19-0135 - Attachment 2 - Photographs of Generator and Transfer Switch Locations.pdf

PDF 10 MB Posted

Attached to
DB Electrical Distribution Repairs, Phase II
Solicitation number
N4008520R4062
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R4062 FINAL.pdf PDF
Amnd 0004 20R4062 FINAL.pdf PDF
Construction Schedule P4041 Dental Clinic.pdf PDF
Amnd 0003 20R4062 FINAL.pdf PDF
Amnd 0002 20R4062 FINAL.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies v2.pdf PDF
19-0135 - Part 2 v2.pdf PDF
Amnd 0001 20R4062 FINAL.pdf PDF
19-0135 - Part 3 v2.pdf PDF
19-0135 - Part 6 TOC v2.pdf PDF
RFP Electrical Distribution Repairs.pdf PDF
19-0135 - Part 2.pdf PDF
19-0135 - Attachment 8 - MCBCL BEAP.pdf PDF
19-0135 - Attachment 4 - Photographs of Substation 2 Control House.pdf PDF
19-0135 - Attachment 7 - Cover.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies.pdf PDF
19-0135 - Attachment 5 - SS2 Precast Control House Submittals.pdf PDF
19-0135 - Attachment 11 - SS2 FINAL SPECS 8-2-17 Section 03 40 00.00 10 Plant Precast Concrete Products.pdf PDF
19-0135 - Attachment 3f - Conceptual Design Substaion SS-3 Control House.pdf PDF
19-0135 - Part 5.pdf PDF
19-0135 - Attachment 10 - Maps of Regimental 400 Area Building Additions.pdf PDF
19-0135 - Attachment 1 - Phase 2 Generator and Transfer Switch List.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
19-0135 - Attachment 3a - Conceptual Design Building 24 Dual Feed and Automatic Transfer Switch.pdf PDF
19-0135 - Attachment 9 - Map of Regimental 400 Area Demolition Plan.pdf PDF
19-0135 - Part 3.pdf PDF
19-0135 - Part 4.pdf PDF
19-0135 - Attachment 3c - Conceptual Design Midway Park Feeder Conversion.pdf PDF
19-0135 - Attachment 7 - MCO 5530.14A.pdf PDF
19-0135 - A1Part 6 TOC.pdf PDF
19-0135 - Attachment 3d - Conceptual Design MCASNR Enlisted FH Conversion.pdf PDF
19-0135 - Attachment 3e - Conceptual Design UG Primary Replacement Regimental 400 Area.pdf PDF
19-0135 - Attachment 3b - Conceptual Design Kent Rd Fdr Connection-Paradise Point Loop Feed.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Distribution Repairs, Phase 2 Project #19-0135

Marine Corps Base Camp Lejeune, NC

Attachment 2 - Page | 1

Attachment 2

Building 902 Generator / Manual Transfer Switch (not pictured)

Attachment 2 - Page | 2

Attachment 2 (cont’d)

Building 607 Generator / Automatic Transfer Switch

Attachment 2 - Page | 3

Building 840 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 4

Building 1948 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 5

S558 – Generator / Automatic Transfer Switch 150A (not pictured)

Attachment 2 - Page | 6

Building 584 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 7

Building 614 – Generator / Manual Transfer Switch

Attachment 2 - Page | 8

Building 617 – Generator / Manual Transfer Switch

Attachment 2 - Page | 9

Building 618 – Generator / Manual Transfer Switch

Attachment 2 - Page | 10

Building 619 – Generator / Manual Transfer Switch

Attachment 2 - Page | 11

Building 621 – Generator / Manual Transfer Switch

Attachment 2 - Page | 12

Building 627 – Generator / Manual Transfer Switch

Attachment 2 - Page | 13

Building 648 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 14

Building 650 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 15

Building 596 – Generator Replacement

Attachment 2 - Page | 16

Building 640 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 17

Building 989 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 18

VL101 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 19

VL102 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 20

VL104 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 21

VL105 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 22

Building 751 – Generator / Manual Transfer Switch

Attachment 2 - Page | 23

Building 842 – Generator / Manual Transfer Switch

Attachment 2 - Page | 24

Building 2617 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 25

SH50 – Generator

Attachment 2 - Page | 26

TT84 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 27

AS100 – Generator / Manual Transfer Switch

Attachment 2 - Page | 28

AS212 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 29

AS302 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 30

AS4114 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 31

G640 – Generator / Manual Transfer Switch

Attachment 2 - Page | 32

TC701 – Generator / Automatic Transfer Switch

Attachment 2 - Page | 33

Building 1212 (NE) – Generator / Automatic Transfer Switch

Attachment 2 - Page | 34

Building 1212 (SW) – Generator / Automatic Transfer Switch

Attachment 2 - Page | 35

S979 – Automatic Transfer Switch

Attachment 2 - Page | 36

Building 2602 – Service Entrance (Overhead Feed)

Attachment 2 - Page | 37

Building 2604 – Service Entrance (Underground Feed)

Attachment 2 - Page | 38

LCH4014 – Service Entrance (Overhead Feed)

Attachment 2 - Page | 39

SR1022 – Service Entrance (Underground Feed)

Attachment 2 - Page | 40

BA191 – Service Entrance (Underground Feed)

Attachment 2 - Page | 41

AS130 – Service Entrance (Overhead Feed)

Attachment 2 - Page | 42

AS4000 – Service Entrance (Underground Feed)

Attachment 2 - Page | 43

AS4038 – Service Entrance (Underground Feed)

Attachment 2 - Page | 44

Building 1101 – Service Entrance (Underground Feed)

File details come from the government source that posted it. Updated .