REVISED 23 81 00.pdf
PDF 93 KB Posted
- Solicitation number
- N4008521R1210
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0008_21R1210.pdf | ||
| Amendment0007_21R1210.pdf | ||
| Revised Price Proposal Form.pdf | ||
| Amendment0006_21R1210.pdf | ||
| Amendment0005_21R1210.pdf | ||
| Amendment0004_21R1210.pdf | ||
| Amendment0003_21R1210.pdf | ||
| 21R1210 Amendment 0002.pdf | ||
| General Requirements (Rev2).pdf | ||
| 21R1210 Amendment 0001.pdf | ||
| General Requirements (Rev1).pdf | ||
| 1387235dwg01of01.pdf | ||
| Attachment C_BASE ACCESS INSTRUCTION.pdf | ||
| General Requirements.pdf | ||
| Attachment G_Price Proposal Form.docx | DOCX document | |
| Attachment F_BLANK DEVGRU SPREADSHEET.xls | XLS spreadsheet | |
| 1387235spc01of01.pdf | ||
| Attachment B_Pre-Proposal Inquiry (PPI) Form.xlsx | XLSX spreadsheet | |
| Attachment E_BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| Attachment D- SECNAV 5512-1 Form.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 23 81 00
DECENTRALIZED UNITARY HVAC EQUIPMENT
05/18
PART 1 GENERAL
1.1 RELATED REQUIREMENTS
Section 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS, applies to this section with the additions and modifications specified herein.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL, INC. (AMCA)
AMCA 500-D (2018) Laboratory Methods of Testing
Dampers for Rating
AMCA 500-L (2015) Laboratory Methods of Testing
Louvers for Rating
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 340/360 I-P (2015) Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment
AHRI 350 (2015) Sound Rating of Non-Ducted Indoor
Air-Conditioning Equipment
AHRI 390 (2003) Performance Rating of Single
Package Vertical Air-Conditioners and Heat
Pumps
AHRI 410 (2001; Addendum 1 2002; Addendum 2 2005;
Addendum 3 2011) Forced-Circulation
Air-Cooling and Air-Heating Coils
AHRI 490 I-P (2011) Performance Rating of Remote
Mechanical-Draft Evaporatively-Cooled
Refrigerant Condensers
AHRI 540 (2015) Performance Rating Of Positive
Displacement Refrigerant Compressors And
Compressor Units
AHRI 700 (2016) Specifications for Fluorocarbon
Refrigerants
AHRI DCAACP (Online) Directory of Certified Applied
Air-Conditioning Products
ANSI/AHRI 210/240 (2008; Add 1 2011; Add 2 2012) Performance
Rating of Unitary Air-Conditioning &
Air-Source Heat Pump Equipment
ANSI/AHRI 270 (2008) Sound Rating of Outdoor Unitary
Equipment
ANSI/AHRI 340/360 (2007; Addendum 1 2010; Addendum 2 2011)
Performance Rating of Commercial and
Industrial Unitary Air-Conditioning and
Heat Pump Equipment
ANSI/AHRI 370 (2015; Addendum 1 2016) Sound Rating of
Large Outdoor Refrigerating and
Air-Conditioning Equipment
ANSI/AHRI 460 (2005) Performance Rating of Remote
Mechanical-Draft Air-Cooled Refrigerant
Condensers
ANSI/AHRI 495 (2005) Performance Rating of Refrigerant
Liquid Receivers
ANSI/AHRI 640 (2005) Performance Rating of Commercial and Industrial Humidifiers
ANSI/AHRI/CSA 310/380 (2014) Standard for Packaged Terminal
Air-Conditioners and Heat Pumps
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ANSI/ASHRAE 15 & 34 (2016) ANSI/ASHRAE Standard 15-Safety
Standard for Refrigeration Systems and
ANSI/ASHRAE Standard 34-Designation and
Safety Classification of Refrigerants
ASHRAE 15 & 34 (2013) ASHRAE Standard 34-2016 Safety
Standard for Refrigeration Systems/ASHRAE
Standard 34-2016 Designation and Safety
Classification of Refrigerants-ASHRAE
Standard 34-2016
ASHRAE 52.2 (2012) Method of Testing General
Ventilation Air-Cleaning Devices for
Removal Efficiency by Particle Size
ASHRAE 55 (2010) Thermal Environmental Conditions for Human Occupancy
ASHRAE 62.1 (2010) Ventilation for Acceptable Indoor
Air Quality
ASHRAE 64 (2011) Methods of Testing Remote
Mechanical-Draft Evaporative Refrigerant
Condensers
ASHRAE 90.1 - IP (2013) Energy Standard for Buildings
Except Low-Rise Residential Buildings
ASHRAE 90.1 - SI (2013) Energy Standard for Buildings
Except Low-Rise Residential Buildings
ASHRAE 127 (2012) Method of Testing for Rating
Computer and Data Processing Room Unitary
Air-Conditioners
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section
IX-Welding, Brazing and Fusing
Qualifications
ASME BPVC SEC VIII D1 (2017) BPVC Section VIII-Rules for
Construction of Pressure Vessels Division 1
AMERICAN WELDING SOCIETY (AWS)
AWS Z49.1 (2012) Safety in Welding and Cutting and
Allied Processes
ASSOCIATION OF HOME APPLIANCE MANUFACTURERS (AHAM)
AHAM RAC-1 (1982; R2008) Directory of Certified Room
Air Conditioners
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc
(Hot-Dip Galvanized) Coatings on Iron and
Steel Products
ASTM A153/A153M (2016) Standard Specification for Zinc
Coating (Hot-Dip) on Iron and Steel
Hardware
ASTM A307 (2014; E 2017) Standard Specification for
Carbon Steel Bolts, Studs, and Threaded
Rod 60 000 PSI Tensile Strength
ASTM B117 (2016) Standard Practice for Operating
Salt Spray (Fog) Apparatus
ASTM C1071 (2019) Standard Specification for Fibrous
Glass Duct Lining Insulation (Thermal and
Sound Absorbing Material)
ASTM D520 (2000; R 2011) Zinc Dust Pigment
ASTM D4587 (2011; R 2019; E 2019) Standard Practice for Fluorescent UV-Condensation Exposures of Paint and Related Coatings
ASTM E84 (2018a) Standard Test Method for Surface
Burning Characteristics of Building
Materials
ASTM E2129 (2010) Standard Practice for Data
Collection for Sustainability Assessment of Building Products
ASTM F104 (2011; R 2020) Standard Classification
System for Nonmetallic Gasket Materials
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 6 (1993; R 2016) Industrial Control and
Systems: Enclosures
NEMA MG 1 (2018) Motors and Generators
NEMA MG 2 (2014) Safety Standard for Construction and Guide for Selection, Installation and
Use of Electric Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 54 (2018) National Fuel Gas Code
NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA
19-4; ERTA 1 2019) National Electrical Code
NFPA 90A (2018) Standard for the Installation of
Air Conditioning and Ventilating Systems
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-DTL-5541 (2006; Rev F) Chemical Conversion Coatings on Aluminum and Aluminum Alloys
UFC 4-010-06 (2016; with Change 1, 2017) Cybersecurity of Facility-Related Control Systems
UNDERWRITERS LABORATORIES (UL)
UL 207 (2009; Reprint Jan 2020)
Refrigerant-Containing Components and
Accessories, Nonelectrical
UL 484 (2014; Reprint Jul 2015) Standard for Room
Air Conditioners
UL 586 (2009; Reprint Dec 2017) UL Standard for
Safety High-Efficiency Particulate, Air
Filter Units
UL 900 (2015) Standard for Air Filter Units
UL 1995 (2015) UL Standard for Safety Heating and
Cooling Equipment
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to
Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Spare Parts
Posted Instructions
Coil Corrosion Protection
System Performance Tests
Training; G
Inventory
Environmental Data
Supplied Products
Manufacturer's Standard Catalog Data
Computer Room Humidifier
Humidifier
SD-06 Test Reports
Refrigerant Tests, Charging, and Start-Up; G
System Performance Tests; G
SD-07 Certificates
Service Organizations
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
SD-11 Closeout Submittals
Ozone Depleting Substances; S
1.4 QUALITY ASSURANCE
Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions. Submit drawings consisting of:
a. Equipment layouts which identify assembly and installation details.
b. Plans and elevations which identify clearances required for maintenance and operation.
c. Wiring diagrams which identify each component individually and interconnected or interlocked relationships between components.
d. Foundation drawings, bolt-setting information, and foundation bolts prior to concrete foundation construction for equipment indicated or required to have concrete foundations.
e. Details, if piping and equipment are to be supported other than as indicated, which include loadings and type of frames, brackets, stanchions, or other supports.
f. Automatic temperature control diagrams and control sequences.
g. Installation details which includes the amount of factory set superheat and corresponding refrigerant pressure/temperature.
h. Equipment schedules
1.5 DELIVERY, STORAGE, AND HANDLING
Protect stored items from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Properly protect and care for all material both before and during installation. Submit an inventory of all the stored items. Replace any materials found to be damaged, at no additional cost to the Government. During installation, cap piping and similar openings capped to keep out dirt and other foreign matter.
1.6 ENVIRONMENTAL REQUIREMENTS
For proper Indoor Environmental Quality, maintain pressure within the building as indicated. Ventilation must meet or exceed ASHRAE 62.1 and all published addenda. Meet or exceed filter media efficiency as tested in accordance with ASHRAE 52.2. Thermal comfort must meet or exceed ASHRAE 55 .
1.7 WARRANTY
Provide equipment with the Manufacturer's Standard Warranty.
PART 2 PRODUCTS
2.1 ENERGY EFFICIENCY REQUIREMENTS
42 USC 8259b requires the procurement of energy efficient products in product categories covered by the Energy Star program or the Federal Energy
Management Program for designated products. A list of covered product categories is available from the Federal Energy Management Web site at http://energy.gov/eere/femp/covered-product-categories. A list of qualified light commercial products is available at http://www.energystar.gov/productfinder/product/certified-light-commercial-hvac/results.
Submit Material, Equipment, and Fixtures List of all supplied products within a covered product category, including manufacturer's catalog numbers, specification and drawing reference number, warranty information, fabrication site, and energy performance data. For product categories covered by the Energy Star program, submit documentation that the product is Energy Star-qualified. For product categories covered by the Federal
Energy Management Program, submit documentation that the product meets or exceeds FEMP-designated efficiency requirements.
2.1.1 Room Air Conditioners
Selected room air conditioners are required to meet performance requirements specified by Energy Star. Information on the requirements can be found at http://www.energystar.gov/ia/partners/product_specs/program_reqs/Room_Air_Conditioner_Program_Requirements_Version_4.pdf
2.1.2 Air-Source Heat Pumps
Selected air-source heat pumps are required to meet applicable performance requirements specified by Energy Star. Information on the requirements can be found for residential models (single-phase units of 65,000 BTU/h or less)at http://www.energystar.gov/products/specs/system/files/Central_ASHP_and_CAC_Program_Requirements v4_1.pdf and for light commercial models (three-phase units of less than
240,000 BTU/h) at http://www.energystar.gov/products/specs/system/files/lchvac_prog_req_v2_2_0.pdf.
2.2 MATERIALS
Provide Manufacturer's standard catalog data, at least 5 weeks prior to the purchase or installation of a particular component, highlighted to show material, size, options, performance charts and curves, etc. in adequate detail to demonstrate compliance with contract requirements. Data includes manufacturer's recommended installation instructions and procedures. If vibration isolation is specified for a unit, include vibration isolator literature containing catalog cuts and certification that the isolation characteristics of the isolators provided meet the manufacturer's recommendations. Submit data for each specified component. Minimum efficiency requirements must be in accordance with ASHRAE 90.1 - IP.
2.2.1 Standard Products
Provide materials and equipment that are standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening . The 2 year use includes applications of equipment and materials under similar circumstances and of similar size. The 2 years' experience must be satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures. Products having less than a 2 year field service record will be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. Products must be supported by a service organization. Ensure system components are environmentally suitable for the indicated geographic locations.
2.2.2 Product Sustainability Criteria
2.2.2.1 Energy Efficient Equipment
Provide equipment meeting the efficiency requirements as stated within this section and provide documentation in conformance with Section 01 33 29
SUSTAINABILITY REPORTING paragraph ENERGY EFFICIENT EQUIPMENT.
2.2.2.2 Electrical Equipment / Motors
Provide electrical equipment, motors, motor efficiencies, and wiring which are in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
Electrical motor driven equipment specified must be provided complete with motors, motor starters, and controls. Electrical characteristics must be as shown, and unless otherwise indicated, all motors of 1 horsepower and above with open, dripproof, totally enclosed, or explosion proof fan cooled enclosures, must be the premium efficiency type in accordance with NEMA MG 1.
Field wiring must be in accordance with manufacturer's instructions. Each motor must conform to NEMA MG 1 and NEMA MG 2 and be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor. Motors must be continuous duty with the enclosure specified. Motor starters must be provided complete with thermal overload protection and other appurtenances necessary for the motor control indicated. Motors must be furnished with a magnetic across-the-line or reduced voltage type starter as required by the manufacturer. Motor duty requirements must allow for maximum frequency start-stop operation and minimum encountered interval between start and stop. Motors must be sized for the applicable loads. Motor torque must be capable of accelerating the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals during one starting period. Motor bearings must be fitted with grease supply fittings and grease relief to outside of enclosure. Manual or automatic control and protective or signal devices required for the operation specified and any control wiring required for controls and devices specified, but not shown, must be provided.
2.2.2.3 Ozone Depleting Substances
Unitary air conditioning equipment must not use CFC-based refrigerants.
Refrigerant may be an approved alternative refrigerant in accordance with
EPA's Significant New Alternative Policy (SNAP) listing. Provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph OZONE DEPLETING SUBSTANCES.
2.2.2.4 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mileradius from the project site, if available from a minimum of three sources.
2.2.3 Nameplates
Major equipment including compressors, condensers, receivers, heat exchanges, fans, and motors must have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment. Plates must be durable and legible throughout equipment life and made of stainless steel . Fix plates in prominent locations with nonferrous screws or bolts.
2.2.4 Safety Devices
Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices must be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements must be in accordance with AWS Z49.1.
2.3 EQUIPMENT
2.3.1 Mini-Split-System Air Conditioners
2.3.1.1 Small-Capacity Split-System Air-Conditioners (Not Exceeding 65,000
Btu/hr)
Provide an air-cooled, split system which employs a remote condensing unit, a separate wall mounted indoor unit, and interconnecting refrigerant piping. Provide the air conditioning type unit conforming to applicable
Underwriters Laboratories (UL) standards including UL 1995. Unit must be rated in accordance with ANSI/AHRI 210/240. Provide indoor unit with necessary fans, air filters, and galvanized steel cabinet construction.
The remote unit must be as specified in paragraph CONDENSING UNIT. Provide double-width, double inlet, forward curved backward inclined, or airfoil blade, centrifugal scroll type evaporator or supply fans. Provide the manufacturer's standard condenser or outdoor fans for the unit specified and may be either propeller or centrifugal scroll type. Fan and condenser motors must have open enclosures. Design unit to operate at outdoor ambient temperatures up to 115 degrees F.
2.3.1.1.1 Energy Efficiency
Provide unit with an Energy Star label.
2.3.1.1.2 Air-to-Refrigerant Coil
Provide condensing coils with copper or aluminum tubes of 3/8 inch minimum diameter with copper or aluminum fins that are mechanically bonded or soldered to the tubes. Casing must be galvanized steel or aluminum. Avoid contact of dissimilar metals. Test coils in accordance with ASHRAE 15 & 34 at the factory and ensure suitability for the working pressure of the installed system. Dehydrate and seal each coil testing and prior to evaluation and charging.
Coat condenser coil with a uniformly applied epoxy electrodeposition, phenolic, or vinyl type coating to all coil surface areas without material bridging between fins. Apply coating at either the coil or coating manufacturer's factory. Coating process must ensure complete coil encapsulation and be capable of withstanding a minimum 500 hours exposure to the salt spray test specified in ASTM B117 using a 5 percent sodium chloride solution.
2.3.1.1.3 Compressor
Provide direct drive variable speed type compressor.Provide compressor with internal over temperature and pressure protector; sump heater; oil pump;
high pressure and low pressure controls; and liquid line dryer.
2.3.1.1.4 Refrigeration Circuit
Refrigerant-containing components must comply with ASHRAE 15 & 34 and be factory tested, cleaned, dehydrated, charged, and sealed. Provide each unit with a factory operating charge of refrigerant and oil or a holding charge. Field charge unit shipped with a holding charge. Provide refrigerant charging valves. Provide filter-drier in liquid line.to prevent freeze-up in event of loss of water flow during heating cycle.
2.3.1.1.5 Unit Controls
Provide unit internally prewired with a 24 volt control circuit powered by an internal transformer. Provide terminal blocks for power wiring and external control wiring. Internally protect unit by fuses or a circuit breaker in accordance with UL 1995. Equip units with three-phase power with phase monitoring protection to protect against problems caused by phase loss, phase imbalance and phase reversal. Provide unit with microprocessor controls to provide all 24V control functions.
Controls must include a control system interface to a BACnet Control system. The control system interface, as well as any network between physically separate units, must meet the requirements of Section 23 09 23.02
BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS.
2.3.1.1.6 Condensing Coil
Provide coils with copper or aluminum tubes of 3/8 inch minimum diameter with copper or aluminum fins that are mechanically bonded or soldered to the tubes. Protect coil in accordance with paragraph CORROSION PROTECTION.
Provide galvanized steel or aluminum casing. Avoid contact of dissimilar metals. Test coils in accordance with ANSI/ASHRAE 15 & 34 at the factory and ensure suitability for the working pressure of the installed system.
Dehydrate and seal eacj coil after testing and prior to evaluation and charging. Provide separate expansion devices for each compressor circuit.
2.3.1.1.7 Remote Condenser or Condensing Unit
Fit each remote condenser coil fitted with a manual isolation valve and an access valve on the coil side. Saturated refrigerant condensing temperature must not exceed 120 degrees F at 104 degrees F ambient.
Provide unit with low ambient condenser controls to ensure proper operation in an ambient temperature of 20degrees F. Provide fan and cabinet construction as specified in paragraph UNITARY EQUIPMENT ACCESSORIES. Fan and condenser motors must have open enclosures.
2.3.1.1.7.1 Air-Cooled Condenser
Provide Unit in accordance with ANSI/AHRI 460 and conform to the requirements of UL 1995. Provide factory fabricated, tested, packaged, and self-contained unit; complete with casing, propeller or centrifugal type fans, heat rejection coils, connecting piping and wiring, and all necessary accessories.
2.3.1.1.8 Primary/Supplemental Heat
Provide heating unit with internal thermal insulation having a fire hazard rating not to exceed 25 for flame spread and 50 for smoke developed as determined by ASTM E84.
2.3.1.1.9 Air Filters
Provide filters of the cleanable type that are capable of filtering the entire air supply. Mount filter(s) integral within the unit and make accessible . 1 inch MERV 8, provide throwaway filter on all units below 6
Tons.
Provide filter rack that can be converted to 2.0 inch capability. Filters must have an average dust spot efficiency of 25-35 percent and an average arrestance of 90 percent when tested in accordance with ASHRAE 52.2.
Provide UL Class 1 filters.
2.3.1.1.10 Fans
Provide direct driven, statically and dynamically balanced, centrifugal type fans. Design the outdoor fan so that condensate will evaporate without drip, splash, or spray on building exterior. Provide indoor fan with a minimum two-speed motor with built-in overload protection. Fan motors must be the inherently protected, permanent split-capacitor type.
2.4 COMPONENTS
2.4.1 Refrigerant and Oil
Refrigerant must be one of the fluorocarbon gases. Refrigerants must have number designations and safety classifications in accordance with
ASHRAE 15 & 34. Refrigerants must meet the requirements of AHRI 700 as a minimum. Provide a complete charge of refrigerant for the installed system as recommended by the manufacturer. Lubricating oil must be of a type and grade recommended by the manufacturer for each compressor. Where color leak indicator dye is incorporated, charge must be in accordance with manufacturer's recommendation.
2.4.2 Fans
Fan wheel shafts must be supported by either maintenance-accessible lubricated antifriction block-type bearings, or permanently lubricated ball bearings. Unit fans must be selected to produce the cfm required at the fan total pressure. Motor starters, if applicable, must be magnetic across-the-line type with a open enclosure. Thermal overload protection must be of the manual or automatic-reset type. Fan wheels or propellers must be constructed of aluminum or galvanized steel. Centrifugal fan wheel housings must be of galvanized steel, and both centrifugal and propeller fan casings must be constructed of aluminum or galvanized steel. Steel elements of fans, except fan shafts, must be hot-dipped galvanized after fabrication or fabricated of mill galvanized steel. Mill-galvanized steel surfaces and edges damaged or cut during fabrication by forming, punching, drilling, welding, or cutting must be recoated with an approved zinc-rich compound. Fan wheels or propellers must be statically and dynamically balanced. Forward curved fan wheels must be limited to 12 to 16 inches.
Direct-drive fan motors must be of the multiple-speed variety. The sheave size must be selected so that the fan speed at the approximate midpoint of the sheave adjustment will produce the specified air quantity.
Centrifugal scroll-type fans must be provided with streamlined orifice inlet and V-belt drive. Each drive will be independent of any other drive. Propeller fans must be direct-drive drive type with fixed pitch blades. V-belt driven fans must be mounted on a corrosion protected drive shaft supported by either maintenance-accessible lubricated antifriction block-type bearings, or permanently lubricated ball bearings. Each drive will be independent of any other drive. Drive bearings must be protected with water slingers or shields.
2.4.3 Primary/Supplemental Heating
2.4.3.1 Water Coil
Coil must conform to the provisions of AHRI 410. Coil must be fin-and-tube type constructed of seamless copper tubes and aluminum or copper fins mechanically bonded or soldered to tubes. Headers must be constructed of cast iron, welded steel or copper. Coil must be constructed to float within the casing to allow free expansion and contraction of tubing.
Casing and tube support sheets must not be lighter than 16 gauge galvanized steel formed to provide structural strength. When required, multiple tube supports must be provided to prevent tube sag. Coil must be circuited for suitable water velocity without excessive pressure drop and properly pitched for drainage where required or indicated. Each coil must be tested at the factory under water at not less than 300 psi air pressure, tested hydrostatically after assembly of the unit and proved tight under a gauge pressure of 200 psi. Coil must be suitable for use with water up to 250 degrees F. Coil must allow complete coil drainage with a pitch of not less than 1/8 inch/foot slope to drain.
2.4.3.2 Gas-Fired Heating Section
Gas-fired heat exchanger must be constructed of aluminized steel, ceramic coated cold-rolled steel or stainless steel suitable for natural gas fuel supply. Burner must have direct spark or hot surface ignition. Valve must include a pressure regulator. Combustion air must be supplied with a centrifugal combustion air blower. Safety controls must include a flame sensor and air pressure switch. Heater section must be mounted to eliminate noise from expansion and contraction and must be completely accessible for service. Gas equipment must bear the AGA label for the type of service involved. Burner must be in accordance with NFPA 54.
2.4.4 Air Filters
Provide filters to filter outside air and return air and locate inside filter box . Provide replaceable (throw-away) type. Filters must conform to UL 900, Class 1 or Class 2. Polyurethane filters cannot be used on units with multiframe filters.
Air filters mustl be listed in accordance with requirements of UL 900, except high efficiency particulate air filters of 99.97 percent efficiency by the DOP Test Method must be as listed under the label service and must meet the requirements of UL 586.
2.4.4.1 Extended Surface Pleated Panel Filters
Filters must be 2 inch depth sectional type of the size indicated and must have an average efficiency of 25 to 30 percent when tested in accordance with ASHRAE 52.2. Initial resistance at 500 feet/minute must not exceed
0.36 inches water gauge. Filters must be UL Class 2. Media must be nonwoven cotton and synthetic fiber mat. A wire support grid bonded to the media must be attached to a moisture resistant fiberboard frame. Four edges of the filter media must be bonded to the inside of the frame to prevent air bypass and increase rigidity.
2.4.4.2 Manometers
Provide inclined-type manometers for filter stations of 2,000 cfm capacity or larger including filters furnished as integral parts of air-handling units and filters installed separately. Provide sufficient length to read at least one inch of water column with 10 major graduations, and equipped with spirit level. Equip manometers with overpressure safety traps to prevent loss of fluid, and two three-way vent valves for checking zero setting. [Mercury cannot be used as the operating fluid.]
2.4.5 Coil Frost Protection
Provide each circuit with a manufacturer's standard coil frost protection system. The coil frost protection system must use a temperature sensor in the suction line of the compressor to shut the compressor off when coil frosting occurs. Use timers to prevent the compressor from rapid cycling.
2.4.6 Pressure Vessels
Pressure vessels must conform to ASME BPVC SEC VIII D1 or UL 207, as applicable for maximum and minimum pressure or temperature encountered.
Where referenced publications do not apply, test pressure components at
1-1/2 times design working pressure. Refrigerant wetted carbon steel surfaces must be pickled or abrasive blasted free of mill scale, cleaned, dried, charged, and sealed.
2.4.6.1 Hot Gas Muffler
Unit must be selected by the manufacturer for maximum noise attenuation.
Units rated for 30 tons capacity and under may be field tunable type.
2.4.7 Mixing Boxes
Mixing boxes must match the base unit in physical size and must include equally-sized openings, each capable of full air flow. Arrangement must be as indicated.
2.4.8 Cabinet Construction
Casings for the specified unitary equipment must be constructed of galvanized steel or aluminum sheet metal and galvanized or aluminum structural members. Minimum thickness of single wall exterior surfaces must be 18 gauge galvanized steel or 0.071 inch thick aluminum on units with a capacity above 20 tons and 20 gauge galvanized steel or 0.064 inch thick aluminum on units with a capacity less than 20 tons. Casing must be fitted with lifting provisions, access panels or doors, fan vibration isolators, electrical control panel, corrosion-resistant components, structural support members, insulated condensate drip pan and drain, and internal insulation in the cold section of the casing. Where double-wall insulated construction is proposed, minimum exterior galvanized sheet metal thickness must be 20 gauge. Provisions to permit replacement of major unit components must be incorporated. Penetrations of cabinet surfaces, including the floor, must be sealed. Unit must be fitted with a drain pan which extends under all areas where water may accumulate. Drain pan must be fabricated from Type 300 stainless steel, galvanized steel with protective coating as required, or an approved plastic material. Pan insulation must be water impervious. Extent and effectiveness of the insulation of unit air containment surfaces must prevent, within limits of the specified insulation, heat transfer between the unit exterior and ambient air, heat transfer between the two conditioned air streams, and condensation on surfaces. Insulation must conform to ASTM C1071. Paint and finishes must comply with the requirements specified in paragraph
FACTORY COATING.
2.4.8.1 Indoor Cabinet
Indoor cabinets must be suitable for the specified indoor service and enclose all unit components.
2.4.8.2 Outdoor Cabinet
Outdoor cabinets must be suitable for outdoor service with a weathertight, insulated and corrosion-protected structure. Cabinets constructed exclusively for indoor service which have been modified for outdoor service are not acceptable.
2.4.9 Condenser Water Piping And Accessories
Provide condenser water piping and accessories in accordance with Section
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS.
2.4.10 Refrigerant Piping
Provide refrigerant piping in accordance with Section 23 23 00 REFRIGERANT
PIPING.
2.4.11 Cooling Tower
Provide cooling towers in accordance with Section 23 65 00 COOLING TOWERS.
2.4.12 Condensate Drain Piping
provide condensate drain piping in accordance with Section 23 05 15 COMMON
PIPING FOR HVAC.
2.4.13 Ductwork
Provide ductwork in accordance with Section 23 30 00 HVAC AIR DISTRIBUTION.
2.4.14 Temperature Controls
Temperature controls shall be in accordance with Section 23 09 23.02 BACnet
DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDNG CONTROL SYSTEMS.
2.5 UNITARY EQUIPMENT ACCESSORIES AND MISCELLANEOUS EQUIPMENT
2.5.1 Air Economizer
Provide horizontal flow installed economizer with fully modulating 0-100 percent motor and dampers, barometric relief, minimum position setting and fixed dry bulb. Field install solid state enthalpy and differential enthalpy control.
2.5.2 Humidifier
Provide humidifiers that meet the requirements of ANSI/AHRI 640
2.5.2.1 Heat Recovery Devices
2.5.2.1.1 Hot Air Reclaim
Provide a built in heat recovery unit, factory-fabricated in accordance with Section 23 00 00 HVAC AIR DISTRIBUTION.
2.5.2.2 Gaskets
Provide gaskets conforming to ASTM F104 - classification for compressed sheet with nitrile binder and acrylic fibers for maximum 700 degrees F service.
2.5.2.3 Bolts and Nuts
Bolts and nuts must be in accordance with ASTM A307. The bolt head must be marked to identify the manufacturer and the standard with which the bolt complies in accordance with ASTM A307.
2.5.2.4 Bird Screen
Screen must be 0.063 inch diameter aluminum wire or 0.031 inch diameter stainless steel wire.
2.6 FINISHES
2.6.1 Coil Corrosion Protection
Provide coil with a uniformly applied epoxy electrodeposition, phenolic, or vinyl type coating to all coil surface areas without material bridging between fins. Submit product data on the type coating selected, the coating thickness, the application process used, the estimated heat transfer loss of the coil, and verification of conformance with the salt spray test requirement. Coating must be applied at either the coil or coating manufacturer's factory. Coating process must ensure complete coil encapsulation. Coating must be capable of withstanding a minimum 1,000 hours exposure to the salt spray test specified in ASTM B117 using a 5 percent sodium chloride solution.
2.6.2 Equipment and Components Factory Coating
Unless otherwise specified, equipment and component items, when fabricated from ferrous metal, must be factory finished with the manufacturer's standard finish, except that items located outside of buildings must have weather resistant finishes that will withstand 500 hours exposure to the salt spray test specified in ASTM B117 using a 5 percent sodium chloride solution. Immediately after completion of the test, the specimen must show no signs of blistering, wrinkling, cracking, or loss of adhesion and no sign of rust creepage beyond 1/8 inch on either side of the scratch mark.
Cut edges of galvanized surfaces where hot-dip galvanized sheet steel is used must be coated with a zinc-rich coating conforming to ASTM D520, Type
I.
Where stipulated in equipment specifications of this section, coat finned tube coils of the affected equipment as specified below. Apply coating at the premises of a company specializing in such work. Degrease and prepare for coating in accordance with the coating applicator's procedures for the type of metals involved. Completed coating must show no evidence of softening, blistering, cracking, crazing, flaking, loss of adhesion, or
"bridging" between the fins.
2.6.2.1 Phenolic Coating
Provide a resin base thermosetting phenolic coating. Apply coating by immersion dipping of the entire coil. Provide a minimum of two coats.
Bake or heat dry coils following immersions. After final immersion and prior to final baking, spray entire coil with particular emphasis given to building up coating on sheared edges. Total dry film thickness must be 2.5 to 3.0 mils.
2.6.2.2 Chemical Conversion Coating with Polyelastomer Finish Coat
Dip coils in a chemical conversion solution to molecularly deposit a corrosion resistant coating by electrolysis action. Chemical conversion coatings must conform to MIL-DTL-5541, Class 1A. Cure conversion coating at a temperature of 110 to 140 degrees F for a minimum of 3 hours. Coat coil surfaces with a complex polymer primer with a dry film thickness of 1 mil. Cure primer coat for a minimum of 1 hour. Using dip tank method, provide three coats of a complex polyelastomer finish coat. After each of the first two finish coats, cure the coils for 1 hour. Following the third coat, spray a fog coat of an inert sealer on the coil surfaces. Total dry film thickness must be 2.5 to 3.0 mils. Cure finish coat for a minimum of
3 hours. Coating materials must have 300 percent flexibility, operate in temperatures of minus 50 to plus 220 degrees F, and protect against atmospheres of a pH range of 1 to 14.
2.6.2.3 Vinyl Coating
Apply coating using an airless fog nozzle. For each coat, make at least two passes with the nozzle. Materials to be applied are as follows:
a. Total dry film thickness, 6.5 mils maximum
b. Vinyl Primer, 24 percent solids by volume: One coat 2 mils thick
c. Vinyl Copolymer, 30 percent solids by volume: One coat 4.5 mils thick
2.6.3 Factory Applied Insulation
Refrigeration equipment must be provided with factory installed insulation on surfaces subject to sweating including the suction line piping. Where motors are the gas-cooled type, factory installed insulation must be provided on the cold-gas inlet connection to the motor in accordance with manufacturer's standard practice. Factory insulated items installed outdoors are not required to be fire-rated. As a minimum, factory insulated items installed indoors must have a flame spread index no higher than 75 and a smoke developed index no higher than 150. Factory insulated items (no jacket) installed indoors and which are located in air plenums, in ceiling spaces, and in attic spaces must have a flame spread index no higher than 25 and a smoke developed index no higher than 50. Flame spread and smoke developed indexes must be determined by ASTM E84. Insulation must be tested in the same density and installed thickness as the material to be used in the actual construction. Material supplied by a manufacturer with a jacket must be tested as a composite material. Jackets, facings, and adhesives must have a flame spread index no higher than 25 and a smoke developed index no higher than 50 when tested in accordance with ASTM E84.
2.7 TESTS, INSPECTIONS, AND VERIFICATIONS
All manufactured units must be inspected and tested, and documentation provided to demonstrate that each unit is in compliance with ANSI/AHRI and
UL requirements and that the minimum efficiency requirements of
ASHRAE 90.1 - IP have been met.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, perform Verification of Dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
3.2 INSTALLATION
Perform work in accordance with the manufacturer's published diagrams, recommendations, and equipment warranty requirements. Where equipment is specified to conform to the requirements of ASME BPVC SEC VIII D1and
ASME BPVC SEC IX, the design, fabrication, and installation of the system must conform to ASME BPVC SEC VIII D1 and ASME BPVC SEC IX.
3.2.1 Equipment
Provide refrigeration equipment conforming to ASHRAE 15 & 34. Provide necessary supports for all equipment, appurtenances, and pipe as required, including frames or supports for compressors, pumps, cooling towers, condensers, and similar items. Isolate compressors from the building structure. If mechanical vibration isolators are not provided, provide vibration absorbing foundations. Each foundation must include isolation units consisting of machine and floor or foundation fastenings, together with intermediate isolation material. Other floor-mounted equipment must be set on not less than a 6 inch concrete pad doweled in place. Concrete foundations for floor mounted pumps must have a mass equivalent to three times the weight of the components, pump, base plate, and motor to be supported. In lieu of concrete pad foundation, concrete pedestal block with isolators placed between the pedestal block and the floor may be provided. Concrete pedestal block must be of mass not less than three times the combined pump, motor, and base weights. Isolators must be selected and sized based on load-bearing requirements and the lowest frequency of vibration to be isolated. Isolators must limit vibration to 10 percent at lowest equipment rpm. Provide lines connected to pumps mounted on pedestal blocks with flexible connectors. Provide foundation drawings, bolt-setting information, and foundation bolts prior to concrete foundation construction for all equipment indicated or required to have concrete foundations. Concrete for foundations must be as specified in Section
03 30 00 CAST-IN-PLACE CONCRETE. Equipment must be properly leveled, aligned, and secured in place in accordance with manufacturer's instructions.
3.2.2 Mechanical Room Ventilation
Provide mechanical ventilation systems in accordance with Section 23 30 00
HVAC AIR DISTRIBUTION.
3.2.3 Field Applied Insulation
Apply field applied insulation as specified in Section 23 07 00 THERMAL
INSULATION FOR MECHANICAL SYSTEMS, except as defined differently herein.
3.2.4 Field Painting
Painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory are specified in Section 09 90 00
PAINTS AND COATINGS.
3.3 CLEANING AND ADJUSTING
Equipment must be wiped clean, with all traces of oil, dust, dirt, or paint spots removed. Temporary filters must be provided for all fans that are operated during construction, and new filters must be installed after all construction dirt has been removed from the building. System must be maintained in this clean condition until final acceptance. Bearings must be properly lubricated with oil or grease as recommended by the manufacturer. Belts must be tightened to proper tension. Control valves and other miscellaneous equipment requiring adjustment must be adjusted to setting indicated or directed. Fans must be adjusted to the speed indicated by the manufacturer to meet specified conditions. Testing, adjusting, and balancing must be as specified in Section 23 05 93 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS.
3.4 REFRIGERANT TESTS, CHARGING, AND START-UP
Split-system refrigerant piping systems must be tested and charged as specified in Section 23 23 00 REFRIGERANT PIPING. Packaged refrigerant systems which are factory charged must be checked for refrigerant and oil capacity to verify proper refrigerant levels in accordance with manufacturer's recommendations. Following charging, packaged systems must be tested for leaks with a halide torch or an electronic leak detector.
Submit 6 copies of each test containing the information described below in bound 8-1/2 by 11 inch booklets. Individual reports must be submitted for the refrigerant system tests.
a. The date the tests were performed.
b. A list of equipment used, with calibration certifications.
c. Initial test summaries.
d. Repairs/adjustments performed.
e. Final test results.
3.4.1 Refrigerant Leakage
If a refrigerant leak is discovered after the system has been charged, the leaking portion of the system must immediately be isolated from the remainder of the system and the refrigerant pumped into the system receiver or other suitable container. Under no circumstances must the refrigerant be discharged into the atmosphere.
3.4.2 Contractor's Responsibility
Take steps, at all times during the installation and testing of the refrigeration system, to prevent the release of refrigerants into the atmosphere. The steps must include, but not be limited to, procedures which will minimize the release of refrigerants to the atmosphere and the use of refrigerant recovery devices to remove refrigerant from the system and store the refrigerant for reuse or reclaim. At no time must more than
3 ounces of refrigerant be released to the atmosphere in any one occurrence. Any system leaks within the first year must be repaired in accordance with the requirements herein at no cost to the Government including material, labor, and refrigerant if the leak is the result of defective equipment, material, or installation.
3.5 SYSTEM PERFORMANCE TESTS
Before each refrigeration system is accepted, conduct tests to demonstrate the general operating characteristics of all equipment by a registered professional engineer or an approved manufacturer's start-up representative experienced in system start-up and testing, at such times as directed. Six copies of the report provided in bound 8-1/2 by 11 inch booklets. The report must document compliance with the specified performance criteria upon completion and testing of the system. The report must indicate the number of days covered by the tests and any conclusions as to the adequacy of the system.
For equipment providing heating and cooling the system performance tests must be performed during the heating and cooling seasons.
a. Submit a schedule, at least 2 weeks prior to the start of related testing, for the system performance tests. The schedules must identify the proposed date, time, and location for each test. Tests must cover a period of not less than 48 hours for each system and must demonstrate that the entire system is functioning in accordance with the drawings and specifications.
b. Make corrections and adjustments, as necessary, tests must be re-conducted to demonstrate that the entire system is functioning as specified. Prior to acceptance, install and tighten service valve seal caps and blanks over gauge points. Replace any refrigerant lost during the system startup.
c. If tests do not demonstrate satisfactory system performance, correct deficiencies and retest the system. Conduct tests in the presence of the Contracting Officer. Water and electricity required for the tests will be furnished by the Government. Provide all material, equipment, instruments, and personnel required for the test.
d. Coordinate field tests with Section 23 05 93 TESTING, ADJUSTING, AND
BALANCING OF HVAC SYSTEMS. Submit 6 copies of the report provided in bound 8-1/2 by 11 inch booklets. The report must document compliance with the specified performance criteria upon completion and testing of the system. The report must indicate the number of days covered by the tests and any conclusions as to the adequacy of the system. Submit the report including the following information (where values are taken at least three different times at outside dry-bulb temperatures that are at least 5 degrees F apart):
(1) Date and outside weather conditions.
(2) The load on the system based on the following:
(a) The refrigerant used in the system.
(b) Condensing temperature and pressure.
(c) Suction temperature and pressure.
(d) Ambient, condensing and coolant temperatures.
(e) Running current, voltage and proper phase sequence for each phase of all motors.
(3) The actual on-site setting of operating and safety controls.
(4) Thermostatic expansion valve superheat - value as determined by field test.
(5) Subcooling.
(6) High and low refrigerant temperature switch set-points
(7) Low oil pressure switch set-point.
(8) Defrost system timer and thermostat set-points.
(9) Moisture content.
(10) Capacity control set-points.
(11) Field data and adjustments which affect unit performance and energy consumption.
(12) Field adjustments and settings which were not permanently marked as an integral part of a device.
3.6 MAINTENANCE
3.6.1 Maintenance Service
Submit a certified list of qualified permanent service organizations, which includes their addresses and qualifications, for support of the equipment.
The service organizations must be reasonably convenient to the equipment installation and be able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
-- End of Section --