J-1502000 Attachments 22R2527.pdf
PDF 6 MB Posted
- Attached to
- Regional Maintenance & Repair Railroad Trackage
- Solicitation number
- N40085-22-R-2527
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-1502000-01 DEFINITIONS AND ACRONYMS
J-1502000-02 REFERENCES AND TECHNICAL DOCUMENTS
J-1502000-03 LOCATION MAPS – CAMP LEJUENE
J-1502000-03-1 LOCATION MAPS – MCAS, CHERRY POINT
J-1502000-04 CONTRACTOR ACTIVITY STATUS REPORT
J-1502000-05 TRACK CLOSURE REQUEST (CAMP LEJEUNE)
J-1502000-05-1 TRACK CLOSURE REQUEST (CHERRY POINT)
J-1502000-06 UFC 4-860-03 RAILROAD TRACK MAINTENANCE AND SAFETY STANDARDS
J-1502000-07 RAIL ANCHOR DETAIL
J-1502000-08 TYPICAL BALLAST ARRANGEMENT
J-1502000-09 EROSION CONTROL GUIDANCE
J-1502000-10 RESERVED
J-1502000-10-1 FACILITY INVENTORY, INVENTORY OF COMPONENTS AND PM FREQUENCIES-
CHERRY POINT
J-1502000-11 CROSSING SIGNAL INSPECTION FORM
J-1502000-12 GENERAL VEGETATION CONTROL GUIDANCE
J-1502000-13 APPROVED PESTICIDE LIST FOR CAMP LEJEUNE AND MCAS, CHERRY POINT, NC
J-1502000-14 HERBICIDE USUAGE PLAN REQUIREMENTS
J-1502000-15 MANAGEMENT INFORMATION RECORD
J-1502000-16 PERFORMANCE ASSESSMENT PLAN (PAP)
J-1502000-17 CONTRACTOR DAILY REPORT
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
CRANE, CATEGORY 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
CRANE, CATEGORY 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2.
Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists, including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
CRANE, CATEGORY 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
EQUIPMENT, COLLATERAL Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
EQUIPMENT, INSTALLED Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
EQUIPMENT, PERSONAL
PROPERTY
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
FACILITIES LIFE CYCLE A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
FACILITIES MAINTENANCE
MANAGEMENT
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Program
(IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
LIFE-CYCLE COSTS A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
MAINTENANCE, PREVENTIVE Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions.
It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
MANAGEMENT
INFORMATION SYSTEMS-
MAINTENANCE
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
REPAIR Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
REPLACEMENT Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
RESTORATION Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
SUSTAINMENT Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
SERVICE ORDER Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for facilities-related work that are too small to be planned and estimated.
SERVICE ORDER CYCLE Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order.
SERVICE ORDER,
EMERGENCY
Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems.
SERVICE ORDER, URGENT Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system.
SERVICE ORDER, ROUTINE Routine is defined as any deficiency that does not qualify as emergency or urgent, but is needed to maintain the agreed upon facility condition. Maintain means to repair to such a condition that it may be used for its intended purpose and to normal working condition. Does not include improvements.
WEIGHT HANDLING
EQUIPMENT (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.
Acronym Title
BPVC Boiler and Pressure Vessel Code
HVAC Heating, Ventilation, and Air Conditioning
RPIE Real Property Inventory Equipment
SCADA Supervisory Control And Data Acquisition
SRM Sustainment, Restoration and Modernization
UFC Unified Facilities Criteria
UPV Unfired Pressure Vessel
VTE Vertical Transportation Equipment
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
Reference Title
NAVFAC P-301 NAVY RAILROAD OPERATING HANDBOOK
UFC 4-860-03 RAILROAD TRACK MAINTENANCE AND SAFETY STANDARDS
49 CFR CHAPTER II FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
49 CFR 217 RAILROAD OPERATING PROCEDURES
ATTACHMENT J-0200000-04
CONTRACTOR ACTIVITY STATUS REPORT
(RUNNING REPORT/RECORD OF INSPECTIONS, SERVICE REQUESTS, AND SPECIFIC
MINOR WORK)
Note: The Contractor may modify the format and arrangement of the following provided only that the data fields shown shall appear somewhere in the revised version of the Contractor
Activity Status Report.
Contract No.: _______________________________ Date: ___________________________
A. Inspection Completed Since Last Report:
(Attach additional sheets as required.)
B. Indefinite Quantity Work Completed Since Last Report:
(Attach additional sheets as required.)
C. Service Work Delayed or Past Due (Explain):
(Attach additional sheets as required.)
D. Work Ordered by Incomplete as of this Report (Indicate Anticipated Completion Date):
(Attach additional sheets as required.)
Prepared by: _______________________________Submitted by:
ATTACHMENT J-1502000-05
TRACK CLOSURE REQUEST
MCB, CAMP LEJEUNE, NC
To: Contracting Officer, FSC, Marine Corps Base, Camp Lejeune, NC
From: _____________________________ Date: ___________________________
(Contractor)
Subject: TRACK CLOSURE, REQUEST FOR
Ref: (a) Maintenance Service Contract, Railroad Trackage, Clause
1. Authorization to close ________________________________________________
(Track name or identification) from _____________________________ to _________________________________
(Location Milepost or Station No.) (Location Milepost or Station No.)
for the purpose of ______________________________________________________ is hereby requested. Date/time of anticipated closure: _________________________
The work is estimated to require __________________________________________.
(Days/Hours to complete)
The work is considered to be ____Emergency or _____ Routine. (Check one)
2. Track closure signs will be placed at the following locations:
3. WORK SHALL NOT COMMENCE UNTIL WRITTEN APPROVAL BY THE CONTRACTING
OFFICER HAS BEEN OBTAINED. IN THE EVENT APPROVAL HAS NOT BEEN RECEIVED
BY THE SCHEDULED TIME FOR COMMENCEMENT OF WORK, THE REQUEST SHALL BE
CONSIDERED DISAPPROVED AND A REVISED REQUEST SHALL BE SUBMITTED.
(Signature of Contractor or Designated Representative)
(Except in an emergency, submit original and 4 copies 14 days in advance.)
ATTACHMENT J-1502000-05
MCB, CAMP LEJEUNE, NC
From: Contracting Officer, FSC, Marine Corps Base, Camp Lejeune, NC
To: _____________________________ Date: ___________________________
(Contractor)
Subject: TRACK CLOSURE, REQUEST FOR
1. This request is ____ Approved/ _____ Disapproved.
(Signature of Contracting Officer or Designated Government Representative)
ATTACHMENT J-1502000-05-1
MCAS, CHERRY POINT
To: Contracting Officer, FEAD, Marine Corps Base, Cherry Point, NC
From: _____________________________ Date: ___________________________
(Contractor)
Subject: TRACK CLOSURE, REQUEST FOR
Ref: (a) Maintenance Service Contract, Railroad Trackage, Clause
1. Authorization to close ________________________________________________
(Track name or identification) from _____________________________ to _________________________________
(Location Milepost or Station No.) (Location Milepost or Station No.)
for the purpose of ______________________________________________________ is hereby requested. Date/time of anticipated closure: _________________________
The work is estimated to require __________________________________________.
(Days/Hours to complete)
The work is considered to be ____Emergency or _____ Routine. (Check one)
2. Track closure signs will be placed at the following locations:
3. WORK SHALL NOT COMMENCE UNTIL WRITTEN APPROVAL BY THE CONTRACTING
OFFICER HAS BEEN OBTAINED. IN THE EVENT APPROVAL HAS NOT BEEN RECEIVED
BY THE SCHEDULED TIME FOR COMMENCEMENT OF WORK, THE REQUEST SHALL BE
CONSIDERED DISAPPROVED AND A REVISED REQUEST SHALL BE SUBMITTED.
(Signature of Contractor or Designated Representative)
(Except in an emergency, submit original and 4 copies 14 days in advance.)
ATTACHMENT J-1502000-05-1
MCAS, CHERRY POINT
From: Contracting Officer, FEAD, Marine Corps Base, Cherry Point, NC
To: _____________________________ Date: ___________________________
(Contractor)
Subject: TRACK CLOSURE, REQUEST FOR
1. This request is ____ Approved/ _____ Disapproved.
(Signature of Contracting Officer or Designated Government Representative)
TRACK LENGTH (FT) LOCATION STATUS
1 and 14 13593 Mainline along Roosevelt Active
2 4899 Mainline along A St Active -
NOTE:
Inactive 975 ft.
6 1978 Pass Track - off Track 2 Active
9 1161 Spur - Heating Plant Active
NOTE: 265
ft. closed
10 1445 Spur - Heating Plant Active
Crossover 9/10 144 Heating Plant Active
14A 1401 Pass Track - Fuel Facility Active
22 496 Siding - Ramp off Track 1 Active
Subtotal 25117 Inspected 25,117 ft. = (4.76 miles)
TRACK LENGTH (FT) LOCATION STATUS
3 2865 Spur at DRMO Inactive
4 1600 Siding - off Track 3 into
DRMO
Inactive
5 1000 Siding - Bldg. 1702 Inactive
7 1865 Spur - Bldg. 150 Inactive
11 655 Spur - Bldg. 149 Inactive
12 5600 Spur - A St-6th
Serving Bldg. 1702 and
Tracks 5 & 13
200 ft.
