AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
19-0094 Construct EOTG PEB Solicitation N4008520R4057 Marine Corps Base Camp Lejeune, North Carolina Amendment 0002
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. The following provides the Government’s responses to preaward inquiries:
Date Submitted
REFERENCE QUESTION GOVERNMENT RESPONSE
Page Section Para.
3/18/2020 A-101 Wall type legend shown on Drawing A-101 does not indicate insulation is required for interior walls. Will insulation be required & what type?
Provide sound batt insulation for wall type B on wall legend, sheet A-101.
3/18/2020 A-101 Finish schedule note from Drawing A-101 indicate ceilings are “exposed structure”.
Note 9 from Drawing A-102 indicates ceilings for Rooms 103, 104, 105, 106 & 107 are acoustical ceiling tile. Which is correct?
Provide 2X2 acoustical ceiling grid in areas indicated by keynote 9 on sheet A-102.
3/23/2020 10 13 34 19 1.4.8 Specs state to provide manufacturer's standard field-assembled, insulated (R-19) metal wall panels complete with vapor barrier however Drawing A-601 is drawn utilizing a vinyl reinforced insulation with a standard wall panel. Which is correct?
Provide typical PEMB wall panels and vinyl reinforced R-19 Batt insulation per drawing A-301.
3/24/2020 n/a n/a n/a Is there a spec section for the acoustical ceilings that can be provided?
Incorporate specification section 09 51 00 Acoustical Ceilings.
3/24/2020 13 34 19 1.10.1 This section indicates that the Contractor furnish a manufacturer's no-dollar-limit warranty for the metal building system and the warranty period is to be no less than 20 years from the date of acceptance of the work & be issued directly to the Government.
A 20-Year NDL warranty for the Building System is not available from our Metal Building Manufacturer. The longest available warranty is a 5-Year Building System NDL Warranty. Can the warranty period for the Building System be reduced from a 20-Year NDL to a 5-Year NDL?
Yes, provide a 5-year NDL warranty for the building system from the Metal Building Manufacturer in lieu of a 20-year warranty.
3/24/2020 07 21 16 13 34 19
2.1 2.8.3
These sections indicate that the PEB Insulation is to be Faced, Glass-Fiber Blanket Insulation: ASTM C665, Type II, blankets with non-reflecting coverings; Class A, membrane-faced surface with a flame spread of 25 or less when tested in accordance with ASTM E84. However, the Roof Detail on Drawing A- 103 indicates the Roof Insulation for the PEB to be reinforced? If the Roof Insulation is to
Typical R-30 PEMB roof insulation shall be used with a laminated vapor barrier membrane on the exposed interior side of the building.
19-0094 Construct EOTG PEB Solicitation N4008520R4057 Marine Corps Base Camp Lejeune, North Carolina Amendment 0002 be reinforced can revised Roof Insulation Specifications be provided by Amendment?
B. This amendment incorporates the following updated attachments:
1. Adds 09 51 00 Acoustical Ceilings SPEC.
C. All other contract terms and conditions remain unchanged.
| Untitled |
| Untitled |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: AMENDMENT NO. 0002 |
| EffDate: 03/26/20 |
| ReqNo: |
| ProjNo: 1636674 |
| IssCode: ACQ1 |
| IssuedBy: NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC |
9742 MARYLAND AVENUE
NORFOLK, VA 23511-3095
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: N4008520R4057 |
| AmendDate: 03/13/20 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: |
N4008520R4057 Construct EOTG PEB
The date for the receipt of proposals remains 13 April 2020, no later than 1:00 pm (EDT).
See continuation page(s).
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |