Amnd 0002 20R4062 FINAL.pdf

PDF 317 KB Posted

Attached to
DB Electrical Distribution Repairs, Phase II
Solicitation number
N4008520R4062
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R4062 FINAL.pdf PDF
Amnd 0004 20R4062 FINAL.pdf PDF
Construction Schedule P4041 Dental Clinic.pdf PDF
Amnd 0003 20R4062 FINAL.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies v2.pdf PDF
19-0135 - Part 2 v2.pdf PDF
Amnd 0001 20R4062 FINAL.pdf PDF
19-0135 - Part 3 v2.pdf PDF
19-0135 - Part 6 TOC v2.pdf PDF
RFP Electrical Distribution Repairs.pdf PDF
19-0135 - Part 2.pdf PDF
19-0135 - Attachment 8 - MCBCL BEAP.pdf PDF
19-0135 - Attachment 4 - Photographs of Substation 2 Control House.pdf PDF
19-0135 - Attachment 7 - Cover.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies.pdf PDF
19-0135 - Attachment 5 - SS2 Precast Control House Submittals.pdf PDF
19-0135 - Attachment 11 - SS2 FINAL SPECS 8-2-17 Section 03 40 00.00 10 Plant Precast Concrete Products.pdf PDF
19-0135 - Attachment 3f - Conceptual Design Substaion SS-3 Control House.pdf PDF
19-0135 - Attachment 2 - Photographs of Generator and Transfer Switch Locations.pdf PDF
19-0135 - Part 5.pdf PDF
19-0135 - Attachment 10 - Maps of Regimental 400 Area Building Additions.pdf PDF
19-0135 - Attachment 1 - Phase 2 Generator and Transfer Switch List.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
19-0135 - Attachment 3a - Conceptual Design Building 24 Dual Feed and Automatic Transfer Switch.pdf PDF
19-0135 - Attachment 9 - Map of Regimental 400 Area Demolition Plan.pdf PDF
19-0135 - Part 3.pdf PDF
19-0135 - Part 4.pdf PDF
19-0135 - Attachment 3c - Conceptual Design Midway Park Feeder Conversion.pdf PDF
19-0135 - Attachment 7 - MCO 5530.14A.pdf PDF
19-0135 - A1Part 6 TOC.pdf PDF
19-0135 - Attachment 3d - Conceptual Design MCASNR Enlisted FH Conversion.pdf PDF
19-0135 - Attachment 3e - Conceptual Design UG Primary Replacement Regimental 400 Area.pdf PDF
19-0135 - Attachment 3b - Conceptual Design Kent Rd Fdr Connection-Paradise Point Loop Feed.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0002 05/01/20 19-0135

ACQ1

NAVAL FACILITIES ENGINEERING COMMAND,

MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VA 23511-3095

See Item 6

✘ N4008520R4062

04/24/20

N4008520R4062 Electrical Distribution Repairs, Phase II

The date and the hour for the receipt of proposals remains to 29 May 2020 no later than 2:00 pm (EDT).

See continuation page(s).

19-0135 Electrical Distribution Repairs, Phase II Solicitation N40085-20-R-4062

Marine Corps Base Camp Lejeune, North Carolina Amendment 0002

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. In light of COVID-19, the following additional information is provided for the site visit scheduled for the subject project:

1. The site visit will be self-led, any time during the week of 4 May 2020 through 8

May 2020.

2. Contractors without base access must provide a list of all site visit attendees, as well as the desired date and time of visit, to casey.buell@navy.mil NLT 1400

4 May 2020 in order to facilitate access to the base. Names provided shall reflect the individual’s name on his/her driver’s license.

3. Attendees shall bring the following items on the day of their visit:

a. Valid driver’s license

b. Driven vehicle’s current registration and proof of insurance

4. Maps of the base, with all project sites shown, will be sent out via email to the

RFP distribution list. Those attachments are part of this amendment and are as follows:

a. 19-0135_SITE VISIT MAP_SHEET 1 of 6

b. 19-0135_SITE VISIT MAP_SHEET 2 of 6

c. 19-0135_SITE VISIT MAP_SHEET 3 of 6

d. 19-0135_SITE VISIT MAP_SHEET 4 of 6

e. 19-0135_SITE VISIT MAP_SHEET 5 of 6

f. 19-0135_SITE VISIT MAP_SHEET 6 of 6

5. EMERGENCY PHONE NUMBER: Casey Buell: (817) 559-0431 or Meghan

Hislop: (757) 675-0535

B. All other contract terms and conditions remain unchanged.

mailto:casey.buell@navy.mil