This document provides specifications for a construction project. The project will construct a new rifle range at Marine Corps Recruit Depot Parris Island in South Carolina to meet Marine Corps requirements. Range support buildings will include a target storage building, Butts control house, and toilet facilities, which will be concrete or reinforced concrete masonry structures with stucco exterior and concrete slab foundations. Some portions of the buildings will be below grade. The project will also construct a target area berm, retaining walls, safety side walls, and side walls with acoustic insulation. Earth berm structures will include a bullet impact berm behind the target with appropriate side and rear retaining walls, and flat lead mining equipment maintenance surfaces. Built-in equipment will include Butts System benches, target numbers, target lifters, flag poles, and firing line benches.

The solicitation number is N4008521R2531 for P405 DESIGN-BID-BUILD, Range Improvements & Modernization, Phase 3 at Marine Corps Recruit Depot Parris Island, South Carolina. The agency is the Naval Facilities Engineering Command, Department of the Navy.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
AMENDMENT 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007 Rev - Attachment E - Price Proposal Form.pdf PDF
Amendment 0006 - P405 Revised Final Bldg HAZMAT Reports.pdf PDF
AMENDMENT 0006.pdf PDF
1641320Amend0006dwg CIVIL.pdf PDF
1641320Amend0006dwg STRUCT.pdf PDF
Amendment 0006 - P405 Geotechnical Investigation Report Rev 4.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
1641320Amend0004dwg_CIVIL.pdf PDF
Amendment 0003 - P405 ACAD.zip ZIP file
AMENDMENT 0003.pdf PDF
Amendment 0002 - eOMSI FDW-Nov2020.xlsx XLSX spreadsheet
AMENDMENT 0002.pdf PDF
Amendment 0002 - Site Visit Roster.jpg JPG image
AMENDMENT 0001 - PROJECT TABLE OF CONTENTS.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
1641320dwg02of07.pdf PDF
1641320dwg03of07.pdf PDF
1641320dwg01of07.pdf PDF
1641320dwg05of07.pdf PDF
N4008521R2531.pdf PDF
1641320dwg06of07.pdf PDF
Attachment D - SBSP (FinalTemplate) Jan2021.doc DOC document
Attachment A - PPI Inquiry Log.doc DOC document
Attachment C - Past Performance Questionnaire.docx DOCX document
1641320dwg04of07.pdf PDF
Attachment B - Construction Experience Data Sheet.docx DOCX document
1641320spc01of01.pdf PDF
1641320dwg07of07.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RANGE IMPROVEMENTS & MODERNIZATION Final Design Submittal

MCRD PARRIS ISLAND, SC EPROJECT NO. 1641320

SECTION 04 20 00

UNIT MASONRY

11/ 15, CHG 2: 05/ 19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C270 (2019) Standard Specification for Mortar for Unit Masonry

THE MASONRY SOCIETY (TMS)

TMS MSJC (2016) Masonry Standard Joint Committee's (MSJC) Book - Building Code Requirements and Specification for Masonry Structures, Containing TMS 402/ACI 530/ASCE 5, TMS 602/ACI 530.1/ASCE 6, and Companion Commentaries

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Cement; G

Cementitious Materials ; G

Precast Concrete Units

Cementitious Materials

Admixtures for Masonry Mortar

SD-08 Manufacturer's Instructions

Admixtures for Masonry Mortar

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver, store, handle, and protect material to avoid chipping, breakage, and contact with soil or contaminating material. Store and prepare materials in already disturbed areas to minimize project site disturbance and size of project site.

SECTION 04 20 00 Page 1

1.3.1 Cementitious Materials, Sand and Aggregates

Deliver cementitious and other packaged materials in unopened containers, plainly marked and labeled with manufacturers' names and brands. Store cementitious material in dry, weathertight enclosures or completely cover. Handle cementitious materials in a manner that will prevent the inclusion of foreign materials and damage by water or dampness. Store sand and aggregates in a manner to prevent contamination and segregation.

1.4 PROJECT/SITE CONDITIONS

Conform to TMS MSJC for hot and cold weather masonry erection.

1.4.1 Hot Weather Procedures

When ambient air temperature exceeds 100 degrees F , or exceeds 90 degrees F and the wind velocity is greater than 8 mph , comply with TMS MSJC Article

1.8 D for: preparation prior to conducting masonry work; construction while masonry work is in progress; and protection for newly completed masonry.

1.4.2 Cold Weather Procedures

When ambient temperature is below 40 degrees F , comply with TMS MSJC Article 1.8 C for: preparation prior to conducting masonry work;

construction while masonry work is in progress; and protection for newly completed masonry.

PART 2 PRODUCTS

2.1 MANUFACTURED UNITS

2.1.1 General Requirements

Do not change the source of materials, which will affect the appearance of the finished work, after the work has started except with Contracting Officer's approval. Submit test reports from an approved independent laboratory. Certify test reports on a previously tested material as the same materials as that proposed for use in this project. Submit certificates of compliance stating that the materials meet the specified requirements.

2.1.2 Precast Concrete Units

2.1.2.1 General

a. Provide precast concrete copings that are factory-made units in a plant regularly engaged in producing precast concrete units. Unless otherwise indicated, provide precast concrete with minimum 3000 psi compressive strength, conforming to Section 03 30 00 CAST-IN-PLACE CONCRETE using 1/2 inch to No. 4 nominal-size coarse aggregate, and with reinforcement required for handling of the units. Maintain minimum clearance of 3/4 inch between reinforcement and faces of units.

b. Unless precast-concrete items have been subjected during manufacture to saturated-steam pressure of at least 120 psi for at least 5 hours, either damp-cure for 24 hours or steam-cure and then age under cover for 28 days or longer. In precast concrete members weighing over 80

SECTION 04 20 00 Page 2 pounds provide built-in loops of galvanized wire or other approved provisions for lifting and anchoring.

c. Fabricate units with beds and joints at right angles to the face, with sharp true arises and with drip grooves on the underside where units overhang walls. Form exposed-to-view surfaces free of surface voids, spalls, cracks, and chipped or broken edges and with uniform appearance and color. Unless otherwise specified, provide units with a smooth dense finish.

d. Prior to installation, wet and inspect each unit for crazing. Items showing evidence of dusting, spalling, crazing, or having surfaces treated with a protective coating will be rejected.

e. Submit specified factory certificates.

2.2 MATERIALS

2.2.1 Mortar Materials

2.2.1.1 Cementitious Materials

Provide cementitious materials that conform to those permitted by ASTM C270.

2.2.1.2 Hydrated Lime and Alternates

Provide lime that conforms to one of the materials permitted by ASTM C207 for use in combination with portland cement, hydraulic cement, and blended hydraulic cement. Do not use lime in combination with masonry cement or mortar cement.

2.2.1.3 Admixtures for Masonry Mortar

In cold weather, use a non-chloride based accelerating admixture that conforms to ASTM C1384, unless Type III portland cement is used in the mortar.

2.2.1.4 Aggregate and Water

Provide aggregate (sand) and water that conform to materials permitted by

ASTM C270.

2.3 MORTAR MIXES

2.3.1 Mortar Mix

a. Provide mortar Type N unless specified otherwise herein. Do not use masonry cement in the mortar.

b. For field-batched mortar, measure component materials by volume. Use measuring boxes for materials that do not come in packages, such as sand, for consistent batching. Mix cementitious materials and aggregates between 3 and 5 minutes in a mechanical batch mixer with a sufficient amount of water to produce a workable consistency. Do not hand mix mortar unless approved by the Contracting Officer. Maintain workability of mortar by remixing or retempering. Discard mortar that has begun to stiffen or is not used within 2-1/2 hours after initial mixing.

SECTION 04 20 00 Page 3

c. For preblended mortar, follow manufacturer's mixing instructions.

PART 3 EXECUTION

3.1 EXAMINATION

Prior to start of work, verify the applicable conditions as set forth in TMS MSJC, inspection.

3.2 PREPARATION

3.2.1 Stains

Protect exposed surfaces from mortar and other stains. When mortar joints are tooled, remove mortar from exposed surfaces with fiber brushes and wooden paddles. Protect base of walls from splash stains by covering adjacent ground with sand, sawdust, or polyethylene.

3.2.2 Loads

Do not apply uniform loads for at least 12 hours or concentrated loads for at least 72 hours after masonry is constructed. Provide temporary bracing as required.

3.2.3 Concrete Surfaces

Where masonry is to be placed, clean concrete of laitance, dust, dirt, oil, organic matter, or other foreign materials and slightly roughen to provide a surface texture with a depth of at least 1/8 inch . Sandblast, if necessary, to remove laitance from pores and to expose the aggregate.

3.3 INSTALLATION

-- End of Section --

SECTION 04 20 00 Page 4

SECTION 33 40 00

STORM DRAINAGE UTILITIES

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings

ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings

ASTM B26/B26M (2014; E 2015) Standard Specification for Aluminum-Alloy Sand Castings

ASTM C76 (2019) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe

ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C270 (2019) Standard Specification for Mortar for Unit Masonry

ASTM C425 (2004; R 2013) Standard Specification for Compression Joints for Vitrified

ASTM C443 (2020) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets

ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections

ASTM C990 (2009; R 2014) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants

ASTM C1433 (2016b) Standard Specification for Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers

ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of

SECTION 33 40 00 Page 1

Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)

ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction

ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D2321 (2018) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications

ASTM D2729 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings

ASTM D3350 (2012) Polyethylene Plastics Pipe and Fittings Materials

ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

ASTM F714 (2013; R 2019) Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Stormwater Check Valves ; G

SD-04 Samples

Pipe for Culverts and Storm Drains

SD-07 Certificates

Resin Certification

Oil Resistant Gasket

SECTION 33 40 00 Page 2

Determination of Density

Frame and Cover for Gratings

Post-Installation Inspection Report

SD-08 Manufacturer's Instructions

Placing Pipe

SD-11 Closeout Submittals

Lid Verification Report ; G

1.3 DELIVERY, STORAGE, AND HANDLING

1.3.1 Delivery and Storage

Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life.

Solvents in use shall be discarded when the recommended pot life is exceeded.

1.3.2 Handling

Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged.

PART 2 PRODUCTS

2.1 PIPE FOR CULVERTS AND STORM DRAINS

Pipe for culverts and storm drains shall be of the sizes indicated and shall conform to the requirements specified.

2.1.1 Concrete Pipe

Manufactured in accordance with and conforming to ASTM C76, Class IV .

2.1.2 Poly Vinyl Chloride (PVC) Pipe

Submit the pipe manufacturer's resin certification , indicating the cell classification of PVC used to manufacture the pipe, prior to installation of the pipe. 2.1.3 Polyethylene (PE) Pipe

Submit the pipe manufacturer's resin certification , indicating the cell classification of PE used to manufacture the pipe, prior to installation of the pipe. The minimum cell classification for polyethylene plastic

SECTION 33 40 00 Page 3 shall apply to each of the seven primary properties of the cell classification limits in accordance with ASTM D3350.

2.1.3.1 Smooth Wall PE Pipe

ASTM F714, maximum DR of 21 for pipes 3 to 24 inches in diameter and maximum DR of 26 for pipes 26 to 48 inches in diameter. Pipe shall be produced from PE certified by the resin producer as meeting the requirements of ASTM D3350, minimum cell class 335434C.

2.2 PERFORATED PIPING

2.2.1 Polyvinyl Chloride (PVC) Pipe . See SECTION 33 46 16 SUBDRAINAGE PIPING for underdrain pipe specifications.

ASTM D2729.

2.3 DRAINAGE STRUCTURES

2.3.1 Precast Reinforced Concrete Box

Manufactured in accordance with and conforming to ASTM C1433.

2.4 MISCELLANEOUS MATERIALS

2.4.1 Nonwoven Geotextile Drainage Panels

Nonwoven-Geotextile-Faced, Molded-Sheet Drainage Panel: Composite subsurface drainage panel consisting of a studded, nonbiodegradable, molded-plastic-sheet drainage core; with a nonwoven, needle-punched geotextile facing with an apparent opening size not exceeding No. 70 (0.21-mm) sieve laminated to one side of the core; and with a vertical flow rate of 9 to 15 gpm per ft. (112 to 188 L/min. per m).

2.4.2 Stormwater Check Valves

Storm check valves shall be installed at two stormwater headwall discharge points indicated on the plans. Check valves shall be rubber "duck bill" type with curved bill and vertical eccentric shape installed vertically with flat bottom design and a minimum inside diameter of 36 inches. Check valves shall be secured to the headwalls using a mating flange where flange size drilling conforms to ANSI Class 125/150#. Storage and installation shall be in accordance with manufacturer's specifications.

Elastomer Duckbill Check Valves shall open when the line pressure inside the valve exceeds the backpressure outside the valve. When backpressure exceeds the line pressure, the bill of the valve shall be forced closed.

Valve shall have a flat bottom to facilitate installation in minimum bottom clearance situations. Material shall be as indicated. Valves for pipes 24" and larger in diameter shall incorporate a metallic support completely encapsulated in the wall thickness at the bottom portion of the valve.

2.4.3 Concrete

Unless otherwise specified, concrete and reinforced concrete shall conform to the requirements Section 03 30 00 CAST-IN-PLACE CONCRETE. The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 3 to 6

SECTION 33 40 00 Page 4 percent when maximum size of coarse aggregate exceeds 1-1/2 inches . Air content shall be determined in accordance with ASTM C231/C231M. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground.

Expansion-joint filler material shall conform to ASTM D1751, or ASTM D1752, or shall be resin-impregnated fiberboard conforming to the physical requirements of ASTM D1752.

2.4.4 Mortar

Mortar for pipe joints, connections to other drainage structures, and block construction shall conform to ASTM C270, Type M, except that the maximum placement time shall be 1 hour. The quantity of water in the mixture shall be sufficient to produce a stiff workable mortar but in no case shall exceed 6 gallons of water per sack of cement. Water shall be clean and free of harmful acids, alkalis, and organic impurities. The mortar shall be used within 30 minutes after the ingredients are mixed with water. The inside of the joint shall be wiped clean and finished smooth. The mortar head on the outside shall be protected from air and sun with a proper covering until satisfactorily cured.

2.4.5 Precast Reinforced Concrete Manholes

Conform to ASTM C478. Joints between precast concrete risers and tops shall be made with flexible watertight, rubber-type gaskets meeting the requirements of paragraph JOINTS.

2.4.6 Frame and Cover for Gratings

Submit certification on the ability of frame and cover or gratings to carry the imposed live load. Frame and cover for gratings shall be cast gray iron, ASTM A48/A48M, Class 35B; cast ductile iron, ASTM A536, Grade 65-45-12; or cast aluminum, ASTM B26/B26M, Alloy 356.O-T6. Weight, shape, size, and waterway openings for grates and curb inlets shall be as indicated on the plans. The word "Storm Sewer" shall be stamped or cast into covers so that it is plainly visible.

2.4.7 Joints

2.4.7.1 Flexible Watertight Joints

a. Flexible watertight joints shall be made with plastic or rubber-type gaskets for concrete pipe. The design of joints and the physical requirements for preformed flexible joint sealants shall conform to ASTM C990, and rubber-type gaskets shall conform to ASTM C443.

Factory-fabricated resilient joint materials shall conform to ASTM C425.

Gaskets shall have not more than one factory-fabricated splice, except that two factory-fabricated splices of the rubber-type gasket are permitted if the nominal diameter of the pipe being gasketed exceeds 54 inches .

b. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. Alternate types of watertight joint may be furnished, if specifically approved.

SECTION 33 40 00 Page 5

2.4.7.2 PVC Plastic Pipes

Joints shall be solvent cement or elastomeric gasket type in accordance with the specification for the pipe and as recommended by the pipe manufacturer.

2.4.7.3 Smooth Wall PE Plastic Pipe

Pipe shall be joined using butt fusion method as recommended by the pipe manufacturer.

2.5 EROSION CONTROL RIP RAP

Provide non-erodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness of 8 inches .

PART 3 EXECUTION

3.1 INSTALLATION OF PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES

Excavation of trenches, and for appurtenances and backfilling for culverts and storm drains, shall be in accordance with the applicable portions of 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below.

3.1.1 Trenching

The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus 24 inches to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified, without any overexcavation.

Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government.

3.1.2 Removal of Rock

Rock in either ledge or boulder formation shall be replaced with suitable materials to provide a compacted earth cushion having a thickness between unremoved rock and the pipe of at least 8 inches or 1/2 inch for each foot of fill over the top of the pipe, whichever is greater, but not more than three-fourths the nominal diameter of the pipe. Where bell-and-spigot pipe is used, the cushion shall be maintained under the bell as well as under the straight portion of the pipe. Rock excavation shall be as specified and defined in Section 31 23 00.00 20 EXCAVATION AND FILL .

3.1.3 Removal of Unstable Material

Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no

SECTION 33 40 00 Page 6 additional cost to the Government.

3.2 BEDDING

The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe.

3.2.1 Concrete Pipe Requirements

When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in granular material minimum 4 inch in depth in trenches with soil foundation. Depth of granular bedding in trenches with rock foundation shall be 1/2 inch in depth per foot of depth of fill, minimum depth of bedding shall be 8 inch up to maximum depth of 24 inches .

The middle third of the granular bedding shall be loosely placed. Bell holes and depressions for joints shall be removed and formed so entire barrel of pipe is uniformly supported. The bell hole and depressions for the joints shall be not more than the length, depth, and width required for properly making the particular type of joint.

3.2.2 Plastic Pipe

Bedding for PVC pipe shall meet the requirements of ASTM D2321. Use Class IB or II material for bedding, haunching, and initial backfill. Use Class I, II, or III material for PP pipe bedding, haunching and initial backfill.

3.3 PLACING PIPE

Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Plastic pipe, excluding SRPE pipe shall be protected from exposure to direct sunlight prior to laying, if necessary to maintain adequate pipe stiffness and meet installation deflection requirements. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated pipe shall be placed in the same vertical plane as the major axis of the pipe.

Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. Deflection of installed flexible pipe shall not exceed the following limits:

TYPE OF PIPE

Reinforced Concrete Pipe (RCP)

MAXIMUM ALLOWABLE

DEFLECTION (percent)

3%

Reinforced Concrete Pipe (RCP) 3

Plastic (PVC) 5

3.3.1 Concrete Pipe

Laying shall proceed upgrade with spigot ends of bell-and-spigot pipe and tongue ends of tongue-and-groove pipe pointing in the direction of the flow.

SECTION 33 40 00 Page 7

3.4 JOINTING

3.4.1 Concrete Pipe

3.4.1.1 Cement-Mortar Bell-and-Spigot Joint

The first pipe shall be bedded to the established grade line, with the bell end placed upstream. The interior surface of the bell shall be thoroughly cleaned with a wet brush and the lower portion of the bell filled with mortar as required to bring inner surfaces of abutting pipes flush and even. The spigot end of each subsequent pipe shall be cleaned with a wet brush and uniformly matched into a bell so that sections are closely fitted. After each section is laid, the remainder of the joint shall be filled with mortar, and a bead shall be formed around the outside of the joint with sufficient additional mortar. If mortar is not sufficiently stiff to prevent appreciable slump before setting, the outside of the joint shall be wrapped or bandaged with cheesecloth to hold mortar in place.

