Amendment 0005.pdf
PDF 116 KB Posted
- Attached to
- IDIQ SB MACC, General Construction, MCI East AOR
- Solicitation number
- N4008521R1215
About this file
This document package includes a request for proposals (RFP) for an indefinite-delivery, indefinite-quantity (IDIQ) multiple award construction contract (MACC) for general construction services within the Marine Corps Installations East area of responsibility. The Naval Facilities Engineering Command seeks proposals for a seed project involving interior and exterior repairs to Building AS124 at Marine Corps Air Station New River in North Carolina. The estimated budget for the seed project is between $1,000,000 to $5,000,000, and the period of performance is 465 calendar days from award. A site visit is scheduled for December 16, 2020, and proposals are due by January 26, 2021. The Davis Bacon wage determination is NC20210038. The RFP includes evaluation criteria, instructions for the technical and price proposals, and responses to pre-proposal inquiries regarding the seed project scope and requirements.
The attached file also contains the questions and answers from a pre-proposal inquiry process, which clarify requirements for personnel, hazardous materials removal, drawings, and other solicitation details.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to all remaining PPIs. As of this amendment, there are no outstanding PPIs. Additionally, this amendment updates the Wage Determination and the Responsibility Determination requirements.
See SF30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R1215
X 9B. DATED (SEE ITEM 11)
02-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jan-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R1215
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of this amendement is to:
1. Update the Wage Determination
2. Provide final PPI responses. As of this Amendment, there are no outstanding PPIs.
Wage Determination for Seed Project
General Decision Number: NC20210038 01/01/2021
Superseded General Decision Number: NC20200038
State: North Carolina
Construction Type: Building
County: Onslow County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021
IRON0848-005 07/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 26.00 15.80
* PLUM0421-003 07/01/2020
Rates Fringes
PIPEFITTER.......................$ 29.35 12.41
SUNC2011-019 08/24/2011
Rates Fringes
BRICKLAYER.......................$ 19.00 0.00
CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00
CARPENTER (Form Work Only).......$ 13.38 1.80
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 16.39 4.26
CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00
ELECTRICIAN......................$ 20.64 6.68
HVAC MECHANIC (HVAC Duct Installation Only)...............$ 17.37 1.82
LABORER: Common or General......$ 11.13 0.32
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.47 2.41
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 12.35 0.00
PLUMBER..........................$ 18.48 3.93
ROOFER...........................$ 11.75 1.06
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40
TRUCK DRIVER.....................$ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
GENERAL REQUIREMENTS SEED PROJ
GENERAL REQUIREMENTS
NAVFAC Solicitation No.: N4008521R1215
NAVFAC Specification Work Order No.: 05-17-0075 NAVFAC Drawings Nos.: 60024409-60024442
Title: Interior/Exterior Repairs, Bldg. AS124
Location of the Work: Marine Corps Air Station New River, NC
Description of Work: This project, Interior/Exterior Repairs, Bldg. AS124, will include new finishes, roof and wall panels, roofing, plumbing, HVAC, electrical, doors, windows, masonry work, painting, and incidental related work.
*See drawings and specifications for full description.
Estimated Budget Amount or Price Range: In accordance with DFARS 236.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000.
Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 465 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance).
Wage Determination: Department of Labor (DoL) General Decision Number NC20210038 01/01/2021 NC38 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award.
Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages – Construction, liquidated damages, at the time of award, will be based upon the liquidated damages for the base price, plus any option or combination of options exercised. If an option(s) is exercised within the timeframe allowed after award, the liquidated damages will be increased based upon the liquidated damages for that option.
Base plus all options: $155/Calendar Day
Utilities: In accordance with FAC 5252.236-9305 Availability of Utilities, when available, the Government will provide reasonable amounts of electric, water and compressed air for the work to be performed under this contract at no cost to the contractor.
Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction and FAC 5252.236-9310 Record Drawings, record shop drawings are required. Reproducible copies of these record drawings are also required.
Bond Requirements: In accordance with FAC 5252.228-9302 Bid Guarantee, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the largest amount for which award can be made under the offer submitted, but in no case to exceed $3,000,000. In accordance with FAC 5252.228-9305 Notice of Bonding Requirements, Performance and Payment Bonds are required from the awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.
Site Visit:
A site visit is scheduled for Wednesday, December 16, 2020. Participants shall meet at the MCAS New River Visitors Center no later than 9:00AM Local Time. All participants shall submit a list of attendees to Lauren Loconto via email at lauren.loconto@navy.mil no later than close of business on Friday, December 11, 2020.
Participants without current DBIDS access to MCAS New River will require sponsorship. Participants shall submit the current version of the SECNAV form 5512/1 (version expiring January 31, 2021, one per attendee), a scanned copy of the photo identification(s) that will be presented at the Visitors Center, and scanned copies of the vehicle registration(s) and insurance(s). Participants requiring sponsorship but planning to use rental vehicles shall submit participant names exactly as they appear on the identification to be presented at the Visitors Center and will need to present the photo identification(s), SECNAV form 5512/1, and rental agreement at the Visitors Center on the date of the site visit. The sponsor information for the SECNAV form 5512/1 is Lauren F. Loconto, Supervisory Contract Specialist. Participants should be aware that wait times at the Visitor’s Center vary, but can be as long as one hour.
The site visit will begin promptly at 9:00AM without delay. Information regarding the Visitors Center, can be found at https://www.newriver.marines.mil/Welcome-Aboard/Pass-Registration/.
Pre-Proposal Inquiries (PPIs): Submit in accordance with Section 00 21 13 – Bidding Schedule Instructions to Bidders of the SF1442, Instruction to Offerors, 5.3 Pre-Proposal Inquiries (PPIs).
Proposal Due Date: 26 January 2021 no later than 2:00 PM Eastern. LATE PROPOSALS WILL NOT BE
CONSIDERED.
Please submit in accordance with Section 00 21 13 – Bidding Schedule/Instructions to Bidders of the SF1442, Instructions to Offerors, 5.2 PROPOSAL SUBMISSION INSTRUCTIONS.
Proposal Delivery Information: Proposals may arrive via U. S. mail or express mail carrier to the following address:
ATTN: John Bishop Naval Facilities Engineering Command, Mid-Atlantic
ACQ21
9324 Virginia Avenue Building Z-140, Room 225 Norfolk, Virginia 23511
Evaluation Factors for Award: Refer to Section 00 21 13 - Bidding Schedule/Instructions to Bidders of the SF1442, Instruction to Offerors, 4. Evaluation Factors for Award.
ATTACHMENTS:
(D) AS124 Dwgs_Part1of2
(E) AS124 Dwgs_Part2of2
(F) AS124 Specs
All attachments will be provided under the “Attachments” link on Beta SAM.
(End of Summary of Changes)
SOLICITATION NO. N40085‐21‐R‐1215
PROJECT TITLE/LOCATION: MCI East AOR MACC
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
50 12/11/2020 41 01 35
1.7.2.2
Paragraph 1.7.2.2 between the initial statement within it and subparagraph c states that a Certified Safety Professional(CSP), Certified Industrial Hygienist(CIH), Associate Safety Professional(ASP), Certified Safety Trained Supervisor(CSTS), and/or Certified Construction Health and Safety Technician(CHST) must be onsite at all times that work or testing is being performed. Is someone with one of the above certifications required onsite during all work or testing?
Delete requirment 5
56 12/11/2020 Civil Is there a dump area to haul the demoed asphalt to or must it be disposed of off base? Dispose off base. 5 75 12/15/2020 9 4.
EVALU
ATION
FACTOR
S
(b) Non‐ cost/Price Factors
The formatting instructions for (b) Non‐cost/Price Proposal state that we are to provide drawings on 11x17 inch paper and fold them down to 8.5x11 inches. However, we do not see a requirement for any drawings in Factors 1 through 4. Are there drawings that should be submitted with our Non‐cost/Price Factors, and if so, what are the specific requirements?
No drawings are required to be included with the Non‐cost/Price Proposal
84 12/17/2020 E‐10 Room R107 notes Data Rack; Spec 27 10 00 2.5.2b rack spec and 2.5.2c cabinet spec
Prints note a Data Rack and Spec references both Data Rack and Cabinet. Please confirm that we are to provide a standard 19” Data rack with wire management as laid out in the specifications. Drawing E‐10, Data/Comm Room R107 notes Data Rack.
Specs: Section 27 10 00 2.5.2 (Page 17). 2.5.2b is the rack spec and 2.5.2c is the cabinet spec.
Provide a standard data rack with wire management as laid out in the specifications.
85 12/17/2020 E‐8
Note 1 Telecomunic ations Riser
Confirm that there is already Fiber Optic and Copper backbone cabling to Room R107 in this building. Drawing E‐8, Note 1 Telecommunication Riser show conduit and fabric interdict but no mention of copper or fiber.
The Government will be installing an underground handhole approx 10' from the edge of the building near the existing OSP pedestal location to intercept incoming OSP cabling. The contractor must extend the overhead OSP Conduit indicated on Plan E‐8, Detail 1 underground to this government installed handhole. All 4'' conduit 90 degree elbows must be wide sweep type if used. The government will be installing OSP Cabling, not the contractor.
87 12/17/2020 E‐2 General Demolition Notes 7 and 9 on sheet E‐2 indicate that existing circuits are to be kept continuously operational except when allowed by the government to remove a circuit from service. The plans suggest that the service is to removed and reinstalled and that there is no need for continuous operation. Are the existing circuits to be kept continuously operational?
Building will not be occupied during construction. Existing circuits will not need to be kept continuously operational.
91 12/17/2020 7 of 15 Amen.
4.a.1.1
Amendment 002, Paragraph 4.a.1.1 indicates that the offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. If an offeror's 2020 fiscal year ends on December 31, 2020, can the Offeror submit certified complete fiscal year financial statements for FY2017, FY2018 and FY2019 with their price proposal since the electronic proposal submission date for the Solicitation is 1/4/2021? If financial information for FY2020 will be required, will a corporate Balance Sheet signed by a Corporate Officer of the Offeror be acceptable?
This PPI's response has been changed: If FY 2020 financial records are not complete, submit FY 17, 18, and 19.
Submit the last three complete fiscal year reports per the RFP.
93 12/17/2020 12 of 1005 01 20
1.6.2.b
Spec Section 01 20 00, Paragraph 1.6.2.b indicates that materials not acceptable for payment prior to installation are consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings. Can these items be acceptable for payment prior to installation if they are indicated on the Contractor's approved Schedule of Prices?
No, for nails and fasteners. Yes, for conduits, gypsum board, glass, insulation and wall coverings.
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on Amend No.
July 2011
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
94 12/17/2020 14 ‐16 of
01 30
1.4.3
Spec Section 01 30 00, Paragraph 1.4.3 indicates the Business Access Security Requirements for the project. These requirements are out‐of‐date. Can the revised requirements for obtaining a Contractor DBIDS Credential at MCAS New River be revised by Amendment?
Yes, to state current requirements. 5
96 12/17/2020 96 of 1005 01 57
1.6
Spec Section 01 57 19, Paragraph 1.6 indicates that the Camp Lejeune Sanitary Landfill can only be used for the disposal of asbestos containing materials, building products with tightly adhered lead containing paint, non‐contaminated clean dirt and clean gravel and that ALL other contractor generated material shall be weighed through the Base Landfill scales before being removed from the Base.
Can the requirement for weighing all Non‐Asbestos and Non‐Lead Based Paint Contractor‐Generated Debris through the Base Landfill scales be removed from Project Specifications by Amendment?
Yes. 5
101 12/17/2020 363 of
07 84
1.5.2
Spec Section 07 84 00, Paragraph 1.5.2 indicates that the firestopping inspector shall be completely independent of, and divested from, the installer, the manufacturer, and the supplier of any material or item being inspected. Normally, firestopping inspectors are the manufacturers rep of the firestopping product being installed on projects performed at MCAS New River. Can the firestopping manufacturer's rep serve as the firestopping inspector for the project?
We have no objection. 5
102 12/17/2020 A‐1 General Note 14
Drawing A‐1, General Note 14 indicates that the Government will remove all interior building contents. How long will it take for the Government to remove the Building Contents prior to the start on‐site work for the project?
60 days. 5
106 1045 Can the QCM / SSHO/ Superintendent be 1 person? Yes. 5 107 12/17/2020 RFP Will Building AS124 be completely empty of all equipment, racks, and debris when it is handed over to the contractor to begin construction?
