2"
AC-1
1"
(TYP.)
The Walker Group Architecture, Inc PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
TN
PN
SITE PLAN
SCALE: 1" = 10'-0"
10' 1" = 10'-0"
20'10'5'0' 01/24/2020
NEW WORK NOTES
PROVIDE 1000 GALLON PROPANE TANK, CONCRETE PAD, AND BOLLARDS COMPLETE.
SEE CIVIL DRAWINGS FOR BOLLARD REQUIREMENTS.
PROVIDE AIR COOLED CHILLER AND CONCRETE PAD WITHIN FENCED ENCLOSURE
COMPLETE. SEE CIVIL DRAWINGS FOR CONTINUATION.
PROVIDE UNDERGROUND CHILLED WATER PIPING, INSULATION, AND SUPPORTS
COMPLETE. PROVIDE HEAT TRACING FOR EXPOSED PIPING.
PROVIDE 2" TAP WITH BUTTERFLY VALVE AND BLIND FLANGE FOR EMERGENCY
CHILLER CONNECTION.
PROVIDE 1" MAKEUP WATER PIPING. PROVIDE HEAT TRACING FOR EXPOSED PIPING.
CONNECT TO AIR SEPARATOR AT CHILLER.
REFER TO EXTERIOR PIPE SUPPORT DETAIL.
A B C D E
AHU-1
VAV-1VAV-2
VAV-4
VAV-5
VAV-10
VAV-8
VAV-7
VAV-9
VAV-6
B-2
B-1
1 (TYP.)
SHWP-2
SHWP-1
VAV-3
B
B
B
A
A
A
A
A
A
A
A
A
A 200A
A
A
A
A
A
24x22 20"Ø 12"Ø
8"Ø
6"Ø
8"Ø
8"Ø
12x10
10"Ø14"Ø
"Ø
"Ø
8"Ø
"Ø
"Ø
10"Ø
14"Ø
"Ø
HWR
HWS
HWR
HWS
HWR
HWS
HW
R HW
S
HW
R HW
S
HW
R HW
S
1-1/2"
1" 1" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
7 (TYP.)
7 (TYP.)
3 (TYP.)
3 (TYP.)
26x26
20x18
Z
X
U
U
V
YY
L-1
P
TO INCOMING
LP SERVICE
HW
S HW
R
CW
S
CW
R
1"
2"
ET-1
DSS-2B
DSS-1B
DSS-1A
CHEMICAL FEED TANK
EB
EB
7 (TYP.)
T
TTT
VAV-10
VAV-1/2/3/4/5
TT
T
VAV-8
T VAV-9
T
VAV-7
T
VAV-6
T
DDC
VFD
VFD
AS-1
6 8
S
5(TYP.)
8"Ø
3/4"
10x10
XDSS-2A
T
A
A
10"Ø10"Ø
A
A
A
A
10"Ø14"Ø
A
A
A
A
10"Ø14"Ø
"Ø
WW
M
30x30
RS
/R
L
RS
/R L
D
C
C
EB
S
LP
EF-114
L-2
2"
UH-115
T T
UH-1
EF-1
L-316
D
M
M
EB
EB
B
B
B
8x10
B
B
B
6x10
8"Ø
T
T
T
T
TN
PN
FLOOR PLAN
SCALE: 3/16" = 1'-0"
3/16" = 1'-0" 0' 5' 10' 20'
NEW WORK NOTES
PROVIDE VAV TERMINAL UNIT, THERMOSTAT, CONTROL WIRING, HANGERS, AND SUPPORTS
COMPLETE.
PROVIDE AIR HANDLING UNIT AND 4" CONCRETE HOUSEKEEPING PAD SUITABLE FOR UNIT
DIMENSIONS COMPLETE.
PROVIDE HWS/HWR PIPING, INSULATION, JACKETING, HANGERS, AND SUPPORTS COMPLETE.
ROUTE PIPE AS HIGH AS POSSIBLE.
PROVIDE BOILER COMPLETE.
PROVIDE DUCT MOUNTED GRILLE COMPLETE.
PROVIDE FIRE DAMPER COMPLETE. REFER TO DETAIL ON SHEET M-502.
PROVIDE DUCTWORK, INSULATION, HANGERS, AND SUPPORTS COMPLETE. ROUTE DUCT AT 12'
AFF. COORDINATE COLOR OF EXPOSED DUCTWORK WITH COTR.
PROVIDE ACCESS DOOR IN DUCTWORK FOR FIRE DAMPER AT INDICATED LOCATION.
PROVIDE CWS/CWR PIPING, INSULATION, JACKETING, HANGERS, AND SUPPORTS COMPLETE.
ROUTE PIPE AS HIGH AS POSSIBLE INSIDE MECHANICAL ROOM. SEE SHEET MS101 FOR
CONTINUATION.
PROVIDE SLEEVES AT PIPING THROUGH EXTERIOR WALL. REFER TO DETAIL ON SHEET M-502.
PROVIDE GAS PIPING, HANGERS, AND SUPPORTS COMPLETE. ROUTE PIPE AT 9' AFF.
PROVIDE 3" CONCENTRIC VENT UP THROUGH ROOF, HANGERS, AND SUPPORTS COMPLETE.
PRESSURE REGULATOR PROVIDED BY PROPANE PROVIDER.
PROVIDE WALL EXHAUST FAN, THERMOSTAT, CONTROL WIRING, HANGERS, AND SUPPORTS
COMPLETE.
PROVIDE GAS FIRED UNIT HEATER, THERMOSTAT, CONTROL WIRING, HANGERS, SUPPORTS, AND
3" CONCENTRIC VENT KIT COMPLETE.
MOUNT LOUVER AT 10' ABOVE FINISHED FLOOR. PROVIDE BAROMETRIC RELIEF DAMPER SET TO
OPEN AT 0.05" W.G. INTERNAL BUILDING PRESSURE.
PROVIDE DIFFERENTIAL PRESSURE SENSOR FOR HEATING WATER FLOW CONTROL. PROVIDE
ISOLATION VALVES AND P/T PORTS ON EACH SIDE OF SENSOR.
MOUNT TRANSFER GRILLE ABOVE CEILING AT 12' ABOVE FINISHED FLOOR.
The Walker Group Architecture, Inc PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
01/24/2020
The Walker Group Architecture, Inc PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
01/24/2020
TURNING VANES,
SINGLE THICKNESS
ELBOW
TEE
MAIN DUCT
45°
45°
W
SA/OA
RA/EA
L = 1/4W
L (4" MIN.)
BRANCH DUCT
BALANCING DAMPER (B.D.)
W
USE ONLY WHERE RECTANGULAR RUN-OUTS ARE INDICATED ON DRAWINGS
SA/OA
RA/EA
MAIN DUCT
BRANCH DUCT
BALANCING DAMPER (B.D.)
USE ONLY WHERE ROUND RUN-OUTS ARE INDICATED ON DRAWINGS
ROUND
RECTANGULAR
L (4" MIN.)
L = 1/4W
DRAIN PAN TRAPPING FOR SECTION UNDER
NEGATIVE PRESSURE:
L = H + J + PIPE DIAMETER WHERE:
H = 1 INCH FOR EACH INCH OF NEGATIVE
PRESSURE PLUS 1 INCH
J = 1/2 H
DRAIN PAN TRAPPING FOR SECTION UNDER
POSITIVE PRESSURE:
L = H + J + PIPE DIAMETER WHERE:
H = 1/2 INCH (MINIMUM)
J = 1/2 INCH PLUS THE UNIT POSITIVE
STATIC PRESSURE AT COIL DISCHARGE
(LOADED FILTERS)
CLEANOUT (TYP. FOR 2)
DRAIN LINE SHALL BE AT LEAST
THE SAME SIZE AS THE NIPPLE
ON THE DRAIN PAN
PITCH DOWN TOWARD
DRAIN, ROUTE AS
INDICATED ON PLAN
DRAIN PANL
J
H
PROVIDE (3) 1/4"Ø VENT HOLES
PRESSURE GAUGE -
0 - 30 PSIG RANGE
CHILLER
MANUAL
AIR VENT
FLOW SWITCH
2" CWR
2" CWS
SUPPORT FROM STRUCTURE
ABOVE
THREADED ROD (TYPICAL)
STEEL ANGLE
NUT WITH LOCK WASHER
(TYPICAL)
METAL HANGER STRAP
SECURE TO BOTTOM AND
SIDES OF DUCT WITH SHEET
METAL SCREWS
NOTE: FOR ANGLE SIZE AND HANGER STRAP GAUGE, SEE SMACNA
LOW PRESSURE DUCT CONSTRUCTION STANDARDS.
SUPPORT FROM
FLOOR OR ROOF
STRUCTURE ABOVE3/8" THREADED
ROD
CLEVIS HANGER (SIZE
AS REQUIRED)
SUPPORT FROM
FLOOR OR ROOF
STRUCTURE ABOVE
BOLT AND CLAMPING
NUT (TYP.)
STEEL PIPE
STRAP
1-5/8" x 1-5/8" x 12
GAUGE STEEL CHANNEL
INSULATION SADDLE
3/8" THREADED ROD
LENGTH AS REQUIRED
INSULATION SADDLE (TYP)MULTIPLE PIPE RUNS
SINGLE PIPE RUN
6"
SECTION
PLAN
EDGE OF CHILLER
6"
6"6"
GRADE
45° CHAMFER
WWF 6 X 6 - W 2.9 X 2.9
TOP SHALL BE LEVEL
8"
2" M
IN
1' -6
STRAIGHT LENGTHS OF UNOBSTRUCTED PIPE
WITHOUT INLINE APPURTENANCES SHALL BE
INSTALLED UP AND DOWNSTREAM OF FLOW
CONTROL BALANCING VALVES PER
MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
THERMOMETER 0 - 200°
F (TYP. OF 2)
3/4" DRAIN VALVE WITH
HOSE CONNECTION
FLOW CONTROL
BALANCING VALVE
PRESSURE GAGE TAP WITH CAP
AND PET COCK (TYP.)
COIL
MANUAL AIR VENT
PROVIDE VIBRATION
ISOLATING FLEXIBLE PIPING
CONNECTOR (TYP. FOR 2)
SUPPLY MAIN
RETURN MAIN
MANUAL BALANCING
VALVE W/TAPS
CONDENSATE DRAIN
TRAP. SEE DETAIL3/4" DRAIN VALVE W/
HOSE CONNECTION
DRAIN
DRAIN PAN
MANUAL AIR VENT
THERMOMETER, 30°- 75°F
RANGE (TYP)
PRESSURE GAGE TAP W/
CAP & PET COCK (TYP)
PROVIDE VIBRATION
ISOLATING FLEXIBLE PIPING
CONNECTOR (TYP. FOR 2)
NOTES:
1. ARRANGE PIPING TO PERMIT REMOVAL OF COIL.
2. MANUAL BALANCING VALVES SHALL BE INSTALLED IN
CONFORMANCE WITH VALVE MANUFACTURER'S RECOMMENDED
SPACING UP AND DOWNSTREAM FROM PIPE CHANGES IN
DIRECTION AND/OR OTHER VALVES AND COMPONENTS IN THE PIPING SYSTEM.
APPROX.
46"
THERMOSTAT/
TEMPERATURE SENSOR,
MOUNTED CENTERLINE WITH
ADJACENT WALL SWITCHES
FINISHED FLOOR
WALL SWITCH
T
WALL FRAMING (TYP.)
2" CWS/CWR
AC-1
THERMOMETER
0°-100°F RANGE (TYP.
FOR 2)
NC
2" OUTDOOR
TEMPORARY CHILLER
CONNECTION
NC
2" CWS/CWR
FLOW SWITCH
UNDERGROUND
FLEXIBLE CONNECTOR (TYP.)
3-WAY CONTROL VALVE
3-WAY CONTROL VALVE
BY-PASS SQUARE HEAD
COCK
4" ALL AROUND UNIT
45° CHAMFER
FINISHED
FLOOR 6/6 WIRE
MESH
EQUIPMENT
4"
3/4"
UNDERGROUND POLYETHYLENE PIPING
FLOORGRADE
NOTES:
1. PROVIDE PRESSURE REGULATOR FOR ALL UNITS.
2. TOTAL LOAD = 340 MBH.
3. GAS PIPING SIZED PER TABLE 402.4(4) OF THE 2015
INTERNATIONAL FUEL GAS CODE FOR SCHEDULE 40
PIPE. TOTAL DEVELOPED LENGTH: 100 FEET.
3/4"(TYP.)
(340 MBH)
PLUG VALVE (TYP.)
APPROX. 1000 GALLON PROPANE TANK
(BY PROPANE SUPPLIER) AND
CONCRETE PAD (BY CONTRACTOR).
TANK SHALL BE LOCATED MINIMUM 25'
FROM THE BUILDING AND 10' FROM
TRANSFORMER.
WALL SLEEVE
PAINTED STEEL PIPING
2ND STAGE REGULATOR, 2 PSIG,
SHUTOFF VALVE AND FLEXIBLE
PIPE CONNECTOR
1ST STAGE REGULATOR, 10-20
PSIG, SHUTOFF VALVE AND
FLEXIBLE PIPE CONNECTOR
PROPANE VENDOR SHALL FURNISH AND INSTALL L.P. GAS TANK, FIRST AND SECOND STAGE
REGULATORS, PIPING AND ASSOCIATED APPURTENANCES UP TO AND INCLUDING GAS COCK AT
BUILDING ENTRANCE. CONTRACTOR SHALL FURNISH CONCRETE PAD SIZED IN ACCORDANCE WITH ACTUAL PROPANE TANK PROVIDED, AND INSTALL GAS PIPING AND NECESSARY CONNECTIONS FROM
GAS COCK TO INDOOR EQUIPMENT. SEE PROPANE FLOW DIAGRAM, THIS SHEET.
PROPANE NOTE:
MECHANICAL 108
EXTERIOR WALL
B-1
(155 CFH)
B-2
(155 CFH)
APPLY CAULKING OR METAL-FAB MST
TAPE WHERE VENT PASSES THRU
FLASHING
APPLY THICK RING OF CAULKING OR
METAL-FAB MST TAPE AROUND VENT
AS SHOWN
MAINTAIN CLEARANCE THRU
COMBUSTIBLE JOIST AREA
PITCHED ROOF
FLASHING
CONCENTRIC VENT
MIN 2'-0"
ABOVE ROOF
OR ANY PART
OF BUILDING
WITHIN 10'
10'
REGULATOR (TYP.)
CHECK VALVE
MANUAL FLOW
CONTROL
BALANCING VALVE
NEEDLE VALVE - N.O.
(CLOSE FOR PUMP
SUCTION PRESSURE)
PRESSURE GAUGE 0 - 120
PSIG RANGE
IF PUMP SUCTION AND
DISCHARGE FLANGES
ARE TAPPED, USE
THESE POINTS FOR
PRESSURE GAUGE
CONNECTIONS
BALL VALVE - N.C.
(OPEN FOR PUMP
SUCTION)
STRAIGHT LENGTHS OF UNOBSTRUCTED PIPE WITHOUT INLINE APPURTENANCES
SHALL BE INSTALLED UP / DOWNSTREAM OF FLOW CONTROL BALANCING VALVE
PER MANUFACTURER'S INSTALLATION INSTRUCTIONS
BALL VALVE
UNION
CONCENTRIC REDUCER
MOTOR
PUMP
CONCENTRIC REDUCER
UNION
BALL VALVE
PIPE SUPPORT DETAILS
SCALE: NO SCALE M-501E CONDENSATE DRAIN TRAP DETAIL
SCALE: NO SCALE M-501F CHILLER PAD TYPICAL DETAIL
SCALE: NO SCALE M-501G
PROPANE FLOW DIAGRAM
SCALE: NO SCALE M-501A INLINE CENTRIFUGAL PUMP DETAIL
SCALE: NO SCALE M-501B CHILLED WATER COIL PIPING DETAIL
SCALE: NO SCALE M-501C AIR HANDLER UNIT HOT WATER COIL PIPING DETAIL
SCALE: NO SCALE M-501D
CHILLER PIPING DIAGRAM
SCALE: NO SCALE M-501H CONCRETE PAD DETAIL - INTERIOR
SCALE: NO SCALE M-501I
CONCENTRIC VENT DETAIL
SCALE: NO SCALE M-501L TYPICAL BRANCH CONNECTION
SCALE: NO SCALE M-501M DUCT SUPPORT DETAIL
SCALE: NO SCALE M-501N DUCTWORK FITTING DETAIL
SCALE: NO SCALE M-501O
CHILLER PIPING DIAGRAM #2
SCALE: NO SCALE M-501J SWITCH/THERMOSTAT MOUNTING HEIGHT DETAIL
SCALE: NO SCALE M-501K
VENTILATION AIR COMBUSTION
AIR
UH-1
(30 CFH)
BY-PASS SQUARE HEAD
COCK
M
PROVIDE 120 VAC
MOTORIZED GAS VALVE.
INTERLOCK WITH
EMERGENCY GAS
SHUTOFF SWITCH.
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
01/24/2020
CONTINUE UP TO
STRUCTURAL ROOF
SUPPORT. PROVIDE
INTERMEDIATE
SUPPORTS AS REQUIRED
SPRING VIBRATION
ISOLATOR (TYP.)
NUT & LOCK WASHER
TOP AND BOTTOM
SUPPORT LUGS
(IF PROVIDED)
EQUIPMENT
CHANNEL
C3x6
NUT & LOCK
WASHER TOP
AND BOTTOM
1/2" THREADED
ROD (TYP.)
THERE IS A 36 INCH CLEARANCE RESTRICTION ON SIDE OF VAV BOX
FOR SERVICE ACCESSIBILITY. THERE SHALL BE NO SPRINKLER PIPE,
LIGHTS, WALLS, ETC. WITHIN THAT AREA.
ALLOW 48 INCH OF STRAIGHT DUCT DOWNSTREAM OF UNIT BEFORE
FIRST RUNOUT.
PROVIDE THREE-WAY VALVE FOR VAV-8 AND VAV-10.
MIN. LENGTH OF STRAIGHT DUCT BETWEEN VAV BOX INLET AND 1st
UPSTREAM ELBOW OR REDUCER NOT LESS THAN 4 DUCT DIAMETERS
PRIMARY
AIR FLOW
PRIMARY AIR DUCT
AIR VALVE/DAMPER
SIZE AS INDICATED
REDUCER
NOTES:
2.
1.
DDC CONTROL BOX
36" SERVICE CLEARANCE
SIZE AS INDICATED
TRANSITION AS REQUIRED
3/4" DRAIN VALVE WITH HOSE
CONNECTION ON LOWEST PIPE
AUTOMATIC AIR VENT WITH SHUTOFF COCK
HWS
HWR
SET SLEEVE IN WALL AND
ANCHOR DURING WALL
CONSTRUCTION
ESCUTCHEON PLATES
(BOTH SIDES WHERE
EXPOSED)
INSULATION
PIPE
PACK WITH FIBERGLASS
AND SEAL BOTH SIDES
PIPE SLEEVE
WALLSET SLEEVE IN WALL
AND ANCHOR DURING
WALL CONSTRUCTION
ESCUTCHEON PLATE
(WHERE EXPOSED)
WATERPROOF
SEALANT
BACK-UP
MATERIAL
EXTERIOR INTERIOR
ANCHOR
PIPE
PIPE SLEEVE
WALL
INSULATION
PIPE WITH HEAT
TAPE
INSULATION AND
METAL JACKET (TYP)
GALVANIZED PIPE EXTENSION
-LENGTH AS REQUIRED (TYP)
3/8"Øx4" LONG GALVANIZED
BOLT SET IN CONCRETE (TYP)
1/4" THICK GALVANIZED
PLATE (TYP)
24"x12"x4" THICK CONCRETE
SUPPORT PAD
PIPE STANCHION SADDLE
(MSS-SP-69 TYPE 37) (TYP)
GRADE
ELECTRICAL POWER
CONNECTION, 120 VOLTS
HEATING CABLE
TEMPERATURE
CONTROLLER PIPING
WRAP WITH ELECTRIC HEATING CABLE
TO PROVIDE 8 WATTS/FOOT
PROVIDE MANUFACTURER'S
RECOMMENDED
ATTACHMENTS AT 6" O.C.
PIPE INSULATIONALUMINUM
JACKET
STAINLESS STEEL
HOSE CLAMP
4" THICK CONCRETE
PAD (16" x 16")
APPROX. 15"
APPROX. 10"
5 GALLON MINIMUM
CAPACITY
HOSE BIBB
BALL VALVE
3/4" TO PUMP SUCTION
3-1/2" MIN. OPENING
3/4" TO PUMP DISCHARGE
BALL VALVE
PLUGGED CROSSES (TYP.)
TWIST OFF PRESSURE CAP
TWO-WAY VALVE (UON)
NOTE: VERTICAL FIRE DAMPER INSTALLATION SHOWN.
HORIZONTAL FIRE DAMPER INSTALLATION SIMILAR EXCEPT
FIRE DAMPER SHALL INCLUDE NEGATOR SPRING CLOSURE
MECHANISM.
IF DUCTWORK IS LINED,
INTERRUPT LINER AT
FIRE DAMPER AND
PROVIDE EXTERIOR
INSULATION
EXTERIOR
INSULATION (TYP)
6" EACH SIDE (MAX.)
WHERE THE WALL IS NON-
SOLID METAL OR WOOD
STUD, OPENING TO BE
LINED WITH FIRE RESISTIVE
MATERIAL OF RATING EQUAL
TO THAT OF THE WALL
RETAINING ANGLES - MIN. 1 1/2" x 1 1/2" x 16 GA. ALL 4
SIDES. OVERLAP STRUCTURAL OPENING A MIN. OF 1" AND
COVER CORNERS OF OPENINGS
PLAIN "S" SLIP CONNECTION OR OTHER APPROVED
CONNECTION TO BE USED FOR DAMPER / DUCT
BREAKAWAY CONNECTION. (TYP) CONNECTION
SHALL BE CONSISTENT WITH DUCT PRESSURE
CLASSIFICATION
CLEARANCE - 1/8" PER LINEAR FOOT - BOTH DIMENSIONS
PROVIDE ACCESS DOOR LARGE ENOUGH TO PERMIT
MAINTENANCE AND RESETTING OF FIRE DAMPER
U.L. APPROVED FIRE DAMPER, 1 1/2 HOUR RATING,
STYLE B, 165 °F FUSIBLE LINK (REPLACEABLE)
STEEL SLEEVE
CLEARANCE - 1/8" PER LINEAR FOOT - BOTH DIMENSIONS
WHERE WALL IS CONCRETE, MASONRY OR SOLID
METAL STUD FRAMING, NO LINING IS REQUIRED
SECURE RETAINING ANGLES TO SLEEVE ONLY ON 8"
CENTERS WITH 1/4" BOLTS AND NUTS, OR No 10 STEEL
SCREWS OR MIN. 3/16" STEEL RIVETS, OR 1/2" LONG
WELDS
NOTCHED PIECE
BENT DOWN
A-A
CEILING
RUNNER
METAL STUD
FRAMING SHOWN
FLOOR
RUNNER
DETAIL A-A
24"
O.C. MAX
CEILING
RUNNER
FLOOR
RUNNER
24"
O.C. MAX
12" 1. FRAME WALL OPENINGS AS SHOWN IN FIGURE 1 OR
2.
2. DOUBLE VERTICAL STUDS ARE NOT REQUIRED FOR
OPENINGS 36"W x 36"H OR SMALLER.
3. ALL CONSTRUCTION AND FASTENERS MUST MEET
THE REQUIREMENTS OF THE APPROPRIATE WALL
DESIGN AND/OR LOCAL CODES.
4. IN WOOD CONSTRUCTION, FIRE RATED GYPSUM
WALL BOARD MUST COVER ALL WOOD STUD
SURFACES.
24" O.C. MAX
(METAL STUD)
2"
FIGURE 1
FIGURE 2
MASTIC ALL
AROUND
PREMOLDED ONE
PIECE PVC INSULATED
FITTING COVER
INSULATION
WHERE REQUIRED
TAPE FITTING COVER
TO INSULATION
BARRIER AS REQUIRED FIRE WALL (SEE
ARCHITECTURAL)
U.L. LISTED FILL, VOID OR
CAVITY MATERIAL FOR USE IN
THROUGH PENETRATION FIRE
STOPS.
PIPE DIMENSIONS VARY
AS SHOWN ON PLANS
METAL SLEEVE GROUTED
TIGHTLY IN CMU WALL
1 OR 2 HOUR WALL PENETRATION PIPING DETAIL
SCALE: NO SCALE M-502B
FIRE DAMPER INSTALLATION DETAIL (VERTICAL) FRAMING FOR OPENINGS IN WOOD AND METAL STUD WALL
SCALE: NO SCALE M-502C
SUSPENDED EQUIPMENT SUPPORT DETAIL
SCALE: NO SCALE M-502D
CHEMICAL FEED TANK DETAIL
SCALE: NO SCALE M-502E
PIPE SLEEVE THRU EXTERIOR WALL DETAIL
SCALE: NO SCALE M-502F PIPE SLEEVE THRU INTERIOR WALL DETAIL
SCALE: NO SCALE M-502G SHUT-OFF VAV TERMINAL UNIT - HOT WATER REHEAT DETAIL
SCALE: NO SCALE M-502H
HEATING CABLE DETAIL
SCALE: NO SCALE M-502J EXTERIOR PIPE SUPPORT DETAIL
SCALE: NO SCALE M-502K
3.
CAULK ALL AROUND
TO MAKE WATER
TIGHT
WALL LOUVER
PRE-ENGINEERED
METAL WALL
SHEET METAL SLEEVE
AIR FLOW
INSECT OR BIRD
SCREEN U.O.N. SEE
SCHEDULE FOR
REQUIREMENTS
6" MAXIMUM
WALL LOUVER DETAIL
SCALE: NO SCALE M-502A
CAULK ALL AROUND TO
MAKE WATER - TIGHT
AUTOMATIC GRAVITY
OPERATED
SHUTTERS
SECURE
SLEEVE TO
BUILDING W/
SCREWS ON 10"
CENTERS
EXTERIOR WALL
WALL
SLEEVE
EXHAUST
FAN
WIRE
GUARD
SECURE FAN TO WALL SLEEVE
W/ SCREWS ON 8" CENTERS
PROVIDE 4 x 4 x 1/8 STEEL
ANGLE AT TOP AND AT
FIBERGLASS PANEL ON SIDES
EXTERIOR WALL
BIRDSCREEN
EXHAUST
WALL EXHAUST FAN DETAIL
SCALE: NO SCALE M-502I
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
01/24/2020
GRILLE, REGISTER & DIFFUSER SCHEDULE
C.F.M. NECK MAX.
TAG TYPE SERVICE RANGE SIZE P.D. REMARKS
A GRILLE SUPPLY 0 - 235 12x4 0.1 14x6 PANEL, DUCT MOUNTED, DRUM LOUVER, 3" BLADE SPACING B DIFFUSER SUPPLY 115 - 230 8" 0.1 LAY-IN, 24x24 PANEL, 4-WAY BLOW PATTERN T GRILLE RETURN - 22x22 - LAY-IN, 24x24 PANEL, 35° DEFLECTION, 3/4" BLADE SPACING U REGISTER TRANSFER - 10x6 0.1 SINGLE DEFLECTION, 35° DEFLECTION, 3/4" BLADE SPACING V REGISTER TRANSFER - 10x10 0.1 SINGLE DEFLECTION, 35° DEFLECTION, 3/4" BLADE SPACING W REGISTER TRANSFER - 12x12 0.1 SINGLE DEFLECTION, 35° DEFLECTION, 3/4" BLADE SPACING X REGISTER TRANSFER - 26x14 0.1 SINGLE DEFLECTION, 35° DEFLECTION, 3/4" BLADE SPACING Y REGISTER TRANSFER - 14x12 0.1 SINGLE DEFLECTION, 35° DEFLECTION, 3/4" BLADE SPACING Z REGISTER RETURN 4900 42x36 0.1 44x36 PANEL, HEAVY DUTY, 30° DEFLECTION, 1/2" BLADE SPACING
THE FOLLOWING NOTES ARE TYPICAL UNLESS OTHERWISE NOTED:
1. PROVIDE ALUMINUM DIFFUSERS AND REGISTERS WITH OPPOSED BLADE VOLUME DAMPERS, BAKED STANDARD WHITE ENAMEL FINISH (INCLUDING HEAD OF SCREWS), MAXIMUM NC=25 AT HIGHEST CFM AND PROVIDE SQUARE TO ROUND TRANSITION AS REQUIRED.
2. MAXIMUM PRESSURE DROP SHALL INCLUDE VOLUME DAMPER WHERE DAMPER IS PROVIDED.
PUMP SCHEDULE
HEAD ELECTRICAL DATA
TAG SERVICE TYPE CONTROL G.P.M. (FT.) H.P. VOLTS PHASE R.P.M. REMARKS
SHWP-1 SECONDARY HOT WATER INLINE VFD 28.0 25.0 0.5 208 3 1800 SEE NOTES
SHWP-2 SECONDARY HOT WATER INLINE VFD 28.0 25.0 0.5 208 3 1800 SEE NOTES
NOTES:
1. PROVIDE NON-OVERLOADING MOTOR SELECTION.
2. PROVIDE INVERTER DUTY RATED MOTOR SUITABLE FOR USE WITH A VFD.
SHUT OFF V.A.V. TERMINAL BOX SCHEDULE (HOT WATER)
VOL. REG. C.F.M. MAX INLET HEATING COIL
INLET S.P. W.P.D. A.P.D.
TAG SIZE (IN.) MIN. MAX. (IN. WG.) M.B.H. G.P.M. E.W.T. L.W.T. (FT. WG.) (IN. WG.) REMARKS
VAV-1 10" 270 900 0.5 24.7 3.0 120 103.4 0.40 0.66 SEE NOTES
VAV-2 10" 270 900 0.5 24.7 3.0 120 103.4 0.40 0.66 SEE NOTES
VAV-3 10" 270 900 0.5 24.7 3.0 120 103.4 0.40 0.66 SEE NOTES
VAV-4 10" 270 900 0.5 24.7 3.0 120 103.4 0.40 0.66 SEE NOTES
VAV-5 10" 275 910 0.5 24.0 2.7 120 102.1 0.32 0.67 SEE NOTES
VAV-6 8" 170 560 0.5 14.4 1.5 120 100.7 0.12 0.56 SEE NOTES
VAV-7 4" 40 130 0.5 3.5 0.3 120 93.9 0.01 0.08 SEE NOTES
VAV-8 4" 50 165 0.5 4.3 0.4 120 95.2 0.01 0.12 SEE NOTES
VAV-9 6" 115 370 0.5 9.9 1.2 120 103.8 0.08 0.45 SEE NOTES
VAV-10 12" 365 1215 0.5 32.2 3.0 120 98.4 0.42 0.64 SEE NOTES
NOTES:
1. HEATING COIL SELECTION BASED ON 55ºF E.A.T. AT 80% OF MAX. AIRFLOW.
2. SELECT UNITS FOR MAXIMUM NOISE CRITERIA OF 35.
DUCTLESS SPLIT SYSTEM HEAT PUMP SCHEDULE
COIL E.A.T. FAN DATA HEATING DATA ELECTRIC DATA INDOOR UNIT ELECTRIC DATA OUTDOOR UNIT
TOTAL COOLING SUPPLY TOTAL E.A.T.
