Amendment_0001_N4008519R7704_MagazineMntRpr.pdf
PDF 1 MB Posted
- Attached to
- Magazine and inert building maintenance and repair at the Naval Support Activity, Crane, Indiana.
- Solicitation number
- N4008519R7704
About this file
This document contains an amendment to a solicitation and related documents for magazine maintenance and repair services at Naval Support Activity Crane in Indiana. The amendment provides responses to contractor questions, details requirements for experience and past performance, outlines the source selection process, and schedules a pre-proposal conference. Services will include concrete work, door and window repairs, hazardous material abatement, and grounds maintenance. Offerors must be small businesses with average annual revenue under $39.5 million. The contract has a minimum value of $5,000, a maximum of $35 million over five years or 60 months, and utilizes Low Price Technically Acceptable selection procedures. Proposals are due on May 19, 2020. The Navy will evaluate proposals based on price and four non-price factors before making award to the lowest priced technically acceptable offeror.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005_19R7704_MagazineMntRrp.pdf | ||
| Amend_0005_Revised_N4008519R7704_ELINS.xlsx | XLSX spreadsheet | |
| REVISED_SECTION_01_45_02_QUALITY_CONTROL.pdf | ||
| Amendment_0004_19R7704_MagazineMntRpr.pdf | ||
| Amend_0004_Revised_N4008519R7704_ELINS.xlsx | XLSX spreadsheet | |
| Revised_N4008519R7704_ELINS.xlsx | XLSX spreadsheet | |
| Amendment0003_N4008519R7704_MagazineMntRprs.pdf | ||
| PW 6087CAS MAG SECURITY.pdf | ||
| Amendment_0002_N4008519R7704_MagazineMntRpr.pdf | ||
| N4008519R7704.pdf | ||
| N4008519R7704ELINS.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5628721
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008519R7704 MAGAZINE MAINTENANCE AND REPAIRS
Amendment 0001 is issued in response to government generated and contractor PPI's. Also provided is the Pre-Proposal Conference pow er point and sign in sheet.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008519R7704
X 9B. DATED (SEE ITEM 11)
16-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-May-2020
CODE
NAVFAC MID ATLANTIC
PWD CRANE FEAD
300 HIGHWAY 361
NSA BLDG 2516
CRANE IN 47522
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
R ANNETTE TAYLOR
812-854-2673 annette.taylor1@navy.mil
N4008519R7704 MAGAZINE MAINTENANCE AND REPAIRS AT NAVAL SUPPORT ACTIVITY CRANE IN
AMENDMENT 0001
1) GOVERNMENT GENERATED:
The offeror will be required to have the capability to bond individual projects valued up to $8,000,000.00 as well as the capability to bond individual projects valued up to $12,000,000.00 of projects within a 12 month time period. When/if requested a letter from the bonding company will be required that describes the contractors bonding capability.
2) GOVERNMENT GENERATED RFI:
Is a $7 MILLION a year cap assumed since it’s up to a $35 MILLION dollar contract over a 5 year period?
Response: No, there is no guaranteed award amount per year.
3) Pre-proposal Conference Question:
Can the Government wait till the last Option Year and then release a $35 Million Task Order?
Response: Yes, the government, can in fact, wait to the last day of the contract, however, that is very unlikely, if it did occur the task order would give the appropriate amount of time to complete the work.
4) Contractor RFI:
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting is a FAR Clause Incorporated by Reference. Is this going to cover the Cybersecurity Maturity Model Certification that will go into effect in September 2020?
Response: This is TBD. When this requirement become effective the contract will be modified to provide the required FAR Clauses.
5) Contractor RFI:
Basis of Unit Prices – Exhibit Line Items; Paragraphs 2.21 & 2.22; refers to PW Drawing #6924, which has not been provided. Will this drawing be posted?
Response: Basis Of Unit Pricing verbiage referring to PW Drawing #6924 in Paragraphs 2.10, 2.21, and 2.22 should be replaced with “refer to PW Drawing 7316”.
6) Contractor RFI:
The SF 1442 section 13B shows that an offer guarantee (bid bond) is required, as confirmed by RFP page 28 among the submittal requirements for the price proposal. 52.228-1 BID GUARANTEE states that the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less. In the absence of a seed project/sample Task Order, upon what “bid price” is the offer guarantee to be based?
Response:
The Bid guarantee would be 20 % of the total ELIN pricing or $3,000,000.00, whichever is less.
7) RFP page 28, “Non-Price Factors,” states that the font should be “12-point Arial or Times New Roman.”
With legibility as the primary concern, may 10-point font be used in charts, illustrations, etc.?
Response: Yes, that is acceptable.
5/5/2020
PRE-PROPOSAL
CONFERENCE
SOLICITATION #N4008519R7400
MAGAZINE AND INERT BUILDINGS
MAINTENANCE & REPAIRS
AT
NSA CRANE, INDIANA
SMALL BUSINESS
SET-ASIDE
All offerors (prime contractors) are required to be small businesses.
NAICS Code = 237990 with a size standard of $39.5 million
Small Business = average annual gross revenues over the last three years must be less than $39.5 million.
SYSTEM FOR AWARD
MANAGEMENT (SAM)
All offerors are required to register in The System for Award Management (SAM), which is a Federal Government, owned and operated FREE web site that consolidates the capabilities in CCR, ORCA, and EPLS. All contractors are required to be registered on the SAM website.
The website address is: https://beta.sam.gov
Note: Registration on SAM is FREE. Beware of websites charging for registration.
WIDE AREA WORKFLOW
Invoices must be submitted electronically via the Invoicing, Receipt, Acceptance and Property Transfer (iRAPT, formerly WAWF) system:
https://wawf.eb.mil/
Training available to contractors on-line
See 252.232-7006 WIDE AREA WORKFLOW PAYMENT
INSTRUCTION
https://wawf.eb.mil/
WAGE DETERMINATIONS
Construction Wage Rate Determination (formerly Davis Bacon Wage Act) applies.
The applicable Construction Wage Rate Determination is found in the RFP.
Contractor must submit all current payrolls prior to invoices being paid. Invoices will be returned, unprocessed if all current payrolls are not on file with NAVFAC MIDLANT PWD Crane.
INDEFINITE QUANTITY CONTRACT
Guaranteed minimum: $5,000.00 (one time)
Maximum: $35,000,000.00 for entire term.
Term: 60 months or $35,000,000.00 whichever comes first.
PRE-PRICED OPTIONS
Exhibits B, C, D, & E are pre-priced for option periods
Updated Wage Rate Determination will be incorporated on the anniversary date of the contract
Adjustments to Exhibit Line Item pricing will not be made
PROPOSALS
Proposals are due 19 May 2020 at 2:00 p.m. (EST)
Proposals that are late will not be considered unless conditions described in FAR 52.215-1(c) apply.
PROPOSALS See Solicitation for complete details
Contractors shall submit an original and two (2) copies of the technical proposal and an original price proposal.
The offerors shall submit a completed electronic copy (via email to annette.taylor1@navy.mil) of the price proposal for the exhibit line items for the base period and all four option periods.
A complete electronic copy of the technical proposal as a .pdf file on a CD-ROM
(include with the “original” technical submission).
Proposals submitted via fax will not be accepted.
Price and technical proposals shall be separately bound and submitted in two separate envelopes. The technical proposal shall not contain any cost/pricing information.
PRICE PROPOSAL
The following shall be submitted with the price proposal:
Signed SF form 1442, 1442 Continuation Page, and page 3
Exhibit Line Items A, B, C, D, & E for the entire project
Bid Guarantee FAR 52.288-1
Offerors shall indicate on the proposal that prices are valid for no less than ninety (90) days
Offerors shall acknowledge all amendments.
TECHNICAL PROPOSAL
Non-Price Proposals Submittal Requirements: Offerors shall submit an original and one (1) copy of the non-price proposal, in separate three-ring binders, that shall include the following:
8 ½ x 11 format
12 point Arial or Times New Roman font
50-page limit (inclusive of all charts, resumes, forms and other documentation responsive to the solicitation requirements), pages sequentially numbered
Include a cover page with Contract Number, Contract Title, Prime Contractor Name, Address, Phone, Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone and email address
Include only information in response to Factors 1, 2, 3 and 4, separated by tabs, as applicable
A complete electronic copy of the non-price proposal as a .pdf file on a CD-ROM (include with the “original” technical submission)
The Non-Price proposal shall include a submission for each evaluation factor, as specified below:
Proposal shall be clear, concise, & sufficiently detailed.
Four technical factors:
Factor 1: Experience
Factor 2: Safety
Factor 3: Management Ability
Factor 4: Past Performance
Factor 1 – Experience
Submit a minimum of two (2) and a maximum of five
(5) relevant projects for the Offeror that best demonstrates your experience as either a prime contractor or subcontractor on relevant projects that are similar in size, scope, and complexity to the RFP.
See solicitation for complete details
Factor 2 – Safety
Experience modification rate (EMR)
OSHA Days Away from Work, Restricted Duty, or Job
Transfer Rate (DART)
Technical Approach for Safety
Factor 3 – Management Ability
The Offeror’s ability in manage and execute a project of similar size and scope to those anticipated to be awarded under this procurement within a similar work environment;
The Offeror’s ability to successfully execute work at multiple work sites simultaneously;
The Offeror’s scheduling program flexibility that can accommodate the customer’s fluctuating schedule; and
The Offeror’s detailed contingency work plan.
See solicitation for complete details5/5/2020
Factor 4 – Past Performance
If a completed CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (PPQ)
SOURCE SELECTION PROCESS
Source Selection Evaluation Board (SSEB) will review proposals
Proposals will initially be screened for price and placed in order (lowest price to highest price).
The Navy will then evaluate the technical factors of the lowest priced proposal. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal.
Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy.
SOURCE SELECTION PROCESS
Source selection process is Low Price Technically Acceptable.
Award will be made to the offeror submitting the lowest priced technically acceptable offer.
Government may make an award without discussion
Proposals should be submitted initially on the most favorable terms
Failure to submit a proposal for all items listed shall be cause for rejection of the proposal.
POINT OF CONTACT FOR
QUESTIONS
Annette Taylor, Contract Specialist e-mail: annette.taylor1@navy.mil
All questions must be submitted in writing.
The Government does not guarantee that questions submitted after noon on May 12, 2020 will receive a response before the proposal due date.
QUESTIONS??
| Amendment_0001_N4008519R7704_MagazineMntRpr |
| Amend_0001 |
| Sign-inSheet |
| Pre-Proposal Conference 19R7400 |
| 2020-05-05T15:15:10-0400 | |
| TAYLOR.R.ANNETTE.1230297556 |
File details come from the government source that posted it. Updated .