N40085-17-R-0355-0005.pdf
PDF 163 KB Posted
- Attached to
- DESIGN-BUILD RM09-2414 RENOVATION OF FLEET TRAINING BUILDING N25A AT NAVAL STATION NORFOLK, VA.
- Solicitation number
- N4008517R0355
About this file
N40085-17-R-0355-0005.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40085-17-R-0355-0009.pdf | ||
| N40085-17-R-0355-0008.pdf | ||
| N40085-17-R-0355-0007.pdf | ||
| N40085-17-R-0355-0006.pdf | ||
| Revised_Attachment_C_-_Price_Proposal_Form_revised_for_Amd_6.pdf | ||
| UFGS_25_50_00.00_20.pdf | ||
| 6_ESR_E20.pdf | ||
| N40085-17-R-0355-0004.pdf | ||
| Site_Visit_Log_NSN_Bldg_N25A.pdf | ||
| N40085-17-R-0355-0003.pdf | ||
| N40085-17-R-0355-0002.pdf | ||
| Attachment_C_-_Construction_and_Design_Exp._Project_Data_Sheet.docx | DOCX document | |
| N40085-17-R-0355.pdf | ||
| Attachment_B_-_One_Day_Visitor_Pass.xls | XLS spreadsheet | |
| Attachment_A_-_PPI_form.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RM09-2414
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project #RM09-2414 Design-Build Renovation of Fleet Training Building #N25A at Naval Station Norfolk, Va.
*** Phase II Proposal due date is extended to Thursday, February 8, 2018 at 2pm local time.***
The purpose of this amendment is as follow s:
(1) provide PPI responses (see the follow ing pages)
(2) provide tw o additional PDF spec documents entitled "6_ESR_E20" and "UFGS 25 50 00.00 20"
All amendments must be acknow ledged on the SF1442.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R0355
X 9B. DATED (SEE ITEM 11)
23-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2018
CODE
NAVFAC MID ATLANTIC
HAMPTON ROADS IPT
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008517R0355
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT #5
Inquiries are numbered in the order they were received. Numbers missing from the sequence do not yet have a Government response and shall appear in a future amendment. No inquiry number will be repeated regardless of the amendment it appears in.
PPI# Reference Inquiry Response
Page/Dwg Section Para
4 Room 2B-N-1- 005 Lobby
Part 3 Para. 5.0 Please clarify the thickness of the solid surface under Uniformat Section C3010.
Bid per RFP
6 46 of 46 Phase 1 RFP - Section 00800 There are no provisions or clauses in Section 00800. Please confirm there are no Special Contract Requirements.
Bid per RFP
7 ESR C10 C1010
Partitions
Per ESR C10 Interior Construction - C1010 Partitions, Phase 2B new partitions shall be concrete masonry. This section also states that the existing partitions are generally 6” CMU.
The majority of work in this phase consists of patch and infill. The Phase 2B Room Requirements state that a STC rating of 55 is required for several rooms. The highest STC rating possible with a fully grouted 6” CMU is between 51-
53. Mechanical rooms 2B-N-1-001 & 2B-N-2-001 as well as Corridor 2B-N-2-018 all have a required STC 55 rating but do not show any new work. The other rooms with this requirement are only requiring infill at door openings. If a STC 55 rating is required in these rooms, additional wall construction will be required over what is stated in the RFP.
Please confirm that an STC 55 rating is required for the following rooms: 2B-N-1-001, 2B-N-1-002, 2B-N-2-001, 2B-N-2-002, 2B-N-2-019 and 2B-N-2-018. If so, please confirm if it is acceptable to furr out the CMU wall by installing gypsum board over metal studs with sound batt insulation to achieve the required STC rating. The additional construction will be added to the room interior thereby reducing the room square footage.
Bid per RFP
8 Where will the contractor staging area be located? See Amendment
9 Where will the contractor parking be located? See
10 1 Part 3, Chapter 1 1 At the end of the first paragraph it indicates to contact
Simone Christian RA, for additional information regarding Phase I construction document availability. Can the Phase 1 documents be issued to all bidder as an Amendment to the
RFP.
Bid per RFP
11 6 Part 4 C30 C301003 1.9.1 Standard paragraph requiring Level 5 finish for all areas unless indicated otherwise. Please review and reconsider, Level 4 is the Industry Standard, Level 5 is a premium finish at a additional cost.
Bid per RFP
12 1 Part 3 - Ch 6 / D20
D201001 There is a reference to electronic flush control for water closets; however, urinals state manual. Typically, projects use the same type of flush for urinals and water closets.
Please confirm electronic flush for water closets is correct.
See Amendment
13 1 Part 3 - Ch 6 / D20
D201001 There is a reference to electronic flush control for water closets. Should the electronic be hard-wired or battery?
See Amendment
14 1 Part 3 - Ch 6
/ D20 D201002 There is a reference to manual flush control for urinals;
however, water closets state electronic. Typically, projects use the same type of flush for urinals and water closets.
Please confirm manual for urinals is correct.
See Amendment
15 2 Part 3 - Ch 6 / D20
D201003 The lavatories are called to be countertop. Is any type acceptable? Integral, top mount, or bottom mount? Also, should the supplies be manual, battery operated electronic, or hard wired electronic?
See Amendment
16 2 Part 3 - Ch 6 / D20
D202003 This section states to provide High Efficiency Gas for domestic hot water and states to provide steam heat exchanger for domestic hot water. Is this for redundancy?
See Amendment
17 2 Part 3 - Ch 6 / D20
D202003 There is a reference to providing a steam heat exchanger for domestic hot water. We understand that NSN has had multiple projects for steam decentralization. Please confirm that steam is an option for this project. If steam is acceptable, can the connection point be in the mechanical room or does it have to go back to the main at the street?
See Amendment
18 2 Part 3 - Ch 6 / D20
D202003 This section does not require separate systems for domestic hot water generation; however, the mechanical system is specified to have separate systems. Is the intent to have separate systems for each phase?
See Amendment
19 4 Part 3 - Ch 6 / D20
D209005 Section requires air compressor and accessories with drops for pneumatic tools/air guns. For appropriate sizing, can you provide quantity of drops and locations? Or spaces that need drops with maximum separation distances? Also, can you provide a list and quantity of tools with usage rate or diversity?
See Amendment
20 3 Part 3 - Ch 6 / D30
6 Section states that "All equipment … of at least 3000 hours."
Please confirm that this should be "All exterior equipment…" as 3000 hour rating is not typical for the fan coil units, water source heat pumps, etc.
See Amendment
21 3 Part 3 - Ch 6 / D30
7 Section speaks to outdoor coils having manufacturer's coating but does not give a specific rating hours. Should this be 3000 hours as well?
Bid per RFP
22 5 Part 3 - Ch 6 / D30
D302004 There is a reference to providing a steam heat exchanger for heating water. We understand that NSN has had multiple projects for steam decentralization. Please confirm that steam is an option for this project. If steam is acceptable, can the connection point be in the mechanical room or does it have to go back to the main at the street?
See Amendment
23 7 Part 3 - Ch 6 / D30
D304006 There is not a requirement for 100% redundant pumping if chilled water is used similar to the condenser water or hot water sections. Please confirm if 100% redundancy would be need and to what extent based on type such as noted below:
> Variable Primary = 100% redundancy (2 pumps) > Primary = 0% redundancy per chiller (1 per chiller for 2 at 60%) > Secondary = 100% redundancy (2 pumps)
See Amendment
24 7 Part 3 - Ch 6 / D30
D304090 There is a reference to underground piping between R62 and R63. Please confirm that this does not affect our project.
See Amendment
25 8 Part 3 - Ch 6
/ D30 D304090 Please confirm that the condenser water piping shall be insulated as condenser water piping is not required to be insulated per ASHRAE. If required to be insulated, please provide a thickness chart as it is not typically clearly noted in the UFGS.
See Amendment
26 Part 6-3 Architectural Drawings
Please provide native CADD files for Drawings CD101, SP101, and A-100 through AD601 for use in preparing our pricing documents.
See Amendment
27 2 Part 3, Chapeter 2
2.3.6 ATFP Criteria: The bidding standoff distances are clearly stated and understood. However, after award what will be the criteria for defining the moving vehicles as "potential location for an explosion" the will pass within the stated standoff distances on Farragut Ave., Gilbert Street and Pochantas Street? Is it the Government's intent to reinforce the existing walls to withstand potienal threats from moving traffic passing Building 25 and 25A?
Bid per RFP
28 Part 1 - 01 33
29.05 20
Section 1.4.4 Leed Silver is required in this section. Are the use of pervious pavements allowed for walkways, etc.
Bid per RFP
29 Please consider extending the proposal due date 2 weeks to February 8, 2018. Since the Phase 2 documents were released just before the Christmas and New Year holidays, we are having trouble getting subcontractors involved. The extension would alllow us to obtain competitive pricing in the local market. Thank you for considering the extension.
See Amendment
30 Part 3, Chapter 6
Section D101002
Part 3 – Chapter 6, Section D101002 Passenger Elevators requires that the elevator comply with the IBC medical stretcher requirement. IBC 2015 Section 3002.4 only requires that an elevator accommodate an ambulance stretcher when a building is four or more stories above or below grade plane. Therefore, it would not be required on this project. Please advise if it the elevator should be sized to fit a stretcher even though code does not require it.
See
31 Part 3, Chapter 6
Section D101002
Please provide the size (unassembled dimensions & weight) of the largest movable equipment or furniture to be used on the project as the elevator is to be sized to accommodate the furniture.
Bid per RFP
32 1 Part 3- Chapter 6 /
ESR B20
B2010 Exterior Walls
Paragraph indicates new replacement windows to match similar elements on Building N-19. Please provide photos of Building N-19.
Bid per RFP
33 1 Part 3- Chapter 6 /
ESR B20
B201001 Exterior Closure
Assemble No. 2C-2 for window infil is indicating EIFS over metal studs and Gypsum bloard. UFC 04-010-10 indicates that the standoff distance for this assembly is a non-load bearing wall, within a controlled perimeter is 167 feet. This exceeds the 100 foot Standoff distance allowed for bidding purposes in paragraph .2.3.6 of Part 3, Chapter 2 stated earlier. Please clairify if this assembly will meet the stipulated ATFP cirteria.
Bid per RFP
34 1 Part 3- Chapter 6 /
ESR B20
B2010 Exterior Walls
Note that this paragraph conflicts with paragraph B202001, which existing window profile should be matched, Building N-19 or the existing building?
Bid per RFP
35 1 Part 3- Chapter 6 /
ESR C10
C102001 Standard
Interior Doors
This paragraph requires the door STC rating to match the wall STC rating in which they occur. Other paragraphes indicate the wall STC rating of 42 is required, therefore the acoustical rated doors with Sound Seal’s Head and Jamb and Acoustic Threshold will need to meet STC 42. Please note to achieve a “tested” STC rating above 32-35, the opening will require a preassembled acoustically tested and rated door. These doors are considerably more expensive that a standard acoustical door with sound seals, head, jamb and threshold. Please confirm that acoustical tested and rated doors are not required for these openings. What is being required is the use of a “Sound Door with applied acoustical Sound seals". Please confirm that if a properly installed door using these materials should be field tested and fails to meet the designated STC levels of 42, that all contractual requirements have been meet.
Bid per RFP
36 Part 3, Section B10
2.3.6 This paragraph provides stand-off distances for bidding.
“Due to the difficulty of strengthening the existing structures, a minimum standoff distance should be selected so that strengthening will not be required. For bidding purposes, the minimum standoff distances for Phase 2B and Phase 2C are 140 feet and 100 feet, respectively.” Should we assume those same standoff distances “140 feet and 100 feet”, respectively could be used for design of window and wall jambs?
Bid per RFP
37 1 Part 3 - Ch 6 / D30
D30 During the site visit, it was noted that additional time is not anticipated. For this type of facility, there is a lot of coordination required to determine accurate HVAC Loads.
For competative bid purposes, can the required loads for the building be provided? Without any additional information, the HVAC loads will be based on capacities of the existing equipment on-site.
38 3 Part 3-Ch 6/G40
G4030 The RFP states that security, telecommunications and fiber otic cabling to the building is existing to remain. The current entrance point for the conductors is room 2B-D-1- 046 (closet) and will become part of 2B-N-1-040 (Urinalysis) in the new plan. Can the closet remain and be used to extend the OSP cables to the new Communications room?
Bid per RFP
39 Part 6 Drawings The only dedicated electrical room is located on the first floor and will be used for the electrical service. Can the floor plan be modified to provide additional electrical rooms on the first floor or will we be allowed to install 208Y/120v panelboards in the corridors to serve receptacles for non-lab areas?
Bid per RFP
40 Part 6 Drawings The new construction drawings for the second floor do not have any dedicated electrical rooms. Can the floor plan be modified to provide electrical rooms on the second floor or will we be allowed to intall panelboards in the corridors to serve receptacles for non-lab areas?
Bid per RFP
41 Part 6 Lab Equipment
In the Lab equipment list there are multiple requirements for 440V. Can the equipment be connected to 480V or will specility transformers be required.
Bid per RFP
42 Part 6 Lab Equipment
In the Lab equipment list there are multiple requirements for 400HZ. Will the government be providing the 400HZ generators? What size are the generators?
Bid per RFP
43 UFC 3-201-
Please advise if is acceptable for the contractor to use a licensed landscape architect if they are licensed outside the state of Virginia.
See Amendment
44 Part 3 Finish Schedule and
Room Requirements
Where there are discrepancies between the finish schedule provided on Sheet AE601 in Part 3 and the finishes noted in Part 3, Chapter 5 Room Requirements or Part 3, Chapter 6, which takes precedence? For example the finish schedule calls for wall tile to 7’ 2” in the bathrooms (ceilings are 8’4”) , whereas Part 3 C3010 Wall Finishes requires it to go full height.
See Amendment
45 Part 3, Chapter 5
What is the quantity of lockers required in Rooms 2C-N-2- 013 Men Staff Head & Shower 2 and 2C-N-c-014 women Staff Head & Shower 2?
Bid per RFP
46 Part 3, Chapter 6
ESR C30,
This section requires SSPC QP1 Certification for the painters. This certification is typically reserved for painters working in industrial, ship building, or applying exterior coatings on open structures in extreme marine environments.
Please remove the requirement for this certification for this project, as it would preclude nearly all commercial painters from bidding the work.
Bid per RFP
47 Part 3, Chapter 6
ESR D40 It is not clear if the existing system is to be completely demolished or only modified to fit the new building configuration. Please advise if any part of the interior wet pipe sprinkler system is to remain.
48 Part 6 Sheet SP101 Note 7 indicates New Concrete Sidewalk and points to walks that have a "dotted" hash. However, there are other sidewalks on this sheet that are not noted by Keynote 7 nor a "dotted" hash. It would seem that, from the site demolition sheet, these are also new walks. Please confirm all sidewalks indicated on Sheet SP101 are new and to be included in this contract.
Bid per RFP
49 Part 3 Please provide an overall clarification regarding the access flooring work showing where (1) all new flooring is to be provided, (2) retaining the existing grid but gets new panels goes, or (3) existing system to remain. The demo drawings appear to show all of the existing access flooring coming out. The finish schedule provided shows where access flooring will be. The room requirements in 2B have a mixture of access flooring being listed B10 Super Structure alone, and some with a combination of B10 Super Structure and C3020 Floor Finishes, which requires the existing frame to be retained only providing new panels. The room requirements in 2C are silent regarding access flooring. The inconsistencies make the scope for the access flooring uncertain.
See Amendment
51 2 Part 3, G4010
Electrical Distribution
1 Part 3, G4010 Electrical Distribution states “that the electrical 11.5 kV connection point will be at the existing SF6 electrical switch #105 (located at SW corner of Pocahontas St. and Farragut Avenue”. However, RFP Section F201007 Electrical Systems (Page 3, paragraph 4) states “Reuse existing Medium Voltage primary distribution circuit, currently serving the facility’s 1000 KVA pad mounted transformer, on the South West side of the building, to feed the facility.”
A. Please clarify the relationship between the G4010 requirement and the F201007 requirement.
B. Is the source of supply of the circuit feeding the existing 1000 kVA transformer at existing SF6 electrical switch #105?
Based on the RFP F201007 statement to “reuse existing medium voltage primary distribution circuit,” C. Can the existing medium voltage conductors and conduit feeding the existing 1000 kVA transformer be reused?
OR
Should new conductors be provided from the 11.5 kV connection point (SF6 Switch #105) to the new substation/transformer?
See Amendment
53 3 G4030 Site Communicati on and Security
1 This paragraph states “The site security, telecommunications and fiber optic cabling from the existing distribution systems points of connection, to Building 25 exist in place and shall remain.”
A. Please confirm where these existing copper cable and fiber optic cable site services terminate in the 1968 building and in the 1917 building.
B. Please confirm the size and quantity of fiber optic cables, i.e. 12 Strand Singe Mode (SM), serving the 1917 building and the 1968 building.
54 3 G4030 Site Communicati on and Security
1 The RFP record drawings indicate that the copper and fiber site telecommunication services turn up into the building at existing telecommunication rooms/backboards. The RFP new/renovation floor plans place non-telecomm rooms in locations of existing telecommunication rooms (Main Point of Entry). However, the RFP states: “The site security, telecommunications and fiber optic cabling from the existing distribution systems points of connection, to building 25 exist in place and shall remain.” To accommodate the renovation floor plans, please confirm that the existing telecommunication services should be spliced in the street at existing manholes and rerouted to new dedicated telecommunication rooms based on the new renovation floor plan.
Bid per RFP
56 1 Part 3 – Chapter 6 /
ESR D20
D201001 Water Closets
Are the water closets required to be hard-wired or battery powered?
See Amendment
57 2 Part 3 –
Chapter 6 /
ESR D20
D201090 Emergency
Fixtures
The RFP indicates, “NOT USED.” If the most LCC effective HVAC system includes chilled water and heating hot water with associated chemical treatment, will an emergency eyewash be required in the room housing the chemical treatment?
See Amendment
58 3 Part 3 – Chapter 6 /
ESR D20
D202003 Domestic
Water Equipment
The RFP indicates to provide a base-mounted domestic water circulator pump which is unusual for this small pump because of its relatively small capacity and non-critical nature. Can an inline pump be provided for this application?
See Amendment
59 3 Part 3 – Chapter 6 /
ESR D20
D203001 Waste Pipe &
Fittings
Is hubless cast iron permitted for above-grade waste piping? See Amendment
60 3 Part 3 –
Chapter 6 /
ESR D20
D203004 Sanitary &
Vent Equipment
In addition to the DDC alarming requirement identified in the RFP, are there any other alarming requirements such as a local alarm or a basewide proprietary alarming network that the elevator sump pump system is required to be connected to?
Bid per RFP
61 4 Part 3 – Chapter 6 /
ESR D20
D204004 Insulation & Identification
Please confirm that the insulation for the storm drain piping is limited to the primary storm drain only.
Bid per RFP
62 4 Part 3 – Chapter 6 /
ESR D20
D209005 Compressed Air System
Please confirm if pressure regulators, isolation valves, and dryers are required at each drop.
See Amendment
63 5 Part 3 – Chapter 6 /
ESR D30
D303001 Chilled Water
Systems
Please confirm if it is allowable to provide a minimum of 2 chillers for the entire building if a minimum turndown of the chillers can be provided to allow Phase 2B to operate at low load prior to Phase 2C being completed.
Bid per RFP
64 5 Part 3 – Chapter 6 /
ESR D30
D303001 Chilled Water
Systems
The 4th paragraph of this section indicates to provide heat recovery for domestic hot water preheat. Please confirm that this will be based on a life cycle cost analysis in accordance with the HVAC UFC.
Bid per RFP
65 6 Part 3 – Chapter 6 /
ESR D30
D304001 Air Distribution, Heating & Cooling
Based on past project experience on this base, please advise where flexible ductwork is permitted and that the maximum length shall be per the current HVAC UFC.
66 3 Part 3 – Chapter 6 /
ESR D30
D304001 Air Distribution, Heating & Cooling
The RFP indicates to provide “VAV Series Fan-Powered Units.” Please confirm that single duct non-fan-powered VAV units can be provided if found to be life cycle cost effective.
See Amendment
67 7 Part 3 – Chapter 6 /
ESR D30
D304006 Chilled Water Distribution
Systems
Please confirm if 100% redundant pumps shall be provided for the chilled water primary and/or secondary pumps similar to the heating hot water pumps.
See Amendment
68 3 Part 3 – Chapter 6 /
ESR D30
D309090 Other Special Mechanical
Systems
The RFP indicates to provide total energy (enthalpy) type energy recovery wheels in the air handling system. Please confirm that this is only required if justified through a life cycle cost analysis.
Bid per RFP
69 Part 6 – Attachments
Existing Drawings
There are a pair of pipes routed across the roof that are not identified on any of the record drawings. What is the function of each of these pipes?
Bid per RFP
70 Part 6 – Attachments
Drawings Drawing AD103 call for the Lean-to/Shed between the building and the existing gymnasium to be demolished in Phase 2C per Work Note #15.
A. What is the use of this shed?
AND
B. Can this shed be demolished during Phase 2B (to create space for grade-mounted mechanical equipment)?
See Amendment
71 Part 6 – Attachments
Drawings Per drawings AD103, the east wall of the existing toilets in the center core is to be demolished. Existing drawings indicate this is a bearing wall. This is not indicated as a bearing wall in the demolition notes. New work will require new foundations and reframing this area. For the purposes of bidding, please confirm this is the intent.
Bid per RFP
73 1 Part 3 Project Description Please provide construction documents for the entire current Phase 1 scope (re-roofing) of N25A.
Bid per RFP
74 A-100 Part 6 Please confirm that a new drain will be required for Phase 2A at the Temporary Lobby and Temporary Quarterdeck. If required, please provide the intent of this drain and a point of connection for new drains not shown on as-builts.
Bid per RFP
75 Due to limited space within the limits of work, please provide areas the Government would like the GC trailers, laydown, and parking areas to be.
See Amendment
76 4 Part 3, D209005 Compressed Air System
(Non- Breathing)
1 RFP states to “Provide piping and compressed air drops with quick disconnects throughout the work areas to allow connection of equipment such as pneumatic tools and air guns.” Please provide the rooms required to receive the compressed air so that we can determine how many air drops there will be.
See Amendment
77 AE101 &
AE102 –
Keynote 19
Part 6 Per sheets AE101 & AE102 / Detail 19, there is a non-combustible, dust-proof enclosure with a 200 lb weight-bearing capacity.
A. Will the radar assemblies be required to be operational during construction?
B. Please provide the specifications for the radar assemblies.
Bid per RFP
78 3 Part 3 – Chapter 6 /
ESR D30
General System
Requirements
The RFP states, “All mechanical equipment must have painted finishes that pass a salt-spray test conducted per ASTM B117 for duration of at least 3000 hours.” Is this intended only for outdoor mechanical equipment and
See condenser coils, and 100% outside air systems?
79 1, 4, 5 Part 3 – Chapter 6 /
ESR D30
D30 HVAC –
System
Description and D301003 Steam Supply System (From Central Plant)
D301003 Steam Supply System (From Central Plant) states “not used” yet previously in this D30 section, the RPF proposes the use of steam-to-hot water heat exchangers at multiple locations. Additionally, in D302004 the RFP directs the use of steam-to-hot water converters. Please clarify the use of steam from the central plant.
See Amendment
80 Part 6 - Attachments
Existing Drawings
The record drawings appear to indicate sump pumps located in the crawl space of the building. The RFP appears to be silent on these sump pumps. Confirm that the existing crawl space sump pumps will not be replaced.
See Amendmenet
81 Will any new roof-mounted equipment require a screen wall?
Bid per RFP
82 1 RFP Part 3 Chapter 6
C30 SSPC
QP 1
Certification
1 In RFP Part 3 Section C30 Interior Finishes sub-section C30 SSPC QP 1 Certification: In our experience this requirement is used in heavy industrial, marine waterworks, and highly corrosive environments. Please confirm that the requirement for a QP-1 certification be waived for this project due to additional cost and nature of this building.
See Amendment
83 1 and 2 RFP Part 3 Chapter 6 B201001 Exterior Closure
1 through 6 In RFP Part 3 Section B20 Exterior Enclosure sub-section B201001 Exterior Closure where the RFP directs to use wood studs for renovation work to reinforce existing wood structure. Will the use metal stud framing be permitted in lieu of wood studs?
See Amendment
84 1 RFP Part 3 Chapter 6
C10 & C1010
1 through 8 In RFP Part 3 Section C10 Interior Construction sub-section C1010 Partitions, in the description for the Phase 2C we are directed to use wood studs with gypsum board on each side for load bearing walls. Also located in Phase 2C, we can use metal studs or wood studs in non-load bearing. Would it be possible to use metal studs in load bearing walls as well for non-load bearing interior walls?
See Amendment
85 255 RFP Part 3 Room
Requirement s 2A-1-002
C10 In RFP Part 3 Room Requirements, specifically room 2A-1- 002 Temporary Quarterdeck, installation of temporary partitions similar to Phase 2C partitions, will these temporary partitions need to be fully built out and finished to match the Phase 2C wall conditions in spec section C1010 and C101001?
Bid per RFP
86 252-568 RFP Part 3 Room Requirements & C30 &
C3030
RFP Part 3 Section C30 Interior Finishes, C3030 Ceiling Finishes states “ceiling finishes will be as indicated in the “Room Requirements” Room Finish schedule portion of this RFP. Many of the room requirements refer back to section C30 and not specifically the sub-section C3030 for ceiling finishes. In Part 6, sheet AD601, Demolition General Note GD4 states,”to remove all ACT scope unless noted otherwise”. We are also directed to do so within the RFP Part 3 Section F201004.
A. For purposes of bidding, is it the intent to replace the existing ceilings with new ceiling finishes shown as on sheet AE601 for rooms within the renovation scope of this project?
87 1 RFP Part 3 Chapter 6
ESR F2020
1 RFP Part 3 Section F2020 states that no reports for asbestos, lead paint, lead, cadmium, chromium, mercury, low level radioactive components, PCBs, ozone depleting substances, animal droppings, molds and spores will not be provided for this project. No reports or specs were provided in the RFP part 3 for abatement work. Should we assume none of the items mentioned above will need to be accounted for abatement outside of the unit pricing?
Bid per RFP
88 1 RFP Part 3 Chapter 6
ESR F2020
1 Please confirm abatement of asbestos work has been executed in previous work as stated within RFP Part 3 Section F2020 1.3 Asbestos and that NO abatement work is anticipated for this project.
Bid per RFP
90 3 RFP Part 3 Chapter 6
ESR
G102006
6 RFP Part 3 Spec G102006 Fencing Relocation states to include a 9’ tall black ornamental fence and a brick screen wall. Should the brick screen wall match the height of the ornamental fence at 9’?
Bid per RFP
91 Part 3 – Chapter 6 /
ESR F20 –
Page 1; Part 3 – Chapter 5
Room Requirements
F20 Selective Building
Demolition;
Various
F2010 Building Elements
Demolition;
C3020 Floor
Finishes
Paragraph F2010 calls for the demolition of the Raised Access Floor System in both Phase 2B and Phase 2C.
However, the Room Requirements includes 12 rooms which require “Retain Existing Raised Access Floor Frame, New Raised Access Floor Panels” under C3020. Please confirm that the existing raised access floor frames at these 12 rooms are to be retained and reused.
Bid per RFP
92 Part 3 – Chapter 6 /
ESR C10 –
C10 Interior Construction
C101001 Fixed
Partitions
Paragraph C101001 Fixed Partitions states: “In Phase 2B:
…The patched and existing sound-rated partition assemblies shall have a minimum Sound Transmission Coefficient (STC) of 42 unless otherwise indicated in the Room Requirements…” Please clarify which patched and existing partitions in Phase 2B are intended to be sound-rated partition assemblies.
Bid per RFP
93 Part 3 – Chapter 6 /
ESR C10 –
C10 Interior Construction
C1010 Partitions, C101001
Fixed Partitions
Paragraph C101001 Fixed Partitions states: “In Phase 2C:
…The patched and existing sound-rated partition assemblies shall have a minimum Sound Transmission Coefficient (STC) of 42 unless otherwise indicated in the Room Requirements…” Please clarify which patched and existing partitions in Phase 2C are intended to be sound-rated partition assemblies.
Bid per RFP
94 Part 3 – Chapter 6 /
ESR C10 –
C10 Interior Construction
C102001 Standard
Interior Doors
Paragraph C102001 Standard Interior Doors states: Provide the STC sound rated door and standard hollow metal door frame…to create a sound control door to match the STC sound rating of the adjacent partition.” Please confirm that all STC 42 sound-rated partition assemblies are to have an STC 42 sound-rated door.
95 Part 3 – Chapter 6 /
ESR C10 –
Page 2; Part 3 – Chapter 5
Room Requirements
C10 Interior Construction;
Various
C102001 Standard
Interior Doors;
Space
Characteristics
– Acoustics
Paragraph C102001 Standard Interior Doors states: Provide the STC sound rated door and standard hollow metal door frame…to create a sound control door to match the STC sound rating of the adjacent partition.” Please confirm that all rooms defined by the Room Requirements to have “Acoustics: min STC 55” are to have an STC 55 sound-rated door.
Bid per RFP
96 Part 3 – Chapter 5
Room Requirements
2A-1-001 Phase 2A
Temporary Lobby
C10 Interior Construction
Please identify whether the Temporary Lobby is to be separated from the adjacent corridor with an interior partition. If so, please provide C102001 Standard Interior Doors and C102007 Interior Door Hardware for the Room Requirements for this room.
Bid per RFP
97 Part 3 – Chapter 5
Room Requirements;
Part 6 – Attachments AE101 and
AE102
2B-N-1-009 Corridor, 2B-
N-1-031 Corridor, 2B-
N-2-007 Corridor, 2B-
N-2-027 Corridor
D201006 Drinking
Fountains and Coolers
Sheets AE101 and AE102 show a single new drinking fountain each at Corridors 2B-N-1-009, 2B-N-1-031, 2B-N- 2-007, and 2B-N-2-027. There is no D201006 Drinking Fountains and Coolers included in the Room Requirements for these rooms. However, please note that a single drinking fountain does NOT meet the ABA requirement for both a wheelchair accessible as well as a drinking fountain for standing persons. If a drinking fountain is to be included at these locations, the existing CMU niches must be reconfigured to accommodate a “Hi-Lo” drinking fountain.
A. Confirm that a drinking fountain is required at Corridors 2B-N-1-009, 2B-N-1-031, 2B-N-2-007, and 2B-N-2-027.
B. Confirm that the required drinking fountains at each of these Corridors is to meet ABA requirements.
C. Provide D201006 Drinking Fountains and Coolers for the Room Requirements for each of these rooms.
See Amendment
98 Part 3 – Chapter 5
Room Requirements;
Part 6 – Attachment
AE102
2B-N-2-007 Corridor, 2B-
N-2-018 Corridor
C10 Interior Construction
Sheet AE102 shows an existing interior partition with a new door between Corridors 2B-N-2-007 and 2B-N-2-018, however C102001 Standard Interior Doors and C102007 Interior Door Hardware are not included in the Room Requirements for these room. Please confirm that the existing interior partition is to remain and a new door is to be provided per sheet AE102. If so, please provide C102001 Standard Interior Doors and C102007 Interior Door Hardware for the Room Requirements for these rooms.
See Amendment
99 During the 1/9/2018 site visit, we observed existing finished raised access floor heights that varied greatly from room to room. With a non-compliant ramp, step access only, or too great of a vertical change in floor level from the adjacent corridor, many of these rooms do not meet ABA requirements for accessibility. Will replacement/new raised access floors be required to meet ABA throughout the building? Please provide required heights for all raised access floors.
Bid per RFP
100 Part 3 – Chapter 6 /
ESR C10 –
C10 Interior Construction
C102002 Glazed
Interior Doors
Paragraph C102002 states: “Provide vision glazing in doors where it is required by the “Room Requirements” portion of this RFP, or it is deemed advantageous to be able to see through the door, either for safety of pedestrian traffic or other function reason. For bidding purposes, please provide a count of doors where vision glazing would be considered advantageous, not including those already defined under the Room Requirements.
101 2 Part 3 Chapter 6 ESR G30 The RFP requires a CCTV visual inspection and leak testing on the sanitary sewer connection to the sanitary sewer system. In the event that issues are found requiring corrective action, please confirm that this would be considered a differing site condition.
Bid per RFP
102 3 Part 3 Chapter 6
ESR G10
G102002 CD101 shows an above ground storage tank north of N25A, but the RFP in G102002 1.1 of Part 3 Chapter 6 ESR G10 page 3 says no aboveground storage tank report is provided.
Please confirm that the AST within the project limits is not a part of the scope.
Bid per RFP
103 Part 6 Sheet
CS101
CS101 shows keynote 14 to be waste receptacles typical of
3. On the north side of the building facing Pocahontas at the entrance at the fire access lane, there are 2 keynote 14’s (one closer to the street with a waste receptacle symbol and one closer to the building without a symbol). Please clarify the intent of the keynote 14 closest to the building as there is no waste receptacle symbol shown.
Bid per RFP
104 5 Part 3 Chapter 6
ESR G20
G204005 The RFP states to provide exterior signage but does not quantify any site or building signage to be provided. For bidding purposes please clarify the number and types of exterior signage required.
Bid per RFP
105 3 Part 3 Chapter 6
ESR G20
G2030 The RFP states to remove and replace all damaged sidewalk within the project limit line to match existing. Please confirm that all sidewalk to be replaced is identified on the site demolition plan and additional sidewalk identified after award will be considered differing site conditions.
Bid per RFP
106 5 Part 3 Chapter 6
ESR G20
G204005 During the site walk we noted that there is a freestanding facility sign currently on site that is not noted on the civil demolition or site plan. Please confirm that there are no modifications or replacements expected to this sign under the scope of work.
See Amendment
107 6 Part 3 – Chapter 6/
ESR C10
C103009 Cabinets
Could not locate the “Staff Lounge” room in the room requirements section. Please clarify if this room is part of the project and confirm the cabinet requirements for this room.
See Amendment
108 7 Part 3 – Chapter
6/ESR C10
C103090 Other Interior
Specialties
Room 2C-N-1-005-E Auditorium calls out for (2) projector screens to be installed. What are the sizes of the screens?
Will they be motorized or manual?
Bid per RFP
109 Part 3 – Chapter 6, Page 4 / Part 4, Page
C10 C103005 Lockers
Part 3 Section C103005 “Lockers” state that the material of the lockers shall be high density polyethylene/solid plastic.
However, Part 4 Section C103005 “Lockers” states that the lockers are to be steel. Please confirm if all lockers are to be HDPE or steel as in some of the room requirements some lockers are defined as HDPE other room do not specify the material type.
See Amendment
110 Part 3 “Room Requirements”, Chapter 6 Page
C10 C103006 Shelving
The Room Requirements specifications do not note the quantities in every room for the heavy duty shelving, nor do they specify the amount of shelves (tiers) in each unit. Will an elevation or a more specific written description be provided? Can a clear center-to-center measurement of each shelving unit that will be installed also be provided?
See
111 275 / Chapter 6
– ESR C10,
Part 3 Room Requirement s, Chapter 5 /
C10
2B-N-1-005 Lobby /
C103009 Cabinets
Please provide a more detailed description regarding the 9 LF built-in display case that is being installed in Room 2B- N-1-005 Lobby. Please provide the height and depth of cabinet, how many tiers for shelving, location of where it will be installed in lobby, etc.
See Amendment
112 Please confirm if exterior perimeter walls in Phase 2B have any existing insulation and if new insulation will be required.
Bid per RFP
113 1 Part 3 – Chapter
6/ESR
B201001 Exterior Closure
1 Room requirements reference “ESR B20 Exterior Closure for Phase 2A Construction,” but no details are provided in the B20 Exterior Closure section. Please provide missing information.
Bid per RFP
114 1 Part 3 – Chapter
6/ESR
B201001 Exterior Closure
2 Paragraph 2 states, “Phase 2B Exterior Wall Construction shall be modified as follows:” Is it intended to read, “Phase 2C Exterior Wall Construction shall be modified as follows:” ?
Bid per RFP
115 1 Part 3 – Chapter
6/ESR
B201001 Exterior Closure
1 Please provide requirements for partition “2B-3” as called out on Room Requirements 2C-N-1-022-E.
Bid per RFP
116 AE104, 1 Part 3 – Chapter
6/ESR C1010
Partitions
1 through 3 In Part 3 of the Room Requirements Room 2C-N-2-004 CORRIDOR calls out for Phase 2B Partitions under the Interior Construction C1010 Partitions C101001 Fixed Partitions description. On sheet AE 104 of the new construction drawings in Part 6 it calls out Phase 2C Partitions as the infill in Room 2C-N-2-004 CORRIDOR.
Please confirm which partition type is correct: Phase 2B Partitions or Phase 2C Partitions.
See Amendment
117 AE103 Phase 2C On the first floor of Phase 2C, two rooms are called out as vaults, 2C-N-1-028 Genser Vault 157 and 2C-N-1-030 EKMS Vault 157A. Please confirm that these two rooms do not have to meet UFC requirements for vault rooms, i.e.
concrete walls and lid, etc.
Bid per RFP
118 1 Part 3 – Chapter
6/ESR
D101002 Passenger Elevators
1 Part 3 section D101002 Passenger Elevator states that the new passenger elevator is required to be able to vertically transport the largest moveable equipment or furniture used on the project. What is the specification of the largest moveable equipment or furniture the new elevator will need to transport?
Bid per RFP
119 Is the intent for the user to occupy the entire 1917 portion of the building during Phase 2A Construction?
Bid per RFP
120 Part 3, Chapter 5
Room requirements, 2A-1-002
D509002 Emergency
Lighting and Power
Part 3, Chapter 5 Room requirements, 2A-1-002, PHASE 2 TEMPORARY QUARTERDECK, D509002 Emergency Lighting and Power states to provide emergency lighting.
Please confirm that 90 minute battery-powered emergency lighting is acceptable similar to the other temp spaces.
121 2 Part 3, E1040 The first paragraph in this section states,"...until such time as the Contractor is ready to install.” Please confirm that the Contractor is required to provide a price for the actual the installation of Mission Equipment.
Bid per RFP
122 7 Part 4 – Section D20
D202003 1.4 Domestic
Water Pressure Booster System
The two water flow tests in the RFP indicate (1) static pressure of 48 psi with residual pressure of 41 psi, and (2) static pressure of 57 psi with residual pressure of 50 psi.
This appears to indicate that domestic water pressure booster pumps will be required. The RFP indicates that the domestic water pressure booster pump package for each side of the building must be a duplex system. Is each pump of the duplex system to be sized for 50% or 100% of the flow?
Bid per RFP
123 Part 6 – Attachments
Existing Drawings
Provide a record drawings for the recent roof replacement project to indicate extent of scope of materials used for insulation and roofing.
Bid per RFP
124 1 Part 3 – Chapter 6 /
ESR B20
B201001 The RFP states to insulate the exterior wall with R-15 spray insulation between existing wood studs.
A. Do the wall insulation requirements of ASHRAE 90.1 also need to be met?
B. Do the exterior walls of Phase 2B need to be insulated?
Bid per RFP
125 AD103 Part 6 - Drawings
Per Keynote #21 existing process mech unit & support frame are to remain. What room does this system serve and what related mechanical equipment inside must remain?
Bid per RFP
126 613 D4040 1 Section D4040 indicates that a wet pipe automatic sprinkler system shall be provided throughout the entire building. The 1917 attic is currently provided with a dry pipe sprinkler system. Please confirm the attic space is to be protected by a wet pipe system.
See Amendment
127 613 D4040 1 Some spaces in the building are currently protected by a manual special suppression aqueous system. Please confirm this system is to be removed and no special suppression protection is required as part of this project.
See Amendment
128 611 D40 Please clarify if the wall separating the 1917 and 1968 construction serves as a fire wall as defined by the building code in order to separate the two different construction types.
See Amendment
129 Part 6 Attachments
Please confirm that each of these new floor plans for Phases 2A, 2B, and 2C are conceptual and that modifications may be required/allowed to these plans in order to meet RFP requirements, building codes, and/or UFC standards, etc.
Bid per RFP
130 30 Part 4 – Section C10
C103014 Entrance Floor
Grilles and Mats
Section C103014 states that recessed entrance mats are to be installed at entrances with enclosed vestibule and all other entryways are to have entranceway mats or entranceway floor tiles. Entranceway of RM 2B-N-1-005 Lobby does not have an enclosed vestibule but the Phase 2B Floor Room Finish Schedule calls for a recessed entry mat there.
A. Please clarify the recessed entry mat requirement.
B. What is the defined area where the recessed entry mat will be installed at the entryway of RM 2B-N-1-005 Lobby and the intent of the transition with the terrazzo flooring?
OR C. Please confirm if entranceway mats or floor tiles can be used instead.
131 Please confirm whether Building N25A is considered a single building or two separate buildings.
Bid per RFP
134 7 Part 2 Spec section 01 33
10.05 20
Section 1.10 In Part 2, Specification section 01 33 10.05 20, page 7, Section 1.10 states that BIM project execution plan (PxP) is required. Same section, page 10 item K states BIM PxP (not required). Please confirm that BIM is a requirement for this project in compliance with the RFP and UFCs.
Bid per RFP
135 General n/a n/a Are raised access floor areas in the 1917 building required to be ADA accessible?
Bid per RFP
136 General n/a n/a Please provide information on the roof replacement that was installed under Phase 2A: Type of roof, sepcifications, insulation R/ U value, vapor barrier location and type, warranty, etc. If we are to penetrate the roof or provide new equipment on the roof this inofmraiton is critical for estimating.
Bid per RFP
137 Existing Bldg Dwg Attachments
The original building drawings indicate significant return air ductwork routed through a crawl space below the building (Phase B, 1968 addition). Original NAVFAC drawings 1199098 & 1199118 indicate crawl space ‘floor’ consists of porous drainage fill (gravel) on bare earth/ground. Current UFC 3-140-01, para 4-2.6.3 prohibits the use of HVAC ducts in enclosed crawl spaces that are exposed to the ground. As no new-ductwork is to be routed within this crawlspace, is it acceptable to abandon-in-place the existing ductwork within the crawlspace?
Bid per RFP
138 Existing Bldg Dwg Attachments
Has the building been tested for radon? Are radon mitigation systems required to be incorporated into the renovated building areas? (Project is in a Zone 3 Low Potential less than 2 pCi/L radon zone). Existing 1968 building drawings provided with the RFP indicate no vapor barrier or passive radon protection membrane, only compacted gravel base on earth (within crawl space).
Bid per RFP
139 Existing Bldg Dwg Attachments
Vents were observed on the exterior of the building during the site walkthrough however investigation into the crawl space did not appear that the vents served to ventilate the crawlspace – is the crawlspace ventilated? Is there adequate access to the crawlspace to perform work (demolition and new work, etc.). What can you tell us about the space:
clearance, lighting, confined space work environment?
Access to get piping in and out?
Bid per RFP
140 D30 Pg 1 & 6 RFP D30 System Description requires/calls for providing 2 separate HVAC systems for the 1917 and 1968 portions of N-25A. If the WSHP system is selected, paragraph D303002 in regard to the closed circuit cooler (CCC) states “The load may be served by a single CCC with multiple fans” – does this allow for a single large CCC for the entire facility (Phase 2B and 2C combined), or is this simply permitting a single CCC per phase in lieu of the dual chillers per phase/ 4 chillers total requirement of D303001?
See Amendment
141 Existing Bldg Dwg Attachments, 1968 Addition
NAVFAC Drawing No. 1199125 indicate that there are sump pumps (appear to be qty=5) within the crawlspace below the 1968 addition - are these required to be replaced within the scope of this project?
See
142 ESR D20 Compressed air is a requirement in Part 3 – Chapter 6 / ESR D20 and to provide quick disconnects throughout the work areas, reviewing the Chapter 5 - Room Requirements there is no mention in any of the rooms requirements for compressed air outlets, nor are any connection requirements indicated in the Mission Equipment Schedules. Please provide additional information for estimation of compressed air requirements (compressor size, piping, qty of drops, etc.).
See Amendment
143 ESR D20
& D30
Life Cycle Costing Analysis is requried for selection of mechanical HVAC systems and determination of feasiblilty of providing solar water heating. Within the allowable HVAC system selection options the heat source is permitted to be either gas-fired condensing boilers or steam-to-hot water heat exchangers (connecting to base steam system) -can utility rates be provided both for natural gas as well as steam to be used in the analysis and determination of which heating source should be used.
See Amendment
144 ESR D20 Can you please provide an estimation of shower usage (showers taken per day on a peak usage day) to be used in calculating the required domestic water heating equipment?
Bid per RFP
145 ESR D20 Can you please provide the male/female ratio to verify plumbing fixture count. Part 3 – Chapter 2 – Page 3 para.
2.5.2 Staffing/Occupancy there will be 125 Uniformed
Instructors, 25 Staff and Contract Instructors and 300 Students for a total of 450 people or 113 people per sex per floor.