TAG LOCATION CAPACITY M.B.H. ºF D.B.ºF W.B.AIR C.F.M. M.B.H (ºF) M.C.A. M.O.C.P. VOLTS PHASE TAG M.C.A. M.O.C.P. VOLTS PHASE REMARKS
DSS-1A ELECTRICAL 9.0 80.0 67.0 265 12.0 70.0 INDOOR UNIT POWERED BY OUTDOOR UNITDSS-1B 9.0 15.0 208 1 SEE NOTES DSS-2A TELECOM 9.0 80.0 67.0 265 12.0 70.0 INDOOR UNIT POWERED BY OUTDOOR UNITDSS-2B 9.0 15.0 208 1 SEE NOTES
NOTES:
1. COOLING CAPACITY BASED ON 96º F AMBIENT, HEATING CAPACITY BASED ON 17° F.
2. PROVIDE INDOOR UNIT WITH COIL FREEZE PROTECTION, REMOTE MOUNTED THERMOSTAT, INTEGRAL CONDENSATE PUMP (5FT HEAD), HIGH SIDE WALL CASSETTE CONFIGURATION.
3. PROVIDE OUTDOOR UNIT WITH LOW AMBIENT CONTROL.
AIR CONTROL SCHEDULE
AIR SEPARATOR EXPANSION TANK
MAX. CAPACITY ACCEPTED APPROX. APPROX.
SYSTEM TAG G.P.M. P.D. FT. SIZE TAG (GAL.) CAPACITY (GAL.) DIAMETER HEIGHT REMARKS
HOT WATER AS-1 28.0 0.04 3 ET-1 7.6 2.5 11 17 SEE NOTES
NOTES:
1. PROVIDE CENTRIFUGAL TYPE AIR SEPARATOR WITH HIGH CAPACITY AIR VENT.
2. PROVIDE VERTICAL BLADDER TYPE EXPANSION TANK WITH FLOOR SKIRT, PRE-CHARGE TO 12 PSIG.
FAN SCHEDULE
E.S.P. ELECTRICAL DATA
TAG FAN TYPE C.F.M. (IN. WG.) DRIVE H.P. VOLTS PHASE REMARKS
EF-1 EXHAUST 500 0.35 DIRECT 1/15 120 1 SEE NOTES
NOTES:
1. PROVIDE DIRECT DRIVE FANS WITH ELECTRONIC SPEED CONTROLLER.
2. PROVIDE SIDEWALL FAN WITH WALL MOUNTING SLEEVE, INTEGRAL DISCONNECT, MOTORSIDE GUARD, AND BACKDRAFT DAMPER.
GAS FIRED UNIT HEATER SCHEDULE
INPUT CAPACITY M.B.H. OUTPUT APPROX. MOTOR ELECTRICAL DATA
TAG (C.F.H.) CAPACITY C.F.M. H.P. VOLTS PHASE REMARKS
UH-1 30 24.0 505 1/15 120 1 SEE NOTES
NOTES:
1. PROVIDE WITH SINGLE STAGE COMBINATION GAS VALVE AND HORIZONTAL CONCENTRIC VENT OUTLET.
2. PROVIDE WITH REMOTE WIRED THERMOSTAT, ADJUSTABLE HORIZONTAL LOUVERS AND PROPELLER FAN.
AIR HANDLING UNIT SCHEDULE
SUPPLY FAN DATA CHILLED WATER COOLING COIL DATA HOT WATER PRE-HEAT COIL DATA
S.A. O.A. ELECTRICAL DATA TOTAL SENS. MAX. TOTAL MAX.
C.F.M. C.F.M. E.S.P. FAN
M.C.A. M.O.C.P.
CAPACITY CAPACITY E.D.B. E.W.B. E.W.T. L.W.T. W.P.D. CAPACITY E.D.B. E.W.T. L.W.T. W.P.D.
TAG (MIN. / MAX.) (MIN. / MAX.) (IN. WG.) QTY H.P. TYPE VOLTS PHASE M.B.H. M.B.H. (ºF)(ºF)(ºF)(ºF)G.P.M. (FT. WG.) M.B.H. (ºF)(ºF)G.P.M. (ºF)(FT. WG.) REMARKS AHU-1 6950 / 2050 2050 / 450 2.00 2.00 4 DIRECT 208 19 25 3 272.6 191.5 79.7 67 45 59.2 38.2 3.24 86.8 26.0 120 6.6 93 0.6 SEE NOTES
NOTES:
1. LEAVING AIR TEMPERATURE IS TO BE PROVIDED AT THE UNIT DISCHARGE, TOTAL & SENSIBLE CAPACITIES ARE "NET" VALUES TO BE PROVIDED DOWNSTREAM OF THE SUPPLY AIR FAN.
2. PROVIDE INVERTER DUTY RATED MOTOR SUITABLE FOR USE WITH A VFD.
3. PROVIDE WITH THE FOLLOWING SECTIONS: MERV 8 FILTER, PREHEAT COIL, COOLING COIL, COIL ACCESS PANEL, FAN, AND FAN ACCESS PANEL.
4. PROVIDE AIR HANDLER UNIT WITH MAXIMUM DIMENSIONS OF 58"x58"x96".
HOT WATER BOILER SCHEDULE
INPUT OUTPUT L.W.T. E.W.T. ELECTRICAL DATA
TAG FUEL (M.B.H.) (M.B.H.) G.P.M. (ºF) (ºF) M.C.A. F.L.A. VOLTS PHASE REMARKS
B-1 PROPANE 155.0 147.3 14.0 120 100 2.8 2.2 120 1 SEE NOTES
B-2 PROPANE 155.0 147.3 14.0 120 100 2.8 2.2 120 1 SEE NOTES
NOTES:
1. PROVIDE SUITABLE FOR 2 PSIG GAS PRESSURE.
2. PROVIDE SUITABLE FOR 80 PSI WORKING PRESSURE.
3. PROVIDE ALL TRIM AND APPURTENANCES RECOMMENDED FOR INDICATED APPLICATION.
4. PROVIDE BOILERS WITH INLINE PRIMARY HOT WATER PUMP RATED FOR 15.0 GPM AND 10 FT OF HEAD
5. PROVIDE CONDENSING BOILERS WITH BACNET MS/TP INTERFACE.
LOUVER SCHEDULE
MIN. FREE AREA
TAG SERVICE SIZE (IN.) WxH (SF) C.F.M. SERVES REMARKS L-1 INTAKE 44x32 5.3 2050 AHU-1 SEE NOTES L-2 INTAKE 20x20 1.1 500 EF-1 SEE NOTES L-3 RELIEF 36x36 4.4 2050 AHU-1 SEE NOTES
NOTES:
1. PROVIDE INSECT SCREEN FOR INTAKE SERVICE, BIRDSCREEN FOR RELIEF SERVICE.
2. PROVIDE ALUMINUM STORMPROOF CONSTRUCTION.
3. PROVIDE COLOR CHART FOR FINISH SELECTION BY COTR.
4. LOUVER SHALL BE LISTED FOR AMCA 500L FOR AIRFLOW RESISTANCE AND WATER PENETRATION.
5. INTAKE LOUVERS SHALL BE AT MINIMUM 10 FEET ABOVE FINISHED FLOOR.
AIR COOLED CHILLER SCHEDULE
CAPACITY EVAPORATOR CONDENSER FAN COMPRESSOR ELECTRICAL DATA
TAG (TONS) G.P.M. P.D. (FT.) E.W.T. (°F)L.W.T. (°F)QUANTITY F.L.A. TYPE QUANTITY R.L.A. M.C.A. M.O.C.P. VOLTS PHASE REMARKS
AC-1 26 38.2 6.6 59.2 45.0 2 6.8 SCROLL 2 50.6 148 175 208 3 SEE NOTES
NOTES:
1. PROVIDE MANUFACTURER'S PUMPING PACKAGE WITH DUAL 5 HP (SIZED FOR 25 FT. HEAD) PUMPS WITH INVERTER DUTY RATED MOTORS SUITABLE FOR USE WITH VARIABLE FREQUENCY DRIVES, STRAINERS, CHECK VALVES, EXPANSION TANK, AIR SEPARATOR, AND 143 GAL. BUFFER TANK. PUMPS SHALL BE CONSTRUCTED OF MANUFACTURER'S STANDARD MATERIALS SUITABLE FOR CHILLED WATER, AND PROVIDED WITH MECHANICAL SEALS, DRIP PROOF ELECTRIC MOTOR, AND NON-OVERLOADING SELECTION.
PUMP MOTORS SHALL BE EQUIPPED WITH VARIABLE FREQUENCY DRIVES BUT SHALL OPERATE AT CONSTANT SPEED.
2. PROVIDE INTEGRAL CIRCUIT BREAKER, CONTROL VOLTAGE TRANSFORMERS, PUMPS, AND SEPARATE 120V CIRCUITS FOR EVAPORATOR PIPING HEAT TAPE AND BUFFER TANK HEAT TAPE.
3. PROVIDE WITH 4 STAGES OF UNLOADING. MINIMUM EFFICIENCY AT AHRI CONDITIONS: 9.89 EER / 14.27 IPLV.
4. PROVIDE WITH BACNET MS/TP INTERFACE, CONDENSER COIL GUARDS, WIDE AMBIENT CONDENSER CONTROL, AND 410A REFRIGERANT.
5. PROVIDE PHASE MONITORS FOR ALL 3 PHASE EQUIPMENT: PHASE UNBALANCE PROTECTION, OVER/UNDER VOLTAGE PROTECTION, PHASE LOSS PROTECTION, DELAY OF BREAK TIMER TO DELAY AUTOMATIC RESTARTS, NON-CRITICAL FAULT DELAY, PROGRAMMABLE AUTO/MANUAL RESTART, AND LOAD AND LINE SLIDE MONITORING.
6. CONDENSER COILS SHALL MEET 3000 HOUR SALT SPRAY TEST IN ACCORDANCE WITH ASTM B117-90.
7. EACH CIRCUIT SHALL BE PROVIDED WITH LIQUID AND SUCTION LINE SERVICE VALVES AND CORE FILTER DRIER ON THE LIQUID LINE.
8. CAPACITY BASED ON 96°F AMBIENT TEMPERATURE.
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO
THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE
FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE
PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
01/24/2020
VAV SHUT-OFF TERMINAL UNITS
GENERAL: AN OVERRIDE SWITCH INTEGRAL TO EACH ZONE TEMPERATURE SENSOR SHALL RETURN THE RESPECTIVE AHU FROM UNOCCUPIED TO OCCUPIED BUT ONLY THE ZONE OVERRIDDEN SHALL RETURN TO OCCUPIED MODE. WHEN ANY OVERRIDE SWITCH IS ENERGIZED, AHU AND ALL VAV BOXES ASSOCIATED WITH THE ZONE OVERRIDDEN SHALL BE ENERGIZED THROUGH DDC CONTROL BUT ONLY THE ZONE OVERRIDDEN SHALL RETURN TO OCCUPIED MODE TEMPERATURE SETPOINTS. AFTER TWO HOURS, THE ZONE SHALL RETURN TO UNOCCUPIED MODE. ENERGIZED AHU AND ALL ASSOCIATED VAV BOXES SHALL BE DE-ENERGIZED UNLESS AHU IS UNDER CONTROL OF ANOTHER ZONE IN OVERRIDE POSITION. REFER TO GLOBAL
TEMPERATURE SETPOINT NOTE THIS SHEET.
COOLING-OCCUPIED: THE ZONE TEMPERATURE SENSOR THROUGH DDC CONTROL SHALL MODULATE THE PRIMARY AIR VALVE IN THE VAV BOX TO MAINTAIN GLOBAL ZONE TEMPERATURE SETPOINT, OPENING THE AIR VALVE ON A RISE IN SPACE TEMPERATURE, OR CLOSING IT ON A FALL IN SPACE
TEMPERATURE, (NOT TO FALL BELOW MINIMUM SCHEDULED PRIMARY AIR QUANTITY).
HEATING-OCCUPIED: THE PRIMARY AIR VALVE SHALL START IN ITS MINIMUM SCHEDULED POSITION THRU DDC CONTROL. THE ZONE TEMPERATURE SENSOR THROUGH DDC CONTROL SHALL MODULATE THE HOT WATER CONTROL VALVE TO MAINTAIN GLOBAL ZONE TEMPERATURE SETPOINT. ON A RISE IN ZONE TEMPERATURE, THE OPPOSITE SHALL OCCUR. IF SPACE TEMPERATURE IS SLOW TO RESPOND, CONTROLLER SHALL MODULATE PRIMARY AIR VALVE OPEN TO A MAX OF 80%. ON A RISE IN ZONE TEMPERATURE, THE OPPOSITE SHALL OCCUR.
COOLING-UNOCCUPIED: THE VAV BOX PRIMARY AIR VALVE SHALL BE FULLY CLOSED UNLESS THE ASSOCIATED AHU SUPPLY FAN IS ENERGIZED. ON A RISE IN ZONE TEMPERATURE ABOVE SETBACK SETPOINT (85°F, ADJ.) THE VAV BOX PRIMARY AIR VALVE SHALL MODULATE TO MAINTAIN SETPOINT. DDC CONTROLLER SHALL MAINTAIN 55°F SUPPLY AIR TEMPERATURE. AHU SHALL REMAIN ENERGIZED UNTIL ZONE SETBACK TEMPERATURE SETPOINT IS ACHIEVED. IF ZONE TEMPERATURE FALLS BELOW SETBACK SETPOINT, VAV BOX SHALL CLOSE AIR VALVE TO MIN. POSITION.
HEATING-UNOCCUPIED: THE VAV BOX PRIMARY AIR VALVE SHALL BE FULLY CLOSED UNLESS THE ASSOCIATED AHU SUPPLY FAN IS ENERGIZED. ON A FALL IN ZONE TEMPERATURE BELOW SETBACK SETPOINT (60°F, ADJ.) THE PRIMARY AIR VALVE SHALL OPEN TO 80%. DDC CONTROLLER SHALL MODULATE VAV BOX HOT WATER CONTROL VALVE TO MAINTAIN ZONE SETBACK TEMPERATURE SETPOINT. IF ZONE TEMPERATURE RISES ABOVE SETBACK
SETPOINT, THE OPPOSITE SHALL OCCUR.
DDC/EMCS SIGNAL-FUNCTION:
ZONE TEMPERATURE SENSOR - AIR VALVE CONTROL, HOT WATER VALVE CONTROL, STATUS, ALARM
OVERRIDE SWITCH - OCCUPIED CONTROL, STATUS
HOT WATER CONTROL VALVE - ZONE TEMPERATURE CONTROL, STATUS
AIR VALVE - ZONE TEMPERATURE CONTROL, STATUS (AIRFLOW)
SUPPLY
TO SPACE
AIR FLOW
TS
OVER-RIDE
PUSH-BUTTON
SENSOR W/
SPACE TEMPERATURE
AIR SUPPLY
PRIMARY
VAV BOX
AIR VALVE
HW VALVE CONTROL
AIR VALVE CONTROL
A N
A L
O G
SHUT-OFF VAV TERMINAL UNIT
LOCAL DDC CONTROLLER
SPACE TEMP.
AIRFLOW QUANTITY
DISCHARGE AIR TEMP.
SPACE TEMP. SETPOINT
HWS
HWR
OVERRIDE
A N
A L
O G
D I G
I T
A L
OUTPUTS
INPUTS
2-WAY CONTROL VALVE. PROVIDE 3-WAY
CONTROL VALVE FOR VAV-8 AND VAV-10.
AO2
AO1
DI1
AI4
AI3
AI2
AI1
AO2
TS
AI3
DI1
AI2AI1
AO1
AI4
GENERAL: AHU SUPPLY FAN SPEED SHALL BE DETERMINED BY DISCHARGE AIR PRESSURE AND
POLLING OF VAV BOX DAMPER POSITIONS. AIR PRESSURE SETPOINT SHALL BE 1.5" W.G.,
ADJUSTABLE.
COOLING-OCCUPIED/OVERRIDE: AHU SUPPLY FAN SHALL BE ENERGIZED AND RUN CONTINUOUSLY.
OUTSIDE AND RETURN AIR DAMPERS SHALL MODULATE TO MAINTAIN MIN. O.A. FLOW AS MEASURED BY THE OUTSIDE AIR AIRFLOW MEASUREMENT STATION. THE O.A. DAMPER SHALL FULLY STROKE
BEFORE THE R.A. DAMPER STARTS MODULATING. DISCHARGE AIR TEMPERATURE CONTROLLER
SHALL MODULATE THE CHILLED WATER VALVE TO MAINTAIN 53°F (ADJ.) LEAVING AIR TEMPERATURE.
HOT WATER CONTROL VALVE SHALL BE FULLY CLOSED TO COIL. A SUPPLY AIR TEMPERATURE RESET
STRATEGY SHALL BE EMPLOYED. SUPPLY AIR TEMPERATURE SHALL BE RAISED IN ONE DEGREE
INCREMENTS UNTIL ONE ZONE DAMPER IS 90% OPEN. IF OA DRY BULB TEMPERATURE IS 65°F (ADJ.)
OR LOWER, THE SUPPLY AIR TEMPERATURE RESET SHALL BE NO HIGHER THAN 58°F (ADJ.). IF ANY
ZONE DAMPER IS 100% OPEN AND ZONE TEMPERATURE RISES ABOVE SETPOINT, SUPPLY AIR
TEMPERATURE SHALL BEGIN TO RESET LOWER.
COOLING-UNOCCUPIED: UNIT SHALL BE DE-ENERGIZED UNLESS THE AVERAGE OF THE ZONE
TEMPERATURES RISES ABOVE THE SETBACK TEMPERATURE SETPOINT. THE OA DAMPER SHALL BE
CLOSED.
HEATING-OCCUPIED: AHU SUPPLY FAN SHALL BE ENERGIZED AND RUN CONTINUOUSLY. O.A. FLOW
SHALL BE MAINTAINED AS DESCRIBED IN COOLING-OCCUPIED MODE ABOVE. WHEN MIXED AIR
TEMPERATURE DROPS TO 52°F, DISCHARGE AIR TEMPERATURE CONTROLLER THRU DDC CONTROL
SHALL MODULATE THE HOT WATER VALVE TO MAINTAIN 55°F LEAVING AIR TEMPERATURE. THE
CHILLED WATER VALVE SHALL BE FULLY CLOSED TO THE COIL.
HEATING-UNOCCUPIED: IF THE AVERAGE OF THE ASSOCIATED ZONE TEMPERATURES FALLS BELOW
THE HEATING NIGHT SETBACK TEMPERATURE THE AHU SHALL BE ENERGIZED. THE OA DAMPER
SHALL BE FULLY CLOSED. THE SUPPLY FAN SHALL MODULATE TO MAINTAIN DUCT STATIC PRESSURE WHILE THE VAV BOXES ARE INITIALLY AT MAXIMUM AIRFLOW. THE HOT WATER CONTROL VALVE SHALL REMAIN CLOSED UNLESS DISCHARGE AIR TEMPERATURE FALLS BELOW 55°F. ZONE HEATING SHALL BE MAINTAINED AT VAV BOXES. AS VAV BOX ZONES REACH SETPOINT, AIR VALVES SHALL
MODULATE TO MAINTAIN SETPOINT.
TRANSITION FROM OCCUPIED TO UNOCCUPIED: AUTOMATICALLY THRU DDC CONTROL AND PRESET
TIME SCHEDULE. SYSTEM SHALL ALSO BE ABLE TO BE RETURNED TO OCCUPIED MODE FROM
UNOCCUPIED MODE BY THE OPERATOR WORKSTATION. TRANSITION FROM COOLING TO HEATING
SHALL OCCUR WHEN CHILLED WATER CONTROL VALVE IS CLOSED AND MIXED AIR TEMP. FALLS
BELOW 52°F.
PRESSURE PROTECTION: A HIGH PRESSURE TRANSMITTER LOCATED AT THE SUPPLY FAN
DISCHARGE SHALL DE-ENERGIZE THE SUPPLY AIR FAN IF ITS SETPOINT, 5" WG, IS REACHED.
SEQUENCE OF OPERATION
COIL
HOT WATER
FROM VARIABLE
FREQUENCY DRIVE
FREEZESTAT
AIR
OPPOSED
DAMPER
BLADE
FILTER
OUTSIDE
NC
OPPOSED
DAMPER
BLADE
C W
R
NO
H W
R
H W
S
C W
S
NC
SET AT
5" WG
CHILLED WATER
SUPPLY FAN
M
COIL
PRIMARY
AIR
SAFETY CONTROL: SMOKE DETECTOR SHALL BE PROVIDED BY FIRE ALARM
CONTRACTOR. THROUGH DDC CONTROL IT SHALL DE-ENERGIZE THE ASSOCIATED AHU,
SIGNAL FIRE ALARM PANEL AND CLOSE THE OUTSIDE AIR DAMPER UPON THE
DETECTION OF THE PRODUCTS OF COMBUSTION.
FREEZE PROTECTION: IF HOT WATER COIL DISCHARGE AIR TEMPERATURE FALLS
BELOW 40°F DURING HEATING MODE, THE FREEZESTAT SHALL CLOSE THE OUTSIDE AIR
DAMPER, DE-ENERGIZE THE AHU SUPPLY FAN AND FULLY OPEN THE HOT WATER AND
CHILLED WATER VALVES TO COIL.
CONDENSATE HIGH LEVEL PROTECTION: IF CONDENSATE HIGH LEVEL SWITCH IS
ACTIVATED, UNIT SHALL BE DE-ACTIVATED AND AN ALARM INITIATED.
MORNING WARM-UP: AHU SHALL EMPLOY OPTIMUM START PRIOR TO OCCUPIED
STATUS. THE OA DAMPER SHALL BE FULLY CLOSED. THE SUPPLY FAN SHALL MODULATE
TO MAINTAIN DUCT STATIC PRESSURE WHILE VAV BOXES ARE INITIALLY AT MAXIMUM
AIRFLOW. HOT WATER COIL VALVE SHALL BE FULLY OPEN. AS VAV BOX ZONES REACH
SETPOINT, PRIMARY AIR VALVES SHALL MODULATE TO MINIMUM AIRFLOW.
MORNING COOL-DOWN: THE UNIT SHALL EMPLOY OPTIMUM START PRIOR TO OCCUPIED
STATUS, THE UNIT SHALL GO INTO MORNING COOL-DOWN. THE OA DAMPER SHALL
FULLY CLOSE, THE SUPPLY FAN SHALL MODULATE TO MAINTAIN DUCT STATIC
PRESSURE, THE CW VALVE SHALL MODULATE TO MAINTAIN A 53°F (ADJ.) LEAVING AIR
TEMPERATURE AND THE HOT WATER VALVE SHALL BE FULLY CLOSED TO THE COIL.
ASSOCIATED VAV BOX AIR VALVES SHALL INITIALLY BE FULLY OPEN AND THEN
MODULATE TO MAINTAIN SPACE OCCUPIED TEMPERATURE SETPOINT, VAV BOX HW
VALVES SHALL BE FULLY CLOSED TO THE COIL.
ALARMS: ALARM IF LEAVING AIR TEMPERATURE EXCEEDS 60°F IN COOLING MODE OR
DROPS BELOW 50°F IN HEATING MODE. ALARM IF AHU SUPPLY FAN FAILS TO START OR
FAILS DURING OPERATION. ALARM IF UNIT DISCHARGE STATIC PRESSURE EXCEEDS 5"
W.G. ALARM IF CONDENSATE REACHES HIGH LEVEL. ALARM UPON SMOKE DETECTOR
ACTIVATION.
DEMAND CONTROL VENTILATION: IF ANY SPACE CARBON DIOXIDE LEVEL FALLS BELOW
SETPOINT (1,000 PPM, ADJ.), THE OUTSIDE AIRFLOW RATE SHALL BE AT THE MINIMUM
SCHEDULED VALUE AS INDICATED IN THE EQUIPMENT SCHEDULE. AS LEVEL INCREASES
ABOVE SETPOINT, THE OUTSIDE AIR DAMPER SHALL PROPORTIONALLY MODULATE
OPEN TO GENERATE THE SCHEDULED MAX OUTSIDE AIRFLOW RATE OVER A 1 HOUR
(ADJ.) TIME PERIOD UNTIL THE LEVEL FALLS BELOW THE SETPOINT, AFTER WHICH THE
DAMPER POSITION SHALL RETURN TO MINIMUM.
INPUTS
D I G
I T
A L
HW VALVE CONTROL
CW VALVE CONTROL
A02
AO1
OUTPUTS
A03
A N
A L
O G
SUPPLY AIR FAN STATUS
SMOKE DETECTOR
FREEZESTAT
MIXED AIR TEMPERATURE
SUPPLY AIR TEMPERATURE
HW COIL DISCHARGE AVERAGE
UNIT DISCHARGE STATIC PRESSURE
SA DOWN DUCT PRESSURE TRANSMITTER
AI4
AI5
DI1
DI3
DI2
AI2
AI1
AI3
A N
A L
O G
LOCAL DDC CONTROLLER
AHU
OA AIRFLOW MEASURE MOUNT STATION
AI6
A04
OUTSIDE AIR DAMPER CONTROL
AO1
AO4
DM
DM
AMSAI6
AI1
TS
FS
DI3
AO2
TS
AI3
AO3
AI2
VFD TS SPS
AI4 AI5
SPS
DI1
DPS
NO
LOCATE AT 2/3 DOWN
DUCT FROM AHU
AI7
CONDENSATE HI-LEVEL
DI4
DI4
LS
RA TEMPERATURE
AI8
AI8 TS
AI7 HS
PROVIDE 3-WAY CONTROL VALVE.
PROVIDE 3-WAY CONTROL VALVE
SEE VFD CONTROL DIAGRAM
AIR
RETURN
DI2
SD
RA HUMIDITY
RETURN AIR DAMPER CONTROL
E
M
E
R
G
E
N
C
Y
H
V
A
C
S
H
U
T
D
O
W
N
P
U
L
L
T
O
R
E
S
E
T
NOTES:
1. EMERGENCY AIR DISTRIBUTION (LOCATION AS SHOWN ON PLAN
AND AS DETERMINED BY THE CONTRACTING OFFICER).
2. UPON ACTIVATION OF EMERGENCY PUSHBUTTON, ALL AIR
HANDLING UNITS SHALL BE DISABLED AND REMAIN
OFF UNTIL A MANUAL RESET HAS OCCURRED.
3. UPON ACTIVATION OF EMERGENCY PUSHBUTTON,
OUTSIDE AIR DAMPER FOR AHU-1 SHALL CLOSE FULLY.
4. SHUTOFF SWITCH SHALL BE MUSHROOM BUTTON WITH CLEAR
HINGED, PULL TO RESET, LABELED "EMERGENCY HVAC
SHUTDOWN".
ZONE TEMPERATURE SET POINTS SHALL BE DETERMINED BY A GLOBAL
TEMPERATURE SET POINT. THE ZONE TEMPERATURE SET POINT SHALL BE
MADE ADJUSTABLE BY BUILDING OCCUPANTS +/- 3°F FROM THE GLOBAL SET
POINT. IF AMBIENT TEMPERATURE IS LESS THAN 50°F, THE GLOBAL ZONE
TEMPERATURE SET POINT SHALL BE 70°F. IF AMBIENT TEMPERATURE IS
GREATER THAN 80°F, THE ZONE TEMPERATURE SHALL BE 76°F. IF AMBIENT
TEMPERATURE IS BETWEEN 50°F AND 80°F, THE GLOBAL SET POINT
TEMPERATURE SHALL BE RESET LINEARLY OR IN NO FEWER THAN 3 STEPS.
ZONE TEMPERATURE SET POINT SHALL BE +/- 1°F FROM GLOBAL SET POINT.
GLOBAL TEMPERATURE SETPOINT NOTE:
INPUTS
D I G
I T
A L
AO1
OUTPUTS
A N
A L
O G
SPEED, %
KWH CONSUMPTION
CURRENT, AMPS
DRIVE STATUS
DRIVE FAULT
DI1
DI2
AI2
AI1
AI3
A N
A L
O G
LOCAL DDC CONTROLLER
VFD
SPEED CONTROL
VFD
AO1 DO1
DI1
DI2
AI1
AI2
AI3
DO1
D I G
I T
A L
ENABLE/DISABLE
EMERGENCY AIR DISTRIBUTION SYSTEM SHUTOFF SWITCH
SEQUENCE OF OPERATION
PER THE REQUIREMENTS OF UFC 4-010-01, SECTION B-4.3, THE FACILITY SHALL BE OUTFITTED WITH AN EMERGENCY AIR DISTRIBUTION SYSTEM SHUTOFF SWITCH WHICH SHALL, THROUGH THE DDC SYSTEM, IMMEDIATELY SHUT DOWN ALL AIR DISTRIBUTION SYSTEM COMPONENTS ASSOCIATED WITH AHU-1 AND CLOSE ASSOCIATED ISOLATION DAMPERS. THE EMERGENCY SWITCH SHALL ALSO INITIATE AN AUDIBLE ALARM NOTIFICATION. SWITCH SHALL BE ACTIVATED IF BUILDING OCCUPANTS SUSPECT AIRBORNE CONTAMINANTS MAY BE PRESENT IN THE VICINITY OF THE FACILITY. LOCATE THE SHUTOFF SWITCH (OR SWITCHES) SUCH THAT THEY ARE EASILY ACCESSIBLE BY BUILDING OCCUPANTS BY LOCATING THEM ADJACENT TO MANUAL FIRE ALARM PULL STATIONS. A MINIMUM OF ONE SWITCH SHALL BE PROVIDED PER FLOOR. ADDITIONAL SWITCHES SHALL BE PROVIDED AS REQUIRED TO ENSURE THAT THE TRAVEL DISTANCE TO THE NEAREST SHUTOFF SWITCH IS NOT IN EXCESS OF 200 FEET.
SHUTOFF SWITCHES SHALL BE WELL LABELED AND BE OF A DIFFERENT COLOR THAN THE FIRE ALARM PULL STATIONS. COORDINATE COLOR AND APPEARANCE REQUIREMENTS OF THE SHUTOFF SWITCHES WITH THE GOVERNMENT PRIOR TO ORDERING.
EMERGENCY AIR DISTRIBUTION SHUT OFF LOCAL DDC CONTROLLER:
1) SHUT-OFF SWITCH STATUS (DI)
2) AUDIBLE ALARM (DO)
3) ENABLE/DISABLE (DO)
VAV AHU CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701
A
VFD CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701
B
HVAC EMERGENCY SHUTOFF SWITCH
SCALE: NO SCALE M-701
C
VAV SHUT-OFF TERMINAL UNIT CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701
D
AI9
CO2
CO2 SENSOR
AI9
REPEAT POINT FOR
EACH SENSOR
| 60025492 |
| 60025493 |
| Sheets and Views |
| M-101 MECHANICAL FLOOR PLAN |
| 60025494 |
| 60025495 |
| 60025496 |
| Sheets and Views |
| M-601 MECHANICAL SCHEDULES |
| 60025497 |
| 60025498 |