01 33 29 05 20.pdf
PDF 45 KB Posted
- Solicitation number
- N4008520R0129
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0005_20R0129.pdf | ||
| Part 6 Appendix 15.pdf | ||
| Amendment0004_20R0129.pdf | ||
| Amendment0003_20R0129.pdf | ||
| Amendment0002_20R0129.pdf | ||
| Amendment0001_20R0129.pdf | ||
| Attachment D_Pre-Proposal Inquiry (PPI) Form.xlsx | XLSX spreadsheet | |
| 1651840rfp01of03.pdf | ||
| 1651840rfp03of03.pdf | ||
| 20R0129 P914 General Requirements.pdf | ||
| 1651840rfp02of03.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 33 29.05 20
SUSTAINABILITY REPORTING FOR DESIGN-BUILD
03/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - IP (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 90.1 - SI (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 189.1 (2014) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)
HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings
GREEN BUILDING INITIATIVE (GBI)
GBI GP Compliance (2016) GBI Guiding Principles Compliance Program for New Construction (DOD Version)
GBI Green Globes for NC (2017) Green Globes(tm) for New Construction Technical Reference Manual
GREEN BUSINESS CERTIFICATION INC. (GBCI)
GP Assessment (DOD) Guiding Principles Assessment for Department of Defense
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
U.S. DEPARTMENT OF AGRICULTURE (USDA)
FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA Biopreferred Program)
U.S. DEPARTMENT OF DEFENSE (DOD)
FC 1-300-09N (2014; with Change 4, 2018) Navy and Marine Corps Design
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED v4 BDC LEED v4 Building Design and Construction
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 433.300 Subpart C - Green Building Certification for Federal Buildings
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 SUMMARY
This specification includes general requirements and procedures for this project to be designed, constructed, and documented per the federally mandated High Performance and Sustainable Building or "HPSB Guiding Principles" (GP), UFC 1-200-02 High Performance and Sustainable Building Requirements, and other requirements identified in this specification.
1.3 SUBMITTALS
Submittals requirements are specified in the technical sections using Submittal Description (SD) numbers and titles. Submittals requiring Government approval use a "G" or submittal designator in the UFGS sections.
In addition, submit the GPV-required sustainability documentation in this specification as "S" submittals. Submittals not having a "G" designation are for Contractor Quality Control approval.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with the requirements of this Section.
Government approval is required for submittals in RFP Part 2 with a "G" designation. Additional construction submittals reserved for Government approval are listed in the Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES. Submittals with a "G" designation found in the sections used by the Contractor to create construction specification, require DOR approval.
DOR approved submittals are also listed in the "Construction Submittals" paragraph in each RFP PART 4, Performance Technical Specifications.
Provide required certification or validation submittals in accordance with Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES, Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES, FC 1-300-09N, Navy and Marine Corps Design Procedures, and as identified below.
SD-01 Preconstruction Submittals
Preliminary High Performance and Sustainable Building Checklist; G
Sustainability Action Plan
Preliminary Sustainability eNotebook; G
SD-05 Design Data
Final Design High Performance and Sustainable Building Checklist; GFinal Design Sustainability eNotebook; G
SD-11 Closeout Submittals
Final High Performance and Sustainable Building Checklist; G
Final Sustainability eNotebook; G
Amended Final Sustainability eNotebook; G
Amended Final High Performance and Sustainable Building Checklist;
G
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
Provide sustainability documentation to verify achievement of HPSB Guiding Principles Validation (GPV).
Provide the following for GPV:
a. Refer to HPSB Checklist at the end of this specification section.
These requirements are based on legislative mandates that must be met by all projects. (Multiple checklists indicate multiple buildings that require individual HPSB Checklist tracking.)
b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES and Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES, paragraph DESIGN CHANGE AND VARIATION.
Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project.
c. All work, including "S" submittals, required to incorporate the applicable HPSB Guiding Principles Requirements indicated on the HPSB Checklist and in this contract.
d. Sustainable Action Plan.
e. Design and construction related documentation for the project Sustainability eNotebook, and keep updated with regularly-scheduled construction meetings. Include design and construction related documentation containing the following components;
(1) HPSB Checklist
(2) Sustainability Action Plan
(3) Documentation illustrating HPSB Guiding Principle Requirements compliance (including "S" submittals)
1.4.1 Costs
Bear all costs associated with designing, constructing, demonstrating and documenting that project complies with approved HPSB Guiding Principles Requirements.
1.4.2 Calculations
Provide all design data, calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.
1.5 SUSTAINABILITY ENOTEBOOK
The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB checklist, provide and maintain a comprehensive and current Sustainability eNotebook.
Sustainability eNotebook must contain all required data to support full compliance with the HPSB Guiding Principles Requirements, including:
a. HPSB checklist
b. Sustainable Action Plan
c. calculations
d. labels
e. "S" submittals (sustainability documentation requirements)
f. Certifications, assessments, or validations
Provide Sustainability eNotebook in the form of an Adobe PDF file; bookmark each HPSB Guiding Principles Requirement and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, such as spreadsheets, templates, with each current submittals.
Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current, until information is updated and on track per project goals.
1.5.1 High Performance Sustainable Building (HPSB) Checklist
Provide documentation that provides proof of and supports compliance with the completed HPSB Checklist.
1.5.1.1 HPSB Checklist Submittals
Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Attach final HPSB Checklist to each DD1354 Real Property Record Submittal.
1.5.2 Sustainability Action Plan
Include the following information in the Sustainability Action Plan:
a. Planned method to achieve each GP requirement.
b. Provide analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.
c. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled. For TPC that include on-site visit by third party representative, provide list of required attendees.
d. Include the Indoor Air Quality plan with the Sustainability Action Plan.
1.5.3 "S" Submittals for Sustainability Documentation
Submit the GPV sustainability documentation required in this specification as "S" submittals in all affected UFGS Sections.
a. Highlight GPV compliance data in "S" submittal.
b. Add "S" submittals to the Sustainability eNotebook only after submittal approval, and bookmark them as required in paragraph SUSTAINABILITY ENOTEBOOK below.
c. Ensure all approved "S" submittals (the sustainability documentation requirements) are included in each Sustainability eNotebook submittal.
1.5.4 Sustainability eNotebook Submittal Schedule
Provide Sustainability eNotebook Submittals at the following milestones of the project:
a. Preliminary Sustainability eNotebook
Submit preliminary Sustainability eNotebook with updated Preliminary High Performance and Sustainable Building Checklist for approval at the Post award Kickoff meeting (PAK), in accordance with Section
01 31 19.05 20 POST AWARD MEETINGS.
] b. Final Design Sustainability eNotebook
Submit updated Sustainability eNotebook with updated Final Design High Performance and Sustainable Building Checklist with the final design, in accordance with Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES.
If issues relating to achieving the sustainability goals of the project are subsequently identified, identify reasons and mitigation from DOR, and resubmit three electronic copies on DVDs to the Contracting Officer for approval.
c. Construction Progress Meetings.
Provide up-to-date GP documentation in the Sustainability eNotebook for each meeting.
d. Final Sustainability eNotebook
Submit updated Sustainability eNotebook with updated Final High Performance and Sustainable Building Checklist, in accordance with Section 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES at Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until Final Sustainability construction phase documentation is complete. Obtain DOR approval and submit three electronic copies on DVDs to the Contracting Officer for approval.
e. Amended Final Sustainability eNotebook
Amend and resubmit the Amended Final Sustainability eNotebook with Amended Final High Performance and Sustainable Building Checklist, to include post-occupancy corrections, updates, and requirements. Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit three final electronic copies of the Amended Final Sustainability eNotebook Submittal on DVDs to the Contracting Officer no longer than 30 days after the GP designated data collection period.
1.6 DOCUMENTATION REQUIREMENTS
a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles. For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.
b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.
1.6.1 Integrated Design Process
For the submittal documentation below, follow the steps of design optimization, as applicable, in ASHRAE 189.1 Section F1.1.1 (Charrette Process), with the exception that F1.1.1, b. does not apply.
1.6.1.1 Design Submittal Documentation
a. Provide listing the sustainability integrated design team, and a description of their roles in all stages of a project's planning and delivery:
(1) Include Contractor's Sustainability Coordinators; Architecture and Engineering disciplines involved on the project, and the DOR in charge of the overall project and each discipline; Construction Subcontractors and the company representatives that align with each architectural and engineering discipline, Planning, Public Works, Environmental Specialist and other appropriate installation personnel.
(2) Describe their roles and responsibilities and plan-of-action for how each team member will be involved to achieve the project sustainability requirements, and how the Contractor will coordinate with Government personnel.
(3) Maintain the list and descriptions up-to-date throughout the project.
b. Provide narratives that:
(1) Indicate performance goals for siting, energy, water, materials, and indoor environmental quality along with other comprehensive design goals and ensures incorporation of these goals throughout the design and lifecycle of the building.
(2) Demonstrate integration of the goals into design and construction.
(3) Demonstrate collaboration with other providers, such as Commissioning Authority.
1.6.2 Commissioning (Cx)
Develop and incorporate Commissioning requirements into the documents.
Submit Final Commissioning Report required by Section 01 91 00.15 TOTAL BUILDING COMMISSIONING as proof of this tracking requirement.
1.6.3 Optimize Energy Performance
For Commercial and Multi-Family High-Rise Residential Buildings, meet the requirements of ASHRAE 90.1 - IP, and achieve at least 30 percent energy efficiency below baseline, when life cycle cost effective.
If none of the reduction choices is life-cycle cost-effective, modify the design of the proposed building system(s) to achieve an energy consumption level at the highest level of energy efficiency that is life-cycle cost-effective.
1.6.3.1 Design Submittal Documentation
a. Narrative that provides a summary of:
(1) The decision making process leading to the selection of at least three energy-efficient solutions (for each individual building energy system) to be analyzed; and the selected design solution(s)
(2) The specific energy standard and version utilized; and the software used in the analysis
(3) The calculated energy consumption and energy use intensity (EUI in kBTU/sf/yr) of the baseline building and the proposed design alternatives
b. A minimum of the following energy modeling files and summaries for the baseline and proposed alternatives:
(1) Input, schedules and libraries; and output
(2) Calculated energy use by energy type
(3) Calculated energy use by building system
c. The life-cycle cost-analysis input and output files for the baseline and the proposed alternatives
1.6.3.2 Construction Submittal Documentation
Provide revised energy modeling for actual system constructed.
1.6.4 Energy Efficient Products
Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient product that are life-cycle cost effective. Provide only energy using product that meets FEMP requirements for low standby power consumption. Energy efficient products can be found at:
http://www1.eere.energy.gov/femp/ and http://www.energystar.gov/.
For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.
1.6.5 On-site Renewable Energy Generation
Provide project energy needs thru on-site renewable energy generation, when life-cycle cost effective.
1.6.5.1 Design Submittal Documentation
a. Provide design drawings and calculations that demonstrate total on-site renewable energy as an annual percentage of proposed building energy consumption in kBTU/year.
b. Provide design drawings, equipment ratings, and calculations that demonstrate the generation capacity of the system in mmbtu/year for thermal and kwAC for electricity
c. Provide life cycle cost analysis (LCCA).
1.6.6 Solar Domestic Hot Water (SDHW)
Provide 30 percent or more of domestic hot water needs through solar thermal water heating, when life-cycle cost effective.
1.6.6.1 Design Submittal Documentation
a. Provide design drawings and calculations that demonstrate total on-site renewable energy as an annual percentage of proposed building energy consumption in kBTU/year.
b. Provide design drawings, equipment ratings, and calculations that demonstrate the generation capacity of the system in mmbtu/year for thermal and kwAC for electricity
b. Provide life cycle cost analysis (LCCA).
1.6.7 Building-level Power Metering
Provide building-level meters for electricity, natural gas (and steam where applicable) use.
1.6.7.1 Design Submittal Documentation
a. Provide design drawings that highlight meter locations on the site.
b. Provide manufacturers data validating compatibility with base-wide system and component advanced meter requirements.
1.6.8 Indoor Water Use
a. Meet the requirements of ASHRAE 189.1 Section 6.3.2 (Building Water Use Reduction), which incorporates USEPA WaterSense-labeled products.
Water closet replacements in renovations may have a flush value of up to 1.6 GPF (6.1 LPF) to accommodate existing plumbing capacity.
b. Meet the requirements of ASHRAE 189.1 Section 6.4.2 (Building Water Use Reduction).
c. Meet the requirements of ASHRAE 189.1 Section 6.4.3 (Special Water Features).
1.6.8.1 Construction Submittal Documentation
Provide proof that fixtures are labeled EPA WaterSense or Energy Star, for products available with EPA WaterSense or Energy Star labeling; for all other fixtures, proof they comply with the cited efficiency requirements.
1.6.9 Indoor Water Metering
a. Provide building-level meters for potable water use.
1.6.9.1 Design Submittal Documentation
a. Provide design drawings that highlight meter locations on the site.
b. Provide manufacturers data validating compatibility with base-wide system and component advanced meter requirements.
1.6.10 Outdoor Water Use
Potable water use is prohibited for irrigating new landscaping, other than for plant establishment. When non-potable water is life cycle cost effective and is used for new, permanent irrigation, provide the following:
1.6.10.1 Design Submittal Documentation
a. Provide design drawings and analysis that identify the non-potable water source used and demonstrate the non-potable water source is appropriate for landscape irrigation.
b. Provide life cycle cost analysis (LCCA).
1.6.11 Outdoor Water Meters
a. Provide building-level meters for potable water used for existing irrigation systems using potable water and serving more than 25,000 square feet of landscape, when life-cycle cost effective.
b. Provide manufacturers data validating compatibility with base-wide system and component advanced meter requirements.
1.6.11.1 Design Submittal Documentation
a. Provide design drawings that highlight meter locations on the site.
b. Provide life cycle cost analysis (LCCA).
1.6.12 Alternative Water
Use alternative sources of water to replace potable water usage, when life-cycle cost effective and to the extent permitted by local laws and regulations.
1.6.12.1 Design Submittal Documentation
a. Provide design drawings and calculations that demonstrate the alternative water sources used, potable water savings as compared to non-alternative water sourcing, and projected annual potable water savings.
b. Provide life cycle cost analysis (LCCA).
1.6.13 Stormwater Management
Develop and incorporate stormwater requirements into the documents. Submit design and construction documentation required by UFC 3-210-10 and Agency processes, as proof of this tracking requirement.
1.6.14 Ventilation and Thermal Comfort
Meet the requirements of UFC 3-410-01.
1.6.14.1 Design Submittal Documentation
a. Provide design drawings and calculations that demonstrate HVAC systems and the building envelope have been designed to meet the requirements.
1.6.15 Daylighting
Achieve the minimum daylighting requirements of ASHRAE 189.1, Section
8.4.1.2 "Minimum Sidelighting effective Aperture for Office Spaces and Classrooms" or Section 8.5.1.2 "Usable Daylight Illuminance in Office Spaces and Classrooms". Provide automated lighting controls in accordance with UFC 3-530-01.
1.6.15.1 Design Submittal Documentation
a. Provide floor plans and elevations.
b. Provide design analysis delineating requirements, to include compliant reflective surface locations and shading devices (where applicable).
1.6.16 Moisture Control
Meet the requirements of ASHRAE 189.1 Section 10.3.1.5 (Moisture Control), UFC 3-410-01, Chapter 3, Sections 3-2 and 3-3 (Ventilation Air), and UFC 3-101-01 Chapter 3 (Building Envelope Requirements).
1.6.16.1 Design Submittal Documentation
a. Provide drawings of building envelope details and HVAC humidity controls.
b. Provide plan for construction material storage and protection, humidity controls during construction, and operation and maintenance plan for ongoing building moisture control.
1.6.17 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)
Meet the requirements of Table 3-1 at the end of this specification.
For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached
TABLE 3-1.
1.6.18 Indoor Air Quality During Construction
Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.
For new construction and for renovation of unoccupied existing buildings, meet the requirements of ASHRAE 189.1 Section 10.3.1.4 (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent.
Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and area air was flushed out in accordance with the cited standard.
1.6.19 Recycled Content
Comply with 40 CFR 247. Refer to:
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.
1.6.19.1 Construction Submittal Documentation
a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.
b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.
c. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for recycled/recovered material content in UFGS 01 78 00 "CERTIFICATION OF EPA DESIGNATED
ITEMS."
1.6.20 Bio-Based Products
Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.
Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.
Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements.
Provide the following documentation:
a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.
b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in
UFGS 01 78 00 "CERTIFICATION OF EPA DESIGNATED ITEMS."
1.6.21 Waste Material Management (Recycling – Design)
Meet the requirements of ASHRAE 189.1 Section 9.3.4.1 (Storage and Collection of Recyclables – Recyclables), where markets or onsite recycling exist.
For design submittal documentation, provide drawing showing an appropriately sized and placed storage area has been dedicated for recyclables.
1.6.22 Waste Material Management (Recycling – Construction)
Divert construction debris from landfill disposal where markets or on-site recycling exists.
Submit in accordance with Section 01 74 19.05 20 CONSTRUCTION AND
DEMOLITION WASTE MANAGEMENT FOR DESIGN-BUILD.
1.6.23 Validation and Certification Restrictions
The purchase of renewable energy credits (RECs) specifically to meet project sustainability goals is prohibited.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.1.1 Coordinating Sustainability Documentation Progress
Provide sustainability focus and coordination at the following meetings to achieve sustainability goals. Coordinate meeting requirements below with other UFGS meeting requirements in this project. The designated sustainability professional responsible for GP documentation must participate in these meetings to coordinate documentation completion.
3.1.1.1 Design Review Meetings
Review progress towards meeting Sustainability requirements in the Sustainability Action Plan, and completeness of Sustainability eNotebook at the following meetings:
a. Post Award Kick-Off Meeting: Refer to Section 01 31 19.05 20 POST AWARD MEETINGS. Discuss the following: HPSB Checklists, Sustainability Action Plan, Design submittal and Construction submittal requirements and schedule, individuals responsible for achieving each Guiding Principle Requirement.
b. Design Quality Assurance Meetings: Discuss progress toward accomplishing Sustainability goals and obtaining sustainability documentation at each design submittal review. Refer to RFP Part 2 Section 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES for designated design submittals.
c. Design Complete Review Meetings (No later than 60 days after final design complete submission): Review HPSB Checklist, Sustainability eNotebook for completeness and identify any outstanding issues relating to final score and documentation requirements.
3.1.1.2 Construction Progress Meetings
Review GP sustainability requirements with project team including contractor and sub-contractor representatives. Demonstrate HPSB Checklist documentation is being collected and updated to the Sustainability eNotebook.
b. Facility Turnover Meetings: Refer to Section 01 31 19.05 20 POST AWARD MEETINGS for further requirements. Review HPSB Checklist, Sustainability eNotebook for completeness and identify any outstanding issues relating to final documentation requirements.
c. Final Sustainability eNotebook Review
3.2 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)
REQUIREMENTS
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
Source: ASHRAE 189.1 section 8.4.2(Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Adhesives and Sealants
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; panel;
primers) Sealants (acoustical;
firestop; HVAC Air duct;
primers) Caulks
SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)
Aerosol adhesives Section 3 of Green Seal Standard GS-36 (except:
cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).
Paints and Coatings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat topcoats, primers, undercoaters, and anti-corrosive coatings
Green Seal Standard GS-11
Source: ASHRAE 189.1 section 8.4.2(Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Paints and Coatings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete/masonry sealers (waterproofing concrete/masonry sealers), concrete curing compounds, dry fog coatings, faux finishing coatings, fire resistive coatings, floor coatings, graphic arts (sign) coatings, industrial maintenance coatings, mastic texture coatings, metallic pigmented coatings, multicolor coatings, pretreatment wash primers, reactive penetrating sealers, recycled coatings, shellacs (clear and opaque), specialty primers, stains, wood coatings (clear wood finishes), wood preservatives, and zinc primers
California Air Resources Board
(CARB)
Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113
Source: ASHRAE 189.1 section 8.4.2(Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Paints and Coatings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Basement specialty coatings, high-temperature coatings, low solids coatings, stone consolidants, swimming-pool coatings, tub-and tile-refining coatings, and waterproofing membranes
California Air Resources Board
(CARB)
Suggested Control Measure for Architectural Coatings
Floor Covering Materials
For carpet, all locations:
CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 01350) none none
Source: ASHRAE 189.1 section 8.4.2(Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Composite Wood, Wood Structural Panel, and Agrifiber Products particleboard medium density fiberboard (MDF) wheatboard strawboard panel substrates door cores no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies
Third-party certification (approved by CARB) of California Air Resource Board's (CARB) regulation, Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products none none
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:
Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or
"HUD-APPROVED"
are considered acceptable for interior use.)
Source: ASHRAE 189.1 section 8.4.2(Materials)(Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Office Furniture Systems and Seating installed prior to occupancy
ANSI/BIFMA X7.1
ANSI/BIFMA X7.1:
(95 percent of installed office furniture system workstations and seating units)
Section 7.6.2 of ANSI/BIFMA e3 (50 percent of office furniture system workstations and seating units) none none
Ceiling and Wall Systems ceiling and wall insulation acoustical ceiling panels tackable wall panels gypsum wall board and panels wall coverings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none
-- End of Section --