The Government is to remove all Building Contents.
111 12/17/2020 Site Visit Will the pile of gravel, sand and rubble, and trucks, on the south side of the building, be removed by the government before construction begins?
No. 5
114 12/17/2020 Spec 01 45 00 & 01 35 29 1.5.1.1
&1.7.2.1
Specification 01 35 29, paragraph 1.7.2.1 reads "SSHO/Superintendent" which we interpret as one individual. Spec 01 45 00, paragraph 1.5.1.1 (Duties), last sentence reads "In addition to managing and implementing the QC Program, the QC Manager may perform the duties of project superintendent". This does not clarify if the SSHO can also be the same individual however the wording of the SSHO paragraph & the wording of the QC Manager leads us to believe the same individual can perform all three duties. Please advise as to the Governments intent for personnel on the project.
Reference response to Response #106. 5
122 12/21/2020 page 6 of Solicitation
No.
N4008521 R1215
General Overview of the Seed Project
Please confirm that the Government will remove all items and debris from the site, including any hazardous materials that are not part of the building itself, such as tanks, paint, supplies, etc.?
Government will remove items indicated on the contract drawings.
127 12/22/2020 General What will the onsite management personnel requirement be for the seed project? Per spec section 01 35 29, Site Safety, states that the SSHO can also be the superintendent. Spec section 01 45 00, Quality Control, also states that the QC Manager can be the site superintendent. Will one personnel be able to provide all management duties?
Reference response #106. 5
128 12/22/2020 7 01 35
1.7.2.2
Per spec section 01 35 29, 1.7.2.2, states that a certified safety professional or a CIH shall be provided. Is this a requirement for the seed project?
No. 5
144 12/28/2020 Will this project require both a QC/SSHO and a superintendent. Or one with the responsibility of a triple hat? Reference response #106. 5 145 12/29/2020 07 42
1.8.1
No manufacturer provides a 20 year NDL warranty for an exposed exterior fastener panel. Would a substitute panel system with a concealed fastener system be considered that could meet the NDL or will the warranty requirement be waived?
Bid per specifications 5
147 12/29/2020 Who will responsible for moving and storing the contents and equipment in the building? The Government will remove items specified on contract drawings.
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
150 1/5/2021 P‐3 Plan detail 1 on sheet P‐3 shows a gas line coming into the building at note 7. The existing conditions drawing does not show this gas line, nor is there a new gas line shown on the C drawings. Where is the gas line coming to feed note 7 and who is responsible for the costs of providing that gas supply line?
Gas meter and exterior gas service will be provided by the Government.
159 1/5/2021 A‐1 General Note 6 states "government shall remove building contents". Confirm that the building will also be vacant of all personnel during the contruction period.
Building will be unoccupied. 5
166 1/6/2021 40 1.7 1.7.2.1 Can the Superintendant be the SSHO also? Reference response #106. 5 167 1/6/2021 01 11
Can the Superintendant or the SSHO double as the QA? Reference response #106. 5
168 1/6/2021 01‐45‐ 10 1.11.1
Will third party testing be required on this project? Yes 5
169 1/15/2021 Amendme nt 4
PPIs Metal Wall Panels
PPI Response #46 States that an exposed‐fastener metal wall panel is acceptable. However, PPI Response #98 states that concealed‐ fastener wall panels are required. Please clarify this discrepancy.
PPII Response #98 is correct. 5
170 1/15/2021 8
V In regards to the FAPIIS Certification requirement… are we to take a screenshot of the FAPIIS if it applies or fill out the forms on pages 30‐31
Fill out the required FAR clauses. 5
171 1/19/2021 Please confirm that the Davis Bacon Wage Scale we are to use for the AS 124 Interior and Exterior renovation project is dated 08/14/2020 NC20200038 Mod 1 and not the Davis Bacon Wage Scale dated 12/25/2020 NC20200038?
See Amendment 0005 5
172 1/20/2021 Regarding question #91, we along with most or all offerors on this RFP will not have accurate 2020 financial records by proposal due date. Can this be changed to FY 2017, 2018, and 2019?
The answer to PPI number 91 has been changed. If FY 2020 financial records are not complete, submit FY 17, 18, and 19.
Submit the last three complete fiscal year reports per the RFP.
| AMD 05 |