Amend 0003 ELINs Cherry Point.xlsx
XLSX spreadsheet 121 KB Posted
- Solicitation number
- N4008521R0036
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| SITE VISIT LOG 21R0036.pdf | ||
| Amendment 0003.pdf | ||
| NAVY SHORE BOILER GUIDE.pdf | ||
| J-0200000-07 Spill Plan.pdf | ||
| Amendment 0002 N4008521R0036.pdf | ||
| Amendment 0001 N4008521R0036 SOLICITATION.pdf | ||
| ELINs Cherry Point.xlsx | XLSX spreadsheet | |
| J-0200000-05-05Leak Rate Calculations.pdf | ||
| Solicitation N4008521R0036.pdf | ||
| J-1607000-03.jpg | JPG image | |
| J-1605000-03.jpg | JPG image | |
| NAVFAC Form PPQ-0.docx | DOCX document | |
| J-1608000-03.jpg | JPG image | |
| J-0200000-07 Installation Spill Control Plan.pdf | ||
| CORPORATE EXPERIENCE PROJECT DATA SHEET.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELIN-Base Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT A |
| Line Item 0001 Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3. |
| ELINs A001 - A002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total
| A001 | Marine Corps Base Cherry Point | ||||
| 1605000 Steam | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.3 | |||||
| A001AA | Boilers, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AB | Expansion Tank-Heating Hot Water & Dom, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AC | Chemical Mixing Tank, 50 gal-Boiler, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AD | Deaeration Tank, 440gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AE | Condensate Storage Tank, 680 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AF | Clean Steam Generator, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AG | Chemical Mixing Tank, 50gal- OFT, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AH | Water Softener, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AJ | Domestic Water Heat Exchanger, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AK | Heating Hot Water Pump, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AL | Fuel Oil Day Tank, 275 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AM | Fuel Oil Storage Tank, 8000gal, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AN | UST Montoring System, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AP | Annual Valve Cycling, Spec Item 3.3 (16 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AQ | Water Treatment, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1607000 Chiller | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| A001AR | Chillers, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AS | Cooling Towers, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AT | Cooling Tower Sumps, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AU | Expansion Tank- Chill Water, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AV | Expansion Tank- Domestic Cold Water, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AW | Secondary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AX | Primary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AY | Condenser Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AZ | Variable Frequency Driv Pumps, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BA | Variable Frequency Drive Fans, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BB | Heat Exchanges, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BC | Annual Valve Cycling, Spec Item 3.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BD | Water Treatment, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1608000 Compressed Air | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| A001BE | Dental/Medical Air Compressor, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BF | Dryer,Absorption -Dental/Medical, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BG | Carbon Monoxide Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BH | Dewpoint Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BJ | Control Air Compressor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BK | Dryer R134a Control Air, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001BL | Vacuum Unit- Medical & Lab, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A002 | Operations | ||||
| A002AA | Operator (1st Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| A002AB | Operator (2nd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| A002AC | Operator (3rd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| TOTAL BASE YEAR |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Base Period-Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT A |
| Line Item 0002 Non-Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRIN WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 1,000 | HR | $ - 0 | $ - 0 |
| A701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 1,000 | HR | $ - 0 | $ - 0 |
| A702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| A703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| TOTAL NONRECURING WORK PRICE BASE YEAR | TOTAL | $ - 0 |
ELIN-Option 1 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT B |
| Line Item 0003 Recurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3. |
| ELINs B001 - B002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total
| B001 | Marine Corps Base Cherry Point | ||||
| 1605000 Steam | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.3 | |||||
| B001AA | Boilers, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AB | Expansion Tank-Heating Hot Water & Dom, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AC | Chemical Mixing Tank, 50 gal-Boiler, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AD | Deaeration Tank, 440gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AE | Condensate Storage Tank, 680 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AF | Clean Steam Generator, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AG | Chemical Mixing Tank, 50gal- OFT, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AH | Water Softener, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AJ | Domestic Water Heat Exchanger, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AK | Heating Hot Water Pump, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AL | Fuel Oil Day Tank, 275 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AM | Fuel Oil Storage Tank, 8000gal, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AN | UST Montoring System, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AP | Annual Valve Cycling, Spec Item 3.3 (16 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AQ | Water Treatment, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1607000 Chiller | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| B001AR | Chillers, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AS | Cooling Towers, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AT | Cooling Tower Sumps, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AU | Expansion Tank- Chill Water, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AV | Expansion Tank- Domestic Cold Water, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AW | Secondary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AX | Primary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AY | Condenser Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AZ | Variable Frequency Driv Pumps, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BA | Variable Frequency Drive Fans, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BB | Heat Exchanges, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BC | Annual Valve Cycling, Spec Item 3.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BD | Water Treatment, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1608000 Compressed Air | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| B001BE | Dental/Medical Air Compressor, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BF | Dryer,Absorption -Dental/Medical, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BG | Carbon Monoxide Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BH | Dewpoint Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BJ | Control Air Compressor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BK | Dryer R134a Control Air, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001BL | Vacuum Unit- Medical & Lab, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B002 | Operations | ||||
| B002AA | Operator (1st Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| B002AB | Operator (2nd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| B002AC | Operator (3rd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| TOTAL BASE YEAR | TOTAL |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-OPT 1 Period-Nonrecuring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT B |
| Line Item 0004 Non-Recurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRIN WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 1,000 | HR | $ - 0 | $ - 0 |
| B701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 1,000 | HR | $ - 0 | $ - 0 |
| B702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700, B701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| B703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700, B701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| TOTAL NONRECURING WORK PRICE BASE YEAR | TOTAL | $ - 0 |
ELIN-Option 2 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT C |
| Line Item 0005 Recurring Work Price - Option 2 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3. |
| ELINs C001 - C002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total
| C001 | Marine Corps Base Cherry Point | ||||
| 1605000 Steam | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.3 | |||||
| C001AA | Boilers, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AB | Expansion Tank-Heating Hot Water & Dom, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AC | Chemical Mixing Tank, 50 gal-Boiler, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AD | Deaeration Tank, 440gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AE | Condensate Storage Tank, 680 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AF | Clean Steam Generator, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AG | Chemical Mixing Tank, 50gal- OFT, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AH | Water Softener, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AJ | Domestic Water Heat Exchanger, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AK | Heating Hot Water Pump, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AL | Fuel Oil Day Tank, 275 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AM | Fuel Oil Storage Tank, 8000gal, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AN | UST Montoring System, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AP | Annual Valve Cycling, Spec Item 3.3 (16 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AQ | Water Treatment, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1607000 Chiller | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| C001AR | Chillers, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AS | Cooling Towers, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AT | Cooling Tower Sumps, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AU | Expansion Tank- Chill Water, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AV | Expansion Tank- Domestic Cold Water, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AW | Secondary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AX | Primary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AY | Condenser Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AZ | Variable Frequency Driv Pumps, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BA | Variable Frequency Drive Fans, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BB | Heat Exchanges, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BC | Annual Valve Cycling, Spec Item 3.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BD | Water Treatment, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1608000 Compressed Air | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| C001BE | Dental/Medical Air Compressor, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BF | Dryer,Absorption -Dental/Medical, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BG | Carbon Monoxide Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BH | Dewpoint Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BJ | Control Air Compressor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BK | Dryer R134a Control Air, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001BL | Vacuum Unit- Medical & Lab, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C002 | Operations | ||||
| C002AA | Operator (1st Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| C002AB | Operator (2nd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| C002AC | Operator (3rd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| TOTAL BASE YEAR | TOTAL |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-OPT 2 Period-Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT C |
| Line Item 0006 Non-Recurring Work Price - Option 2 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRIN WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 1,000 | HR | $ - 0 | $ - 0 |
| C701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 1,000 | HR | $ - 0 | $ - 0 |
| C702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| C703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| TOTAL NONRECURING WORK PRICE BASE YEAR | TOTAL | $ - 0 |
ELIN-Option 3 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT D |
| Line Item 0007 Recurring Work Price -Option 3 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3. |
| ELINs D001 - D002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total
| D001 | Marine Corps Base Cherry Point | ||||
| 1605000 Steam | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.3 | |||||
