J-0200000-06 ELINs Proposal SS 22R2527.pdf

PDF 570 KB Posted

Attached to
Regional Maintenance & Repair Railroad Trackage
Solicitation number
N40085-22-R-2527
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

A001AA Service Orders, Spec Item 3.1 30 EA -$

A001AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$

A001AC Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Item 3.3

12 EA -$

A001AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

A001AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

A001AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

A001AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT A -CLIN 0001

TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE

TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AA THROUGH A001AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AF THROUGH A001AG

CLIN 0002 NON-RECURRING/IDIQ - BASE YEAR

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - B002AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA $ -

B002AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

B002AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

B002AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

B002AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

B002AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

B002AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

B002AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

B002AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

B002AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

B002AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA $ -

B002AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

B002AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

B002AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

B002AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -

B002AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

B002AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AA THROUGH B002AT

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

B002AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

B002AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

B002AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

B002AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

B002AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

B002BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

B002BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

B002BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

B002BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

B002BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

B002BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

B002BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AU THROUGH B002BG

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG

J-0200000-06

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

B002BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

B002BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

B002BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

B002BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

B002BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

J-0200000-06

TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AU through B002BG

TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG

EXHIBIT B -CLIN 0002

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002BH THROUGH B002BM

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002BH through B002BM

CLIN 0003 RECURRING/FIRM-FIXED PRICE - FIRST OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

C003AA Service Orders, Spec Item 3.1 30 EA -$

C003AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$

C003AC Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Item 3.3

12 EA -$

C003AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

C003AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0003 RECURRING/FIRM-FIXED PRICE -FIRST OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

C003AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

C003AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT C -CLIN 0003

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AA THROUGH C003AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS C003AF THROUGH C003AG

TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE

TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG

CLIN 0004 NON-RECURRING/IDIQ - FIRST OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - D004AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA $ -

D004AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

D004AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

D004AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

D004AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

D004AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

D004AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

D004AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

D004AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

D004AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA $ -

D004AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

D004AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

D004AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

D004AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -

D004AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

D004AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT D -CLIN 0004

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT

SOLICITATION/CONTRACT N40085-22-R-2527

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AA THROUGH D004AT

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

D004AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

D004AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

D004AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

D004AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

D004AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

D004BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

D004BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

D004BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

D004BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

D004BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

D004BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

D004BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

SOLICITATION/CONTRACT N40085-22-R-2527

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT D -CLIN 0004

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004AU THROUGH D004BG

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

D004BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

D004BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

D004BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

D004BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

D004BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

EXHIBIT D -CLIN 0004

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL RECURRING PRICE/FFP FIRST OPTION ELINS C003AA through C003AE

EXHIBIT LINE ITEM NUMBERS

TOTAL RECURRING PRICE/FIRST OPTION ELINS C003AF through C003AG

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS D004BH THROUGH D004BM

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AU through D004BG

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004BH through D004BM

TOTAL NON-RECURRING PRICE/IDIQ FIRST OPTION ELINS D004AA through D004AT

CLIN 0005 RECURRING/FIRM-FIXED PRICE -SECOND OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

E005AA Service Orders, Spec Item 3.1 30 EA -$

E005AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$

E005AC Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Item 3.3

12 EA -$

E005AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

E005AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0005 RECURRING/FIRM-FIXED PRICE - SECOND OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

E005AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

E005AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

-$ TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT E -CLIN 0005

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AA THROUGH E005AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS E005AF THROUGH E005AG

TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE

CLIN 0006 NON-RECURRING/IDIQ - SECOND OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - F006AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA $ -

F006AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

F006AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

F006AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

F006AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

F006AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

F006AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

F006AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

F006AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

F006AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

D004AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA $ -

F006AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

F006AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

F006AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

F006AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -

F006AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

F006AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT F -CLIN 0006

J-0200000-06

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AA THROUGH F006AT

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

F006AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

F006AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

F006AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

F006AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

F006AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

F006BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

F006BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

F006BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

F006BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

F006BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

F006BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

F006BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG

SOLICITATION/CONTRACT N40085-22-R-2527

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006AU THROUGH F006BG

EXHIBIT F -CLIN 0006

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

F006BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

F006BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

F006BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

F006BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

F006BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AU through F006BG

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006AA through F006AT

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS F006BH THROUGH F006BM

TOTAL RECURRING PRICE/SECOND OPTION ELINS E005AF through E005AG

TOTAL RECURRING PRICE/FFP SECOND OPTION ELINS E005AA through E005AE

EXHIBIT F -CLIN 0006

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM

TOTAL NON-RECURRING PRICE/IDIQ SECOND OPTION ELINS F006BH through F006BM

CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

G007AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$

G007AC Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Item 3.3

12 EA -$

G007AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

G007AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0007 RECURRING/FIRM-FIXED PRICE - THIRD OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

G007AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA -$

G007AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT LINE ITEM NUMBERS

TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG

TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE

J-0200000-06

EXHIBIT G -CLIN 0007

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AA THROUGH G007AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS G007AF THROUGH G007AG

CLIN 0008 NON-RECURRING/IDIQ - THIRD OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - H008AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA $ -

H008AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

H008AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

H008AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

H008AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

H008AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

H008AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

H008AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

H008AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

H008AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

H008AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA $ -

H008AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

H008AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

H008AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

H008AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -

H008AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

H008AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT H -CLIN 0008

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AA THROUGH H008AT

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

H008AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

H008AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

H008AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

H008AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

H008AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

H008BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

H008BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

H008BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

H008BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

H008BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

H008BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

H008BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

SOLICITATION/CONTRACT N40085-22-R-2527

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT H -CLIN 0008

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008AU THROUGH H008BG

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

H008BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

H008BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

H008BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

H008BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

H008BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

EXHIBIT H -CLIN 0008

TOTAL RECURRING PRICE/FFP THIRD OPTION ELINS G007AA through G007AE

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AU through H008BG

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008AA through H008AT

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H080BM

TOTAL NON-RECURRING PRICE/IDIQ THIRD OPTION ELINS H008BH through H008BM

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL RECURRING PRICE/THIRD OPTION ELINS G007AF through G007AG

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS H008BH THROUGH H008BM

CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue Unit Price Total

J009AA Service Orders, Spec Item 3.1 30 EA -$

J009AB Emergency Service Orders, Spec Item 3.1.1 30 EA -$

J009AC Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Item 3.3

12 EA -$

J009AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J009AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI -$

CLIN 0009 RECURRING/FIRM-FIXED PRICE - FOURTH OPTION

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

(CHERRY POINT)

Estimated Quantity

Unit of Issue Unit Price Total

J009 J009AF Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Items 3.3

12 EA -$

J009AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA -$

J-0200000-06

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AF THROUGH J009AG

Railway, Spec Item 3

TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT J -CLIN 0009

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS J009AA THROUGH J009AE

TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG

CLIN 0010 NON-RECURRING/IDIQ - FOURTH OPTION

ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total K010AA Unit-Priced Labor - NTE 400 HRS 400 HR $ - K010AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA $ -

K010AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the price to perform per track foot.

10,000 TF $ -

K010AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF $ -

K010AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON $ -

K010AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA $ -

K010AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF $ -

K010AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF $ -

K010AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA $ -

K010AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA $ -

K010AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA $ -

K010AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA $ -

K010AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA $ -

K010AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF $ -

K010AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF $ -

K010AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA $ -

K010AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA $ -

K010AT Disposal Fees For Used Cross and Switch Ties 7120 EA $ -

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AA THROUGH K010AT

EXHIBIT K -CLIN 0010

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT

ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total K010AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & supervision to install/replace bolts. Unit price is the price to perform per bolt.

100 EA $ -

K010AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA $ -

K010AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision to install/replace pair compromise joint bars. Unit price is the price to perform per pair compromise joint bar.

1 EA $ -

K010AX Insulated Joint - Labor, material, equipment, & supervision to install/replace an insulated joint. Unit price is the price to perform per insulated joint.

2 EA $ -

K010AY Replace Switch Stand - Labor, material, equipment, & supervision to replace a switch stand. Unit price is the price to perform per switch stand.

1 EA $ -

K010AZ Repair Switch Stand - Labor, material, equipment, & supervision to repair a switch stand. Unit price is the price to perform per switch stand. 4 EA $ -

K010BA Repair Switch Point Insert - Labor, material, equipment, & supervision to repair a switch point insert. Unit price is the price to perform per switch point insert.

4 EA $ -

K010BB Repair Switch Points by Welding - Labor, material, equipment, & supervision to repair switch points by welding. Unit price is the price to perform per switch point.

2 EA $ -

K010BC Switch Plates & Gage Plates - Labor, material, equipment, & supervision to install/replace switch plates and gage plates. Unit price is the price to perform per plate.

1 EA $ -

K010BD Install Rail Stops - Labor, material, equipment, & supervision to install rail stops. Unit price is the price to perform per rail stop.

2 EA $ -

K010BE Remove Existing Asphalt - Labor, material, equipment, & supervision to remove existing asphalt. Unit price is the price to perform per cubic yard of asphalt.

20 CY $ -

K010BF Place Asphaltic Concrete (Includes Prime Coat) - Labor, material, equipment, & supervision to place asphaltic concrete. Unit price is the price to perform per ton of asphalt.

40 TON $ -

K010BG Stabilized Aggregate - Labor, material, equipment, & supervision to place stabilized aggregate. Unit price is the price to perform per ton of stabilized aggregate.

20 TON $ -

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010AU THROUGH K010BG

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG

SOLICITATION/CONTRACT N40085-22-R-2527

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

EXHIBIT K -CLIN 0010

ELIN/Sub Description -1502000 Facility Investment Estimated Unit of Issue Unit Price Total K010BH Install New Derails - Labor, material, equipment, & supervision to install new derails. Unit price is the price to perform per derail.

1 EA $ -

K010BJ Guard Rails - Labor, material, equipment, & supervision to install/replace guard rails. Unit price is the price to perform per guard rail.

1 EA $ -

K010BK Tree Removal - Labor, material, equipment, & supervision to perform tree removal. Unit price is the price to remove per tree.

500 EA $ -

K010BL Soil Stabilization - Labor, material, equipment, & supervision to perform soil stabilization. Unit price is the price to perform per cubic yard of soil. 200 CY $ -

K010BM Replace Sign - Labor, material, equipment, & supervision to replace a sign. Unit price is the price to perform per sign.

24 EA $ -

$ - TOTAL CONTRACT VALUE (BASE, OPTION YEAR 1, OPTION YEAR 2, OPTION YEAR 3, OPTION YEAR 4)

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AA through K010AT

TOTAL RECURRING PRICE/FOURTH OPTION ELINS J009AF through J009AG

TOTAL RECURRING PRICE/FFP FOURTH OPTION ELINSJ009AA through J009AE

EXHIBIT K -CLIN 0010

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010AU through K010BG

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS K010BH THROUGH K010BM

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM

TOTAL NON-RECURRING PRICE/IDIQ FOURTH OPTION ELINS K010BH through K010BM

CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE)

Estimated Quantity

Unit of Issue

A001AA Service Orders, Spec Item 3.1 30 EA

A001AB Emergency Service Orders, Spec Item 3.1.1 30 EA A001AC Monthly Inspections and Associated Preventative Maintenance &

Repair, Spec Item 3.3

12 EA

A001AD Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA

A001AE Annual Tree and Vegetation Control, Spec Item 3.4 34 MI

CLIN 0001 RECURRING/FIRM-FIXED PRICE - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage

Estimated Quantity

Unit of Issue

A001AF Monthly Inspections and Associated Preventative Maintenance & Repair, Spec Items 3.3

12 EA

A001AG Inspections and Associated Preventative Maintenance & Repair of Crossing Signals, performed every two weeks, Spec Item 3.3.4.1

26 EA

CLIN 0002 NON-RECURRING/IDIQ - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue

B002AA Unit-Priced Labor - NTE 400 HRS 400 HR

B002AB Material Costs - Provide all materials beyond the requirements of unit priced task work per the scope and deliver schedule specified in the order. See Annex 0200000 Spec Items 2.14, 2.14.1, and 2.14.2 - NTE $50,000

50,000 EA

B002AC Vertical & Horizontal Alignment - Labor, material, equipment, & supervision to perform vertical & horizontal alignment. Unit price is the

10,000 TF

B002AD Regage - Labor, material, equipment, & supervision to regage the track.

Unit price is the price to perform per track foot.

200 TF

B002AE Ballast - Labor, material, equipment, & supervision to add ballast where needed. Unit price is the price to perform per ton of ballast.

200 TON

B002AF Gauge Rods - Labor, material, equipment, & supervision to install/replace gauge rods. Unit price is the price to perform per gauge rod.

20 EA

NON-RECURRING WORK UNIT PRICES FOR NON-RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 4 ELINS B002AA THROUGH B002AT

EXHIBIT B -CLIN 0002

J-0200000-06

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT N40085-22-R-2527

EXHIBIT A -CLIN 0001

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AA THROUGH A001AE

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL RECURRING PRICE/FFP BASE YEAR ELINS A001AA through A001AE

RECURRING WORK UNIT PRICES FOR RECURRING WORK IN ACCORDANCE WITH ANNEX 1502000, SPEC ITEM 3 ELINS A001AF THROUGH A001AG

TOTAL RECURRING PRICE/BASE YEAR ELINS A001AF through A001AG

B002AG Cribbing for Cross Ties - Labor, material, equipment, & supervision for cribbing for cross ties. Unit price is the price to perform per track foot. 95 TF

B002AH Cribbing for Switch Ties - Labor, material, equipment, & supervision for cribbing for switch ties. Unit price is the price to perform per track foot. 20 TF

B002AJ Rail Web Bond for Standard Joints - Labor, material, equipment, & supervision to install/replace rail web bond for standard joints. Unit price is the price to perform per joint.

35 EA

B002AK Rail Web Bond for Frogs - Labor, material, equipment, & supervision to install/replace rail web bond for frogs. Unit price is the price to perform per frog.

4 EA

B002AL Cross Ties - Labor, material, equipment, & supervision to install/replace cross ties. Unit price is the price to perform per cross tie. 7000 EA

B002AM Cross Ties - (PLASTIC COMPOSITE TIES-CHERRY POINT ONLY)- Labor, material, equipment, & supervision to install/replace cross ties.

Unit price is the price to perform per cross tie. 400 EA

B002AN Switch Ties - Labor, material, equipment, & supervision to install/replace switch ties. Unit price is the price to perform per switch tie.

120 EA

B002AP Straighten Skewed Ties - Labor, material, equipment, & supervision to straighten skewed ties. Unit price is the price to perform per track foot. 200 TF

B002AQ Install Rail - Labor, material, equipment, & supervision to install rail.

Unit price is the price to perform per track foot.

156 TF

B002AR Install Rail Anchors - Labor, material, equipment, & supervision to install rail anchors. Unit price is the price to perform per rail anchor. 200 EA

B002AS Install Spikes - Labor, material, equipment, & supervision to install spikes. Unit price is the price to perform per spike.

200 EA

B002AT Disposal Fees For Used Cross and Switch Ties 7120 EA

CLIN 0002 NON-RECURRING/IDIQ - BASE YEAR

ELIN/Sub

ELIN

Description -1502000 Facility Investment Maintenance and Repair Railroad Trackage (CAMP

LEJEUNE & CHERRY POINT)

Estimated Quantity

Unit of Issue

B002AU Bolts (Including Nuts and Washers) - Labor, material, equipment, & 100 EA B002AV Joint Bars - Labor, material, equipment, & supervision to install/replace joint bars. Unit price is the price to perform per joint bar. 4 EA

B002AW Pair Compromise Joint Bars - Labor, material, equipment, & supervision 1 EA

EXHIBIT B -CLIN 0002

SOLICITATION/CONTRACT N40085-22-R-2527

TOTAL NON-RECURRING PRICE/IDIQ BASE YEAR ELINS B002AA through B002AT

J-0200000-06

NON-…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .