19-0135 - Attachment 1 - Phase 2 Generator and Transfer Switch List.pdf

PDF 143 KB Posted

Attached to
DB Electrical Distribution Repairs, Phase II
Solicitation number
N4008520R4062
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R4062 FINAL.pdf PDF
Amnd 0004 20R4062 FINAL.pdf PDF
Construction Schedule P4041 Dental Clinic.pdf PDF
Amnd 0003 20R4062 FINAL.pdf PDF
Amnd 0002 20R4062 FINAL.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies v2.pdf PDF
19-0135 - Part 2 v2.pdf PDF
Amnd 0001 20R4062 FINAL.pdf PDF
19-0135 - Part 3 v2.pdf PDF
19-0135 - Part 6 TOC v2.pdf PDF
RFP Electrical Distribution Repairs.pdf PDF
19-0135 - Part 2.pdf PDF
19-0135 - Attachment 8 - MCBCL BEAP.pdf PDF
19-0135 - Attachment 4 - Photographs of Substation 2 Control House.pdf PDF
19-0135 - Attachment 7 - Cover.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies.pdf PDF
19-0135 - Attachment 5 - SS2 Precast Control House Submittals.pdf PDF
19-0135 - Attachment 11 - SS2 FINAL SPECS 8-2-17 Section 03 40 00.00 10 Plant Precast Concrete Products.pdf PDF
19-0135 - Attachment 3f - Conceptual Design Substaion SS-3 Control House.pdf PDF
19-0135 - Attachment 2 - Photographs of Generator and Transfer Switch Locations.pdf PDF
19-0135 - Part 5.pdf PDF
19-0135 - Attachment 10 - Maps of Regimental 400 Area Building Additions.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
19-0135 - Attachment 3a - Conceptual Design Building 24 Dual Feed and Automatic Transfer Switch.pdf PDF
19-0135 - Attachment 9 - Map of Regimental 400 Area Demolition Plan.pdf PDF
19-0135 - Part 3.pdf PDF
19-0135 - Part 4.pdf PDF
19-0135 - Attachment 3c - Conceptual Design Midway Park Feeder Conversion.pdf PDF
19-0135 - Attachment 7 - MCO 5530.14A.pdf PDF
19-0135 - A1Part 6 TOC.pdf PDF
19-0135 - Attachment 3d - Conceptual Design MCASNR Enlisted FH Conversion.pdf PDF
19-0135 - Attachment 3e - Conceptual Design UG Primary Replacement Regimental 400 Area.pdf PDF
19-0135 - Attachment 3b - Conceptual Design Kent Rd Fdr Connection-Paradise Point Loop Feed.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Distribution Repairs, Phase 2 Project #19-0135 Marine Corps Base Camp Lejeune, NC

Attachment 1 - Page | 1

Attachment 1 – Phase 2 Generator and Transfer Switch List

Facility Existing

Generator Size Manual Automatic Equip to be returned to Gov't Notes:

902 135 kW UNKNOWN Generator Resize and Install new generator. Install an Automatic Transfer Switch resized from current Manual Transfer Switch 607 25 kW 100 Install new generator and ATS to match existing 840 33 kW 105 Install new generator and ATS to match existing 1948 33 kW 70 Install new generator and ATS to match existing S558 40 kW 150 ATS Install new ATS to match existing 584 50 kW 100 ATS Install new generator and ATS to match existing 614 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 617 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 618 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 619 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 621 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 627 60 kW 100 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch 648 30 kW 100 Install new generator and ATS to match existing 650 60 kW 300 Install new generator and ATS to match existing 596 35 kW Generator Install new generator to match existing 640 25 kW 104 Install new generator and ATS to match existing 989 33 kW 80 Install new generator and ATS to match existing

VL 101 65 kW 150 Install new generator and ATS to match existing VL102 65 kW 150 Install new generator and ATS to match existing VL104 80 kW 150 Install new generator and ATS to match existing VL105 80 kW 150 Install new generator and ATS to match existing 751 60 kW UNKNOWN Resize and Install new generator. Install an Automatic Transfer Switch resized from current Manual Transfer Switch 842 100 kW UNKNOWN Resize and Install new generator. Install an Automatic Transfer Switch resized from current Manual Transfer Switch 2617 21.6 kW 125 Resize generator and ATS, only backs up front desk and snack bar SH50 40 kW Generator Resize generator and install New ATS, only partially backs up building TT84 350 kW 1600 Resize and Install new generator. Install an Automatic Transfer Switch resized from current Transfer Switch AS100 125 kW 1000 Install new generator to match existing. Install an Automatic Transfer Switch to match current Manual Transfer Switch AS212 75 kW 400 Resize generator and ATS, only partially backs up building. Must install Extended Exhaust similar to exsisting.

AS302 100 kW 400 Resize generator and ATS, only partially backs up building AS4114 50 kW 150 Replace/Relocate Generator and ATS. Flightline gate proximity may be an issue…. Also fuel containment pit will need to be removed G640 375 kW UNKNOWN Generator Resize and Install new generator. Install an Automatic Transfer Switch resized from current Manual Transfer Switch TC701 60 kW 260 Resize generator and ATS, only partially backs up building

1212 (NE) 35 kW 400 ATS 1212 (SW) 150 kW 400 ATS

S979 150 kW 260 Replace ATS…. Current ATS INOP. Ensure proper grounding past fill dirt level.

2602 NONE Need New Install transfer switch at pole for connection of portable generator 2604 NONE Need New Install transfer switch at pole for connection of portable generator

LCH‐4014 Need New Need New MCCS Base Theater and Community Center SR‐1022 Need New Need New Base Telephone building supported with temp during storms BA‐191 Need New Need New Base Telephone building supported with temp during storms AS130 Need New Need New New River DWx Recovery Center AS4000 Need New Need New New River Backup Destructive Weather Center AS4038 Need New Need New New River Backup Destructive Weather Center 1101 Need New Need New Provisions for temporary generator, doesn't back up the whole bldg currently

Generator & ATS Replacement/Installation List ‐ Phase 2 Exsisting Transfer Switch

Hardened DWx Ride‐out Shelter. Remove 2 generators/ATSs; Install single generator and ATS for whole building. Reconfigure electrrical service.

NONE