N4008521B0056 Amendment 0001.pdf
PDF 386 KB Posted
- Attached to
- Pier 11 South Berth Expansion and Maintenance Dredging at Naval Station Norfolk, Norfolk, Virginia
- Solicitation number
- N4008521B0056
About this file
This document provides details on a federal solicitation for dredging services at Naval Station Norfolk in Virginia. The solicitation seeks dredging of Pier 11 South Berth Expansion Area and maintenance dredging of outer berths of Piers 5 North and 6 North via conventional clamshell bucket or hydraulic cutterhead dredge. Dredged materials will be disposed at the Craney Island Dredge Material Management Area upland cell or rehandling basin. A portion of contaminated sediment from the Pier 11S area must be dredged and disposed of at an upland facility. Additional requirements include placement of sandy capping material dredged onsite and rip-rap armor stone layers to cap contaminated materials. Interested parties must provide a DUNS number, CAGE code, point of contact information, and pricing by the response date in order to be considered for award of this contract for dredging services at Naval Station Norfolk.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5884892 1663506
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008521B0056 Pier 11 South Expansion Dredging and 5 North and 6 North Maintenance Dredging, NSN, Norfolk, VA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008521B0056
X 9B. DATED (SEE ITEM 11)
30-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Oct-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
PWD NORFOLK
FACILITIES ENGINEERING & ACQ DIV
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3624
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521B0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
The purpose of this amendment is to:
1. Revise the Price Bid Worksheet
2. Provide Responses to Pre-Bid Inquiries (PBIs)
1. Revise the Price Bid Worksheet
See Attachment 6 – Price Bid Workseet Revision 01. Revisions are shown in red font.
2. Provide Responses to (PBIs) #1-3
PBI
Reference
Question
Page Section Paragraph Government Response Posted on Amend
No
1 3 Attachment
CLIN 0002
Option 0001
& CLIN 0003
- Option 0002
The CLIN description states that the price is to be for Mechanical dredging using hydraulic cutterhead dredge at outer berth (of Pier 5 and Pier 6). The Specification states that the outer berths of Piers 5 North and 6 North may be dredged via conventional clamshell bucket OR hydraulic cutterhead dredge.
Can mechanical dredging with a clamshell bucket be used for all dredging, including the Options?
Dredging shall be performed via Conventional Clamshell or Hydraulic Cutterhead Dredge, Dispose at Craney Dredge Material Management Area Upland Cell or Rehandling Basin. Unit price shall include all transportation and disposal related costs including Craney Island disposal fees payable to the Army Corps of Engineers. The government SHALL NOT be responsible for payment of any Craney Island disposal fees. Please see revised price bid worksheet provided as per amendment 0001.
2 11 01 14 00 1.1
This section states that the dredge plans are to show progressive positioning of hydraulic dredge, crane barge, etc. If clamshell bucket is an allowable form of dredging, can this be accounted for in the language?
Clamshell dredging is permitted. 0001
N4008521B0056
3 1 10
On the 1442 form Item 10 below phone number is lists attachment A, B,C as attachments; and below that says Failure to provide this information may result in rejection of bid. I would assume that notice was referring to Duns, Cage, POC, etc. And not A, B, C?
Correct. Bidders shall provide: DUNS, CAGE, Contractor POC, Email and Phone.
NAVFAC Drawings, Specs and Appendix A, B and C Documents were provided as attachments.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .