General Requirements (Rev1).pdf
PDF 71 KB Posted
- Solicitation number
- N4008521R1210
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0008_21R1210.pdf | ||
| Amendment0007_21R1210.pdf | ||
| Revised Price Proposal Form.pdf | ||
| REVISED 23 81 00.pdf | ||
| Amendment0006_21R1210.pdf | ||
| Amendment0005_21R1210.pdf | ||
| Amendment0004_21R1210.pdf | ||
| Amendment0003_21R1210.pdf | ||
| 21R1210 Amendment 0002.pdf | ||
| General Requirements (Rev2).pdf | ||
| 21R1210 Amendment 0001.pdf | ||
| 1387235dwg01of01.pdf | ||
| Attachment C_BASE ACCESS INSTRUCTION.pdf | ||
| General Requirements.pdf | ||
| Attachment G_Price Proposal Form.docx | DOCX document | |
| Attachment F_BLANK DEVGRU SPREADSHEET.xls | XLS spreadsheet | |
| 1387235spc01of01.pdf | ||
| Attachment B_Pre-Proposal Inquiry (PPI) Form.xlsx | XLSX spreadsheet | |
| Attachment E_BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| Attachment D- SECNAV 5512-1 Form.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P698 DBB Physical Security Building Addition, Solicitation N4008521R1210 NAS Oceana, Dam Neck Annex, Virginia Beach, Virginia Work Order # 5832911
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
9324 VIRGINIA AVENUE NORFOLK, VIRGINIA 23511-3095
POC: Primary: Laura Thomas, (757) 341-1624, laura.e.thomas4@navy.mil
Secondary: Gary Milton, (757) 341-2075, gary.milton1@navy.mil
8(a) SMALL BUSINESS DESIGN-BUILD/DESIGN-BID-BUILD
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ)
FIRM FIXED PRICE MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
FOR HAMPTON ROADS, VA
PROPOSED TASK ORDER:
N4008521R1210
DESIGN-BID-BUILD PHYSICAL SECURITY BUILDING ADDITION,
NAVAL AIR STATION OCEANA, DAM NECK ANNEX
VIRGINIA BEACH, VIRGINIA
DATE OF SOLICITATION: 21 DECEMBER 2020
8(a) SMALL BUSINESS MACC CONTRACT HOLDERS:
N4008518D1140 AMES/Lunacon 919 E. Main St., Suite 100 Richmond, Virginia 23219 POC: John Mahler Phone: 907-344-0067 Email: jmahler@ames1.net
N4008518D1141 Asturian Group, Inc.
760 Lynnhaven Parkway, Suite 200 Virginia Beach, Virginia 23452 POC: Andrew Quiroz & Vic Lopez Phone: 757-452-3100 Email: drew@asturiangroup.com;
vic@asturiangroup.com; rfp@asturiangroup.com
N4008518D1143 Syncon 660 Independence Parkway, Suite 320 Chesapeake, Virginia 23320 POC: Mark Lilly Phone: 757-351-0770 Email: mark.lilly@synconllc.com
N4008518D1144 Tazewell-BGI JV, LLC 112 Brooke Avenue Norfolk, Virginia POC: Heather Robinson Phone: 757-502-7254 Email: hrobinson@tazewellcontracting.com
N4008218D1145 Turner Strategic Technologies Construction 7440 Central Business Park Drive, Suite 100 Norfolk, VA 23513 POC: Matt Hemsley Phone: 757-416-7610 Emails: mhemsley@tstvb.com
GENERAL REQUIREMENTS
All terms and conditions of N40085-18-D-1140/1141/1143/1144/1145 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Laura Thomas at laura.e.thomas4@navy.mil.
Amendments will be posted directly to beta.sam.gov.
NAVFAC Solicitation No.: N4008521R1210 NAVFAC Specification/Drawings: Work Order No. 5832911 (Provided as separate attachments and uploaded to beta.sam.gov) Attachments labeled as follows: 1387235spc01of01, 1387235dwg01of01
Title: DBB PHYSICAL SECURITY BUILDING ADDITION, DAM NECK, NAS OCEANA, VIRGINIA
BEACH, VIRGINIA
Description of the Work: The work includes the addition and renovation of Building 301 to construct a roughly 3,500 SF single story addition to the existing facility, for Naval Special Warfare Development Group (NSWDG) at NAS Oceana Dam Neck Annex. Work includes all site work and foundation requirements, paving and grading, and building construction including all utilities. The building will house the SOF Physical Security forces and will have the following spaces: Offices, Training Room, Break Room, Gear Storage (including existing armory), locker rooms, restroom facilities and mechanical spaces. New finishes will be installed throughout the facility.
See Section 01 11 00 Summary of Work, 1.2.1 Project Description
Estimated Budget Amount for Design and Construction: In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000.
Time for Completion: Contract completion date is 564 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed.
Wage Determination: General Decision Number: VA20200167 05/29/2020, included below (Attachment H).
Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $574.81 for each calendar day of delay until the work is completed or accepted.
Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.
Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are required.
Government Furnished Property: Not Included.
Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each offeror on price only and the basis for award will be low price.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or or $3,000,000, whichever is less.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: 120 calendar days from receipt of offers.
Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. PPIs must be submitted in writing to Laura Thomas at laura.e.thomas4@navy.mil. The cutoff for PPIs is 14 days prior to proposal due date in order to process all inquiries by the proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment B). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment to beta.sam.gov.
Site Visit: All MACC holders are invited to attend Site Visit for the project. Firms participating in the site visit will not be directly compensated for their participation. Additional information regarding base access, time, date and location will be addressed in a future amendment. Please be prepared to turn around required security forms quickly once the date is announced.
The site visit will be held on 12 January 2021 at 1300. Please meet at NSWDG (DEVGRU) Visitor’s Center, 1636 Regulus Avenue.
Security Information: All contractors who are not in possession of a valid DBIDS badge for Naval Air Station Oceana, Dam Neck Annex, Virginia Beach, VA must fill out the required attachments (Attachments D & E) as outlined in the base access instruction (Attachment C). Please make sure that you allow sufficient time to obtain passes before the site visit.
In addition to access to Dam Neck Annex, all contractors must fill out the required attachment (Attachment F) as outlined in the base access instruction (Attachment C) for access to DEVGRU.
Photographs will not be allowed.
Proposal Due Date: 20 JANUARY 2021 no later than 2:00 pm (EDT). LATE PROPOSALS WILL NOT BE
CONSIDERED.
Proposal Delivery Information: PROPOSALS SHALL BE EMAILED TO laura.e.thomas4@navy.mil. The offeror shall submit an electronic copy of the price proposal form and bid bond. A hard copy of each must be submitted within three (3) days to the below address after the due date of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.
Naval Facilities Engineering Command, Mid-Atlantic, ACQ22 Attn: Laura Thomas, Contract Specialist 9324 Virginia Avenue Building Z-140, Room 225 Norfolk, VA 23511-3624
Evaluation Factors for Award
1. The proposed task order will be awarded to the responsible offeror offering the best value to the Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price.
To make a determination of best value, the Government shall evaluate each offeror on price only.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price
(1) Solicitation Submittal Requirements: Offeror shall submit the following:
Cover page that includes:
- Solicitation Number
- Solicitation Title
- Prime Contractor Name
- Prime Contractor Address
- Phone Number
- Fax Number
- DUNS
- Cage Code
- Point of Contact
- Point of Contact Phone No.
- Point of Contact Email
Price Proposal Form Acknowledged Amendments (if applicable) Bid Bond
(2) Basis of Evaluation: The government will evaluate price based on the lump sum price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of proposed prices with the Independent Government Cost Estimate (IGCE).
EVALUATION
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest price proposal.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
ATTACHMENTS: (Attachments A, C, D, E, F will be provided under additional documents in beta.sam.gov)
(A) RFP Technical Specifications and Drawings
(B) Pre-Proposal Inquiries (PPI) Form
(C) Base Access Instruction
(D) SECNAV 5512
(E) Blank Sponsor Verification Spreadsheet
(F) Blank DEVGRU Spreadsheet
(G) Price Proposal Form
(H) Wage Determination
Attachment G
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
1.2 GENERAL BID NOTES
1.3 PLANNED MODIFICATION BID NOTES
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents –
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 – BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work for Building 301 Renovation, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB, 0001AC, 0001AD, 0002, 0003, 0004, and 0005.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0001AA
0001AA Building 301 Renovation $_________
CLIN 0001AB. Price for the entire work for Building 301 Addition (New Construction) complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0002, 0003, 0004, and 0005.
0001AB
0001AB Building 301 Addition (New Construction)
CLIN 0001AC. Price for the entire project Site Work, outside the facility's 5 foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004, and 0005.
0001AC
0001AC Site Work $ ________
CLIN 0001AD. Price for undercutting of geotechnically unsuitable soils not identified in the Contract Documents and replacement with imported backfill and fill material, and disposal of the excavation spoils at a permitted facility, in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AB, 0001AC, 0002, 0003, 0004, and 0005.
In accordance with the following schedule:
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN
0001AD (UNIT PRICE X
NO. UNITS)
0001AD Remove geotechnically unsuitable soils and replace with imported backfill and fill material
Cubic yards
$ 70.00 100 $ _______
Total Price for CLIN 0001 - BASE PRICE: $ ________
CLIN 0002 Option Item No. 1 – Price includes the following:
Price for providing all work in connection with Replacing Extra 137 LF of Security Fence, complete in accordance with the drawings and specifications.
0002 Replace Extra 137 LF of Security Fence
CLIN 0003 Option Item No. 2 - Price includes the following:
Price for provision, design, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV) complete in accordance with the drawings and specifications. Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together.
Include the price for supporting, permanent infrastructure under CLIN 0001 - BASE PRICE. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior ductbanks, manholes, utility poles, utility connections, and power connections.
0003 Electronic Security System (ESS) equipment
CLIN 0004 Planned Modification Item 1 - Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications and in accordance with the following schedule:
CLIN ITEM GOVERNMENT
FF&E
ESTIMATE
HAR
(NTE
5%)
AMOUNT
(GOVT FF&E
ESTIMATE x
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR
CLIN 0004
(GOVT FF&E
ESTIMATE +
AMOUNT)
FF&E $325,551.67 5% $_________ $_________
CLIN 0005 Planned Modification Item 2 - Price includes the following:
Price for providing work in connection with all labor, material, equipment, transportation and supervision required for the Audio/Visual (A/V) complete in accordance with the plans and specifications and the following schedule:
CLIN ITEM GOVERNMENT
A/V
ESTIMATE
A/V HAR
(NTE
5%)
AMOUNT
(GOVT A/V
ESTIMATE x
HAR%)
TOTAL AV
ESTIMATED
AMOUNT FOR
CLIN 0005
(GOVT A/V
ESTIMATE +
AMOUNT)
Audio/Visual (A/V)
$183,142.86 5% $________ $________
CLINs 0001-0005 Total: $__________
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item[s] 0001AA, 0001AB, and 0001AC, and the sum of the extensions under Contract Line Item 0001AD. For CLIN 0001AD enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002 and CLIN 0003 to the Contractor at the proposed price within 180 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, and CLIN 0003. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains [_____] calendar days after award of the contract.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
e. If CLIN 0002 and 0003 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification CLINs.
a. The estimated amount for FF&E and A/V has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E and A/V Estimate is only an estimated amount.
b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in Section 01 30 01.00 22 DESIGN PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES, AND
EQUIPMENT.
c. Bonding is not required for the design, procurement and installation of FF&E and A/V equipment.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent.
This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E and A/V. The proposed HAR is a fixed rate.
e. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.
f. If awarded, the FF&E and A/V modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contract completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the modification is in the last six months of the contract.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
Attachment H
"General Decision Number: VA20200167 05/29/2020
Superseded General Decision Number: VA20190167
State: Virginia
Construction Type: Building
County: Virginia Beach* County in Virginia.
*INDEPENDENT CITY OF VIRGINIA BEACH
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 04/10/2020 4 05/22/2020 5 05/29/2020
* ASBE0024-006 04/01/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 38.01 17.37+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 32.72 25.26
BRVA0008-001 02/01/2018
Rates Fringes
BRICKLAYER.......................$ 20.59 8.13
ELEV0052-005 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 42.70 34.765+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15
IRON0079-012 05/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 26.18 16.37
IRON0079-013 05/01/2020
Rates Fringes
IRONWORKER, RIGGER...............$ 26.18 16.37
PLUM0110-008 11/01/2019
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 29.22 16.98
PLUMBER..........................$ 29.22 16.98
SUVA2013-052 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.93 4.41
CAULKER..........................$ 18.49 1.33
CEMENT MASON/CONCRETE FINISHER...$ 17.13 0.00
ELECTRICIAN, Includes Low Voltage Wiring and Alarm Installation.....................$ 22.94 1.94
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 13.48 3.27
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
LABORER: Pipelayer..............$ 12.40 1.96
LABORER: Common or General, Including Demolition.............$ 12.90 0.96
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.25 2.72
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 18.00 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 17.50 2.20
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"