removed across 6th
& C
13 400 Siding - Bldg. 145 Inactive
20 1000 Siding - Bldg. 159 Inactive
24 4900 Ordnance Track
1200 ft. removed from
Norfolk Southern, Hwy 70 and Slocum Rd
Inactive
25 2700 Ordnance Track 1200 ft. removed from Norfolk Southern, Hwy 70 and Slocum RdInactive
ATTACHMENT J-1502000-10-1
FACILITY INVENTORY - MCAS, CHERRY POINT
(NOT INSPECTED)
Subtotal 22585 Not Inspected 22,585 ft. =
(9.03 miles)
ATTACHMENT J-1502000-11
CROSSING SIGNAL INSPECTION FORM
RAILROAD
LOCATION DATE
Plans legible and correct Inspect insulated joints
Security of crossing components Inspect bonds and connections
Fouling wires Railroad signs
Tagging of wires Gate arm horizontal position
Test flashing lights Inspect gate arm & mechanism
Clean/repair flashing lights Test gate arm operation
Flashing light alignment Test audible warning devices
Frequency of flashes Test grounds
Test crossing operation w/ AC power on Check connections
Test crossing operation w/ AC power off Check arrestors/equalizers
Warning time in accordance w/ plans Clean cabinet
Shunt crossing (.06 ohm) Check cabinet ventilation
Battery voltage left total bank Battery voltage right total bank
Each cell Each cell
Left battery bank charger Right battery bank charger
Check AC voltage Check locks, latches, hinges
Time between activation of lights and onset of descent of gate
Time for gate to close fully Time for gate to open fully
Comments:
Contractor Inspector
ATTACHMENT J-1502000-13
APPROVED PESTICIDE LIST FOR CAMP LEJEUNE NC
Per OPNAVINST 6250.4C "All personnel applying pesticides shall be certified"
IPM - APPENDIX E Updated: 07 July 2021
EPA Reg # Trade Name Intended Use REMARKS
***Approve Must be secured inside tamper-resistant bait boxes
100-1055
WeatherBlok XT (formerly 10182-339)
(NOTE: Must be secured inside tamper-resistant bait boxes)
Rodenticide
Approve:certified applicators only
100-1091
Reward (NSN#6840-01-005-7523)
AQUATIC weeds
100-1111
Archer
Roaches
100-1134
Monument 75WG
Weeds
100-1139
Barricade 4FL
Insecticide
100-1218
Demon Max
100-834
Barricade 65 WG
Crabgrass,weeds
100-937
Primo MAXX
Growth Regulator
10182-100
Demon WP
10182-105
Demon EC
Insecticide/Gen Household
10182-339
Weather Block
(NOTE:Must be secured inside tamper-resistant bait boxes)
10182-361
Demand CS
1021-1641-57056
Conquer
1021-1691-149
TERRO ANT KILLER SPRAY T401 (16 oz)
"issued to units thru SELF HELP 451-0072 (WO needed)"
Ants
Approve: SELF HELP or certified applicators only
1021-1815
Onslaught Microencapsulated Insecticide
1021-2574
Onslaught Fastcap
11540-1
ULD BP-300
11540-9
ULD BP-100
11649-7
Avitrol Whole Corn (LABELED "RESTRICTED USE")
Avicide
12455-69
Contrac Bait
(NOTE: use only OUTSIDE of bldgs)
12455-79
Contrac All Weather Bait Blocks (NSN#6840-01-501-2858)
12455-82
Contrac Blox (Super Size)
149-8-64405
Terro Ant Bait Gel
1812-307
K-Tea
Algaecide
19713-60
Simazine 4L
Weeds & Vines
19713-623
Drexel Imitator Aquatic Herbicide
Aquatic Weeds
2217-774
Gordans Brushmaster
Poison Ivy/Vines
2217-833
SpeedZone
2217-835
Southern Speedzone
228-480
Polaris AC
(G10 Aerial Spray approved 5/18/2010)
Herbicide
228-534
Polaris
228-675
Nufarm Diquat SPC 2 L
Aqautic Weeds
241-322
Amdro Pro Fire Ant Granular Bait
241-341
Pendulum
241-372
Sahara DG Herbicide
Cracks, Concrete
241-392
Phantom (NSN#6840-01-525-7139)
241-426
Habitat (NSN#6840-01-532-5403)
(NOTE:only MCAS is approved for use to control alligator weeds)
241-430
Chopper Gen2
(approved for Wildlife)
2724-274
Golden Malrin (NSN#6840-01-183-7244)
Flying insects
2724-351
Gentrol IGR (NSN#6840-01-318-7416)
2724-404-50809
Petcor Flea Spray
IGR
2724-490
Precor 2000 Plus / Premise
279-3062
Dragnet
279-3168
Talstar PL
279-3206
Talstar One (Pre-treat for Termites)(NSN#6840-01-525-6888)
3125-390
Tempo Ultra WP
352-439
Escort XP
Kudzu
352-627
Advion Fire Ant Bait Granular
352-643
TranXit
352-652
Advion Cockroach Gel Bait
Insecticide/Roaches
352-668
Advion Roach Arena
352-746
Advion Ant Gel Bait
352-776
Arilon
42750-29
Weed-Hoe 108
432-1217
TOP CHOICE Fire Ant / Fipronil (NSN#6840-01-585-9950)
Insecticide/Fire Ants
432-1223
ProStar 70 WP
Fungicide
432-1254
Maxforce Gel Bait
432-1256
Maxforce Ant Bait Stations (NSN#6840-01-298-1122)
432-1257
Maxforce FC (Sml Roach)
432-1264
Maxforce FC Ant Killer Bait Gel (NSN#6840-01-500-4579)
432-1331
Premise (Pre Construction Insecticide)
432-1332
Premise 75 / Centerfire 75 WSP
Termites
432-1332-73748
Imaxx Pro
432-1363
Bayer Tempo Ultra SC
432-1375
Maxforce Fly Granular Bait (NSN#6840-01-518-5807)
Flying insects
432-1391
Premise Foam
432-1433
MaxForce FC Fire Ant Bait
432-1455
Maxforce Fly Spot Bait (NSN#6840-01-555-9369)
432-1460
Maxforce FC Magnum Roach Killer Bait Gel
432-1483
Temprid SC
Ants, Roaches
432-1514
Suspend Polyzone
432-716
SCOURGE (LABELED "RESTRICTED USE")
432-763
Suspend SC
432-772
Delta Dust (NSN#6840-01-431-3345)
Bees,Wasps,Hornets
432-992
Drione Dust
Insecticide/Gen Household
499-153
Whitmire Wasp Freeze
499-290
