View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004 RFI Responses.pdf PDF
Amendment 0004 Section J-1 PTO SOW Rev.pdf PDF
Amendment 0004.pdf PDF
Amendment 0002 Section J-5 Key Personnel List.pdf PDF
Amendment 0002 Section J-5 Key Personnel List.docx DOCX document
Amendment 0002 Section J-9 Relevant Experience Project Checklist.xlsx XLSX spreadsheet
Amendment 0003 Section J-1 PTO SOW.pdf PDF
N4008521R0062 Amendment 0003.pdf PDF
Amendment 0002 Section J-1 PTO SOW.pdf PDF
Amendment 0002 RFI Responses.pdf PDF
Amendment 0002 Section J-1a Service Calls Proposal Sheet (REV).pdf PDF
N4008521R0062 Amendment 0002.pdf PDF
Amendment 0001 Draft OandM Manual for Steam Injection.pdf PDF
Amendment 0001 CBandI Final Work Plan Site 4.pdf PDF
N4008521R0062 Amendment 0001.pdf PDF
Amendment 0001 Resolution Consultants BOD.pdf PDF
Amendment 0001 Technical Memo for OU3 Site 4.pdf PDF
N4008521R0062 Solicitation.pdf PDF
Section J-1 PTO SOW.docx DOCX document
Section J-2 Price Proposal Form.xlsx XLSX spreadsheet
Section J-3 CO Markup Rates.docx DOCX document
Section J-5 Key Personnel List.docx DOCX document
N4008521R0062 Solicitation.pdf PDF
Section J-8 Project Data Form.docx DOCX document
Section J-4 Responsibility Eval Form.docx DOCX document
Section J-7 PPQ.docx DOCX document
Section J-6 WD 2015-4157.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION QUESTION GOVERNMENT RESPONSE AMEND

NO.

Is the oil water separator operational to remove condensed vapors extracted from the subsurface by the SVE?

The oil water separator was used for the groundwater extraction system, it is not being used as part of the biosparge system. No condensed vapors requiring an oil water separator are anticipated.

Is the biosparge system treating soils w/ TPH> 1,000 ppm or both soil & GW? Our understanding is that all wells (six new and 3 steam inj wells ) used for sparging are screened below the water table. If so then biosparging is primarily used for GW treatment. However, section 3.1.3 in the draft O & M manual says that soils above 1,000 ppm TPH is treated by biosparging.

The system is designed to treat both soil and GW. 0005

Due to discrepancies in the RFP and Q&A, such as referencing items in Factors, but not describing what is to be included in that factor would the Government consider issuing a revised RFP that has made corrections to section L & M based on answers to questions so all contractors have a clear understanding of the proposal submittal requirements needed for each volume?

The Q&As provide clarification to any descrepancies in the RFP and should be used/reference when producing the submittal requirements.

Volume # 1 – General Proposal, Section L.5.2, the naming convention, has Factor 5: Technical Proposal, Tabs A-D within Volume 1. Is Factor 5 intended to be part of the 125 page limit for Volume 1 indicated in Section L.6.2.1?

Yes; however, the soliciation notes several documents are not part of the page count such as the RAO and LTM reports.The proposal due date is 7/25/2022 by 2:00 PM.

L.8.5.3 Describe your technical approach to completion. Identify and explain work elements and decision points, including as appropriate: planning, testing, punch list inspection, resolution of punches list items, final inspection, final clean up and turnover”

Can you please clarify this statement as applicable to the seed project?

The items listed are examples of actions that may be included as part of your technical approach for addressing the seed project. As noted only include the items that are appropriated for completing the task