DESIGN-BUILD RM09-2414 RENOVATION OF FLEET TRAINING BUILDING N25A AT NAVAL STATION NORFOLK, VA.
Solicitation number
N4008517R0355
Issued by

About this file

N40085-17-R-0355-0007.pdf

View the file

Other files

File Type Posted
N40085-17-R-0355-0009.pdf PDF
N40085-17-R-0355-0008.pdf PDF
N40085-17-R-0355-0006.pdf PDF
Revised_Attachment_C_-_Price_Proposal_Form_revised_for_Amd_6.pdf PDF
UFGS_25_50_00.00_20.pdf PDF
6_ESR_E20.pdf PDF
N40085-17-R-0355-0005.pdf PDF
N40085-17-R-0355-0004.pdf PDF
Site_Visit_Log_NSN_Bldg_N25A.pdf PDF
N40085-17-R-0355-0003.pdf PDF
N40085-17-R-0355-0002.pdf PDF
Attachment_C_-_Construction_and_Design_Exp._Project_Data_Sheet.docx DOCX document
N40085-17-R-0355.pdf PDF
Attachment_B_-_One_Day_Visitor_Pass.xls XLS spreadsheet
Attachment_A_-_PPI_form.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RM09-2414

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project #RM09-2414 Design-Build Renovation of Fleet Training Building #N25A at Naval Station Norfolk, Va.

*** Phase II Proposal due date is extended to Wednesday, February 21, 2018 at 2pm local time.***

The purpose of this amendment is as follow s:

(1) provide PPI response (see the follow ing page)

All amendments must be acknow ledged on the SF1442.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R0355

X 9B. DATED (SEE ITEM 11)

23-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Feb-2018

CODE

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008517R0355

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #7

There are no further pending PPIs as of the date of this amendment. Liquidated damages associated with the phasing schedule described below will be identified in a future amendment.

PPI# Reference Inquiry Response Page/Dwg Section Para

217 Page 2 01 32 17.05 20 1.3 Please verify the following info provided in Amendment 005 “Construction is not permitted to start prior to October 31, 2019.” There are 915 days in the contract. Bid date is 2/13/18.

Construction start date will be around 1 year and 9 months after bid. Depending on award date, that may leave less than 1 year to build all 3 phases of construction including government transition (30 +120days) between phases. After deducting the 4 months required for government move in between phases, that would potentially leave less than 8 months to construct the 3 phases. This does not appear to be adequate time to build the facility. If the construction start date is October 31 2019 please consider adding time to the construction contract.

See Amendment 7

AMENDMENT 7 CONTINUATION SHEET

PPI #217:

Specification Section 01 14 00.05 20 Work Restrictions for Design-Build Delete paragraph 1.4 Special Scheduling Requirements sub-paragraph (a) in its entirety and replace it with the following

1.4 SPECIAL SCHEDULING REQUIREMENTS

“a. Construction is not permitted to start prior to October 31, 2019. Phasing is listed in order of construction execution, except for the elevator which can begin October 31, 2019:

Phase 2A:

Phases 2B and 2C, shall remain in operation, including all engineering systems, while minor demolition and minor construction of the Phase 2A is executed. The contractor shall allow a 30 calendar day de‐mobilization interval between the completion of Phase 2A and the start of Phase 2B.

Phase 2B:

Phases 2A and 2C shall remain in operation, including all engineering systems, while demolition and construction of the Phase 2B is executed. The contractor shall allow a 120 calendar day de‐mobilization interval between the completion of Phase 2B and the start of Phase 2C.

Phase 2C:

N4008517R0355

Phases 2A and 2B shall remain in operation, including all engineering systems, while demolition and construction of the Phase 2C is executed.

Conduct operations so as to cause the least possible interference with normal operations of the activity in each Phase in the occupied portion of the building.”

The contractor is required to have a Government-approved design prior to starting construction work on October 31, 2019.

The construction completion duration will be phased as follows:

Phase A - 120 days starting October 31 2019 Phase B – 240 days starting once Gov’t transition between phases is complete Phase C - 240 days starting once Gov’t transition between phases is complete

(End of Summary of Changes)