PT 565 Plus XLO (NSN#6840-00-823-7849)
499-294
Avert Dry Flowable Cockroach Bait/
Whitmire AvertPT310 Abamectin Dust (NSN#6840-01-561-
9766)
499-304
Cy-Kick CS Prescription Treatment
499-310
Whitmire PT 566 Pyrethrum
499-404
Ultracide Flea IGR & Adulticide
499-450
BP-100
499-452
BP-300
499-462
Pro-Control Plus
499-465
Pro-Control
499-470
Cy-Kick (NSN#6840-01-561-9717)
499-473
Whitmire PT 221L Residual Insecticide
499-527
PT Alpine Dust
499-535
Cyhalocap CS
Pesticide
499-540
Alpine Flea Insecticide
499-561
Alpine WSG
56-73
JT Eaton Boric Acid
50404-5
Permethrin
50534-202
Daconil Ultrex
Fungicide
524-343
Aqua Master
AQUATIC Herbicide
524-454
Honcho Plus Herbicide
524-475
ROUND-UP PRO / Ranger Pro (NSN#6840-01-108-9578)
Herbicide/Weeds
524-529
ROUND-UP PRO Concentrate
524-535
Quick Pro ROUND-UP (NSN#6840-01-399-0673)
524-549
ROUND-UP Powermax
53871-3
Stimukill Fly Bait
53883-118
Bifenthrin
53883-124
Bifen LP Granules
53883-328
Fuse
Termiticide/Insecticide
55809-3
Wasp & Hornet Killer Plus
"Available SERVMART-GSA or issued to units thru SELF
HELP 451-0071 (WO needed)"
Approve: SERVMART-GSA / SELF
HELP or certified applicators only
58007-1
Ultrathon Insect Repellant
59639-31
Orthene PCO Pellets
6218-47
Mosquito Dunks
62719-260
Crossbow Brush Killer
62719-324
Rodeo / Accord (NSN#6840-01-356-8893)
AQUATIC herbicide
62719-40
GARLON 4 / Element 4
62719-426
Dimension EC
62719-553
Garlon XRT
63120-1
Insect/Arthropod Repellent Fabric Treatment (NSN#6840-01-
334-2666)
(Note:PrevMed Use only)
63120-3
Insect/Arthropod Repellent Fabric Treatment (NSN#6840-01-
345-0237)
(Note:PrevMed Use only)
64248-10
Maxforce Ant Bait F1
64248-14
Maxforce FC Roach Killer Bait Gel
64248-6
Maxforce Ant Killer/Granular Bait
64405-1
Bora-Care
Insect/Fungicide
64405-2
Niban Fine Granular Bait
Fire Ants
64405-8
Tim-Bor
Wood Destroying Fungi
655-798
ExciteR
655-802
Larva-Lur
66222-22
PRAMITOL 25E (NSN#6840-00-145-0013)
67425-15
EcoPCO WPX
6754-22-5802
Drione
67760-34
Malathion
6959-79
CESSCO 5 E
71995-33
7113)
71995-36
ROUND-UP READY TO USE-PLUS POISON IVY
Poison Ivy/Vines
72155-58
Tempo 2.5 SC Ultra
73342-1
AMDRO Fire Ant Bait
73342-6
AMDRO Fire Ant Bait
73079-2
In Tice granular bait
73079-4
BorActin Insecticide Powder
62719-608
Recruit HD
Termiticide/termite Bait
73079-6
InTice Perimeter Baits
73079-8
InTice Gelanimo Ant Bait
7969-209
Termidor 80 WG (NSN#6840-01-483-3072)
7969-210
Termidor SC T/L (NSN#6840-01-483-3068)
7969-272
Drive XLR8
Grasses
7969-285
PT Phantom Pressurized Insecticide
8033-109-279
Transport Mikron
81927-7
Alligare MSM 60 (Base Stables)
81927-11
Triclopyr 4E
8329-40
Biomist 1.5+7.5 ULV
Mosquitos
83487-1
Uncle Albert's Super Smart Ant Bait
901-82 d-Phenothrin
9444-129
Borid
9444-183
Intruder HPX Aerosol
9444-217
D-Force HPX (NSN#6840-01-561-9745)
9688-187
TAT ANT & ROACH KILLER SPRAY (12 oz)
Ants/Roaches
9688-239-8845
HotShot Ultra LIQUID Roach Baits
9688-242-8845
HotShot Ultra LIQUID Ant Baits
***BELOW LIST DOES NOT REQUIRE CERTIFIED
APPLICATORS (NOT REGULATED OR EXEMPT)***
FIFRA Exempt
Eco Exempt IC
Approve:certified applicators NOT required
Not regulated
Bac A Zap
Bacteria/Odor/Drain Fly
Deer Stopper Concentrate-Messina Wildlife
Deer
Locally approved:certified applicators NOT required
Osmocote Slow Release
Fertilizer not pesticide
Kleer-Out - Geraniol
Locally approved:certified applicators NOT required
***BELOW LIST DOES NOT REQUIRE CERTIFIED
APPLICATORS (NOT REGULATED OR EXEMPT)***
EcoSMART (Flying & Crawling Insects) (available thru
SERVMART-GSA)
Flying & Crawling insects Locally approved:SERVMART-GSA / certified applicators NOT required
Liquid Fertilizer
Housing area
Eco Exempt D
Eco Exempt G
Mosquito Barrier
Mosquitos
Allure Pheromone Moth Traps
Moth
StorGard Pheromone Traps
Moth
CatchMaster Glueboards
Rodents & Insects
Predascent (available thru SERVMART-GSA)
Snake Repellent
Approve:SERVMART-GSA / certified applicators NOT required
Pyrethiums
Fruit Bug
Not requlated
Cazamoscas Fly Catcher (Base Stables)
Flys
Snake-A-Way
Repellent
Camp Lejeune Pest Management Coordinator:
William Parkin (Environmental Management Department) (910) 451-7018 email william.parkin@usmc.mil
Link to the AUL for the PMP:
For External Site: http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/HazardousWasteMaterialManagement.aspx
For Internal Site :https://em.usmc.mil/sites/le/default.aspx mailto:william.parkin@usmc.mil http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/HazardousWasteMaterialManagement.aspx
ATTACHMENT J-1502000-14
HERBICIDE USAGE PLAN REQUIREMENTS
1. An annual Herbicide Usage Plan shall be prepared by the Contractor and approved by the Contracting Officer before any herbicide is used. Upon approval, only the prescribed herbicide applications as shown on the plan shall be accomplished by the Contractor during the contract period. The facilitate review of herbicide(s) specified in the plan, the Contractor shall submit copies of either the EPA or State registered herbicide labels.
2. The Contractor shall prepare and submit the Annual Herbicide Usage Plan which shall list all prepared herbicides to be used during the term of the contract. The following minimum information shall be required for each herbicide specified:
a. Areas to be treated and specific usage;
b. Approximate time or frequency of application;
c. Common name and EPA or State registration number of each herbicide product;
d. Form of herbicide received from supplier (i.e. wettable powder);
e. Any special precautions not on label to prevent environmental damage or herbicide injury; and
f. A verifiable listing of the Contractor’s or Sub-Contractor’s State category of herbicide applicator licensing, name or names of license holders in each category, and State license numbers.
3. Herbicides shall be applied only by a firm holding a valid State license (s) for each category of work involved, to include right of ways. Any required State, county or local permits for procurement, possession, or use of any herbicide under this contract shall be obtained at no additional expense to the Government.
4. All herbicide mixing and application shall be performed by or under the direct supervision of an individual licensed by the North Carolina Department of Agriculture for the specific category of work being performed. For the purpose of this contract, “direct supervision” shall mean that any unlicensed herbicide applicator acts under the instruction and control of a licensed person when the herbicide is mixed and when it is applied, and that the licensed person providing such supervision is physically present within the area of the work.
5. All herbicides shall be procured, possessed, handled, and applied in strict accordance with the manufacturer’s label, which shall be registered with the Environmental Protection Agency or the State of North Carolina. Each herbicide formulation shall be registered for use under the particular environmental conditions for which it is intended and applied. Any additional recommendations or instructions from the Contracting Officer in connection with the use of herbicide including stoppage of work shall be accurately followed. Contractor personnel applying herbicide shall wear and use appropriate protective and safety equipment. These personnel are subject to inspection by DOD-certified base pest control personnel.
6. Herbicide application shall be performed only on still days and will be stopped when unfavorable weather or other conditions exist which would unduly increase the hazard to personnel or desirable vegetation by drift, runoff, or leaching through the soil. Any Government property or desirable vegetation damaged by the Contractor or his representatives shall be repaired or replace das directed or as specified herein at no expense to the Government.
ATTACHMENT J-1502000-14
HERBICIDE USAGE PLAN REQUIREMENTS
7. All chemicals shall be applied in strict accordance with the product’s EPA or State registered label. All instructions or recommendations by the Contracting Officer’s authorized representative and those of the herbicide’s manufacturer are to be accurately followed. The chemical to be used and the rate and method of application are to be identified in the Annual Herbicide Plan.
8. The Contractor shall be responsible for cleaning, decontaminating, and reporting pesticide spills to the
Contracting officer or his designated representative.
9. The Contractor shall be responsible for preparing a monthly Herbicide Usage Plan in a format that is acceptable to the Contracting Officer. The plan is to list, by day, all the applications and locations by worksite for use of herbicide during the next month and shall be based on the Annual Herbicide Usage Plan. The plan shall represent all applications of the herbicide the Contractor intends to apply in the coming month. Deviations from the work plan are permissible only after approval from the Contracting Officer and only due to inclement weather, local conditions (such as the growth rate of vegetation exceeding original estimates), or convenience of the Government.
10. The Contractor shall be responsible for preparing a daily Pest Management Information Record. This report shall meet the reporting requirements of NAVFAC which will be available for the Contractor’s review. The record shall be prepared daily as required and submitted with the Contractor’s monthly invoice for payment if herbicides have been used during the month for which invoiced. A copy of Pest Management Information Record is attached in J-1502000-09.
ATTACHMENT J-1502000-15
MANAGEMENT INFORMATION RECORD
ADMINISTRATIVE INFORMATION
UIC NUMBER: _________________ DATE:___________________ CONTRACT:_______________
INDOOR/OUTDOOR: ________________ TIME REQUIRED: ____________________
PEST AND OPERATION
PEST: ______________________________________________________________________________
OPERATION: _______________________________________________________________________
SITE: _______________________________________________________________________________
SPECIFIC LOCATION: _______________________________________________________________
CONTROL AGENT
TRADE NAME: ________________________ PESTICIDE NAME: __________________________
EPA REG NUMBER: ___________________ PESTICIDE AMOUNT: ________________________
FORMULATION: ______________________ FINAL CONCENTRATION: ___________________
% OR RATE PER AREA: _______________ POUNDS OF ___% PRODUCT PER _____________
COMMENTS: _______________________________________________________________________
(SIGNATURE) (CERTIFICATION NO.)
ATTACHMENT J-1502000-16
PERFORMANCE ASSESSMENT PLAN (PAP)
PERFORMANCE
ASSESSMENT
PLAN
Maintenance and Repair Railroad Trackage
Marine Corps Base
Camp Lejeune, NC
PREPARED BY:
Facilities Support Contracts (FSC)
13 July 2021
Version 2.1 Updated 13 July 2021
Performance Assessment Plan Contents
1. Introduction
1.1 Purpose
1.2 Partnering
2. Roles and Responsibilities
3. Training
4. Safety
5. Security
6. Submittals
6.1 Quality Management Plan Submittal
6.2 Accident Prevention Plan Submittal
7. Meetings
8. Methods of Assessment (MOA)
9. Quality Management System (QMS)
10. Performance Assessment Process
10.1 Post-Award Planning
10.2 Scheduling Assessments
10.3 Non-recurring Task Orders
10.4 Assessment Procedures
10.4.1 AL1 Assessments
10.4.2 AL2/3 Assessments
10.4.3 Safety Assessment
10.4.4 Management and Administration Assessment
10.4.5 Contract Discrepancy Reports
11. Assessment Summary and Evaluation
11.1 Monthly Performance Assessment Summary (MPAS)
11.2 Invoice Validation and Withholdings
11.3 COR Activity File
11.4 Performance Assessment Board (PAB)
12. Summary
List of Attachments
Attachment A: Functional Assessment Plan (FAP)
Attachment B: Performance Assessment Worksheet
Attachment C: QMS Pre-performance Review Checklist
Attachment D: Customer Comment Record
Attachment E: QMS In-process Review Checklist
Attachment F: Contract Discrepancy Report (CDR)
Attachment G: FSC Safety Assessment
Checklist
Attachment H: Annex 2 – Management and Administration Evaluation Checklist
Attachment I: MPAS
Coversheet
Attachment J: PAB Rating Summary
Performance Assessment Plan
1. Introduction
1.1 Purpose
The Performance Assessment Plan (PAP) establishes Performance Assessment (PA) provisions for
Contract N40085-17-R-3001, Maintenance and Repair Railroad Trackage. The PAP describes the methodology for assessing the Contractor’s performance that will be used to provide Contractor feedback, update Contractor Performance Assessment Rating System (CPARS). The PAP includes the Functional Assessment Plan (FAP), Attachment A, and standard Performance Assessment
Worksheets (PAW), Attachment B, to document and report Government observations of Contractor performance. The Government’s role is to assess Contractor’s work against measurable performance standards, and per the principles of Performance Based Services Acquisition (PBSA), the Contractor’s role is to ensure its quality through successful implementation of its Quality
Management System (QMS). Per FAR Subpart 46.4, Government PA “shall be performed at such times and places as may be necessary to determine that the supplies or services conform to contract requirements” in order to ensure payments are made only for services that meet performance standards specified in the contract.
1.2 Partnering
Effective partnering and establishing a positive relationship between the Government and the
Contractor is essential in fulfilling a performance-based requirement. The Government’s relationship with the Contractor should be one that promotes a strong and positive business alliance to achieve mutually beneficial goals, such as timely delivery and acceptance of high-quality services through the use of efficient business practices. Business relationships should seek to create a cooperative environment to ensure effective communication between the parties. Teamwork, cooperation, and good-faith performance are important for meeting mission objectives and resolving conflicts and problems. Each party should clearly understand the goals, objectives, and needs of the other. It is essential that the Government and the Contractor work together as a team to communicate expectations, agree on common goals, develop a common understanding of measurable standards, and identify and address problems early in the contract to achieve desirable outcomes.
2. Roles and Responsibilities
The Government’s key roles and responsibilities for performance assessment are as follows:
FSC Management and Facility Services (FMFS) Branch Head. The FMFS Branch Head provides direct supervision of SPARs, PARs, Spec Writers, etc assigned to the FMFS Branch. The FMFS branch head is responsible for ensuring adequate funding and staffing to support the specification development, contract management, and performance assessment function of the branch as well as all personnel management responsibilities. The COR and PAR are assigned for this contract.
Facilities Support Contract Manager (FSCM). The FSCM is the overall technical lead for the management of Facility Support Contract requirements from cradle to grave.
Contracting Officer (KO). The ACO and/or PCO assigned to the contract. The KO has final responsibility for Contractor PA per FAR Part 42—Contract Administration and Audit Services, non-conformance modifications, and unilateral determination of incentives.
Contracting Officer’s Representative (COR). The COR is responsible for monitoring the
Contractor’s technical compliance and progress based on the contract requirements specified in the
PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work.
Senior PAR (SPAR). The SPAR is responsible for coordinating efforts of multiple PARs assigned to this contract. The SPAR reviews PA schedules and PA documentation for sufficiency and consistency of oversight.
Performance Assessment Representative (PAR). The PAR is assigned as a Technical Point of
Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on Performance Assessment
Worksheets (PAWs) and the Monthly Performance Assessment Summary (MPAS), and communicates findings as necessary with the Contractor, Senior PAR (SPAR), and Contracting
Officer Representative (COR).
Note: Throughout NAVFAC policy, processes, and training, the term Performance Assessment
Representative (PAR) refers to anyone responsible for conducting assessments of a NAVFAC administered Facility Support Contract. The term PAR will be used in reference to any individual assigned as a TPOC/SME to provide support to the COR, including as a collateral duty of other
PWD or customer personnel, regardless of billet. All personnel assigned these duties must follow the guidance and direction provided to PARs.
Performance Assessment Board (PAB). The PAB is comprised of key technical and administrative personnel appointed in writing by the KO. The PAB will convene on a regular basis to review
Contractor performance documentation for the prior evaluation period, and prepare and forward a summary report of findings and recommendations to the KO. The PAB makes recommendations for
CPARS and provides input for the determination of contract incentives, if applicable. Details of
PAB membership and the process for convening the PAB are provided in paragraph 11.4 below.
3. Training
To effectively implement the PA Program, individuals who monitor the Contractor’s performance should be experienced in the annex/sub-annex areas for which they are assigned and adequately trained. Mandatory training standards for all personnel performing PA of NAVFAC contracts are specified in BMS B-14.3, Performance Assessment. Additionally, safety training requirements are detailed in BMS B-14.18, FSC Safety and training for those assigned as CORs is promulgated by
NFAS 1.602 and detailed in NAVFAC Instruction 4200.1.
CORs assigned to provide oversight of this contract must meet the applicable training requirements and must be appointed in writing by the KO per BMS S-18.3.6. PARs providing support as
TPOC/SME for the COR must meet the applicable training requirements and must be assigned in writing by per BMS S-18.3.6 and B-14.3.
4. Safety
Proper oversight of Contractor safety is an integral part of effective performance assessment. The
PAR must ensure that the Contractor is in compliance with safety requirements specified in Spec
Item 2.9 of the contract. The PAR should be present during any local Safety briefings. If the PAR observes a violation of any safety requirements by the Contractor, the PAR should:
• Report the safety hazard resulting from unsafe acts or conditions, defective tools, materials, or equipment used by the Contractor to the COR.
• When imminent danger is apparent (where, if the hazard is not immediately corrected, there is a high probability that a serious accident will occur, life will be in danger or there will be extensive property damage), immediately inform the Contractor and request immediate action is taken to correct the hazard. If the Contractor does not voluntarily take corrective action, require the Contractor to stop work and immediately notify the COR.
Further detail of safety assessment procedures is provided in paragraph 10.4.3 below.
5. Security
The PAR should become familiar with all security requirements specified in Spec Item 2.8.7 of the contract and report any observed violations to the KO.
6. Submittals
The PAR should review reports and other submittals identified in Section F to ensure they comply with applicable requirements and specifications.
6.1 Quality Management Plan Submittal
The Quality Management System Pre-Performance Review Checklist, Attachment C, should be used for the review of the Contractor’s QM Plan submittal and as a guideline for discussion of the
Contractor’s QMS during the post-award kickoff/pre-performance conference. The PAR, SPAR, Contractor Quality Manager and Project Manager, and any applicable subcontractor quality representatives should sign off on the QMS review checklist.
6.2 Accident Prevention Plan Submittal
Per BMS B-14.18, FSC Safety, the FMFS Pre-Performance Safety Checklist should be used for the review of the Contractor’s Accident Prevention Plan submittal (including Activity Hazard Analyses
(AHAs) and Occupational Risk and Compliance Plans and Programs) and as a guideline for discussion of the Contractor’s Safety Program during the post-award kickoff/pre-performance conference. The PAR should coordinate with the local command Safety Representative for assistance in review of Contractor’s APP. The PAR, SPAR, Contractor Site Safety and Health
Officer (SSHO) and Project Manager, and any applicable subcontractor safety representatives should sign off on the Safety review checklist. The Contractor must submit and have an approved APP before any work may begin on site. Additionally, new or revised AHAs must be submitted and reviewed at the beginning of each work phase, when new hazards are identified, or when a new work crew is brought on site.
7. Meetings
The PAR should attend and be prepared for required meetings, including partnering sessions. The
PAR should be familiar with the Spec Items in Annex 2 titled “Required Conferences and Meetings” and “Partnering.” The FSC Partnering process is addressed in BMS B-14.16.
8. Methods of Assessment (MOA)
The PAR will periodically assess services for conformance to contract performance objectives and standards using the following MOAs:
• Periodic Sampling (PS) – requires a pre-determined plan for assessing a portion of the work, using sample size and frequency at the applicable assessment level.
• Validated Customer Comments (VCC) – consists of customers observing the performance of services they have received and using a pre-determined procedure to provide feedback and/or report observations to the PAR for validation.
• Unscheduled Visits (UV) – impromptu assessments of performance standards and objectives whenever practical.
• Customer’s Evaluation (CE) – consists of collected survey data of Contractor performance from the customer’s perspective through the use of a feedback form.
The MOAs used for assessment of each performance objective and standard are identified within the
FAP included in Attachment A.
9. Quality Management System (QMS)
When the Government’s assessment of the Contractor’s performance reveals that the quality management efforts are not effective in ensuring performance objectives and standards are achieved, further action is required. The PAR will conduct a review of the Contractor’s QMS processes and quality inspection and surveillance records for the work item(s) where deficiencies are noted to validate the accuracy and effectiveness of the Contractor’s QMS.
For QMS to be considered acceptable, the Contractor must demonstrate to the Government through quality management and QC corrective and preventive actions that the risk of failure to meet performance standards has been satisfactorily mitigated.
Further detail of the QMS review process is provided within the assessment procedures in paragraph
10.4 below.
10. Performance Assessment Process
10.1 Post-Award Planning
Performance Assessment personnel should review and understand the final contract requirements, including any amendments made during the solicitation period, paying particular attention to performance objectives and standards and any changes in the scope of work. Performance
Assessment personnel should also review the Contractor’s technical proposal received in response to the solicitation and initial submittals, such as the QMS program (including Quality Management
Plan), Accident Prevention Plan (including Activity Hazard Analyses (AHAs) and Occupational
Risk and Compliance Plans and Programs), list of key personnel and employee listing.
Performance Assessment personnel should also meet with customer representatives to review details of the contract and discuss the process for reporting and handling of customer comments and review the contract requirements for partnering and the process described in BMS B-14.16, FSC Partnering, to be prepared for these meetings.
10.2 Scheduling Assessments
Performance Assessment personnel should develop a planned assessment schedule based upon factors such as selected MOAs, Contractor’s recurring performance schedule, population of work, and local priorities and conditions. Certain work requirements may necessitate increased assessment based on performance risk considerations, e.g., services that are mission critical or have life safety impacts. Increased assessment may be conducted by adding AL2 or AL3 assessments or by targeting specific samples during routine AL1 assessment. Risk is measured based on two things:
the likelihood (or probability) and event will occur and the consequence (or impact) if the event does occur.
The FAP, Attachment A, along with the starting point for assessments based on risk determination should be compared against the Contractor’s work schedules as applicable to develop the initial assessment schedule. This schedule may be adjusted when required based on Contractor performance as detailed within the assessment procedures in paragraph 10.4 below.
10.3 Non-recurring Task Orders
Non-recurring Task Orders (TO) require 100% assessment. This means that all TOs must be verified as satisfactorily complete prior to payment. For EMALL Task Orders, verification is performed by the customer through the validation of the credit card payment and acceptance in
EMALL. EMALL orders that involve high-risk evolutions will be indicated as “HIGH RISK” in the
EMALL short description. The customer must notify the COR by email or phone immediately upon ordering a high-risk Non-recurring TO. The COR will schedule appropriate safety oversight for these evolutions. For all other Non-recurring TOs, validation is the responsibility of PA personnel.
Scheduling of assessments must be planned based on the nature of the work (i.e. simple, short duration tasks performed at a single location vs. complex work performed over a longer period at multiple locations) and added to the assessment schedule after TO award.
10.4 Assessment Procedures
Every assessment must be documented on a Performance Assessment Worksheet (PAW) using the form provided in Attachment B. The assessment procedures based on the scheduled level of assessment performed are detailed below.
10.4.1 AL1 Assessments
The flowchart in Figure 1 below and corresponding descriptions shown below detail the performance assessment process used by the PAR to observe, assess, and document Contractor’s performance for
2-digit Spec Items (AL1).
Figure 1. Performance Assessment Process for Assessment Level 1 (AL1)
Step 1: Assess Performance at AL1 – This is the typical starting point of assessment. Assess the
Contractor’s performance using the MOA, frequencies, and sample sizes indicated at AL1 of the
FAP. The starting point may include additional PA at lower assessment levels for mission critical, safety, or environmental related services as determined based on the risk assessment performed during post-award planning. A Performance Assessment Worksheet (PAW) must be used for each assessment indicating this is an AL1 assessment. A PAW is the form used to document and report
Government observations and rate Contractor performance.
Step 2: Defect(s) Found – The PAR should evaluate the Contractor’s performance of work looking for both failures to comply with performance objectives and standards as well as instances of valueadded services or work that exceeds performance standards. Any observation of work that fails to meet any of the specified performance standards will be documented as a defect. Instances of nonconforming work discovered during unscheduled visits (UV) should also be documented as defects. Where customer comments are received (VCC), all alleged defects must be evaluated within a reasonable time to validate that the performance standards were not met. Documentation will be completed using the Customer Comment Record, Attachment D. Documentation of UVs will be completed on a PAW. DECISION: If a defect is found, continue. If not, jump to Step 12.
Step 3: Document and Notify Contractor – Document any observed negative performance that fails to meet contract performance standards with supporting narrative on the Performance Assessment
Worksheet (PAW). If defects are found, the PAR will forward a copy of the PAW to the Contractor.
The Contractor shall sign and return the PAW within the specified timeframe to acknowledge receipt of the document. The Contractor’s signature does not constitute agreement with the Government’s assessment, it merely acknowledges that the Contractor has been notified of a Government observed defect. Should the Contractor disagree with the Government’s observations, discussions should be conducted to reach a common understanding of performance objectives and standards.
Step 4: Rework if Necessary – In the case of unsatisfactory or non-performed work, the
Government may, at its option, allow the Contractor an opportunity to correct by reperformance at no additional cost to the Government. Rework shall be completed within the timeframe specified in
Section E, Consequences of Contractor’s Failure to Perform Required Services clause of the contract.
Step 5: Defect(s) Warrant Evaluation of QMS? – Defects warrant evaluation of QMS if: 1) they are
“Significant”, 2) a “Trend” has been established, or 3) the work is not considered “Substantially
Complete”. Significant defects include the Contractor’s failure to meet performance objectives and standards that result in damage to the Government, or incomplete major or critical work items.
Significant defects are subjective and should be discussed in initial partnering sessions with the
Contractor. Trends are defects that may be considered minor but are recurring and have not been corrected through the Contractors QMS. Trends are typically defects found in the same or similar work requirements repeated consistently over several periods of the assessment frequency.
Substantially complete means that the performance standard is fully met except for minor or trivial non-conformances per FAR 46.407. A service will be judged to be fully conforming to the contract performance standards if the nonconformance is minor or trivial and there is no omission of essential work, and approximately 95% of the total work (population) assessed meets the performance standard. Substantial completion can be measured based on the total work requirement being assessed or based on any one element of work performance. DECISION: If QMS evaluation is warranted, continue. If not, jump to Step 14.
Step 6: Evaluate QMS – The PAR should evaluate the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .