This amendment modifies a solicitation for design-build construction services to improve and modernize a rifle range at the Marine Corps Recruit Depot in Parris Island, South Carolina. The scope of work includes constructing a new known distance rifle range and associated support buildings in the same location as an existing range. Support buildings will be concrete or masonry structures and include facilities for target storage, a control house, and toilets. Earthworks will construct target area berms, retaining walls, safety walls, and a bullet impact berm with retaining walls. Built-in equipment comprises benches, target numbers and lifters, flag poles, and firing line benches. The amendment provides responses to contractor questions, revises drawings, and clarifies contract details. The proposal due date remains September 16, 2021.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007 Rev - Attachment E - Price Proposal Form.pdf PDF
Amendment 0006 - P405 Revised Final Bldg HAZMAT Reports.pdf PDF
AMENDMENT 0006.pdf PDF
1641320Amend0006 spc 04 20 00 33 40 00.pdf PDF
1641320Amend0006dwg CIVIL.pdf PDF
1641320Amend0006dwg STRUCT.pdf PDF
Amendment 0006 - P405 Geotechnical Investigation Report Rev 4.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
1641320Amend0004dwg_CIVIL.pdf PDF
Amendment 0003 - P405 ACAD.zip ZIP file
AMENDMENT 0003.pdf PDF
Amendment 0002 - eOMSI FDW-Nov2020.xlsx XLSX spreadsheet
Amendment 0002 - Site Visit Roster.jpg JPG image
AMENDMENT 0001 - PROJECT TABLE OF CONTENTS.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
1641320dwg02of07.pdf PDF
1641320dwg03of07.pdf PDF
1641320dwg01of07.pdf PDF
1641320dwg05of07.pdf PDF
N4008521R2531.pdf PDF
1641320dwg06of07.pdf PDF
Attachment D - SBSP (FinalTemplate) Jan2021.doc DOC document
Attachment A - PPI Inquiry Log.doc DOC document
Attachment C - Past Performance Questionnaire.docx DOCX document
1641320dwg04of07.pdf PDF
Attachment B - Construction Experience Data Sheet.docx DOCX document
1641320spc01of01.pdf PDF
1641320dwg07of07.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-21-R-2531 - DESIGN-BID-BUILD, P-405 RANGE IMPROVEMENTS AND MODERNIZATIONS, PHASE 3, MARINE

CORPS RECRUIT DEPOT, PARRIS ISLAND, SOUTH CAROLINA

The purpose of this amendment is to provide responses to Pre-Proposal Inquiries, the eOMSI spreadsheet and the Site Visit roster.

The proposal due date of 16 September 2021 NLT 2:00 PM EDT remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2531

X 9B. DATED (SEE ITEM 11)

04-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R2531

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

CONTINUATION PAGES

SPECIFICATIONS

03 30 30 CAST-IN-PLACE CONCRETE

2.4.6 Vapor Retarder and Vapor Barrier

Delete the first paragraph.

DRAWINGS

NAVFAC Dwg.

No.

A-E Dwg. No. Addition / Revision / Clarification

12832227

SF103 TARGET STORAGE FOUNDATION PLAN

Revision: The notation “SOG6” is changed to read “CS18”in front of the building.

12832229

12832237

SB101

S304:

A1/S304, A2/S304, A3/S305

NORTH SIDE SAFETY WALL PLAN

SIDE SAFETY WALL SECTIONS

Clarification: Reference to footing details and sizes is correct. At the Contractor’s option the footing size referenced in A1/S304 can be used for A2/S304 and A3/S04.

12832238

S305:

C3/S305

C4/S305

TARGET BERM WALL SECTIONS

Revision: C3 – Add dowels, #7 @ 4”O.C. to complete the dimension string.

Revision: C4 – Add dowels, #7 @ 6”O.C. to complete the dimension string.

S305

Clarification: At the Target Platform wall provide #4 @ 12” O.C. for both vertical and horizontal reinforcing

12832230

SB102

S305:

A2/S205

TARGET BERM RETAINING WALL PLAN

Clarification: Elevation 11.7 references the front edge of the platform.

12832239

S306:

C3/S306

IMPACT BERM FRONT WALL SECTIONS

Clarification: The footing thickness is 1’-4”, not 2’-0”.

12832231

SB103

IMPACT BERM FRONT RETAINING WALL PLAN

Clarification: The Top of Footing (TOF) elevation should be 6.00 throughout.

SB103:

C3/SB103

S306

Clarification: Top of wall in A4/SB103 is also sloped (see elevations on A1/S-306).

SB103:

C3/SB103

B3/S307

IMPACT BERM REAR WALL SECTIONS

Clarification: The section cut is correct but is similar. C3/SB103 is the connector wall between the rear and front impact wall and is the same detail as the rear impact wall but without the Sacon wall

S306

C3/S306

IMPACT BERM FRONT WALL SECTIONS

Clarification: The dimension string references the two different bar sizes. The #7 @ 4" o.c. length shall be calculated for the lap distance of 48" as shown in the Lap Schedule on S-004.

S302

Clarification: A3 column size is 18”.

12832233

SB105:

B1/SB105

IMPACT BERM WALL ELEVATION

Clarification: One Sacon column indicated as W24x24 should be W12x36.

SB105:

C5/S308

IMPACT BERM WALL ELEVATION

Clarification: Columns should be W12x35 where indicated as W12x30

SB105: IMPACT BERM WALL ELEVATION

Clarification: The SACON supplier shall provide steel strapping, clips and bolts for attachment.

PRE-PROPOSAL INQUIRY RESPONSES

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

1 SF1442 10 n/a Is there any way we can get an index/table of contents for the solicitation? Also, please check your email address on the 1442. It has a period between the u and the s in us.navy.mil.

Provided with Amendment 0001.

Contract Specialist POC is Brittany Cristelli at brittany.cristelli.civ@us.navy.mil

2 SS 03 30

1.8.2 n/a There is no location indicated for FSC lumber to be used on this project therefore it is our interpretation that FSC lumber is not applicable to this project. Please confirm and/or clarify.

Timber may be used for formwork for the concrete as well as on some of the civil details. Major items include firing line benches, utility emplacement protection and target line benches.

3 n/a n/a CD102 Keynote 127 notes demo on a waterline that was not found during P404 construction.

The water main segment between the two values to be removed per keynote 127 is a line currently being built as part of the Hue City utility construction plans. During Chosin construction this segment needs to be removed per Keynote 127 to accommodate one of the pit head storage buildings.

Chosin utility plans have a new water line running around the pit head and storage building to reconnect this pipe. Please follow the guidance in Keynote 127 which calls for the demo of the Hue City water main between the two Hue City valves.

4 SS 03 30

2.4.6 n/a There are 2 thicknesses of vapor barrier specified however there is no indication of which one is to be used where. It is our interpretation that we can use the 10 mil vapor barrier under all slab on grades and that the 15 mil vapor barrier is not applicable to this project. Please confirm and/or clarify.

Disregard the 10 mil and use 15 mil under the slabs

5 00 21 16 - Instructions to Proposers

Factor 1.

Corporate Experience n/a Corporate Experience requirements for relevant projects state that projects submitted shall be completed within ten year prior to the date of issuance of the RFP. Please consider revising this language to be shall be at least 75% complete prior to submission of the proposal. We are currently performing construction on the P-404 Range

Propose per RFP.

Improvements and Modernization, Phase 2 project, and due to permitting delays, the completion date has been pushed back to November of 2021.

The original completion date was prior to issuance of the RFP, and the project would have been complete if not for the permitting delays that occurred early in the project.

We have received an interim CPARS that illustrates past performance, and as of the issuance of the RFP are approximately 90% complete by contract duration. Please consider revising the language in the RFP to allow submission of this project as evidence of Corporate Experience and Past Performance.

6 SF103,

C1/S302, SF101 &

SF102

Target Storage Building. SF103 foundation plan shows a CS18 18" SOG under the building walls and a SOG6 6" SOG out in front of the building entrance way.

C1/S302 shows an 18" SOG under the building walls and out in front of the building entrance way (no 6" SOG).

The pit heads on SF101 and SF102 call for the CS18 18" SOG under building walls and out in front of the building

The SOG out in front should be 18" thick (not 6" thick) entrance way (no 6" SOG). Please clarify.

7 SB101

and S304

Reference page Zone D2 in upper left corner. The bent section of foundation and wall show sections A1, A2 and A3/S304. These sections all have different footing widths designated.

The referenced footings on SB101 scale out as 14'00 which corresponds to Section A1/S304. It is our interpretation that the bent section should reference only Section A1/S304.

Please confirm and/or clarify

Structurally the footings can change size at the control joints as shown in the details. If it is better for construction, it is acceptable to use A1/S304 throughout this area

8 S-305, Sections C3 & C4

Both sections reference "vertical reinforcing varies, see dimension string". Where is this dimension string shown? What is the vertical reinforcing on the outside face of target berm wall below the #5's @ 4" OC at C3 and #5's @ 6" OC at C4? This reinforcing is not indicated.

There is a missing rebar callout string. C3 dowels should be #7 @4" o.c. and C4 dowels should be #7 @ 6" o.c.

9 A2/S305 What size rebar and spacing is required in the Target Platform support wall? We are figuring #4's @ 12" OC for both vertical and horizontal

#4 @ 12" o.c. is correct for both the vertical and horizontal reinforcing reinforcing. Confirm and/or clarify

10 SB102,

A2/S305

Shouldn't the T/FTG EL 11.70 in Plan View A/SB102 read T/Platform EL 11.70? Confirm and/or clarify.

Correct - the 11.7 references the front edge of the platform

11 S306, C1/S306, C3/S306

Reference C1 and C3. C1 shows footing thickness as 16" while C3 shows footing thickness as 2'0. It is our interpretation that the footing thickness is 16" per C1. Please confirm and/or clarify.

The 2-0" should be 1'-4"

12 SB103 A4 shows the skewed wall with a TOF elevation of

6.00 and then the straight wall at 7.67.

A3 which is a continuation of A4 only shows the TOF as being 6.00 and no step footing is defined. It is our interpretation that all of the Front Impact Berm TOF is to be

6.00. Please

confirm and/or clarify.

The TOF elevation should be

6.00 throughout

13 SB103,

S306

Please confirm that the skewed wall section in A4/SB103 is supposed to be sloped like that as shown in A1/SB103.

Based on the site conditions, the skewed sections are different and are to be as shown on the drawing

14 C3/SB103 B3/S307 cut thru C3/SB103 is incorrect. B3/S307 is for the rear impact wall not the front impact wall. Please provide correct section cut.

The section cut is correct.

C3/SB103 is the connector wall between the rear and front impact wall and is the same detail as the rear impact wall

15 C3/S306 C3/S306 states "vertical reinforcing varies, see dimension string". Where is this dimension string shown? Provide dimensions for the #7 and #4 vertical reinforcing on the berm side. This dimension is not indicated.

The dimension string references the two different bar sizes. The #7 @ 4" o.c. length shall be calculated for the lap distance of 48" as shown in the Lap Schedule on S-004.

16 S306 B1 calls for 18" column while A3 calls for 16" column.

Clarify correct size.

Column sizes are 18" (the reference should be S-302, not S- 306)

17 B1/SB105 There is one Sacon Column sized as W24x24. Shouldn't it be a W12x26?

Please clarify and/or confirm.

W24X24 is incorrect. This should be a W12X26.

18 SB105

and C5/S308

SB105 shows Sacon Columns as W12x26 and W12x35.

C5/S308 shows the Sacon Columns as W12x26 and W12x30. Shouldn't the Sacon Columns be as sized on SB105 as W12x26 and W12x35? Please confirm and/or clarify.

Columns should be W12x35 where shown as W12x30.

19 SB105 Reference the note "SACON on Walls Above Grade" at the ends of the Rear Impact Berm Wall.

Please provide details on the SACON is to attach to the concrete CIP walls

SACON supplier shall provide steel strapping/clips and bolts to the concrete wall

20 Section 00 21 16 - Instructions to Proposers

Paragraph

4.3 - Pre- Proposal Inquiries (PPIs)

N/A In the solicitation, this paragraph states the deadline for PPIs is fourteen calendar days prior to the solicitation closing date. With Amendment 0001 extension of the bid date and establishment of site visit information, please consider altering the PPI deadline to September 2, 2021.

This would be fourteen days prior to the extended bid date and one day after the site visit.

PPI deadline is fourteen calendar days prior to the solicitation closing date.

21 Section 00 21 16 - Instructions to Proposers

Paragraph

4.2 - Proposal Submission Instructions

N/A In the solicitation, this paragraph states "All proposals shall be MAILED ONLY to the following address:..." Due to COVID shipping delays and numerous recent government electronic submission acceptances, please consider setting up a Dod SAFE for secure submission of this proposal.

Propose as described in Proposal Submission Instructions.

-- END OF AMENDMENT --

(End of Summary of Changes)

File details come from the government source that posted it. Updated .