19-0135 - A1Part 6 TOC.pdf

PDF 86 KB Posted

Attached to
DB Electrical Distribution Repairs, Phase II
Solicitation number
N4008520R4062
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R4062 FINAL.pdf PDF
Amnd 0004 20R4062 FINAL.pdf PDF
Construction Schedule P4041 Dental Clinic.pdf PDF
Amnd 0003 20R4062 FINAL.pdf PDF
Amnd 0002 20R4062 FINAL.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies v2.pdf PDF
19-0135 - Part 2 v2.pdf PDF
Amnd 0001 20R4062 FINAL.pdf PDF
19-0135 - Part 3 v2.pdf PDF
19-0135 - Part 6 TOC v2.pdf PDF
RFP Electrical Distribution Repairs.pdf PDF
19-0135 - Part 2.pdf PDF
19-0135 - Attachment 8 - MCBCL BEAP.pdf PDF
19-0135 - Attachment 4 - Photographs of Substation 2 Control House.pdf PDF
19-0135 - Attachment 7 - Cover.pdf PDF
19-0135 - Attachment 6 - Camp Lejeune Electrical Policies.pdf PDF
19-0135 - Attachment 5 - SS2 Precast Control House Submittals.pdf PDF
19-0135 - Attachment 11 - SS2 FINAL SPECS 8-2-17 Section 03 40 00.00 10 Plant Precast Concrete Products.pdf PDF
19-0135 - Attachment 3f - Conceptual Design Substaion SS-3 Control House.pdf PDF
19-0135 - Attachment 2 - Photographs of Generator and Transfer Switch Locations.pdf PDF
19-0135 - Part 5.pdf PDF
19-0135 - Attachment 10 - Maps of Regimental 400 Area Building Additions.pdf PDF
19-0135 - Attachment 1 - Phase 2 Generator and Transfer Switch List.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
19-0135 - Attachment 3a - Conceptual Design Building 24 Dual Feed and Automatic Transfer Switch.pdf PDF
19-0135 - Attachment 9 - Map of Regimental 400 Area Demolition Plan.pdf PDF
19-0135 - Part 3.pdf PDF
19-0135 - Part 4.pdf PDF
19-0135 - Attachment 3c - Conceptual Design Midway Park Feeder Conversion.pdf PDF
19-0135 - Attachment 7 - MCO 5530.14A.pdf PDF
19-0135 - Attachment 3d - Conceptual Design MCASNR Enlisted FH Conversion.pdf PDF
19-0135 - Attachment 3e - Conceptual Design UG Primary Replacement Regimental 400 Area.pdf PDF
19-0135 - Attachment 3b - Conceptual Design Kent Rd Fdr Connection-Paradise Point Loop Feed.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Distribution Repairs, Phase 2 Project #19-0135 Marine Corps Base Camp Lejeune, NC

PART 6 Attachments

TABLE OF CONTENTS

1. Generator and Transfer Switch Installation/Replacement List

2. Photographs of Generator/Transfer Switch Locations

3. Conceptual Designs

a. Building 24 Dual Feed and Automatic Transfer Switchgear

b. Kent Road Feeder Connection/Paradise Point Loop Feed

c. Midway Park Feeder Overhead to Underground Conversion

d. MCAS New River Enlisted Family Housing Overhead to Underground

Conversion

e. Underground Primary Replacement, Regimental 400 Area

f. Substation SS-3 Control House

4. Photographs of Substation 2 Control House

5. Substation 2 Control House Submittal for reference

6. Camp Lejeune Electrical Policies

7. MCO 5530.14A

8. Base Exterior Architectural Plan (BEAP)

9. Map of Regimental 400 Area demolition plans

10. Maps of Regimental 400 Area building additions

11. Substation 2 Plant-Precast Concrete Products Specification for reference

File details come from the government source that posted it. Updated .