This amendment modifies a solicitation for design-bid-build services for range improvements and modernization at the Marine Corps Recruit Depot in Parris Island, South Carolina. The scope of work includes constructing a new rifle range and associated support buildings at the same location as an existing range. Support facilities will include target storage, a control house, and toilet buildings constructed of concrete or masonry with stucco exteriors. Earth berms will be constructed for backstops and side containment, along with retaining walls, safety side walls, and acoustic side walls. Installation will include target operation equipment, benches, and other range infrastructure. This amendment provides updated submission requirements for corporate experience evaluation factors and reserves a line item previously described as payment for removed timber.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0007 Rev - Attachment E - Price Proposal Form.pdf PDF
Amendment 0006 - P405 Revised Final Bldg HAZMAT Reports.pdf PDF
AMENDMENT 0006.pdf PDF
1641320Amend0006 spc 04 20 00 33 40 00.pdf PDF
1641320Amend0006dwg CIVIL.pdf PDF
1641320Amend0006dwg STRUCT.pdf PDF
Amendment 0006 - P405 Geotechnical Investigation Report Rev 4.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
1641320Amend0004dwg_CIVIL.pdf PDF
Amendment 0003 - P405 ACAD.zip ZIP file
AMENDMENT 0003.pdf PDF
Amendment 0002 - eOMSI FDW-Nov2020.xlsx XLSX spreadsheet
AMENDMENT 0002.pdf PDF
Amendment 0002 - Site Visit Roster.jpg JPG image
AMENDMENT 0001 - PROJECT TABLE OF CONTENTS.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
1641320dwg02of07.pdf PDF
1641320dwg03of07.pdf PDF
1641320dwg01of07.pdf PDF
1641320dwg05of07.pdf PDF
N4008521R2531.pdf PDF
1641320dwg06of07.pdf PDF
Attachment D - SBSP (FinalTemplate) Jan2021.doc DOC document
Attachment A - PPI Inquiry Log.doc DOC document
Attachment C - Past Performance Questionnaire.docx DOCX document
1641320dwg04of07.pdf PDF
Attachment B - Construction Experience Data Sheet.docx DOCX document
1641320spc01of01.pdf PDF
1641320dwg07of07.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-21-R-2531 - DESIGN-BID-BUILD, P-405 RANGE IMPROVEMENTS AND MODERNIZATIONS, PHASE 3, MARINE

CORPS RECRUIT DEPOT, PARRIS ISLAND, SOUTH CAROLINA

The purpose of this Amendment is to issue discussion questions and to include an updated Price Proposal Form as w ell as the Solicitation Submittal Requirements for Factor 1 - Corporate Experience.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Dec-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2531

X 9B. DATED (SEE ITEM 11)

04-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Dec-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R2531

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

The purpose of this amendment is to provide updated Solicitation Submittal Requirements in Factor 1 – Corporate Experience. Revised Factor 1 – Corporate Experience (revisions shown in bold italic text).

F. EVALUATION FACTORS FACTOR AWARD

(1) Factor 1, Corporate Experience:

(i) Solicitation Submittal Requirements:

The offeror shall submit the following information:

Submit a minimum of one (1) to a maximum of five (5) relevant construction projects that best demonstrates your experience on projects that are similar in Size, Scope, and Complexity as detailed below. The Government will not consider more than five (5) projects and will review only the first five (5) projects if more are submitted.

For purposes of this evaluation, a relevant project is further defined as:

Size: A final project cost of $10,000,000 or greater.

Scope: New construction or renovation of an outdoor Federal Government distance range or outdoor military known distance range with related support facilities including, but not limited to, target storage buildings and bathrooms.

Complexity: Experience with impact berm construction and stabilization, and experience installing pile supported walls.

SECTION 00 10 00 - SOLICITATION

CLIN 0007

The CLIN description has changed from Bid Option Item No. 6 to RESERVED.

The CLIN extended description has changed from:

Payment to the United States Treasury- Forestry Account for marketable timber to be removed from the P-405 new construction site.

To:

N4008521R2531

For possible post-award use.

The unit of issue Each has been deleted.

The option status has changed from Option to No Status.