3.4.1.2 Cement-Mortar Tongue-and-Groove Joint

The first pipe shall be bedded carefully to the established grade line with the groove upstream. A shallow excavation shall be made underneath the pipe at the joint and filled with mortar to provide a bed for the pipe. The grooved end of the first pipe shall be thoroughly cleaned with a wet brush, and a layer of soft mortar applied to the lower half of the groove. The tongue of the second pipe shall be cleaned with a wet brush;

while in horizontal position, a layer of soft mortar shall be applied to the upper half of the tongue. The tongue end of the second pipe shall be inserted in the grooved end of the first pipe until mortar is squeezed out on interior and exterior surfaces. Sufficient mortar shall be used to fill the joint completely and to form a bead on the outside.

3.4.1.3 Flexible Watertight Joints

Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade.

3.5 DRAINAGE STRUCTURES

3.5.1 Manholes and Inlets

Construction shall be of reinforced concrete, plain concrete, precast reinforced concrete, precast concrete segmental blocks, prefabricated corrugated metal, or bituminous coated corrugated metal; complete with frames and covers or gratings; and with fixed galvanized steel ladders where indicated. Pipe studs and junction chambers of prefabricated corrugated metal manholes shall be fully bituminous-coated and paved when the connecting branch lines are so treated. Pipe connections to concrete

SECTION 33 40 00 Page 8 manholes and inlets shall be made with flexible, watertight connectors.

3.5.2 Walls and Headwalls

Construction shall be as indicated.

3.5.2.1 Stormwater Check Valves

Storm check valves shall be installed at two stormwater headwall discharge points indicated on the plans. Check valves shall be rubber "duck bill" type with curved bill and vertical eccentric shape installed vertically with flat bottom design and a minimum inside diameter of 36 inches. Check valves shall be secured to the headwalls using a mating flange where flange size drilling conforms to ANSI Class 125/150#. Storage and installation shall be in accordance with manufacturer's specifications.

Elastomer Duckbill Check Valves shall open when the line pressure inside the valve exceeds the backpressure outside the valve. When backpressure exceeds the line pressure, the bill of the valve shall be forced closed.

Valve shall have a flat bottom to facilitate installation in minimum bottom clearance situations. Material shall be as indicated. Valves for pipes 24" and larger in diameter shall incorporate a metallic support completely encapsulated in the wall thickness at the bottom portion of the valve. 3.6 BACKFILLING

3.6.1 Backfilling Pipe in Trenches

After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers. This method of filling and compacting shall continue until the fill has reached an elevation equal to the midpoint (spring line) of concrete pipe or has reached an elevation of at least 12 inches above the top of the pipe for flexible pipe. The remainder of the trench shall be backfilled and compacted by spreading and rolling or compacted by mechanical rammers or tampers in layers not exceeding 6 inches . Tests for density shall be made as necessary to ensure conformance to the compaction requirements specified below. Where it is necessary, in the opinion of the Contracting Officer, that sheeting or portions of bracing used be left in place, the contract will be adjusted accordingly. Untreated sheeting shall not be left in place beneath structures or pavements.

3.6.2 Backfilling Pipe in Fill Sections

For pipe placed in fill sections, backfill material and the placement and compaction procedures shall be as specified below. The fill material shall be uniformly spread in layers longitudinally on both sides of the pipe, not exceeding 6 inches in compacted depth, and shall be compacted by rolling parallel with pipe or by mechanical tamping or ramming. Prior to commencing normal filling operations, the crown width of the fill at a height of 12 inches above the top of the pipe shall extend a distance of not less than twice the outside pipe diameter on each side of the pipe or 12 feet , whichever is less. After the backfill has reached at least 12 inches above the top of the pipe, the remainder of the fill shall be placed and thoroughly compacted in layers not exceeding 6 inches . Use select granular material for this entire region of backfill for flexible pipe installations.

SECTION 33 40 00 Page 9

3.6.3 Movement of Construction Machinery

When compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced.

3.6.4 Compaction

3.6.4.1 General Requirements

Cohesionless materials include gravels, gravel-sand mixtures, sands, and gravelly sands. Cohesive materials include clayey and silty gravels, gravel-silt mixtures, clayey and silty sands, sand-clay mixtures, clays, silts, and very fine sands. When results of compaction tests for moisture-density relations are recorded on graphs, cohesionless soils will show straight lines or reverse-shaped moisture-density curves, and cohesive soils will show normal moisture-density curves.

3.6.4.2 Minimum Density

Backfill over and around the pipe and backfill around and adjacent to drainage structures shall be compacted at the approved moisture content to the following applicable minimum density, which will be determined as specified below.

a. Under airfield and heliport pavements, paved roads, streets, parking areas, and similar-use pavements including adjacent shoulder areas, the density shall be not less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material, up to the elevation where requirements for pavement subgrade materials and compaction shall control.

b. Under unpaved or turfed traffic areas, density shall not be less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material.

c. Under nontraffic areas, density shall be not less than that of the surrounding material.

3.7 FIELD PAINTING

3.7.1 Cast-Iron Covers, Frames, Gratings, And Steps

After installation, clean cast-iron, not buried in masonry or concrete, of mortar, rust, grease, dirt, and other deleterious materials to bare metal and apply a coat of bituminous paint. 3.8 FIELD QUALITY CONTROL

3.8.1 Tests

Testing is the responsibility of the Contractor. Perform all testing and retesting at no additional cost to the Government.

3.8.1.1 Determination of Density

Testing shall be performed by an approved commercial testing laboratory or

SECTION 33 40 00 Page 10 by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained.

Laboratory tests for moisture-density relations shall be made in accordance with ASTM D1557 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D2167 or ASTM D6938. When ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications.

ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D6938. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed.

3.8.2 Inspection

3.8.2.1 Post-Installation Inspection

Visually inspect each segment of concrete pipe for alignment, settlement, joint separations, soil migration through the joint, cracks, buckling, bulging and deflection. An engineer must evaluate all defects to determine if any remediation or repair is required.

3.8.2.1.1 Concrete

Cracks with a width greater than 0.01 inches . An engineer must evaluate all pipes with cracks with a width greater than 0.01 inches but less than

0.10 inches to determine if any remediation or repair is required.

3.8.2.1.2 Flexible Pipe

Check each flexible pipe (PVC) for rips, tears, joint separations, soil migration through the joint, cracks, localized bucking, bulges, settlement and alignment.

3.8.2.1.3 Post-Installation Inspection Report

The deflection results and final post installation inspection report must include: pipe location identification, equipment used for inspection, inspector name, deviation from design, grade, deviation from line, deflection and deformation of flexible pipe, inspector notes, condition of joints, condition of pipe wall (e.g. distress, cracking, wall damage dents, bulges, creases, tears, holes, etc.).

3.8.3 Repair Of Defects

3.8.3.1 Deflection Testing

When deflection readings are in excess of the allowable deflection of average inside diameter of pipe are obtained, remove pipe which has excessive deflection and replace with new pipe. Retest 30 days after completing backfill, leakage testing and compaction testing.

3.8.3.2 Inspection

Replace pipe or repair defects indicated in the Post-Installation

SECTION 33 40 00 Page 11

Inspection Report.

3.8.3.2.1 Concrete

Replace pipes having cracks with a width greater than 0.1 inches .

3.8.3.2.2 Flexible Pipe

Replace pipes having cracks or splits.

3.9 PROTECTION

Protect storm drainage piping and adjacent areas from superimposed and external loads during construction.

3.10 WARRANTY PERIOD

Pipe segments found to have defects during the warranty period must be replaced with new pipe and retested.

