AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
7000 EA $ -
K010AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT
ONLY)-Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie.
400 EA $ -
K010AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.
120 EA $ -
K010AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot.
200 TF $ -
K010AQ Install Rail - Labor, material, equipment, & supervision to install rail.
Unit price is the price to perform per track foot.
156 TF $ -
K010AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -
K010AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.
200 EA $ -
K010AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AA THROUGH
K010AT
EXHIBIT K -CLIN 0010
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT
ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total
K010AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.
100 EA $ -
K010AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar.
4 EA $ -
K010AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.
1 EA $ -
K010AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.
2 EA $ -
K010AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.
1 EA $ -
K010AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand.
4 EA $ -
K010BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.
4 EA $ -
K010BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.
2 EA $ -
K010BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.
1 EA $ -
K010BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.
2 EA $ -
K010BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.
20 CY $ -
K010BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.
40 TON $ -
K010BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.
20 TON $ -
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AU THROUGH
K010BG
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG
SOLICITATION/CONTRACT N40085-22-R-2527
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
EXHIBIT K -CLIN 0010
ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total
K010BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.
1 EA $ -
K010BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.
1 EA $ -
K010BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.
500 EA $ -
K010BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil.
200 CY $ -
K010BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.
24 EA $ -
$ - TOTAL CONTRACT VALUE (BASE, OPTION YEAR 1, OPTION YEAR 2, OPTION YEAR 3, OPTION YEAR 4)
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT
TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG
TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE
EXHIBIT K -CLIN 0010
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG
J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-22-R-2527
NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010BH THROUGH
K010BM
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM
TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM