Amendment 0001 N4008521R0036 SOLICITATION.pdf

PDF 3 MB Posted

Attached to
Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point NC
Solicitation number
N4008521R0036
Issued by

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
SITE VISIT LOG 21R0036.pdf PDF
Amendment 0003.pdf PDF
Amend 0003 ELINs Cherry Point.xlsx XLSX spreadsheet
NAVY SHORE BOILER GUIDE.pdf PDF
J-0200000-07 Spill Plan.pdf PDF
Amendment 0002 N4008521R0036.pdf PDF
ELINs Cherry Point.xlsx XLSX spreadsheet
J-0200000-05-05Leak Rate Calculations.pdf PDF
Solicitation N4008521R0036.pdf PDF
J-1607000-03.jpg JPG image
J-1605000-03.jpg JPG image
NAVFAC Form PPQ-0.docx DOCX document
J-1608000-03.jpg JPG image
J-0200000-07 Installation Spill Control Plan.pdf PDF
CORPORATE EXPERIENCE PROJECT DATA SHEET.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 2/1/2021

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

FEAD CHERRY POINT See Item 6

BLDG 163 CURTIS ROAD

PSC BOX 8006

CHERRY POINT, NC 28533-0006

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

N4008521R0036

9B. DATED (SEE ITEM 11) 1/28/2021

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued to remove the word “draft” from the original solicitation.

The corrected solicitation removing the word “draft” is attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 23 Feb 2021

X

A X B X C

D

EX

X G F 174 - 185

186 - 192 H 193 - 195

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 195

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40085 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

B-163 MCAS Cherry Point, NC conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 10

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

11 - 73 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

74 - 76 77 - 88

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 89 - 91 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

92 - 98

PART II - CONTRACT CLAUSES

NAVFACSYSCOM MID-ATLANTIC

FEAD CHERRY POINT

BLDG 163 CURTIS ROAD

PSC BOX 8006

CHERRY POINT NC 28533-0006

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

99 - 173

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

28 Jan 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008521R0036

Section B - Supplies or Services and Prices

GENERAL INFORMATION

B.1 Contract Title: Equipment Operation and Maintenance for the Central Energy Building, Naval Health

Clinic, Marine Corps Air Station Cherry Point, North Carolina.

B.2 Type of Contract: This is a combination Recurring/Non-Recurring Firm Fixed Price Indefinite Delivery-

Indefinite Quantity (FFP/IDIQ) type contract as noted in Section L, Instructions, Conditions, and Notices to Offerors.

B.3 Minimum Guarantee: The minimum guarantee for this contract is the Firm Fixed Price portion of the base period only.

B.4 Set-Aside: This requirement is set-aside for competition among 100% small business concerns.

B.5 NAICS Code: The NAICS Code assigned to this procurement is 561210 Facilities Support Services with a

Small Business Size Standard of $41.5 million. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM.

B.6 Wage Determination (Service): A Service Contract Act (SCA) wage determination is included in this solicitation. Refer to Section J, Attachments.

B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this solicitation.

B.8 Contract Term: This contract contains provisions for a One-year Base Period with four (4) One-year Option

Periods, not to exceed 60 months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, FAR 52.217-9, Option to Extend the Term of the Contract- Services (Mar 2000).

B.9 Period of Performance: The base period of performance will start on the award date and last one year.

B.10 Evaluation of Proposal: Offeror shall submit a lump sum price for Section B, CLINs 0001 through 0010 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).

B.11 Contract Line Items and Contract Exhibit Line Items

a. Offerors shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly.

The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.

c. The schedule of Recurring Work (CLINs 0001, 0003, 0005, 0007, 0009) and the schedule of Non-

Recurring Work (CLINs 0002, 0004, 0006, 0008, 0010) will be used as the basis for deductions in accordance with the FAR Clause 52.246-4, Inspection of Services – Fixed Price (AUG 1996).

B.12 Non-Recurring (IDIQ) Individual Contract Line Item Quantities

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.13 Maximum Not to Exceed (NTE) and Minimum Guarantee

The maximum NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum or NTE value of the contract is the total value of all CLINs in the Schedule. Orders shall not be made that exceed the maximum NTE value for any ordering period. The maximum NTE value of an ordering period and of the contract may be increased by written modification to the contract in conjunction with any modification that increases the value of an existing task order that is authorized by a contract clause. Orders in excess of the estimated quantity set forth for any particular CLIN shall not be exceeded without the Contractor’s agreement which shall be indicated by signing or beginning performance of the order.

Currently, with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee for:

CLIN 0001 Facilities Support Services.

Minimum guarantees do not apply to the option periods.

B.14 Unit Price Adjustments in Option Periods

This contract incorporates the Service Contract Act (SCA). The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract and the unit prices will be adjusted in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of his proposal that the price does not include any contingency for future wage increases.

B.15 Unit Prices for Labor

a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Work.

b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring” accomplished in the time period shown.

c. The Contractor shall enter, in the unit price space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards). The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.

B.16 Incorporation of Technical Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (I) the contract (excluding the proposal), and then (ii) the technical proposal.

B.17 Request for Proposal (RFP) Information/Clarification Questions

Contractor is required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, by email to kimberly.c.lacy@navy.mil and ericka.j.bishop@navy.mil. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.18 Solicitation

This solicitation incorporates a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 16. The contractor will be required to meet the specifications in those Annexes and Attachments.

B.19 Site Visit

A site visit is scheduled for 9:00 a.m. (EST) on 09 February 2021. This will be the Government’s only scheduled site visit. Prior to the scheduled site visit Contractor shall meet with government personnel at 8:50 a.m. located at Bldg 163, Curtis Road, MCAS Cherry Point, NC. If you need access to the base, please provide that information to kimberly.c.lacy@navy.mil or ericka.j.bishop@navy.mil at least 24 hours prior to the site visit.

B.20 Notice to Offeror:

Offeror is required to submit Section B, Bid Schedule, required clauses/provisions, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:

CLINS ELINs 0001 A001-B001 ELINS 1605000, 1607000, 1608000 Facility Investment 0002 A700-A703 ELINS 1605000, 1607000, 1608000 Facility Investment 0003 B001-B002 ELINS 1605000, 1607000, 1608000 Facility Investment 0004 B700-B703 ELINS 1605000, 1607000, 1608000 Facility Investment 0005 C001-C001 ELINS 1605000, 1607000, 1608000 Facility Investment 0006 C700-C703 ELINS 1605000, 1607000, 1608000 Facility Investment 0007 D001-D002 ELINS 1605000, 1607000, 1608000 Facility Investment 0008 D700-D703 ELINS 1605000, 1607000, 1608000 Facility Investment 0009 E001-E002 ELINS 1605000, 1607000, 1608000 Facility Investment 0010 E700-E703 ELINS 1605000, 1607000, 1608000 Facility Investment

B.21 Proposal Delivery:

Proposals sent via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:

Facilities Engineering & Acquisition Division (FEAD)

Attn: ERICKA J. BISHOP PSC Box 8006 Bldg 163 Curtis Rd MCAS Cherry Point, North Carolina 28533-0006

Proposals hand carried excluding commercial carriers noted above shall be delivered to the Contracts Office in Building 163, 1st Floor, Room 1, located at Curtis Road, Marine Corps Air Station, Cherry Point, NC 28533.

Proposals are due 2:00 p.m. EST on 23 February 2021 .

B.22 Notice to Offeror for Base Access to MCAS Cherry Point:

a. Defense Biometrics Identification System (DBIDS): DBIDS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. Under the DBIDS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in DBIDS is located in Annex 0200000 Section C. Contractors should be aware that any costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining DBIDS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.

b. One-Day Passes: Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes and comply with REAL ID Act of 2005 (See Annex 0200000 Section C), be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the

DBIDS.

c. The Contractor shall obtain the required employee badges and vehicle passes from the Government at his own expense, or daily passes at no additional cost. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 5 calendar days.

d. Be advised by this notice that the level of security at various Military Installations may change at any time. As the level of security heightens, the amount of time required to gain access to all Navy Installations also increases.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Each Base Period Recurring Services FFP

FFP

Price to perform recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with Performance Work Statement, Attachments, and the terms and conditions of the contract.

The price for CLIN 0001 is Facility Investment ELIN A001-A002 Spec Item 3;

Attachment J-0200000-08 FOB: Destination

NET AMT

0002 Each Base Period Non-Recurring Services

FFP

Price to perform non-recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with the Performance Work Statement, Attachments; and the terms and conditions of the contract.

The estimated price for CLIN 0002 is Facility Investment ELIN A700-A703 Spec Item 4; Attachment J-0200000-08

0003 Each OPTION Option Period One Recurring Services FFP

FFP

Price to perform recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with Performance Work Statement, Attachments, and the terms and conditions of the contract.

The price for CLIN 0003 is Facility Investment ELIN A001-A002 Spec Item 3;

0004 Each OPTION Option Period One Non-Recurring Services

FFP

Price to perform non-recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with the Performance Work Statement, Attachments; and the terms and conditions of the contract.

The estimated price for CLIN 0004 is Facility Investment ELIN A700-A703 Spec

0005 Each OPTION Option Period Two Recurring Services FFP

FFP

Price to perform recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with Performance Work Statement, Attachments, and the terms and conditions of the contract.

The price for CLIN 0005 is Facility Investment ELIN A001-A002 Spec Item 3;

0006 Each OPTION Option Period Two Non-Recurring Services

FFP

Price to perform non-recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with the Performance Work Statement, Attachments; and the terms and conditions of the contract.

The estimated price for CLIN 0006 is Facility Investment ELIN A700-A703 Spec

0007 Each OPTION Opt Period Three Recurring Services FFP

FFP

Price to perform recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with Performance Work Statement, Attachments, and the terms and conditions of the contract.

The price for CLIN 0007 is Facility Investment ELIN A001-A002 Spec Item 3;

0008 Each OPTION Opt Period Three Non-Recurring Services

FFP

Price to perform non-recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with the Performance Work Statement, Attachments; and the terms and conditions of the contract.

The estimated price for CLIN 0008 is Facility Investment ELIN A700-A703 Spec

0009 Each OPTION Opt Period Four Recurring Services FFP

FFP

Price to perform recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with Performance Work Statement, Attachments, and the terms and conditions of the contract.

The price for CLIN 0009 is Facility Investment ELIN A001-A002 Spec Item 3;

0010 Each OPTION Opt Period Four Non-Recurring Services

FFP

Price to perform non-recurring work for Equipment Operation and Maintenance for the Central Energy Building, Naval Health Clinic, MCAS Cherry Point, NC in accordance with the Performance Work Statement, Attachments; and the terms and conditions of the contract.

The estimated price for CLIN 0010 is Facility Investment ELIN A700-A703 Spec

Section C - Descriptions and Specifications

ANNEX 0100000 GENERAL

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor's Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Central Energy Building located at Marine Air Corps Station, Cherry Point North Carolina, by the means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 1 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operation N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support N/A Annex 16 Utilities

Annex 1605000 Steam Annex 1607000 Chiller Annex 1608000 Compressed Air

Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A

1.2 Project Location All work described in this PWS will be located at the Naval Health Clinic, Facility #4390, Marine Corps Air Station, Cherry Point North Carolina.

The Naval Hospital was downsized to an Outpatient Ambulatory Health Clinic by BRAC on 1 October 2007.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations in addition to the services and locations identified in the recurring work requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information Marine Corps Air Station (MCAS) Cherry Point is located in southeastern

Craven County, North Carolina. The installation covers approximately 11,485 acres. Commissioned in 1942 as Cunningham Field, MCAS Cherry Point and Naval Aviation Depot (NAVAVNDEPOT), its largest tenant command, has served the country for more than half a century. The Air Station's primary mission is to maintain and operate support facilities and services to the 2nd Marine Aircraft Wing, NAVAVNDEPOT, and the Naval Health Clinic.

Under the claimancy of the Bureau of Medicine and Surgery, the dispensary was commissioned as a Naval Hospital on 01 July 1968. On 09 September 1992, construction began for a new, state of the art facility.

This $34 million, 201,806 square foot facility was designed by Rogers, Lovelock, and Fritz, Inc., and constructed by Pizzagali Construction Company. This masterpiece of modern medical and dental care was dedicated on 01 October 1994 as Halyburton Naval Hospital.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns North Carolina's climate results from global-scale weather patterns that are modified by the diverse landscape of the state. In the eastern portion of the state the Atlantic Ocean and its "river of warm water", commonly called the Gulf Stream, play a dominate role in differentiating North Carolina's precipitation and climate. Winter storms in the vicinity of the east coast generally move northeastward paralleling the coast and the Gulf Stream.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government.

Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements.

Specification item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item

3 standards apply to all firm fixed priced specification items.

Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to

3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

ANNEX 0200000 MANAGEMENT

0200000 – Management and Administration Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 Quality Management System (QMS)

2.6.6.1 Quality Management (QM) Plan

2.6.6.2 Quality Inspection and Surveillance

2.6.6.3 Quality Inspection and Surveillance Report

2.6.7 Property Management Plan

2.6.8 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Access to Navy Marine Corps Intranet (NMCI)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 ODS Requirements for Refrigerant Recycling

2.10.2.2 Non-Regulated Waste Disposal

2.10.2.3 Spill Prevention, Containment, and Clean-up

2.10.2.4 Hazardous Material Management

2.10.2.5 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.6 Noise Control

2.10.2.7 Salvage

2.10.2.8 Asbestos Containing Material (ACM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Notification to the Government for Work Above the Recurring Work Limitations

2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.15 Non-Recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-Recurring Work ELINS

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Wage Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as directed by the Contracting Officer.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.

The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager

* Site Safety and Health Officer Sub-contractor Reps

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law.

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

The Marine Corps’ IT system is Navy Marine Corps Intranet (NMCI).

Additional information about NMCI may be obtained from the Contracting Officer.

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Refer to Section G for invoicing instructions. in Section J and reference attachment as applicable, e.g., .

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04.

2.4 Government-

Furnished Property, Materials and Services

In accordance with Section H, paragraph H.10 Govt-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below. A list of Government Furnished Property, Materials, and Services is provided in J-0200000-05.

2.4.1 Government-

Furnished Facilities

(GFF)

The Government will furnish or make available to the Contractor the facilities and areas listed in J-0200000-05. Upon completion of the contract, all facilities shall be returned to the Government in the same or better condition as received, except for reasonable wear. The Contractor shall be responsible and accountable for such facilities and shall take adequate precautions to prevent fire hazards, safety hazards, odors, and vermin infestation. The Contractor shall maintain all shops, material storage, buildings, structures, and all other areas furnished for the performance of this contract in a clean, neat, orderly, and sanitary condition. The Contractor shall obtain written approval from the KO prior to making any modifications or alterations to assigned facilities. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract, all facilities shall be returned to the Government in the same condition as it was received, except for reasonable wear and tear. The Contractor shall be liable for the cost of any repairs caused by negligence or abuse on their part, or on the part of their employees. The Contractor shall ensure proper safety; energy conservation, housekeeping, and maintenance management are observed. The Contractor shall be responsible for the physical security of the Government Furnished Facilities and installed equipment. The Contractor shall secure all Government Furnished Property when not occupied by Contractor personnel.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during…