AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Response to RFI's and extend proposal due date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0062
X 9B. DATED (SEE ITEM 11)
07-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2022
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R0062
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to provide the following:
• Extend the proposal due date to 25 July 2022.
• Revised Section J-1 PTO Scope of Work to include Site Visit information.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
SECTION L - INSTRUCTIONS TO OFFERORS
L.1 PRE-PROPOSAL MEETING/SITE VISIT
A pre-proposal meeting or conference call may be scheduled for the solicitation. NAVFAC will provide information regarding such a meeting or conference call to those Offerors that are selected for the evaluation process.
L.2 PROPOSAL DUE DATE
Proposals are due no later than 2:00 pm EST on 25 July 2022.
Proposals shall be delivered to the following address in accordance with the date and time set for receipt of proposals:
NAVFACSYSCOM MID-ATLANTIC
ATTN: Heather Dennis 9324 Virginia Avenue Bldg. Z-140, ROOM 216 Norfolk, VA 23511 Tel: (757) 341-1518 heather.m.dennis13.civ@us.navy.mil
RECEIPT OF PROPOSALS IS ON A SECURED MILITARY INSTALLATION. IF YOU REQUIRE
BASE ACCESS FOR PROPOSAL SUBMISSION YOU MUST NOTIFY (VIA
heather.m.dennis13.civ@us.navy.mil) THREE (3) BUSINESS DAYS PRIOR TO THE DATE ACCESS IS
REQUIRED. IF YOU SEND AN EMAIL REQUEST FOR BASE ACCESS AND DO NOT RECEIVE
A REPLY WITHIN ONE BUSINESS DAY CONFIRMING THAT ACCESS HAS BEEN ARRANGED,
YOU MUST CALL TO CONFIRM AT (757) 341-1518. PROPOSALS RECEIVED AFTER THE DUE
DATE/TIME BECAUSE OF DELAYS ARISING FROM BASE ACCESS MAY NOT BE
CONSIDERED. PLAN ACCORDINGLY; THE TIME TO BE GRANTED BASE ACCESS
FLUCTUATES.
L.3 INQUIRIES OR QUESTIONS
Inquiries and questions on this Request for Proposal shall be submitted in writing electronically to the Contract Specialist or Contracting Officer as follows:
Contract Specialist: Heather Dennis Email: heather.m.dennis13.civ@us.navy.mil
Contracting Officer: Stewart Wittmann Email: stewart.b.wittmann.civ@us.navy.mil
All inquiries or questions must state the solicitation number, clearly state the question and reference, and MUST BE RECEIVED NO LATER THAN 10 DAYS BEFORE THE PROPOSAL DUE DATE in order to permit adequate time for the Government to reply to inquiries.
Always confirm receipt via email at heather.m.dennis13.civ@us.navy.mil.
L.4 PROPOSAL SUBMITTAL REQUIREMENTS:
L.4.1 General: Proposals submitted in response to the solicitation shall be formatted as follows and furnished in the number of copies stated herein. Both paper and electronic copies of the technical proposal are required. Firms shall submit proposals via electronic format on CD-ROM. The acceptable electronic formats for proposals include Word 2016 or later version, Excel 2016 or later version, or Adobe Acrobat 2017 or later version.
L.4.2 Electronic mail is not an acceptable media format. Firms shall ensure that proposal disks are virus free, and free of password protection. If access to proposal data is prohibited due to viruses, passwords, or wrong format, the proposal may be rejected.
L.4.3 Proposal Submission Requirements:
L.4.3.1 All proposals (paper and electronic) shall be labeled with the Volume Number and Title, Solicitation Number, Name, address, and phone number of the Offeror.
L.4.3.2 Page limits, where stipulated, must be adhered to. Electronic page size shall be 8.5" x 11".
Font size shall be 10 point or larger.
L.4.3.3 The electronic/paper proposals shall be submitted on separate Disks/Binders. The following information shall be included in each Volume (Disk/Binder) and tabbed/labeled accordingly:
L.5 VOLUME #1 – GENERAL PROPOSAL
L.5.1 General Information: A cover letter shall accompany the proposal as required by FAR 52.215- 01(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the solicitation number, name, address, telephone number and facsimile number of the offeror. This page will not be included in the page count of the proposal.
L.5.2 File naming of proposal information: The file naming convention of Volume 1shall be as follows:
Factor 1 – Management Approach Tab A – Management Approach Tab B – Key Personnel Tab C – Teaming and Partnering Agreements/Joint Venture Team Agreements
Factor 2 – Recent, Relevant Experience of the Firm
Tab A – Project Data Sheet Submittals Tab B – Awards, Certificates, and Letters of Recommendation
Factor 3 – Safety Tab A – Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate Tab B – Technical Approach for Safety
Factor 4 - Past Performance Tab A - Project Data Sheets with Accompanying Project Performance Evaluations (CPARS or
PPQ)
Tab B - List of Additional Projects Tab C - Awards, Certificates, and Letters of Recommendations Tab D – Disclosure of Enforcement Actions and Non-Compliance Issues
Factor 5: Technical Proposal- Proposed Task Order 0001 Tab A – PTO 0001- Project Approach Tab B – PTO 0001- Team Organization and Experience Tab C – PTO 0001- Technical Approach Breakdown Tab D – PTO 0001- Project Milestone Schedule
L.6 VOLUME #2 – PRICE PROPOSAL:
L.6.1 General Information: A cover letter shall accompany the proposal as required by FAR 52.215-
01(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the solicitation number, as well as the name, address, telephone number, facsimile number, Dun & Bradstreet Number, Cage Code, and Tax Identification Number (TIN) of the offeror. In addition it shall contain a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the prices stated for each item. It shall include the name, address, telephone number, facsimile number, and email address of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation. Furthermore, it shall contain the names, titles, and signatures of persons authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. This page will not be included in the page count of the proposal.
L.6.1.1 File naming of proposal information: The file naming convention of Volume 2 - Price
Proposal and Compensation Plan shall be as follows:
Proposed Task Order (PTO) 0001 - Price Proposal Tab A - PTO 0001 – Required Submittals Tab B - PTO 0001 - Seed Project Price Proposal Tab C - PTO 0001 – Compensation Plan
L.6.2 Offeror(s) shall submit proposal copies as follows:
L.6.2.1 Volume #1 – Submit six (6) paper copies of contents in three ring binders with one (1) marked “Original” with the following characteristics:
a) 8 1/2 x 11 format
b) 12-point Times New Roman font.
c) 125 page limit (inclusive of all charts, resumes forms and other documentation to the solicitation requirements), pages sequentially numbered. Price proposals are not part of the 125-page limitation.
d) Include a cover page with Contract Number, Contract Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone number and email address.
e) Include only information in response to Factors 1, 2, 3, 4 and 5 separated by tabs as applicable.
f) A complete electronic copy of the technical proposal as a single .pdf file on a CD-ROM (include with the “original” technical submission)
L.6.2.2 Volume #2 – Submit (1) paper copy in a separate three-ring binder of the price proposal.
In addition to providing a hard copy of the price proposals, offerors shall also provide one
(1) non-rewritable CD with pricing information. Offerors are advised that in the event of a discrepancy between pricing information contained on the CD and the hard copy, the hard copy will govern.
a) SF33, signed with all amendments acknowledged and executed representations and certifications (SAM).
b) Confirm submission of the most recent Vets 4212 Report.
c) Provide name of financial institution, point of contact, telephone number and e-mail address. Provide a signed statement of release giving the reference permission to release the information to the Navy.
d) The price proposal shall be submitted at the same time as the technical proposal.
L.7 PROPOSAL CONTENT
L.7.1 General. Proposal(s) shall contain complete written responses to Factors 1, 2, 3, 4, 5, and Price.
L.8 GENERAL PROPOSAL
L.8.1 Factor 1 Management Approach
L.8.1.1 Factor 1 Management Approach – Proposal Submittal Requirements L.8.1.2 Submit a narrative that discusses the following topics: a) Describe the Offeror’s ability to manage multiple projects simultaneously; b) address how offeror will provide labor, materials, equipment, subcontractors, and project management for sites. Offeror information provided shall not exceed five (5) pages total.
L.8.1.3 Indicate the type and percentage of work the Offeror will self-perform. Offeror must meet the requirements of FAR 52.219-14, Limitation on Subcontracting. Explain how you will manage your subcontracts under multiple projects at varying locations. Information provided shall not exceed three (3) pages.
L.8.1.4 Discuss the firm’s general quality control procedures, identifying how Remedial Action Operation and Long-Term Management quality will be managed and maintained. Explain how you will manage and control the three phases of the Quality Control Program (i.e., preparation phase, initial phase, Follow-up phase) to assure a highly performing QC program is provided. Discuss how you define the activities for which the three phases of control are performed, and discuss the actual inspection activities and documentation of inspections at each phase. Information provided shall not exceed five (5) pages.
L.8.1.5 Provide documentation that a safety program is in place that meets the requirements of the most recent US Army Corps of Engineers Safety and Health Requirements Manual, EM- 385-1-1 and OSHA 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response. Information shall not exceed three (3) pages.
L.8.2 Factor 2 Recent / Relevant Corporate Experience – Proposal Submittal Requirements L.8.2.1 Definitions and qualifying information:
• “Relevant experience” is work completed by an offeror that is similar in size, scope, and complexity to the types of projects intended to be awarded under the IDIQ contract.
Projects Note that once a relevancy determination is made, a further delineation regarding the “degree” of relevancy for the projects offered may be made by reviewing officials.
Further “degrees” of relevancy for the projects determined to be relevant will be as follows:
Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
• A “project” is defined as a single contract or single task order awarded under an indefinite quantity or on-call contract.
• The term “substantially complete” shall mean that more than 80% of the project has been performed.
• “Within the past five (5) years” shall be calculated from the date of the proposal submission. .
• “Long Term Management” (LTM) occurs when the selected remedy has achieved the cleanup goals (possibly done under the remedial action or RAO phase) and the hazardous substances remain at the site above levels that would allow unlimited use and unrestricted exposure. LTM may include long-term monitoring, implementation and/or management of land use controls (LUCs), maintenance of the final remedy, and preparation of the five-year review.
• “Remedial Action” (RA) may include, but are not limited to the construction of various soil, sediment, and/or groundwater remediation systems that functions as containment (e.g. soil cover, RCRA cap, slurry wall, pump and treatment system); in-situ treatment (e.g. natural attenuation, soil vapor extraction, enhanced bio-remediation, air-sparging) or ex-situ treatment (air stripping, constructed wetlands, offsite disposal, stabilization, solidification)
• “Remedial Action Operation” (RAO) is the phase of the CERCLA process when the remediation system (possibly constructed under the remedial action phase) is in place and is operating, or the chemical or biological processes are occurring leading to the cleanup objective. RAO may include active remediation, monitoring, operation, and optimization for extended periods of time to reduce contaminants to site cleanup standards; along with the implementation and management /maintenance of Land Use Controls (LUCs).
• For the purposes of this solicitation, the term “TEAM” shall be defined as two or more companies, which form a partnership or joint venture to act as a potential PRIME CONTRACTOR for the purposes of contract performance under the subject solicitation. A team member is one of more of those companies. A team member is NOT a subcontractor for the purposes of this solicitation. This definition shall be used and applied consistently throughout this solicitation
L.8.2.2 Solicitation Submittal Requirements:
• Submit three (3) relevant Remedial Action Operation (RAO) projects and three (3) relevant Long Term Management (LTM) projects. The offeror shall submit a total of six (6) projects. Projects must have been completed or substantially completed within the last five (5) years. Offeror (or your team member) must have been the prime contractor for each project; subcontractor experience will not be considered.
• Submit two (2) examples of actual LTM environmental reports that offeror prepared and submitted to local, state or federal agencies. The two (2) reports should be directly associated with any two (2) of the relevant projects submitted for Factor 2. These reports should be submitted as separate attachments and do not count toward the total page restriction for Project Data Sheets.
• Complete the “Project Data Sheet” Section (J-8) for each project. Each Project Data Sheet package may not be longer than six (6) pages in length.
• Complete and submit a “Relevant Experience Project Checklist” (Section J-9) that covers all of the relevant projects submitted for this factor. This Checklist will serve as the Contractor’s self-assessment of the type of services contained in each of the relevant projects. This Checklist does not count towards the total page restriction for Project Data Sheets. LTM Reports developed in accordance with CERCLA requirements should also be annotated on the “Relevant Experience Project Checklist.”
Joint venture offerors must include two (2) relevant projects performed by the joint venture as existing or relevant projects performed by each firm comprising the joint venture. The Small Business Administration (SBA) determines the validity of a joint venture under an 8(a) Program.
Projects may include work with federal, state, or local governments, as well as private industry. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy.
L.8.2.3 Basis of Evaluation: The Government’s evaluation will assess the Contractor’s recent
(within the past five (5) years) and relevant experience with respect to size, scope, and complexity.
• Projects submitted by Joint Ventures in which the joint venture partners performed together (either as joint venture partners or in a prime-sub relationship), will be given more weight than submitted projects in which the Joint Venture firms did not perform together.
• Higher ratings may be given for demonstration of the following:
o Offeror’s (and team members) demonstrated knowledge and experience with type of projects anticipated for this RAOMAC in the area of responsibility for New England” area (Maine, Massachusetts, Connecticut, Rhode Island) and the “Mid- Atlantic” area (New York, Pennsylvania and New Jersey) as well as other locations in the Mid-Atlantic AOR in terms of codes, specific state & federal environmental regulations, laws, permit requirements, construction materials, general practices, topography and subsurface conditions, etc.
o Specific type of RAO/LTM work: While there are many examples of environmental restoration RAO/LTM work, the following specific types of environmental restoration RAO/LTM types are deemed more important to this RFP than others. Therefore, ensure that you provide your firm’s (and team members) experience, if any, in the following types of work, which are listed in descending order of importance (weight).
• Treatment plant operation & optimization: Provide experience with the operation and optimization of groundwater (especially complex, multiple treatment trains) treatment facilities including operating, maintaining, monitoring, repairing, and incidental construction support. Provide the size, duration and yearly operation and maintenance cost of the treatment facility, and task order or contract pricing. Optimization experience shall include optimizing equipment performance, monitoring requirements and overall system protectiveness (containment of site plume, etc.). Include significant recommendations (alternate technologies, studies, groundwater-modeling efforts) and how they were incorporated into the facilities’ operation in order to reduce costs or improve protectiveness. Provide experience with RAO/LTM systems start up and shut down support including the transition of the facility to other parties for operation and maintenance.
• Site management & remedy maintenance: Experience with site management and maintenance including, but not limited to, protection of human health and the environment, site security, disposal of investigation derived wastes, decommissioning of wells, sampling, and construction support required for ensuring the protection of an existing remedy (i.e. installation of fencing, landfill maintenance and erosion control, provision of warning signs)
• Technical Reports: Experience with the preparation of RAO/LTM technical reports (i.e.
annual reports, Operation and Maintenance Manuals, site sampling results reports, 5-year review reports) for each site noted above.
• Offerors (and team members) shall demonstrate experience working multiple projects simultaneously typical of those ordered by indefinite delivery/indefinite type contracts.
L.8.3 Factor 3 Safety - Solicitation Submittal Requirements
L.8.3.1 Solicitation Submittal Requirements: The Offeror shall submit the following information:
The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
• DART Rate: Submit five (5) previous complete calendar years’ [CY2021, CY2020, CY2019, CY2018, and CY2017] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.
• DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
• Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
L.8.3.2 TCR Rate: Submit five (5) previous complete calendar years’ [CY2021, 2020, 2019, 2018, and 2017] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.
• TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
• Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.
L.8.3.3 Technical Approach to Safety:
• Describe the Offeror’ s approach to implementing and executing a Safety Management
System (SMS) including Management/ Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
• Describe the evaluation process used to select potential subcontractors.
• Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).
The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
NOTE: In the event the prime will perform all work with its in house staff, that is NO subcontractors will be used at any level, provide this information in your narrative to document why the required information concerning subcontractors is not included in your proposal. Failure to provide the required information or an affirmative statement that the offeror shall perform all work itself without subcontractors will be considered a material defect rendering the proposal UNACCEPTABLE for this factor.
All information outlined above in (1), (2), and (3) MUST be provided or the proposal will be considered UNACCPTABLE. If information is not available in the submitted narratives, provide a reason for missing required information.
L.8.3.4 Basis of Evaluation: The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation.
The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
• DART Rate: The board will evaluate trends over the last five (5) years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
o Missing data without an explanation is considered a deficiency.
o Declining trends, that push the risk levels from Moderate Risk (MR) or higher to
Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
o An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
o This chart correlates the DART rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
• TCR Rate: The board will evaluate trends over the last five (5) years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
o Missing data without an explanation is considered a deficiency.
o Declining trends, that push the risk levels from Moderate Risk (MR) or higher to
Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
o An increasing TCR rate trend could be considered a weakness (i.e. MR or better to
High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
o This chart correlates the TCR rate to the level of risk:
Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0
• The Technical Approach to Safety Narrative. To determine the degree to which the
Offeror:
o Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
o Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.
o Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.
• The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc. The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project.
The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
NOTE: In the event the prime will perform all work with its in-house staff, that is NO subcontractors will be used at any level, provide this information in your narrative to document why the required information concerning subcontractors is not included in your proposal. Failure to provide the required information or an affirmative statement that the offeror shall perform all work itself without subcontractors will be considered a material defect rendering the proposal UNACCEPTABLE for this factor.
All information outlined above in (1), (2), and (3) MUST be provided or the proposal will be considered UNACCPTABLE. If information is not available in the submitted narratives, provide a reason for missing required information.
L.8.4 Factor 4 Past Performance
L.8.4.2 Definitions
• Past Performance is a measure of the degree to which an offeror satisfied its customers’ requirements in the past and complied with applicable laws and regulations.
L.8.4.3 Solicitation Submittal Requirements
• For each project submitted under Factor 2: IF A COMPLETED CPARS
EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE
PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ), Section J-7, included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. AN OFFEROR SHALL NOT SUBMIT A PPQ
WHEN A COMPLETED CPARS IS AVAILABLE.
• IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Section J), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
If the client requests, questionnaires may be submitted directly to the Government's point of contact, Andre Forte, via email at andre.forte.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
• Also include performance recognition documents received within the last five (5) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
• In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS),and any other known sources not provided by the offeror.
• While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
L.8.4.4 Basis of Evaluation
The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
• A pattern of successful completion of tasks.
• A pattern of deliverables that are timely and of good quality.
• A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.).
• Recency of tasks performed that are identical to, similar to, or related to the task at hand.
• A respect for stewardship of Government funds.
Projects submitted by Joint Ventures, where the joint venture partnerships performed together (either as joint venture partners or in a prime-sub relationship), may be given more weight than projects submitted where the Joint Venture firms did not perform together.
In the case of an offeror without a record of relevant past performance, the offeror may be evaluated neither favorably nor unfavorably on past performance. Rather, the offeror will receive an NR (No Rating).
L.8.5 PTO 0001 Price Proposal
L.8.5.1 Proposal Submittal Requirements: Offerors shall submit an original and one (1) copy of the price proposal, in a separate three ring binder, that shall include the following:
• SF33, signed with all amendments acknowledged and executed representations and certifications (SAM).
• Confirm submission of the most recent Vets 4212 Report.
• Provide name of financial institution, point of contact, telephone number and e-mail address. Provide a signed statement of release giving the reference permission to release the information to the Navy.
• The price proposal shall be submitted at the same time as the technical proposal.
• In addition to providing a hard copy of the price proposals, offerors shall also provide one (1) non-rewritable CD with pricing information. Offerors are advised that in the event of a discrepancy between pricing information contained on the CD and the hard copy, the hard copy will govern.
L.8.5.2 Basis of Evaluation: The Government will evaluate price based on costs submitted for the “Seed Project” included in the solicitation. The offerors shall provide a complete breakdown of the sample project tasks in the form of an Implementation Plan (IP) and Price Proposal (PP). The Government intends to award the “Seed Project” via Task Order 0001 to the successful offeror determined to be most advantageous to the Government, cost and technical factors considered. A maximum of four (4) additional offerors may simultaneously receive an award as a result of this solicitation. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
• Comparison of proposed prices received in response to the RFP.
• Comparison of proposed prices with the IGCE.
• Comparison of proposed prices with available historical information.
• Comparison of market survey results.
The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
L.8.5.3 PTO 0001 Technical Proposal (TAB A) – Project Approach
Provide a narrative describing your overall technical approach for completing Proposed Task Order (PTO) 0001 that will be utilized to create a result that meets or exceeds performance objectives. Figures, charts, and/or diagrams may also be included to support the narrative, but they must not be larger than 8 ½” x 11” are must be included in the page count.
Describe your approach to implementation and optimization of PTO 0001. Describe how plans will be transformed into work-in-place, including supervisory controls of the labor force (including subcontractor personnel), cost tracking (overall and between CLINS and
SLINS), enforcement of safety standards, regulatory requirements, standards of workmanship, and the overall standards of the workplace.
Describe your technical approach to completion. Identify and explain work elements and decision points, including as appropriate: planning, testing, punch list inspection, resolution of punches list items, final inspection, final clean up and turnover.
Identify and describe any potentially difficult and challenging special issues, and your planned approach to successfully handling them.
Sequentially number all pages in the upper right hand corner of the page. Figures, charts, and/or diagrams may also be included to support the narrative, but they must not be larger than 8 ½” x 11” are must be included in the page count. The entire Technical Proposal (Tabs A, B, C, and D) shall be limited to a maximum of thirty (30) pages.
L.8.5.4 PTO 0001 Technical Proposal (TAB B) - Team Organization and Experience
The task order management approach shall address quality control procedures, evidence of the firm’s knowledge of applicable regulatory requirements, and a staffing plan for PTO 0001. The management approach shall also address how costs will be effectively managed.
Describe your organization for this specific job (PTO 0001). Include an organizational chart showing lines of authority. Provide a Personnel Table containing a brief description for each position indicated in the organizational chart including the individual’s name, years in the industry, years with the firm, level of education/and or journeyman-ship, and license or certification if applicable. Provide resumes for all non-Key Personnel that will be involved with this PTO, and all Key Personnel involved with this task order that do not already have resumes provided under Evaluation Factor 1 requirements. Key and non- Key Personnel requirements are listed in Section C of the solicitation. Resumes are excluded from the page limit for this factor.
Provide a plan for resolution of Conflicts of Interest.
Describe the quality control procedures of the CQC program to be utilized to ensure submittals are approved in a timely manner and that only approved materials are incorporated into the work. Describe the structure and controls that drive field oversight, process and approval authority, testing, and similar procedures.
Describe the health and safety program for this proposed PTO 0001 that will apply to prime and subcontractor personnel. Identify who will be responsible for developing the site specific health and safety plan, their experience and training, and lines of authority.
Describe the processes for budgeting, planning and managing resources, tracking of labor and material expenditures, and cost control.
L.8.5.5 PTO 0001 Technical Proposal (Tab C) –Technical Approach Breakdown Provide a technical approach breakdown proposal by tasks, level of effort and resources that demonstrate your understanding and analysis of the project work requirements. This proposal shall include labor mix, man hours, material, and equipment for prime and any proposed subcontractors. The proposal breakdown shall be submitted in an Excel Spreadsheet, at a level of detail sufficient to validate your understanding of this technical requirement. Do not include rates, costs, or prices with your technical proposal.
Proposals that contain rates, costs, and or prices in the technical proposal may be rejected.
L.8.5.6 PTO 0001 Technical Proposal (Tab D) – Performance Milestone Schedule
Provide a Performance Milestone Schedule that demonstrates understanding of objectives and challenges to successful performance with a target completion date proposed in accordance with the Performance Work Statement.
L.9 VOLUME #2 PRICE PROPOSAL
L.9.1 PTO 0001 Price Proposal – Proposal Submittal Requirements/VOLUME #2 L.9.1.1 PTO 0001 Price Proposal Tab A - Required Submittals
• There are no page limitations on the Tab A submittals; however, all submitted materials must be relevant to the Tab A requirements.
• Executed Solicitation, Offer and Award Forms (SF 33), including supplemental pages.
• Letter from offeror’s surety showing proof of bonding capability in the amount of
$2,000,000 for a single project and an aggregate bonding capability of $4,000,000.
• Signed acknowledgement of all amendments (SF30).
• Representations and Certifications printed from Online Representations and
Certifications Application (ORCA).
• Section 8(a) of the Small Business Act Certification.
• Bank/Credit References: Submit at least one bank and one credit reference. Provide name of institution, point of contact, email address, phone number and account number for each reference (Use Responsibility Evaluation Form, provided as J-4). Provide a signed statement of release giving the reference permission to release the information to the Navy.
L.9.1.2 PTO 0001 Price Proposal Tab B – Seed Project (PTO 001) Price Proposal
• PTO 0001 Price Proposal must be submitted on the NAVFAC-provided Price Proposal Form (PTO 0001), Section J-2.
• If Offeror is proposing a technical approach that differs from what is presented in the Scope of Work, Contractor shall provide a cost proposal for the work as currently scoped in order to provide a basis of comparison with other Offerors. Contractor can provide a supplemental cost proposal that reflects the alternative technical approach.
L.9.1.3 PTO 001 Price Proposal Tab C - Compensation Plan
• Per FAR 52.222-46, Evaluation of Compensation for Professional Employees, the Offeror shall submit a narrative compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. It must address the Offeror’s ability to provide uninterrupted high-quality work, and impact upon recruiting and retention. Supporting information will include data used in establishing the total compensation structure, such as recognized national and regional compensation surveys and studies of professional, public and private organizations.
• Sequentially number all pages in the upper right hand corner of the page. The narrative compensation plan shall not exceed five (5) pages. Supporting information does not count against this page limit.