-- End of Section --

SECTION 33 40 00 Page 12

04 20 00 - UNIT MASONRY
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Cementitious Materials, Sand and Aggregates
1.4 PROJECT/SITE CONDITIONS
1.4.1 Hot Weather Procedures
1.4.2 Cold Weather Procedures
PART 2 PRODUCTS
2.1 MANUFACTURED UNITS
2.1.1 General Requirements
2.1.2 Precast Concrete Units
2.1.2.1 General
2.2 MATERIALS
2.2.1 Mortar Materials
2.2.1.1 Cementitious Materials
2.2.1.2 Hydrated Lime and Alternates
2.2.1.3 Admixtures for Masonry Mortar
2.2.1.4 Aggregate and Water
2.3 MORTAR MIXES
2.3.1 Mortar Mix
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 Stains
3.2.2 Loads
3.2.3 Concrete Surfaces

3.3 INSTALLATION

33 40 00 - STORM DRAINAGE UTILITIES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
1.3.2 Handling
PART 2 PRODUCTS
2.1 PIPE FOR CULVERTS AND STORM DRAINS
2.1.1 Concrete Pipe
2.1.2 Poly Vinyl Chloride PVC Pipe
2.1.3 Polyethylene PE Pipe
2.1.3.1 Smooth Wall PE Pipe
2.2 PERFORATED PIPING
2.2.1 Polyvinyl Chloride PVC Pipe. See SECTION 33 46 16 SUBDRAINAGE
2.3 DRAINAGE STRUCTURES
2.3.1 Precast Reinforced Concrete Box
2.4 MISCELLANEOUS MATERIALS
2.4.1 Nonwoven Geotextile Drainage Panels
2.4.2 Stormwater Check Valves
2.4.3 Concrete
2.4.4 Mortar
2.4.5 Precast Reinforced Concrete Manholes
2.4.6 Frame and Cover for Gratings
2.4.7 Joints
2.4.7.1 Flexible Watertight Joints
2.4.7.2 PVC Plastic Pipes
2.4.7.3 Smooth Wall PE Plastic Pipe

2.5 EROSION CONTROL RIP RAP

PART 3 EXECUTION
3.1 INSTALLATION OF PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES
3.1.1 Trenching
3.1.2 Removal of Rock
3.1.3 Removal of Unstable Material
3.2 BEDDING
3.2.1 Concrete Pipe Requirements
3.2.2 Plastic Pipe
3.3 PLACING PIPE
3.3.1 Concrete Pipe
3.4 JOINTING
3.4.1 Concrete Pipe
3.4.1.1 Cement-Mortar Bell-and-Spigot Joint
3.4.1.2 Cement-Mortar Tongue-and-Groove Joint
3.4.1.3 Flexible Watertight Joints
3.5 DRAINAGE STRUCTURES
3.5.1 Manholes and Inlets
3.5.2 Walls and Headwalls
3.5.2.1 Stormwater Check Valves
3.6 BACKFILLING
3.6.1 Backfilling Pipe in Trenches
3.6.2 Backfilling Pipe in Fill Sections
3.6.3 Movement of Construction Machinery
3.6.4 Compaction
3.6.4.1 General Requirements
3.6.4.2 Minimum Density
3.7 FIELD PAINTING
3.7.1 Cast-Iron Covers, Frames, Gratings, And Steps
3.8 FIELD QUALITY CONTROL
3.8.1 Tests
3.8.1.1 Determination of Density
3.8.2 Inspection
3.8.2.1 Post-Installation Inspection
3.8.2.1.1 Concrete
3.8.2.1.2 Flexible Pipe
3.8.2.1.3 Post-Installation Inspection Report
3.8.3 Repair Of Defects
3.8.3.1 Deflection Testing
3.8.3.2 Inspection
3.8.3.2.1 Concrete
3.8.3.2.2 Flexible Pipe
3.9 PROTECTION
3.10 WARRANTY PERIOD

File details come from the government source that posted it. Updated .