About this file
This solicitation seeks proposals for magazine and inert building maintenance and repairs at the Naval Support Activity in Crane, Indiana. Work will include concrete installation and removal, dock and wing wall replacement, steel door replacement, lead paint removal, dead light replacement, dome repair and replacement, grounding, seeding, mulching, and excavation. The contract will have a base period of 12 months plus four 12-month option periods exercisable at the Government's discretion, with a minimum value of $5,000 and maximum of $35 million over 60 months. Proposals will be evaluated using Low Price Technically Acceptable procedures. The NAICS code is 237990 for other heavy and civil engineering construction, with a small business size standard of $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005_19R7704_MagazineMntRrp.pdf | ||
| REVISED_SECTION_01_45_02_QUALITY_CONTROL.pdf | ||
| Amendment_0004_19R7704_MagazineMntRpr.pdf | ||
| Amend_0004_Revised_N4008519R7704_ELINS.xlsx | XLSX spreadsheet | |
| Revised_N4008519R7704_ELINS.xlsx | XLSX spreadsheet | |
| Amendment0003_N4008519R7704_MagazineMntRprs.pdf | ||
| PW 6087CAS MAG SECURITY.pdf | ||
| Amendment_0002_N4008519R7704_MagazineMntRpr.pdf | ||
| Amendment_0001_N4008519R7704_MagazineMntRpr.pdf | ||
| N4008519R7704.pdf | ||
| N4008519R7704ELINS.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
REVISED PER AMENDMENT 00005
Contract: #N4008519R7704, Magazine & Inert Buildings Maintenance and Repair Base Period
| EXHIBIT LINE | LINE ITEM | UNIT OF | UNIT | EXTENDED | |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| A001 | Concrete work for removal (See Paragraph 2.4) | 1200 | SF | $ - 0 | |
| A002 | Sawcut opening (up to 12'x12') in wall. (See Pargraph 2.5) | 5 | EA | $ - 0 | |
| A003 | Concrete repair of spalling slab areas (See Paragraph 2.6) | 100 | SF | $ - 0 | |
| A004 | Concrete crack injection (See Paragraph 2.7) | 500 | LF | $ - 0 | |
| A005 | Patching of Concrete Wall Crack and Spalled Area (See Paragraph 2.8) | 35 | CF | $ - 0 | |
| A006 | Seal Concrete (See Paragraph 2.9) | 3600 | SF | $ - 0 | |
| A007 | Concrete wing wall and footer Hi-Ex Mag (See Parag. 2.10) | 120 | CYD | $ - 0 | |
| A008 | Concrete wing wall and footer S.P. Mag (See Parag. 2.11) | 420 | CYD | $ - 0 | |
| A009 | Concrete dock slab replacement (See Paragraph 2.12) | 160 | CYD | $ - 0 | |
| A010 | Concrete dock face wall replacement (See Paragraph 2.13) | 80 | CYD | $ - 0 | |
| A011 | Concrete Slab Replacement (For Extended Width Dock) (See Paragraph 2.14) | 200 | CY | $ - 0 | |
| A012 | Concrete Dock Face Wall (For Extended Width Dock)(See Paragraph 2.15) | 210 | CY | $ - 0 | |
| A013 | Concrete Footer incl. Excavation (For Extended Width Dock) (See Paragraph 2.16) | 90 | CY | $ - 0 | |
| A014 | Crushed Stone Backfill (For Extended Width Dock)(See Paragraph 2.17) | 630 | CY | $ - 0 | |
| A015 | Concrete Steps (See Paragraph 2.18) | 80 | CYD | $ - 0 | |
| A016 | Repair Parapet Wall (See Paragraph 2.19) | 20 | CY | $ - 0 | |
| A017 | Interior Concrete Slab Replacement(See Paragraph 2.20) | 20 | CY | $ - 0 | |
| A018 | Repair Partial Magazine Wall Section (See Parag. 2.21) | 20 | CY | $ - 0 | |
| A019 | Reposition Magazine Gravity Wall (See Parag. 2.22) | 2 | EA | $ - 0 | |
| A020 | Repair crack of smokeless powder magazine wingwall(See Paragraph 2.23) | 2 | EA | $ - 0 | |
| A021 | Infill with CMU's (to install personnel door)(See Paragraph 2.24) | 2 | EA | $ - 0 | |
| A022 | Infill with CMU's (to install double doors)(See Paragraph 2.25) | 2 | EA | $ - 0 | |
| A023 | Infill with CMU's (to replace glass block)(See Paragraph 2.26) | 8 | EA | $ - 0 | |
| A024 | Infill with CMU's (Minimum 12'-0" Wide X 12'-0" Tall Opening)(See Paragraph 2.27) | 324 | EA | $ - 0 | |
| A025 | Concrete Reinforcement bars and mesh (See Parag. 2.28) | 1000 | LB | $ - 0 | |
| A026 | Dock angle edge protection (See paragraph 2.29) | 120 | LF | $ - 0 | |
| A027 | Steel Door Replacement size 8' - 0 1/2" X 10' - 0" (Double) Type "H" with hinge protection (See Paragraph 2.30) | 6 | SET | $ - 0 | |
| A028 | Steel Door Replacement size 8' - 3" X 10' - 5 3/4" (Double)Type "J" with hinge protection (See Paragraph 2.31) | 12 | SET | $ - 0 | |
| A029 | Steel Door Replacement size 6' - 3" X 10' - 5 3/4" (Double)Type "G" (See Paragraph 2.32) | 4 | SET | $ - 0 | |
| A030 | Steel Door Replacement size 8' X 8' - 5" Double faceType (K) (See Paragraph 2.33) | 12 | SET | $ - 0 | |
| A031 | Steel Door Replacement size 10' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 4 | SET | $ - 0 | |
| A032 | Steel Door Replacement size 12' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 2 | SET | $ - 0 | |
| A033 | Steel Door Replacement size 14' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| A034 | Steel Door Replacement size 15' - 6" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| A035 | Install 10' X 10' roll-up door(See Paragraph 2.35) | 2 | EA | $ - 0 | |
| A036 | Install 12' X 12' roll-up door(See Paragraph 2.36) | 2 | EA | $ - 0 | |
| A037 | Install 3'-0" Personel Door with panic hardware(See Paragraph 2.37) | 2 | EA | $ - 0 | |
| A038 | Install 6'-0" Double Door with panic hardware(See Paragraph 2.38) | 2 | SET | $ - 0 | |
| A039 | Steel door paint two coats both sides (See Paragraph 2.39) | 50 | EA | $ - 0 | |
| A040 | Install Door Hook or Eye Bolt (See Paragraph. 2.40) | 100 | EA | $ - 0 | |
| A041 | Door flashing replacement (See Paragraph 2.41) | 200 | LF | $ - 0 | |
| A042 | Install Door Sweeps (Prior to Shop Fab.) (See Paragraph. 2.42) | 160 | LF | $ - 0 | |
| A043 | Install Door Sweeps (Post Shop Fab.) (See Paragraph. 2.43) | 160 | LF | $ - 0 | |
| A044 | Steel door hinge or repair (See Paragraph 2.44) | 40 | EA | $ - 0 | |
| A045 | Steel door lead paint removal (See Paragraph 2.45) | 50 | SF | $ - 0 | |
| A046 | Steel door Napec Hasp replacement (See Paragraph 2.46) | 24 | EA | $ - 0 | |
| A047 | Steel door operator repair (See Paragraph 2.47) | 32 | EA | $ - 0 | |
| A048 | Install operator (See Paragraph 2.48) | 20 | EA | $ - 0 | |
| A049 | Install Internal Locking Device on Doors (Prior to Shop Fab)(See Paragraph 2.49) | 2 | EA | $ - 0 | |
| A050 | Install Internal Locking Device on Doors (Post Shop Fab)(See Paragraph 2.50) | 2 | EA | $ - 0 | |
| (See Paragraph 2.50) | |||||
| A051 | Install Drop Locking Bar on Doors (Prior to Shop Fab)(See Paragraph 2.51) | 4 | EA | $ - 0 | |
| A052 | Install Drop Locking Bar on Doors (Post Shop Fab)(See Paragraph 2.52) | 2 | EA | $ - 0 | |
| A053 | Install Cane Bolt on Upper Leaf of Door (Post Shop Fab)(See Paragraph 2.53) | 50 | EA | $ - 0 | |
| A054 | Repair Cane Bolt on Lower Leaf of Existing Door (See Paragraph 2.54) | 50 | EA | $ - 0 | |
| A055 | Replace Door Vent Screen (See Parag. 2.55) | 60 | SF | $ - 0 | |
| A056 | Door Insulation Panel Removal (See Paragraph 2.56) | 24 | EA | $ - 0 | |
| A057 | Install Hinge Protection On An Existing Set Of Magazine Doors(See Paragraph 2.57) | 10 | SET | $ - 0 | |
| A058 | Dead Light Removal (See Paragraph 2.58) | 16 | UNIT | $ - 0 | |
| A059 | Dead Light Removal (with asbestos contaminated caulk) (See Paragraph 2.59) | 16 | UNIT | $ - 0 | |
| A060 | Dead light replacement (See Paragraph 2.60) | 512 | SF | $ - 0 | |
| A061 | Dead light covering with 3/8" Lexan(See Paragraph 2.61) | 1440 | SF | $ - 0 | |
| A062 | Install High Steel Security Grating (See Paragraph 2.62) | 60 | EA | $ - 0 | |
| A063 | Install Handrail above steps (See Paragraph 2.63) | 40 | EA | $ - 0 | |
| A064 | Install Two-pipe Railing (See Paragraph 2.64) | 76 | LF | $ - 0 | |
| A065 | Install Dock Access Ladder (See Paragraph 2.65) | 2 | EA | $ - 0 | |
| A066 | Dome flashing replacement (See Paragraph 2.66) | 20 | EA | $ - 0 | |
| A067 | Vent dome replacement (See Paragraph 2.67) | 2 | EA | $ - 0 | |
| A068 | Waterproof Existing Roof Ventilator (See Paragraph 2.68) | 8 | EA | $ - 0 | |
| A069 | Ground dome flashing to grounding grid (See Paragraph 2.69) | 50 | LF | $ - 0 | |
| A070 | Ground doors/frames to grounding grid (See Paragraph 2.70) | 100 | LF | $ - 0 | |
| A071 | Ground rail to grounding grid (See Paragraph 2.71) | 50 | LF | $ - 0 | |
| A072 | Install Cover On Hi-Ex Magazine (See Paragraph 2.72) | 1 | EA | $ - 0 | |
| A073 | Install Cover On Smokeless Powder Magazine(See Paragraph 2.73) | 1 | EA | $ - 0 | |
| A074 | Waterproof Hi-Ex Magazine (See Paragraph 2.74) | 1 | EA | $ - 0 | |
| A075 | Waterproof Smokeless Powder Magazine(See Paragraph 2.75) | 1 | EA | $ - 0 | |
| A076 | Excavation (See Paragragh 2.76) | 2100 | CY | $ - 0 | |
| A077 | Fill / Backfill (See Paragragh 2.77) | 1800 | CY | $ - 0 | |
| A078 | Relocate/Reinstall Alarm Systems Pedestal(See Paragraph 2.78) | 2 | EA | $ - 0 | |
| A079 | Install Silt Fence (See Paragraph 2.79) | 400 | LF | $ - 0 | |
| A080 | Straw bales for erosion control (See Paragraph 2.80) | 50 | EA | $ - 0 | |
| A081 | Mulch (See Paragraph 2.81) | 150 | MSF | $ - 0 | |
| A082 | Straw Blanket Mulch (See Paragraph 2.82) | 50 | MSF | $ - 0 | |
| A083 | Seeding (See Paragraph 2.83) | 50 | MSF | $ - 0 | |
| A084 | Hydroseeding; Mulch, Seed, and Fertilize (See Paragraph 2.84) | 2000 | SYD | $ - 0 | |
| A085 | Construction of temporary road to buildings that are rail accessible only(See Paragraph 2.85) | 50 | CY | $ - 0 | |
| A086 | Stone Fill #2 (See Paragraph 2.86) | 200 | CY | $ - 0 | |
| A087 | Stone Paving #53 (See Paragraph 2.87) | 400 | CY | $ - 0 | |
| A088 | Crushed Stone (See Paragragh 2.88) | 100 | CY | $ - 0 | |
| A089 | Rip Rap Ends (See Paragragh 2.89) | 20 | CY | $ - 0 | |
| A090 | Install Geogrid Fabric (See Paragraph 2.90) | 600 | SYD | $ - 0 | |
| A091 | Install 6" Pipe Bollards Concrete Filled (See Paragraph 2.91) | 12 | EA | $ - 0 | |
| A092 | Removal of dock bumper blocks (See Paragraph 2.92) | 6 | EA | $ - 0 | |
| A093 | Installation of dock bumper blocks (See Paragraph 2.93) | 18 | EA | $ - 0 | |
| A094 | Reanchor Building Sign (See Paragraph 2.94) | 10 | EA | $ - 0 | |
| A095 | Install Drain Cover (See Paragraph 2.95) | 2 | EA | $ - 0 | |
| A096 | Storm Drain 12" Corrogated Pipe (See Paragraph 2.96) | 60 | LF | $ - 0 | |
| A097 | Storm Drain 18" Corrogated Pipe (See Paragraph 2.97) | 45 | LF | $ - 0 | |
| A098 | Concrete Storm Inlet (See Paragraph 2.98) | 2 | EA | $ - 0 | |
| A099 | Adjust Existing Casting (See Paragraph 2.99) | 2 | EA | $ - 0 | |
| A100 | Furnish New Casting (See Paragraph 2.100) | 2 | EA | $ - 0 | |
| A101 | Downspout Trunk Line for Dock (See Paragraph 2.101) | 180 | LF | $ - 0 | |
| A102 | Downspout Trunk Line for Extended Width Dock(See Paragraph 2.102) | 180 | LF | $ - 0 | |
| A103 | Remove Railroad Tracks (See Paragraph 2.103) | 440 | LF | $ - 0 | |
| A104 | Remove & Relocate Railroad Stop Blocks (See Paragraph 2.104) | 1 | EA | $ - 0 | |
| A105 | Crosstie Wheel Stops (See Paragraph 2.105) | 1 | EA | $ - 0 | |
| A106 | Paint Loading Dock Edge (4") (Two Coats)(See Paragraph 2.106) | 120 | LF | $ - 0 | |
| A107 | Restencil Inside Hi-Ex Magazine (See Paragraph. 2.107) | 1 | EA | $ - 0 | |
| A108 | Prep/Paint Concrete/Steel/Wood(See Paragraph. 2.108) | 500 | SF | $ - 0 | |
| A109 | Prep/Paint/Screen Gable Vent/Louver On Inert Bldg/AGM(See Paragraph. 2.109) | 4 | EA | $ - 0 | |
| A110 | Notice of Intent Line Item (See Paragraph 2.110) | 1 | LS | $ - 0 | |
| A111 | Labor for Installation of Material in Conjunction with Magazine/Building Repairs(See Paragraph 2.111) | 240 | LH | $ - 0 | |
| A112 | Material and Equipment in Conjunction with Magazine/Building repairs (See Paragraph 2.112) | 5,000 | LS | % | ERROR:#VALUE! |
| % Mark-up on material invoice cost | |||||
| For proposal purposes only, assume the value of the material is $5,000.00 | |||||
| To calculate the amount for ELIN A112 multiply $5,000.00 by the percent mark-up + 100% | |||||
| For example if the percent mark up is 10% then $5,000.00 x 1.10 = $5,500.00 which is entered in ELIN A112 | |||||
| A113 | Bond Cost for Payment and Performance Bonds(See Paragraph 2.113) | ERROR:#VALUE! | LS | % | ERROR:#VALUE! |
| % | Bond Premium | ||||
| To calculate the amount for ELIN 113 multiple the subtotal of ELINS 001 through 112 by the bond premium | |||||
| Bonding Requirement: | |||||
| < $35,000.00 - bonding not required | |||||
| $35,000.00 - $150,000 = Payment Bond | |||||
| $150,000 > = Performance & Payment Bond | |||||
| ESTIMATED TOTAL PRICE: | ERROR:#VALUE! | ||||
| BASE PERIOD | |||||
| (Line Items A001 - A113) |
Option Period One
Contract: #N4008519R7704, Magazine & Inert Buildings Maintenance and Repair Option Period One
| EXHIBIT LINE | LINE ITEM | UNIT OF | UNIT | EXTENDED | |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| B001 | Concrete work for removal (See Paragraph 2.4) | 1200 | SF | $ - 0 | |
| B002 | Sawcut opening (up to 12'x12') in wall. (See Pargraph 2.5) | 5 | EA | $ - 0 | |
| B003 | Concrete repair of spalling slab areas (See Paragraph 2.6) | 100 | SF | $ - 0 | |
| B004 | Concrete crack injection (See Paragraph 2.7) | 500 | LF | $ - 0 | |
| B005 | Patching of Concrete Wall Crack and Spalled Area (See Paragraph 2.8) | 35 | CF | $ - 0 | |
| B006 | Seal Concrete (See Paragraph 2.9) | 3600 | SF | $ - 0 | |
| B007 | Concrete wing wall and footer Hi-Ex Mag (See Parag. 2.10) | 120 | CYD | $ - 0 | |
| B008 | Concrete wing wall and footer S.P. Mag (See Parag. 2.11) | 420 | CYD | $ - 0 | |
| B009 | Concrete dock slab replacement (See Paragraph 2.12) | 160 | CYD | $ - 0 | |
| B010 | Concrete dock face wall replacement (See Paragraph 2.13) | 80 | CYD | $ - 0 | |
| B011 | Concrete Slab Replacement (For Extended Width Dock) (See Paragraph 2.14) | 200 | CY | $ - 0 | |
| B012 | Concrete Dock Face Wall (For Extended Width Dock)(See Paragraph 2.15) | 210 | CY | $ - 0 | |
| B013 | Concrete Footer incl. Excavation (For Extended Width Dock) (See Paragraph 2.16) | 90 | CY | $ - 0 | |
| B014 | Crushed Stone Backfill (For Extended Width Dock)(See Paragraph 2.17) | 630 | CY | $ - 0 | |
| B015 | Concrete Steps (See Paragraph 2.18) | 80 | CYD | $ - 0 | |
| B016 | Repair Parapet Wall (See Paragraph 2.19) | 20 | CY | $ - 0 | |
| B017 | Interior Concrete Slab Replacement(See Paragraph 2.20) | 20 | CY | $ - 0 | |
| B018 | Repair Partial Magazine Wall Section (See Parag. 2.21) | 20 | CY | $ - 0 | |
| B019 | Reposition Magazine Gravity Wall (See Parag. 2.22) | 2 | EA | $ - 0 | |
| B020 | Repair crack of smokeless powder magazine wingwall(See Paragraph 2.23) | 2 | EA | $ - 0 | |
| B021 | Infill with CMU's (to install personnel door)(See Paragraph 2.24) | 2 | EA | $ - 0 | |
| B022 | Infill with CMU's (to install double doors)(See Paragraph 2.25) | 2 | EA | $ - 0 | |
| B023 | Infill with CMU's (to replace glass block)(See Paragraph 2.26) | 8 | EA | $ - 0 | |
| B024 | Infill with CMU's (Minimum 12'-0" Wide X 12'-0" Tall Opening)(See Paragraph 2.27) | 324 | EA | $ - 0 | |
| B025 | Concrete Reinforcement bars and mesh (See Parag. 2.28) | 1000 | LB | $ - 0 | |
| B026 | Dock angle edge protection (See paragraph 2.29) | 120 | LF | $ - 0 | |
| B027 | Steel Door Replacement size 8' - 0 1/2" X 10' - 0" (Double) Type "H" with hinge protection (See Paragraph 2.30) | 6 | SET | $ - 0 | |
| B028 | Steel Door Replacement size 8' - 3" X 10' - 5 3/4" (Double)Type "J" with hinge protection (See Paragraph 2.31) | 12 | SET | $ - 0 | |
| B029 | Steel Door Replacement size 6' - 3" X 10' - 5 3/4" (Double)Type "G" (See Paragraph 2.32) | 4 | SET | $ - 0 | |
| B030 | Steel Door Replacement size 8' X 8' - 5" Double faceType (K) (See Paragraph 2.33) | 12 | SET | $ - 0 | |
| B031 | Steel Door Replacement size 10' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 4 | SET | $ - 0 | |
| B032 | Steel Door Replacement size 12' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 2 | SET | $ - 0 | |
| B033 | Steel Door Replacement size 14' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| B034 | Steel Door Replacement size 15' - 6" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| B035 | Install 10' X 10' roll-up door(See Paragraph 2.35) | 2 | EA | $ - 0 | |
| B036 | Install 12' X 12' roll-up door(See Paragraph 2.36) | 2 | EA | $ - 0 | |
| B037 | Install 3'-0" Personel Door with panic hardware(See Paragraph 2.37) | 2 | EA | $ - 0 | |
| B038 | Install 6'-0" Double Door with panic hardware(See Paragraph 2.38) | 2 | SET | $ - 0 | |
| B039 | Steel door paint two coats both sides (See Paragraph 2.39) | 50 | EA | $ - 0 | |
| B040 | Install Door Hook or Eye Bolt (See Paragraph. 2.40) | 100 | EA | $ - 0 | |
| B041 | Door flashing replacement (See Paragraph 2.41) | 200 | LF | $ - 0 | |
| B042 | Install Door Sweeps (Prior to Shop Fab.) (See Paragraph. 2.42) | 160 | LF | $ - 0 | |
| B043 | Install Door Sweeps (Post Shop Fab.) (See Paragraph. 2.43) | 160 | LF | $ - 0 | |
| B044 | Steel door hinge or repair (See Paragraph 2.44) | 40 | EA | $ - 0 | |
| B045 | Steel door lead paint removal (See Paragraph 2.45) | 50 | SF | $ - 0 | |
| B046 | Steel door Napec Hasp replacement (See Paragraph 2.46) | 24 | EA | $ - 0 | |
| B047 | Steel door operator repair (See Paragraph 2.47) | 32 | EA | $ - 0 | |
| B048 | Install operator (See Paragraph 2.48) | 20 | EA | $ - 0 | |
| B049 | Install Internal Locking Device on Doors (Prior to Shop Fab)(See Paragraph 2.49) | 2 | EA | $ - 0 | |
| B050 | Install Internal Locking Device on Doors (Post Shop Fab)(See Paragraph 2.50) | 2 | EA | $ - 0 | |
| (See Paragraph 2.50) | |||||
| B051 | Install Drop Locking Bar on Doors (Prior to Shop Fab)(See Paragraph 2.51) | 4 | EA | $ - 0 | |
| B052 | Install Drop Locking Bar on Doors (Post Shop Fab)(See Paragraph 2.52) | 2 | EA | $ - 0 | |
| B053 | Install Cane Bolt on Upper Leaf of Door (Post Shop Fab)(See Paragraph 2.53) | 50 | EA | $ - 0 | |
| B054 | Repair Cane Bolt on Lower Leaf of Existing Door (See Paragraph 2.54) | 50 | EA | $ - 0 | |
| B055 | Replace Door Vent Screen (See Parag. 2.55) | 60 | SF | $ - 0 | |
| B056 | Door Insulation Panel Removal (See Paragraph 2.56) | 24 | EA | $ - 0 | |
| B057 | Install Hinge Protection On An Existing Set Of Magazine Doors(See Paragraph 2.57) | 10 | SET | $ - 0 | |
| B058 | Dead Light Removal (See Paragraph 2.58) | 16 | UNIT | $ - 0 | |
| B059 | Dead Light Removal (with asbestos contaminated caulk) (See Paragraph 2.59) | 16 | UNIT | $ - 0 | |
| B060 | Dead light replacement (See Paragraph 2.60) | 512 | SF | $ - 0 | |
| B061 | Dead light covering with 3/8" Lexan(See Paragraph 2.61) | 1440 | SF | $ - 0 | |
| B062 | Install High Steel Security Grating (See Paragraph 2.62) | 60 | EA | $ - 0 | |
| B063 | Install Handrail above steps (See Paragraph 2.63) | 40 | EA | $ - 0 | |
| B064 | Install Two-pipe Railing (See Paragraph 2.64) | 76 | LF | $ - 0 | |
| B065 | Install Dock Access Ladder (See Paragraph 2.65) | 2 | EA | $ - 0 | |
| B066 | Dome flashing replacement (See Paragraph 2.66) | 20 | EA | $ - 0 | |
| B067 | Vent dome replacement (See Paragraph 2.67) | 2 | EA | $ - 0 | |
| B068 | Waterproof Existing Roof Ventilator (See Paragraph 2.68) | 8 | EA | $ - 0 | |
| B069 | Ground dome flashing to grounding grid (See Paragraph 2.69) | 50 | LF | $ - 0 | |
| B070 | Ground doors/frames to grounding grid (See Paragraph 2.70) | 100 | LF | $ - 0 | |
| B071 | Ground rail to grounding grid (See Paragraph 2.71) | 50 | LF | $ - 0 | |
| B072 | Install Cover On Hi-Ex Magazine (See Paragraph 2.72) | 1 | EA | $ - 0 | |
| B073 | Install Cover On Smokeless Powder Magazine(See Paragraph 2.73) | 1 | EA | $ - 0 | |
| B074 | Waterproof Hi-Ex Magazine (See Paragraph 2.74) | 1 | EA | $ - 0 | |
| B075 | Waterproof Smokeless Powder Magazine(See Paragraph 2.75) | 1 | EA | $ - 0 | |
| B076 | Excavation (See Paragragh 2.76) | 2100 | CY | $ - 0 | |
| B077 | Fill / Backfill (See Paragragh 2.77) | 1800 | CY | $ - 0 | |
| B078 | Relocate/Reinstall Alarm Systems Pedestal(See Paragraph 2.78) | 2 | EA | $ - 0 | |
| B079 | Install Silt Fence (See Paragraph 2.79) | 400 | LF | $ - 0 | |
| B080 | Straw bales for erosion control (See Paragraph 2.80) | 50 | EA | $ - 0 | |
| B081 | Mulch (See Paragraph 2.81) | 150 | MSF | $ - 0 | |
| B082 | Straw Blanket Mulch (See Paragraph 2.82) | 50 | MSF | $ - 0 | |
| B083 | Seeding (See Paragraph 2.83) | 50 | MSF | $ - 0 | |
| B084 | Hydroseeding; Mulch, Seed, and Fertilize (See Paragraph 2.84) | 2000 | SYD | $ - 0 | |
| B085 | Construction of temporary road to buildings that are rail accessible only(See Paragraph 2.85) | 50 | CY | $ - 0 | |
| B086 | Stone Fill #2 (See Paragraph 2.86) | 200 | CY | $ - 0 | |
| B087 | Stone Paving #53 (See Paragraph 2.87) | 400 | CY | $ - 0 | |
| B088 | Crushed Stone (See Paragragh 2.88) | 100 | CY | $ - 0 | |
| B089 | Rip Rap Ends (See Paragragh 2.89) | 20 | CY | $ - 0 | |
| B090 | Install Geogrid Fabric (See Paragraph 2.90) | 600 | SYD | $ - 0 | |
| B091 | Install 6" Pipe Bollards Concrete Filled (See Paragraph 2.91) | 12 | EA | $ - 0 | |
| B092 | Removal of dock bumper blocks (See Paragraph 2.92) | 6 | EA | $ - 0 | |
| B093 | Installation of dock bumper blocks (See Paragraph 2.93) | 18 | EA | $ - 0 | |
| B094 | Reanchor Building Sign (See Paragraph 2.94) | 10 | EA | $ - 0 | |
| B095 | Install Drain Cover (See Paragraph 2.95) | 2 | EA | $ - 0 | |
| B096 | Storm Drain 12" Corrogated Pipe (See Paragraph 2.96) | 60 | LF | $ - 0 | |
| B097 | Storm Drain 18" Corrogated Pipe (See Paragraph 2.97) | 45 | LF | $ - 0 | |
| B098 | Concrete Storm Inlet (See Paragraph 2.98) | 2 | EA | $ - 0 | |
| B099 | Adjust Existing Casting (See Paragraph 2.99) | 2 | EA | $ - 0 | |
| B100 | Furnish New Casting (See Paragraph 2.100) | 2 | EA | $ - 0 | |
| B101 | Downspout Trunk Line for Dock (See Paragraph 2.101) | 180 | LF | $ - 0 | |
| B102 | Downspout Trunk Line for Extended Width Dock(See Paragraph 2.102) | 180 | LF | $ - 0 | |
| B103 | Remove Railroad Tracks (See Paragraph 2.103) | 440 | LF | $ - 0 | |
| B104 | Remove & Relocate Railroad Stop Blocks (See Paragraph 2.104) | 1 | EA | $ - 0 | |
| B105 | Crosstie Wheel Stops (See Paragraph 2.105) | 1 | EA | $ - 0 | |
| B106 | Paint Loading Dock Edge (4") (Two Coats)(See Paragraph 2.106) | 120 | LF | $ - 0 | |
| B107 | Restencil Inside Hi-Ex Magazine (See Paragraph. 2.107) | 1 | EA | $ - 0 | |
| B108 | Prep/Paint Concrete/Steel/Wood(See Paragraph. 2.108) | 500 | SF | $ - 0 | |
| B109 | Prep/Paint/Screen Gable Vent/Louver On Inert Bldg/AGM(See Paragraph. 2.109) | 4 | EA | $ - 0 | |
| B110 | Notice of Intent Line Item (See Paragraph 2.110) | 1 | LS | $ - 0 | |
| B111 | Labor for Installation of Material in Conjunction with Magazine/Building Repairs(See Paragraph 2.111) | 240 | LH | $ - 0 | |
| B112 | Material and Equipment in Conjunction with Magazine/Building repairs (See Paragraph 2.112) | 5,000 | LS | % | ERROR:#VALUE! |
| % Mark-up on material invoice cost | |||||
| For proposal purposes only, assume the value of the material is $5,000.00 | |||||
| To calculate the amount for ELIN B112 multiply $5,000.00 by the percent mark-up + 100% | |||||
| For example if the percent mark up is 10% then $5,000.00 x 1.10 = $5,055.00 which is entered in ELIN B112 | |||||
| B113 | Bond Cost for Payment and Performance Bonds(See Paragraph 2.113) | ERROR:#VALUE! | LS | % | ERROR:#VALUE! |
| % | Bond Premium | ||||
| To calculate the amount for ELIN 113 multiple the subtotal of ELINS 001 through 112 by the bond premium | |||||
| Bonding Requirement: | |||||
| < $35,000.00 - bonding not required | |||||
| $35,000.00 - $150,000 = Payment Bond | |||||
| $150,000 > = Performance & Payment Bond | |||||
| ESTIMATED TOTAL PRICE: | ERROR:#VALUE! | ||||
| Option Period One | |||||
| (Line Items B001 - B113) |
Option Period Two
Contract: #N4008519R7704, Magazine & Inert Buildings Maintenance and Repair Option Period Two
| EXHIBIT LINE | LINE ITEM | UNIT OF | UNIT | EXTENDED | |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| C001 | Concrete work for removal (See Paragraph 2.4) | 1200 | SF | $ - 0 | |
| C002 | Sawcut opening (up to 12'x12') in wall. (See Pargraph 2.5) | 5 | EA | $ - 0 | |
| C003 | Concrete repair of spalling slab areas (See Paragraph 2.6) | 100 | SF | $ - 0 | |
| C004 | Concrete crack injection (See Paragraph 2.7) | 500 | LF | $ - 0 | |
| C005 | Patching of Concrete Wall Crack and Spalled Area (See Paragraph 2.8) | 35 | CF | $ - 0 | |
| C006 | Seal Concrete (See Paragraph 2.9) | 3600 | SF | $ - 0 | |
| C007 | Concrete wing wall and footer Hi-Ex Mag (See Parag. 2.10) | 120 | CYD | $ - 0 | |
| C008 | Concrete wing wall and footer S.P. Mag (See Parag. 2.11) | 420 | CYD | $ - 0 | |
| C009 | Concrete dock slab replacement (See Paragraph 2.12) | 160 | CYD | $ - 0 | |
| C010 | Concrete dock face wall replacement (See Paragraph 2.13) | 80 | CYD | $ - 0 | |
| C011 | Concrete Slab Replacement (For Extended Width Dock) (See Paragraph 2.14) | 200 | CY | $ - 0 | |
| C012 | Concrete Dock Face Wall (For Extended Width Dock)(See Paragraph 2.15) | 210 | CY | $ - 0 | |
| C013 | Concrete Footer incl. Excavation (For Extended Width Dock) (See Paragraph 2.16) | 90 | CY | $ - 0 | |
| C014 | Crushed Stone Backfill (For Extended Width Dock)(See Paragraph 2.17) | 630 | CY | $ - 0 | |
| C015 | Concrete Steps (See Paragraph 2.18) | 80 | CYD | $ - 0 | |
| C016 | Repair Parapet Wall (See Paragraph 2.19) | 20 | CY | $ - 0 | |
| C017 | Interior Concrete Slab Replacement(See Paragraph 2.20) | 20 | CY | $ - 0 | |
| C018 | Repair Partial Magazine Wall Section (See Parag. 2.21) | 20 | CY | $ - 0 | |
| C019 | Reposition Magazine Gravity Wall (See Parag. 2.22) | 2 | EA | $ - 0 | |
| C020 | Repair crack of smokeless powder magazine wingwall(See Paragraph 2.23) | 2 | EA | $ - 0 | |
| C021 | Infill with CMU's (to install personnel door)(See Paragraph 2.24) | 2 | EA | $ - 0 | |
| C022 | Infill with CMU's (to install double doors)(See Paragraph 2.25) | 2 | EA | $ - 0 | |
| C023 | Infill with CMU's (to replace glass block)(See Paragraph 2.26) | 8 | EA | $ - 0 | |
| C024 | Infill with CMU's (Minimum 12'-0" Wide X 12'-0" Tall Opening)(See Paragraph 2.27) | 324 | EA | $ - 0 | |
| C025 | Concrete Reinforcement bars and mesh (See Parag. 2.28) | 1000 | LB | $ - 0 | |
| C026 | Dock angle edge protection (See paragraph 2.29) | 120 | LF | $ - 0 | |
| C027 | Steel Door Replacement size 8' - 0 1/2" X 10' - 0" (Double) Type "H" with hinge protection (See Paragraph 2.30) | 6 | SET | $ - 0 | |
| C028 | Steel Door Replacement size 8' - 3" X 10' - 5 3/4" (Double)Type "J" with hinge protection (See Paragraph 2.31) | 12 | SET | $ - 0 | |
| C029 | Steel Door Replacement size 6' - 3" X 10' - 5 3/4" (Double)Type "G" (See Paragraph 2.32) | 4 | SET | $ - 0 | |
| C030 | Steel Door Replacement size 8' X 8' - 5" Double faceType (K) (See Paragraph 2.33) | 12 | SET | $ - 0 | |
| C031 | Steel Door Replacement size 10' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 4 | SET | $ - 0 | |
| C032 | Steel Door Replacement size 12' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 2 | SET | $ - 0 | |
| C033 | Steel Door Replacement size 14' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| C034 | Steel Door Replacement size 15' - 6" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| C035 | Install 10' X 10' roll-up door(See Paragraph 2.35) | 2 | EA | $ - 0 | |
| C036 | Install 12' X 12' roll-up door(See Paragraph 2.36) | 2 | EA | $ - 0 | |
| C037 | Install 3'-0" Personel Door with panic hardware(See Paragraph 2.37) | 2 | EA | $ - 0 | |
| C038 | Install 6'-0" Double Door with panic hardware(See Paragraph 2.38) | 2 | SET | $ - 0 | |
| C039 | Steel door paint two coats both sides (See Paragraph 2.39) | 50 | EA | $ - 0 | |
| C040 | Install Door Hook or Eye Bolt (See Paragraph. 2.40) | 100 | EA | $ - 0 | |
| C041 | Door flashing replacement (See Paragraph 2.41) | 200 | LF | $ - 0 | |
| C042 | Install Door Sweeps (Prior to Shop Fab.) (See Paragraph. 2.42) | 160 | LF | $ - 0 | |
| C043 | Install Door Sweeps (Post Shop Fab.) (See Paragraph. 2.43) | 160 | LF | $ - 0 | |
| C044 | Steel door hinge or repair (See Paragraph 2.44) | 40 | EA | $ - 0 | |
| C045 | Steel door lead paint removal (See Paragraph 2.45) | 50 | SF | $ - 0 | |
| C046 | Steel door Napec Hasp replacement (See Paragraph 2.46) | 24 | EA | $ - 0 | |
| C047 | Steel door operator repair (See Paragraph 2.47) | 32 | EA | $ - 0 | |
| C048 | Install operator (See Paragraph 2.48) | 20 | EA | $ - 0 | |
| C049 | Install Internal Locking Device on Doors (Prior to Shop Fab)(See Paragraph 2.49) | 2 | EA | $ - 0 | |
| C050 | Install Internal Locking Device on Doors (Post Shop Fab)(See Paragraph 2.50) | 2 | EA | $ - 0 | |
| (See Paragraph 2.50) | |||||
| C051 | Install Drop Locking Bar on Doors (Prior to Shop Fab)(See Paragraph 2.51) | 4 | EA | $ - 0 | |
| C052 | Install Drop Locking Bar on Doors (Post Shop Fab)(See Paragraph 2.52) | 2 | EA | $ - 0 | |
| C053 | Install Cane Bolt on Upper Leaf of Door (Post Shop Fab)(See Paragraph 2.53) | 50 | EA | $ - 0 | |
| C054 | Repair Cane Bolt on Lower Leaf of Existing Door (See Paragraph 2.54) | 50 | EA | $ - 0 | |
| C055 | Replace Door Vent Screen (See Parag. 2.55) | 60 | SF | $ - 0 | |
| C056 | Door Insulation Panel Removal (See Paragraph 2.56) | 24 | EA | $ - 0 | |
| C057 | Install Hinge Protection On An Existing Set Of Magazine Doors(See Paragraph 2.57) | 10 | SET | $ - 0 | |
| C058 | Dead Light Removal (See Paragraph 2.58) | 16 | UNIT | $ - 0 | |
| C059 | Dead Light Removal (with asbestos contaminated caulk) (See Paragraph 2.59) | 16 | UNIT | $ - 0 | |
| C060 | Dead light replacement (See Paragraph 2.60) | 512 | SF | $ - 0 | |
| C061 | Dead light covering with 3/8" Lexan(See Paragraph 2.61) | 1440 | SF | $ - 0 | |
| C062 | Install High Steel Security Grating (See Paragraph 2.62) | 60 | EA | $ - 0 | |
| C063 | Install Handrail above steps (See Paragraph 2.63) | 40 | EA | $ - 0 | |
| C064 | Install Two-pipe Railing (See Paragraph 2.64) | 76 | LF | $ - 0 | |
| C065 | Install Dock Access Ladder (See Paragraph 2.65) | 2 | EA | $ - 0 | |
| C066 | Dome flashing replacement (See Paragraph 2.66) | 20 | EA | $ - 0 | |
| C067 | Vent dome replacement (See Paragraph 2.67) | 2 | EA | $ - 0 | |
| C068 | Waterproof Existing Roof Ventilator (See Paragraph 2.68) | 8 | EA | $ - 0 | |
| C069 | Ground dome flashing to grounding grid (See Paragraph 2.69) | 50 | LF | $ - 0 | |
| C070 | Ground doors/frames to grounding grid (See Paragraph 2.70) | 100 | LF | $ - 0 | |
| C071 | Ground rail to grounding grid (See Paragraph 2.71) | 50 | LF | $ - 0 | |
| C072 | Install Cover On Hi-Ex Magazine (See Paragraph 2.72) | 1 | EA | $ - 0 | |
| C073 | Install Cover On Smokeless Powder Magazine(See Paragraph 2.73) | 1 | EA | $ - 0 | |
| C074 | Waterproof Hi-Ex Magazine (See Paragraph 2.74) | 1 | EA | $ - 0 | |
| C075 | Waterproof Smokeless Powder Magazine(See Paragraph 2.75) | 1 | EA | $ - 0 | |
| C076 | Excavation (See Paragragh 2.76) | 2100 | CY | $ - 0 | |
| C077 | Fill / Backfill (See Paragragh 2.77) | 1800 | CY | $ - 0 | |
| C078 | Relocate/Reinstall Alarm Systems Pedestal(See Paragraph 2.78) | 2 | EA | $ - 0 | |
| C079 | Install Silt Fence (See Paragraph 2.79) | 400 | LF | $ - 0 | |
| C080 | Straw bales for erosion control (See Paragraph 2.80) | 50 | EA | $ - 0 | |
| C081 | Mulch (See Paragraph 2.81) | 150 | MSF | $ - 0 | |
| C082 | Straw Blanket Mulch (See Paragraph 2.82) | 50 | MSF | $ - 0 | |
| C083 | Seeding (See Paragraph 2.83) | 50 | MSF | $ - 0 | |
| C084 | Hydroseeding; Mulch, Seed, and Fertilize (See Paragraph 2.84) | 2000 | SYD | $ - 0 | |
| C085 | Construction of temporary road to buildings that are rail accessible only(See Paragraph 2.85) | 50 | CY | $ - 0 | |
| C086 | Stone Fill #2 (See Paragraph 2.86) | 200 | CY | $ - 0 | |
| C087 | Stone Paving #53 (See Paragraph 2.87) | 400 | CY | $ - 0 | |
| C088 | Crushed Stone (See Paragragh 2.88) | 100 | CY | $ - 0 | |
| C089 | Rip Rap Ends (See Paragragh 2.89) | 20 | CY | $ - 0 | |
| C090 | Install Geogrid Fabric (See Paragraph 2.90) | 600 | SYD | $ - 0 | |
| C091 | Install 6" Pipe Bollards Concrete Filled (See Paragraph 2.91) | 12 | EA | $ - 0 | |
| C092 | Removal of dock bumper blocks (See Paragraph 2.92) | 6 | EA | $ - 0 | |
| C093 | Installation of dock bumper blocks (See Paragraph 2.93) | 18 | EA | $ - 0 | |
| C094 | Reanchor Building Sign (See Paragraph 2.94) | 10 | EA | $ - 0 | |
| C095 | Install Drain Cover (See Paragraph 2.95) | 2 | EA | $ - 0 | |
| C096 | Storm Drain 12" Corrogated Pipe (See Paragraph 2.96) | 60 | LF | $ - 0 | |
| C097 | Storm Drain 18" Corrogated Pipe (See Paragraph 2.97) | 45 | LF | $ - 0 | |
| C098 | Concrete Storm Inlet (See Paragraph 2.98) | 2 | EA | $ - 0 | |
| C099 | Adjust Existing Casting (See Paragraph 2.99) | 2 | EA | $ - 0 | |
| C100 | Furnish New Casting (See Paragraph 2.100) | 2 | EA | $ - 0 | |
| C101 | Downspout Trunk Line for Dock (See Paragraph 2.101) | 180 | LF | $ - 0 | |
| C102 | Downspout Trunk Line for Extended Width Dock(See Paragraph 2.102) | 180 | LF | $ - 0 | |
| C103 | Remove Railroad Tracks (See Paragraph 2.103) | 440 | LF | $ - 0 | |
| C104 | Remove & Relocate Railroad Stop Blocks (See Paragraph 2.104) | 1 | EA | $ - 0 | |
| C105 | Crosstie Wheel Stops (See Paragraph 2.105) | 1 | EA | $ - 0 | |
| C106 | Paint Loading Dock Edge (4") (Two Coats)(See Paragraph 2.106) | 120 | LF | $ - 0 | |
| C107 | Restencil Inside Hi-Ex Magazine (See Paragraph. 2.107) | 1 | EA | $ - 0 | |
| C108 | Prep/Paint Concrete/Steel/Wood(See Paragraph. 2.108) | 500 | SF | $ - 0 | |
| C109 | Prep/Paint/Screen Gable Vent/Louver On Inert Bldg/AGM(See Paragraph. 2.109) | 4 | EA | $ - 0 | |
| C110 | Notice of Intent Line Item (See Paragraph 2.110) | 1 | LS | $ - 0 | |
| C111 | Labor for Installation of Material in Conjunction with Magazine/Building Repairs(See Paragraph 2.111) | 240 | LH | $ - 0 | |
| C112 | Material and Equipment in Conjunction with Magazine/Building repairs (See Paragraph 2.112) | 5,000 | LS | % | ERROR:#VALUE! |
| % Mark-up on material invoice cost | |||||
| For proposal purposes only, assume the value of the material is $5,000.00 | |||||
| To calculate the amount for ELIN C112 multiply $5,000.00 by the percent mark-up + 100% | |||||
| For example if the percent mark up is 10% then $5,000.00 x 1.10 = $5,055.00 which is entered in ELIN C112 | |||||
| C113 | Bond Cost for Payment and Performance Bonds(See Paragraph 2.113) | ERROR:#VALUE! | LS | % | ERROR:#VALUE! |
| % | Bond Premium | ||||
| To calculate the amount for ELIN 113 multiple the subtotal of ELINS 001 through 112 by the bond premium | |||||
| Bonding Requirement: | |||||
| < $35,000.00 - bonding not required | |||||
| $35,000.00 - $150,000 = Payment Bond | |||||
| $150,000 > = Performance & Payment Bond | |||||
| ESTIMATED TOTAL PRICE: | ERROR:#VALUE! | ||||
| Option Period Two | |||||
| (Line Items C001 - C113) |
Option Period Three
Contract: #N4008519R7704, Magazine & Inert Buildings Maintenance and Repair Option Period Three
| EXHIBIT LINE | LINE ITEM | UNIT OF | UNIT | EXTENDED | |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| D001 | Concrete work for removal (See Paragraph 2.4) | 1200 | SF | $ - 0 | |
| D002 | Sawcut opening (up to 12'x12') in wall. (See Pargraph 2.5) | 5 | EA | $ - 0 | |
| D003 | Concrete repair of spalling slab areas (See Paragraph 2.6) | 100 | SF | $ - 0 | |
| D004 | Concrete crack injection (See Paragraph 2.7) | 500 | LF | $ - 0 | |
| D005 | Patching of Concrete Wall Crack and Spalled Area (See Paragraph 2.8) | 35 | CF | $ - 0 | |
| D006 | Seal Concrete (See Paragraph 2.9) | 3600 | SF | $ - 0 | |
| D007 | Concrete wing wall and footer Hi-Ex Mag (See Parag. 2.10) | 120 | CYD | $ - 0 | |
| D008 | Concrete wing wall and footer S.P. Mag (See Parag. 2.11) | 420 | CYD | $ - 0 | |
| D009 | Concrete dock slab replacement (See Paragraph 2.12) | 160 | CYD | $ - 0 | |
| D010 | Concrete dock face wall replacement (See Paragraph 2.13) | 80 | CYD | $ - 0 | |
| D011 | Concrete Slab Replacement (For Extended Width Dock) (See Paragraph 2.14) | 200 | CY | $ - 0 | |
| D012 | Concrete Dock Face Wall (For Extended Width Dock)(See Paragraph 2.15) | 210 | CY | $ - 0 | |
| D013 | Concrete Footer incl. Excavation (For Extended Width Dock) (See Paragraph 2.16) | 90 | CY | $ - 0 | |
| D014 | Crushed Stone Backfill (For Extended Width Dock)(See Paragraph 2.17) | 630 | CY | $ - 0 | |
| D015 | Concrete Steps (See Paragraph 2.18) | 80 | CYD | $ - 0 | |
| D016 | Repair Parapet Wall (See Paragraph 2.19) | 20 | CY | $ - 0 | |
| D017 | Interior Concrete Slab Replacement(See Paragraph 2.20) | 20 | CY | $ - 0 | |
| D018 | Repair Partial Magazine Wall Section (See Parag. 2.21) | 20 | CY | $ - 0 | |
| D019 | Reposition Magazine Gravity Wall (See Parag. 2.22) | 2 | EA | $ - 0 | |
| D020 | Repair crack of smokeless powder magazine wingwall(See Paragraph 2.23) | 2 | EA | $ - 0 | |
| D021 | Infill with CMU's (to install personnel door)(See Paragraph 2.24) | 2 | EA | $ - 0 | |
| D022 | Infill with CMU's (to install double doors)(See Paragraph 2.25) | 2 | EA | $ - 0 | |
| D023 | Infill with CMU's (to replace glass block)(See Paragraph 2.26) | 8 | EA | $ - 0 | |
| D024 | Infill with CMU's (Minimum 12'-0" Wide X 12'-0" Tall Opening)(See Paragraph 2.27) | 324 | EA | $ - 0 | |
| D025 | Concrete Reinforcement bars and mesh (See Parag. 2.28) | 1000 | LB | $ - 0 | |
| D026 | Dock angle edge protection (See paragraph 2.29) | 120 | LF | $ - 0 | |
| D027 | Steel Door Replacement size 8' - 0 1/2" X 10' - 0" (Double) Type "H" with hinge protection (See Paragraph 2.30) | 6 | SET | $ - 0 | |
| D028 | Steel Door Replacement size 8' - 3" X 10' - 5 3/4" (Double)Type "J" with hinge protection (See Paragraph 2.31) | 12 | SET | $ - 0 | |
| D029 | Steel Door Replacement size 6' - 3" X 10' - 5 3/4" (Double)Type "G" (See Paragraph 2.32) | 4 | SET | $ - 0 | |
| D030 | Steel Door Replacement size 8' X 8' - 5" Double faceType (K) (See Paragraph 2.33) | 12 | SET | $ - 0 | |
| D031 | Steel Door Replacement size 10' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 4 | SET | $ - 0 | |
| D032 | Steel Door Replacement size 12' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 2 | SET | $ - 0 | |
| D033 | Steel Door Replacement size 14' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| D034 | Steel Door Replacement size 15' - 6" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| D035 | Install 10' X 10' roll-up door(See Paragraph 2.35) | 2 | EA | $ - 0 | |
| D036 | Install 12' X 12' roll-up door(See Paragraph 2.36) | 2 | EA | $ - 0 | |
| D037 | Install 3'-0" Personel Door with panic hardware(See Paragraph 2.37) | 2 | EA | $ - 0 | |
| D038 | Install 6'-0" Double Door with panic hardware(See Paragraph 2.38) | 2 | SET | $ - 0 | |
| D039 | Steel door paint two coats both sides (See Paragraph 2.39) | 50 | EA | $ - 0 | |
| D040 | Install Door Hook or Eye Bolt (See Paragraph. 2.40) | 100 | EA | $ - 0 | |
| D041 | Door flashing replacement (See Paragraph 2.41) | 200 | LF | $ - 0 | |
| D042 | Install Door Sweeps (Prior to Shop Fab.) (See Paragraph. 2.42) | 160 | LF | $ - 0 | |
| D043 | Install Door Sweeps (Post Shop Fab.) (See Paragraph. 2.43) | 160 | LF | $ - 0 | |
| D044 | Steel door hinge or repair (See Paragraph 2.44) | 40 | EA | $ - 0 | |
| D045 | Steel door lead paint removal (See Paragraph 2.45) | 50 | SF | $ - 0 | |
| D046 | Steel door Napec Hasp replacement (See Paragraph 2.46) | 24 | EA | $ - 0 | |
| D047 | Steel door operator repair (See Paragraph 2.47) | 32 | EA | $ - 0 | |
| D048 | Install operator (See Paragraph 2.48) | 20 | EA | $ - 0 | |
| D049 | Install Internal Locking Device on Doors (Prior to Shop Fab)(See Paragraph 2.49) | 2 | EA | $ - 0 | |
| D050 | Install Internal Locking Device on Doors (Post Shop Fab)(See Paragraph 2.50) | 2 | EA | $ - 0 | |
| (See Paragraph 2.50) | $ - 0 | ||||
| D051 | Install Drop Locking Bar on Doors (Prior to Shop Fab)(See Paragraph 2.51) | 4 | EA | $ - 0 | |
| D052 | Install Drop Locking Bar on Doors (Post Shop Fab)(See Paragraph 2.52) | 2 | EA | $ - 0 | |
| D053 | Install Cane Bolt on Upper Leaf of Door (Post Shop Fab)(See Paragraph 2.53) | 50 | EA | $ - 0 | |
| D054 | Repair Cane Bolt on Lower Leaf of Existing Door (See Paragraph 2.54) | 50 | EA | $ - 0 | |
| D055 | Replace Door Vent Screen (See Parag. 2.55) | 60 | SF | $ - 0 | |
| D056 | Door Insulation Panel Removal (See Paragraph 2.56) | 24 | EA | $ - 0 | |
| D057 | Install Hinge Protection On An Existing Set Of Magazine Doors(See Paragraph 2.57) | 10 | SET | $ - 0 | |
| D058 | Dead Light Removal (See Paragraph 2.58) | 16 | UNIT | $ - 0 | |
| D059 | Dead Light Removal (with asbestos contaminated caulk) (See Paragraph 2.59) | 16 | UNIT | $ - 0 | |
| D060 | Dead light replacement (See Paragraph 2.60) | 512 | SF | $ - 0 | |
| D061 | Dead light covering with 3/8" Lexan(See Paragraph 2.61) | 1440 | SF | $ - 0 | |
| D062 | Install High Steel Security Grating (See Paragraph 2.62) | 60 | EA | $ - 0 | |
| D063 | Install Handrail above steps (See Paragraph 2.63) | 40 | EA | $ - 0 | |
| D064 | Install Two-pipe Railing (See Paragraph 2.64) | 76 | LF | $ - 0 | |
| D065 | Install Dock Access Ladder (See Paragraph 2.65) | 2 | EA | $ - 0 | |
| D066 | Dome flashing replacement (See Paragraph 2.66) | 20 | EA | $ - 0 | |
| D067 | Vent dome replacement (See Paragraph 2.67) | 2 | EA | $ - 0 | |
| D068 | Waterproof Existing Roof Ventilator (See Paragraph 2.68) | 8 | EA | $ - 0 | |
| D069 | Ground dome flashing to grounding grid (See Paragraph 2.69) | 50 | LF | $ - 0 | |
| D070 | Ground doors/frames to grounding grid (See Paragraph 2.70) | 100 | LF | $ - 0 | |
| D071 | Ground rail to grounding grid (See Paragraph 2.71) | 50 | LF | $ - 0 | |
| D072 | Install Cover On Hi-Ex Magazine (See Paragraph 2.72) | 1 | EA | $ - 0 | |
| D073 | Install Cover On Smokeless Powder Magazine(See Paragraph 2.73) | 1 | EA | $ - 0 | |
| D074 | Waterproof Hi-Ex Magazine (See Paragraph 2.74) | 1 | EA | $ - 0 | |
| D075 | Waterproof Smokeless Powder Magazine(See Paragraph 2.75) | 1 | EA | $ - 0 | |
| D076 | Excavation (See Paragragh 2.76) | 2100 | CY | $ - 0 | |
| D077 | Fill / Backfill (See Paragragh 2.77) | 1800 | CY | $ - 0 | |
| D078 | Relocate/Reinstall Alarm Systems Pedestal(See Paragraph 2.78) | 2 | EA | $ - 0 | |
| D079 | Install Silt Fence (See Paragraph 2.79) | 400 | LF | $ - 0 | |
| D080 | Straw bales for erosion control (See Paragraph 2.80) | 50 | EA | $ - 0 | |
| D081 | Mulch (See Paragraph 2.81) | 150 | MSF | $ - 0 | |
| D082 | Straw Blanket Mulch (See Paragraph 2.82) | 50 | MSF | $ - 0 | |
| D083 | Seeding (See Paragraph 2.83) | 50 | MSF | $ - 0 | |
| D084 | Hydroseeding; Mulch, Seed, and Fertilize (See Paragraph 2.84) | 2000 | SYD | $ - 0 | |
| D085 | Construction of temporary road to buildings that are rail accessible only(See Paragraph 2.85) | 50 | CY | $ - 0 | |
| D086 | Stone Fill #2 (See Paragraph 2.86) | 200 | CY | $ - 0 | |
| D087 | Stone Paving #53 (See Paragraph 2.87) | 400 | CY | $ - 0 | |
| D088 | Crushed Stone (See Paragragh 2.88) | 100 | CY | $ - 0 | |
| D089 | Rip Rap Ends (See Paragragh 2.89) | 20 | CY | $ - 0 | |
| D090 | Install Geogrid Fabric (See Paragraph 2.90) | 600 | SYD | $ - 0 | |
| D091 | Install 6" Pipe Bollards Concrete Filled (See Paragraph 2.91) | 12 | EA | $ - 0 | |
| D092 | Removal of dock bumper blocks (See Paragraph 2.92) | 6 | EA | $ - 0 | |
| D093 | Installation of dock bumper blocks (See Paragraph 2.93) | 18 | EA | $ - 0 | |
| D094 | Reanchor Building Sign (See Paragraph 2.94) | 10 | EA | $ - 0 | |
| D095 | Install Drain Cover (See Paragraph 2.95) | 2 | EA | $ - 0 | |
| D096 | Storm Drain 12" Corrogated Pipe (See Paragraph 2.96) | 60 | LF | $ - 0 | |
| D097 | Storm Drain 18" Corrogated Pipe (See Paragraph 2.97) | 45 | LF | $ - 0 | |
| D098 | Concrete Storm Inlet (See Paragraph 2.98) | 2 | EA | $ - 0 | |
| D099 | Adjust Existing Casting (See Paragraph 2.99) | 2 | EA | $ - 0 | |
| D100 | Furnish New Casting (See Paragraph 2.100) | 2 | EA | $ - 0 | |
| D101 | Downspout Trunk Line for Dock (See Paragraph 2.101) | 180 | LF | $ - 0 | |
| D102 | Downspout Trunk Line for Extended Width Dock(See Paragraph 2.102) | 180 | LF | $ - 0 | |
| D103 | Remove Railroad Tracks (See Paragraph 2.103) | 440 | LF | $ - 0 | |
| D104 | Remove & Relocate Railroad Stop Blocks (See Paragraph 2.104) | 1 | EA | $ - 0 | |
| D105 | Crosstie Wheel Stops (See Paragraph 2.105) | 1 | EA | $ - 0 | |
| D106 | Paint Loading Dock Edge (4") (Two Coats)(See Paragraph 2.106) | 120 | LF | $ - 0 | |
| D107 | Restencil Inside Hi-Ex Magazine (See Paragraph. 2.107) | 1 | EA | $ - 0 | |
| D108 | Prep/Paint Concrete/Steel/Wood(See Paragraph. 2.108) | 500 | SF | $ - 0 | |
| D109 | Prep/Paint/Screen Gable Vent/Louver On Inert Bldg/AGM(See Paragraph. 2.109) | 4 | EA | $ - 0 | |
| D110 | Notice of Intent Line Item (See Paragraph 2.110) | 1 | LS | $ - 0 | |
| D111 | Labor for Installation of Material in Conjunction with Magazine/Building Repairs(See Paragraph 2.111) | 240 | LH | $ - 0 | |
| D112 | Material and Equipment in Conjunction with Magazine/Building repairs (See Paragraph 2.112) | 5,000 | LS | % | ERROR:#VALUE! |
| % Mark-up on material invoice cost | |||||
| For proposal purposes only, assume the value of the material is $5,000.00 | |||||
| To calculate the amount for ELIN D112 multiply $5,000.00 by the percent mark-up + 100% | |||||
| For example if the percent mark up is 10% then $5,000.00 x 1.10 = $5,055.00 which is entered in ELIN D112 | |||||
| D113 | Bond Cost for Payment and Performance Bonds(See Paragraph 2.113) | ERROR:#VALUE! | LS | % | ERROR:#VALUE! |
| % | Bond Premium | ||||
| To calculate the amount for ELIN 113 multiple the subtotal of ELINS 001 through 112 by the bond premium | |||||
| Bonding Requirement: | |||||
| < $35,000.00 - bonding not required | |||||
| $35,000.00 - $150,000 = Payment Bond | |||||
| $150,000 > = Performance & Payment Bond | |||||
| ESTIMATED TOTAL PRICE: | ERROR:#VALUE! | ||||
| Option Period Three | |||||
| (Line Items D001 - D113) |
Option Period Four
Contract: #N4008519R7704, Magazine & Inert Buildings Maintenance and Repair Option Period Four
| EXHIBIT LINE | LINE ITEM | UNIT OF | UNIT | EXTENDED | |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| E001 | Concrete work for removal (See Paragraph 2.4) | 1200 | SF | $ - 0 | |
| E002 | Sawcut opening (up to 12'x12') in wall. (See Pargraph 2.5) | 5 | EA | $ - 0 | |
| E003 | Concrete repair of spalling slab areas (See Paragraph 2.6) | 100 | SF | $ - 0 | |
| E004 | Concrete crack injection (See Paragraph 2.7) | 500 | LF | $ - 0 | |
| E005 | Patching of Concrete Wall Crack and Spalled Area (See Paragraph 2.8) | 35 | CF | $ - 0 | |
| E006 | Seal Concrete (See Paragraph 2.9) | 3600 | SF | $ - 0 | |
| E007 | Concrete wing wall and footer Hi-Ex Mag (See Parag. 2.10) | 120 | CYD | $ - 0 | |
| E008 | Concrete wing wall and footer S.P. Mag (See Parag. 2.11) | 420 | CYD | $ - 0 | |
| E009 | Concrete dock slab replacement (See Paragraph 2.12) | 160 | CYD | $ - 0 | |
| E010 | Concrete dock face wall replacement (See Paragraph 2.13) | 80 | CYD | $ - 0 | |
| E011 | Concrete Slab Replacement (For Extended Width Dock) (See Paragraph 2.14) | 200 | CY | $ - 0 | |
| E012 | Concrete Dock Face Wall (For Extended Width Dock)(See Paragraph 2.15) | 210 | CY | $ - 0 | |
| E013 | Concrete Footer incl. Excavation (For Extended Width Dock) (See Paragraph 2.16) | 90 | CY | $ - 0 | |
| E014 | Crushed Stone Backfill (For Extended Width Dock)(See Paragraph 2.17) | 630 | CY | $ - 0 | |
| E015 | Concrete Steps (See Paragraph 2.18) | 80 | CYD | $ - 0 | |
| E016 | Repair Parapet Wall (See Paragraph 2.19) | 20 | CY | $ - 0 | |
| E017 | Interior Concrete Slab Replacement(See Paragraph 2.20) | 20 | CY | $ - 0 | |
| E018 | Repair Partial Magazine Wall Section (See Parag. 2.21) | 20 | CY | $ - 0 | |
| E019 | Reposition Magazine Gravity Wall (See Parag. 2.22) | 2 | EA | $ - 0 | |
| E020 | Repair crack of smokeless powder magazine wingwall(See Paragraph 2.23) | 2 | EA | $ - 0 | |
| E021 | Infill with CMU's (to install personnel door)(See Paragraph 2.24) | 2 | EA | $ - 0 | |
| E022 | Infill with CMU's (to install double doors)(See Paragraph 2.25) | 2 | EA | $ - 0 | |
| E023 | Infill with CMU's (to replace glass block)(See Paragraph 2.26) | 8 | EA | $ - 0 | |
| E024 | Infill with CMU's (Minimum 12'-0" Wide X 12'-0" Tall Opening)(See Paragraph 2.27) | 324 | EA | $ - 0 | |
| E025 | Concrete Reinforcement bars and mesh (See Parag. 2.28) | 1000 | LB | $ - 0 | |
| E026 | Dock angle edge protection (See paragraph 2.29) | 120 | LF | $ - 0 | |
| E027 | Steel Door Replacement size 8' - 0 1/2" X 10' - 0" (Double) Type "H" with hinge protection (See Paragraph 2.30) | 6 | SET | $ - 0 | |
| E028 | Steel Door Replacement size 8' - 3" X 10' - 5 3/4" (Double)Type "J" with hinge protection (See Paragraph 2.31) | 12 | SET | $ - 0 | |
| E029 | Steel Door Replacement size 6' - 3" X 10' - 5 3/4" (Double)Type "G" (See Paragraph 2.32) | 4 | SET | $ - 0 | |
| E030 | Steel Door Replacement size 8' X 8' - 5" Double faceType (K) (See Paragraph 2.33) | 12 | SET | $ - 0 | |
| E031 | Steel Door Replacement size 10' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 4 | SET | $ - 0 | |
| E032 | Steel Door Replacement size 12' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 2 | SET | $ - 0 | |
| E033 | Steel Door Replacement size 14' - 0" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| E034 | Steel Door Replacement size 15' - 6" Wide X 10' - 6" Tall (Double)(See Paragraph 2.34) | 1 | SET | $ - 0 | |
| E035 | Install 10' X 10' roll-up door(See Paragraph 2.35) | 2 | EA | $ - 0 | |
| E036 | Install 12' X 12' roll-up door(See Paragraph 2.36) | 2 | EA | $ - 0 | |
| E037 | Install 3'-0" Personel Door with panic hardware(See Paragraph 2.37) | 2 | EA | $ - 0 | |
| E038 | Install 6'-0" Double Door with panic hardware(See Paragraph 2.38) | 2 | SET | $ - 0 | |
| E039 | Steel door paint two coats both sides (See Paragraph 2.39) | 50 | EA | $ - 0 | |
| E040 | Install Door Hook or Eye Bolt (See Paragraph. 2.40) | 100 | EA | $ - 0 | |
| E041 | Door flashing replacement (See Paragraph 2.41) | 200 | LF | $ - 0 | |
| E042 | Install Door Sweeps (Prior to Shop Fab.) (See Paragraph. 2.42) | 160 | LF | $ - 0 | |
| E043 | Install Door Sweeps (Post Shop Fab.) (See Paragraph. 2.43) | 160 | LF | $ - 0 | |
| E044 | Steel door hinge or repair (See Paragraph 2.44) | 40 | EA | $ - 0 | |
| E045 | Steel door lead paint removal (See Paragraph 2.45) | 50 | SF | $ - 0 | |
| E046 | Steel door Napec Hasp replacement (See Paragraph 2.46) | 24 | EA | $ - 0 | |
| E047 | Steel door operator repair (See Paragraph 2.47) | 32 | EA | $ - 0 | |
| E048 | Install operator (See Paragraph 2.48) | 20 | EA | $ - 0 | |
| E049 | Install Internal Locking Device on Doors (Prior to Shop Fab)(See Paragraph 2.49) | 2 | EA | $ - 0 | |
| E050 | Install Internal Locking Device on Doors (Post Shop Fab)(See Paragraph 2.50) | 2 | EA | $ - 0 | |
| (See Paragraph 2.50) | $ - 0 | ||||
| E051 | Install Drop Locking Bar on Doors (Prior to Shop Fab)(See Paragraph 2.51) | 4 | EA | $ - 0 | |
| E052 | Install Drop Locking Bar on Doors (Post Shop Fab)(See Paragraph 2.52) | 2 | EA | $ - 0 | |
| E053 | Install Cane Bolt on Upper Leaf of Door (Post Shop Fab)(See Paragraph 2.53) | 50 | EA | $ - 0 | |
| E054 | Repair Cane Bolt on Lower Leaf of Existing Door (See Paragraph 2.54) | 50 | EA | $ - 0 | |
| E055 | Replace Door Vent Screen (See Parag. 2.55) | 60 | SF | $ - 0 | |
| E056 | Door Insulation Panel Removal (See Paragraph 2.56) | 24 | EA | $ - 0 | |
| E057 | Install Hinge Protection On An Existing Set Of Magazine Doors(See Paragraph 2.57) | 10 | SET | $ - 0 | |
| E058 | Dead Light Removal (See Paragraph 2.58) | 16 | UNIT | $ - 0 | |
| E059 | Dead Light Removal (with asbestos contaminated caulk) (See Paragraph 2.59) | 16 | UNIT | $ - 0 | |
| E060 | Dead light replacement (See Paragraph 2.60) | 512 | SF | $ - 0 | |
| E061 | Dead light covering with 3/8" Lexan(See Paragraph 2.61) | 1440 | SF | $ - 0 | |
| E062 | Install High Steel Security Grating (See Paragraph 2.62) | 60 | EA | $ - 0 | |
| E063 | Install Handrail above steps (See Paragraph 2.63) | 40 | EA | $ - 0 | |
| E064 | Install Two-pipe Railing (See Paragraph 2.64) | 76 | LF | $ - 0 | |
| E065 | Install Dock Access Ladder (See Paragraph 2.65) | 2 | EA | $ - 0 | |
| E066 | Dome flashing replacement (See Paragraph 2.66) | 20 | EA | $ - 0 | |
| E067 | Vent dome replacement (See Paragraph 2.67) | 2 | EA | $ - 0 | |
| E068 | Waterproof Existing Roof Ventilator (See Paragraph 2.68) | 8 | EA | $ - 0 | |
| E069 | Ground dome flashing to grounding grid (See Paragraph 2.69) | 50 | LF | $ - 0 | |
| E070 | Ground doors/frames to grounding grid (See Paragraph 2.70) | 100 | LF | $ - 0 | |
| E071 | Ground rail to grounding grid (See Paragraph 2.71) | 50 | LF | $ - 0 | |
| E072 | Install Cover On Hi-Ex Magazine (See Paragraph 2.72) | 1 | EA | $ - 0 | |
| E073 | Install Cover On Smokeless Powder Magazine(See Paragraph 2.73) | 1 | EA | $ - 0 | |
| E074 | Waterproof Hi-Ex Magazine (See Paragraph 2.74) | 1 | EA | $ - 0 | |
| E075 | Waterproof Smokeless Powder Magazine(See Paragraph 2.75) | 1 | EA | $ - 0 | |
| E076 | Excavation (See Paragragh 2.76) | 2100 | CY | $ - 0 | |
| E077 | Fill / Backfill (See Paragragh 2.77) | 1800 | CY | $ - 0 | |
| E078 | Relocate/Reinstall Alarm Systems Pedestal(See Paragraph 2.78) | 2 | EA | $ - 0 | |
| E079 | Install Silt Fence (See Paragraph 2.79) | 400 | LF | $ - 0 | |
| E080 | Straw bales for erosion control (See Paragraph 2.80) | 50 | EA | $ - 0 | |
| E081 | Mulch (See Paragraph 2.81) | 150 | MSF | $ - 0 | |
| E082 | Straw Blanket Mulch (See Paragraph 2.82) | 50 | MSF | $ - 0 | |
| E083 | Seeding (See Paragraph 2.83) | 50 | MSF | $ - 0 | |
| E084 | Hydroseeding; Mulch, Seed, and Fertilize (See Paragraph 2.84) | 2000 | SYD | $ - 0 | |
| E085 | Construction of temporary road to buildings that are rail accessible only(See Paragraph 2.85) | 50 | CY | $ - 0 | |
| E086 | Stone Fill #2 (See Paragraph 2.86) | 200 | CY | $ - 0 | |
| E087 | Stone Paving #53 (See Paragraph 2.87) | 400 | CY | $ - 0 | |
| E088 | Crushed Stone (See Paragragh 2.88) | 100 | CY | $ - 0 | |
| E089 | Rip Rap Ends (See Paragragh 2.89) | 20 | CY | $ - 0 | |
| E090 | Install Geogrid Fabric (See Paragraph 2.90) | 600 | SYD | $ - 0 | |
| E091 | Install 6" Pipe Bollards Concrete Filled (See Paragraph 2.91) | 12 | EA | $ - 0 | |
| E092 | Removal of dock bumper blocks (See Paragraph 2.92) | 6 | EA | $ - 0 | |
| E093 | Installation of dock bumper blocks (See Paragraph 2.93) | 18 | EA | $ - 0 | |
| E094 | Reanchor Building Sign (See Paragraph 2.94) | 10 | EA | $ - 0 | |
| E095 | Install Drain Cover (See Paragraph 2.95) | 2 | EA | $ - 0 | |
| E096 | Storm Drain 12" Corrogated Pipe (See Paragraph 2.96) | 60 | LF | $ - 0 | |
| E097 | Storm Drain 18" Corrogated Pipe (See Paragraph 2.97) | 45 | LF | $ - 0 | |
| E098 | Concrete Storm Inlet (See Paragraph 2.98) | 2 | EA | $ - 0 | |
| E099 | Adjust Existing Casting (See Paragraph 2.99) | 2 | EA | $ - 0 | |
| E100 | Furnish New Casting (See Paragraph 2.100) | 2 | EA | $ - 0 | |
| E101 | Downspout Trunk Line for Dock (See Paragraph 2.101) | 180 | LF | $ - 0 | |
| E102 | Downspout Trunk Line for Extended Width Dock(See Paragraph 2.102) | 180 | LF | $ - 0 | |
| E103 | Remove Railroad Tracks (See Paragraph 2.103) | 440 | LF | $ - 0 | |
| E104 | Remove & Relocate Railroad Stop Blocks (See Paragraph 2.104) | 1 | EA | $ - 0 | |
| E105 | Crosstie Wheel Stops (See Paragraph 2.105) | 1 | EA | $ - 0 | |
| E106 | Paint Loading Dock Edge (4") (Two Coats)(See Paragraph 2.106) | 120 | LF | $ - 0 | |
| E107 | Restencil Inside Hi-Ex Magazine (See Paragraph. 2.107) | 1 | EA | $ - 0 | |
| E108 | Prep/Paint Concrete/Steel/Wood(See Paragraph. 2.108) | 500 | SF | $ - 0 | |
| E109 | Prep/Paint/Screen Gable Vent/Louver On Inert Bldg/AGM(See Paragraph. 2.109) | 4 | EA | $ - 0 | |
| E110 | Notice of Intent Line Item (See Paragraph 2.110) | 1 | LS | $ - 0 | |
| E111 | Labor for Installation of Material in Conjunction with Magazine/Building Repairs(See Paragraph 2.111) | 240 | LH | $ - 0 | |
| E112 | Material and Equipment in Conjunction with Magazine/Building repairs (See Paragraph 2.112) | 5,000 | LS | % | ERROR:#VALUE! |
| % Mark-up on material invoice cost | |||||
| For proposal purposes only, assume the value of the material is $5,000.00 | |||||
| To calculate the amount for ELIN E112 multiply $5,000.00 by the percent mark-up + 100% | |||||
| For example if the percent mark up is 10% then $5,000.00 x 1.10 = $5,055.00 which is entered in ELIN E112 | |||||
| E113 | Bond Cost for Payment and Performance Bonds(See Paragraph 2.113) | ERROR:#VALUE! | LS | % | ERROR:#VALUE! |
| % | Bond Premium | ||||
| To calculate the amount for ELIN 113 multiple the subtotal of ELINS 001 through 112 by the bond premium | |||||
| Bonding Requirement: | |||||
| < $35,000.00 - bonding not required | |||||
| $35,000.00 - $150,000 = Payment Bond | |||||
| $150,000 > = Performance & Payment Bond | |||||
| ESTIMATED TOTAL PRICE: | ERROR:#VALUE! | ||||
| Option Period Four | |||||
| (Line Items E001 - E113) |