| D001AA | Boilers, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AB | Expansion Tank-Heating Hot Water & Dom, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AC | Chemical Mixing Tank, 50 gal-Boiler, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AD | Deaeration Tank, 440gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AE | Condensate Storage Tank, 680 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AF | Clean Steam Generator, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AG | Chemical Mixing Tank, 50gal- OFT, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AH | Water Softener, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AJ | Domestic Water Heat Exchanger, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AK | Heating Hot Water Pump, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AL | Fuel Oil Day Tank, 275 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AM | Fuel Oil Storage Tank, 8000gal, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AN | UST Montoring System, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AP | Annual Valve Cycling, Spec Item 3.3 (16 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AQ | Water Treatment, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1607000 Chiller | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| D001AR | Chillers, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AS | Cooling Towers, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AT | Cooling Tower Sumps, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AU | Expansion Tank- Chill Water, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AV | Expansion Tank- Domestic Cold Water, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AW | Secondary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AX | Primary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AY | Condenser Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001AZ | Variable Frequency Driv Pumps, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BA | Variable Frequency Drive Fans, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BB | Heat Exchanges, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BC | Annual Valve Cycling, Spec Item 3.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BD | Water Treatment, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1608000 Compressed Air | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| D001BE | Dental/Medical Air Compressor, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BF | Dryer,Absorption -Dental/Medical, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BG | Carbon Monoxide Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BH | Dewpoint Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BJ | Control Air Compressor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BK | Dryer R134a Control Air, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| D001BL | Vacuum Unit- Medical & Lab, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| D002 | Operations | ||||
| D002AA | Operator (1st Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| D002AB | Operator (2nd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| D002AC | Operator (3rd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| TOTAL BASE YEAR | TOTAL | $0.00 |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-OPT 3 Period Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT D |
| Line Item 0008 Non-Recurring Work Price - Option 3 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRIN WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 1,000 | HR | $ - 0 | $ - 0 |
| D701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 1,000 | HR | $ - 0 | $ - 0 |
| D702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| D703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| TOTAL NONRECURING WORK PRICE BASE YEAR | TOTAL | $ - 0 |
ELIN-Option 4 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT E |
| Line Item 0009 Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3. |
| ELINs E001 - E002 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total
| E001 | Marine Corps Base Cherry Point | ||||
| 1605000 Steam | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.3 | |||||
| E001AA | Boilers, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AB | Expansion Tank-Heating Hot Water & Dom, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AC | Chemical Mixing Tank, 50 gal-Boiler, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AD | Deaeration Tank, 440gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AE | Condensate Storage Tank, 680 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AF | Clean Steam Generator, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AG | Chemical Mixing Tank, 50gal- OFT, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AH | Water Softener, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AJ | Domestic Water Heat Exchanger, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AK | Heating Hot Water Pump, Spec Item 3.3 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AL | Fuel Oil Day Tank, 275 gal, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AM | Fuel Oil Storage Tank, 8000gal, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AN | UST Montoring System, Spec Item 3.3 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AP | Annual Valve Cycling, Spec Item 3.3 (16 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AQ | Water Treatment, Spec Item 3.3 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1607000 Chiller | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| E001AR | Chillers, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AS | Cooling Towers, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AT | Cooling Tower Sumps, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AU | Expansion Tank- Chill Water, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AV | Expansion Tank- Domestic Cold Water, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AW | Secondary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AX | Primary Chill Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AY | Condenser Water Pump, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001AZ | Variable Frequency Driv Pumps, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BA | Variable Frequency Drive Fans, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BB | Heat Exchanges, Spec Item 3.2 (3 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BC | Annual Valve Cycling, Spec Item 3.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BD | Water Treatment, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| 1608000 Compressed Air | |||||
| Intergrated Maintenance Program (IMP) Spec Item 3.2 | |||||
| E001BE | Dental/Medical Air Compressor, Spec Item 3.2 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BF | Dryer,Absorption -Dental/Medical, Spec Item 3.2 (4 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BG | Carbon Monoxide Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BH | Dewpoint Monitor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BJ | Control Air Compressor, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BK | Dryer R134a Control Air, Spec Item 3.2 (1 EA) | 12 | MO | $ - 0 | $ - 0 |
| E001BL | Vacuum Unit- Medical & Lab, Spec Item 3.2 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| E002 | Operations | ||||
| E002AA | Operator (1st Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| E002AB | Operator (2nd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| E002AC | Operator (3rd Shift) (1EA) | 12 | MO | $ - 0 | $ - 0 |
| TOTAL BASE YEAR | TOTAL |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-OPT 4 Period Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40085-21-R-0036 |
| EXHIBIT E |
| Line Item 00010 Non-Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRIN WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E703 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 1,000 | HR | $ - 0 | $ - 0 |
| E701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 1,000 | HR | $ - 0 | $ - 0 |
| E702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| E703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 100,000 | EA | $ 1.00 | $ 100,000.00 |
| TOTAL NONRECURING WORK PRICE BASE YEAR | TOTAL | $ - 0 |
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .