Price Proposal Form (Sec 00800)

View the file

Other files

File Type Posted
N4008516R3034_0007.pdf PDF
MACC_PPI_-_Amend_0007.pdf PDF
N4008516R3034_0006.pdf PDF
MACC_PPI_-_Amend_0006.pdf PDF
MACC_PPI_-_Amend_0005.pdf PDF
N4008516R3034_0005.pdf PDF
N4008516R3034_0004.pdf PDF
macc_site_visit_1.pdf PDF
MACC_PPI_-_Amend_0004.pdf PDF
N4008516R3034_0003.pdf PDF
MACC_PPI_-_Amend_0003.pdf PDF
N4008516R3034_0002.pdf PDF
MACC_PPI_-_Amend_0002.pdf PDF
Appendix_B_GEI_HBM_Report.pdf PDF
Appendix_A_GEI_Subsurface_Explorations_Report.pdf PDF
N4008516R3034_0001.pdf PDF
02_82_16_Asbestos_Abatement.pdf PDF
No_12731020_SD-101.pdf PDF
Attachment A - Experience Data Sheet.pdf PDF
Attachment D -One Day Pass.xls XLS spreadsheet
Williams Bldg Drawings Part 1.pdf PDF
Project Specifications.pdf PDF
N4008516R3034_RFP.pdf PDF
Attachment C - PPI Log form.doc DOC document
Williams Bldg Drawings Part 2.pdf PDF
Attachment B - Past Performance Questionairre.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Proposal Form for N40085-16-R-3034 Williams Building and Seawall Repair, Boston Harbor, Boston, MA

The proposed price shall be the lump sum price for the following item:

CLIN 0001 (Base Price) – Price includes the following:

0001A 1 JB $___________

Seawall Repairs - includes the removal and reinstallation of all appurtenances; removal of the concrete slab, steel support beams and concrete backer wall; deconstruction and reconstruction of the top four courses of the granite block seawall, installation of a new concrete slab-on-grade, backer wall, backfill material, and guardrail system. For bidding purposes, assume that three granite seawall blocks are non-salvageable and will need to be replaced.

0001B 1 JB $___________

Elevated Platform Replacement - includes the removal of the existing concrete elevated platform, installation of micropiles and pile cap, and installation of steel platform with brick veneer.

Price for the entire work, complete in accordance with the drawings and specifications.

0001C 1 JB $___________

Northern Return Concrete Wall Repairs - includes removal of existing sheet piling, removal of deteriorated concrete to a competent subsurface, installation of reinforcement and placement of new concrete facing.

0001D 1 JB $___________

Northern Ave. Stair Replacement - includes the removal of the existing concrete stairway and installation of concrete stairs supported on a steel frame structure with granite treads and brick veneer.

0001E 1 JB $___________

Contaminated Soil Removal - includes removal and proper disposal of the soil behind the seawall identified for removal.

0001F 1 JB $___________

Abandoned Coal Vault Asbestos Abatement - includes the proper removal and disposal of asbestos containing materials within the abandoned coal vault area.

0001G 1 JB $___________

Hazardous Building Materials Removal - includes the proper removal and disposal of the hazardous building materials identified to include lead paint, asbestos and PCBs.

0001H 1 JB $___________

Stair Landing to First Floor Repairs - All work associated with providing stair landing repairs to the first floor to include providing concrete sump, sump pump; including piping and electrical connections and miscellaneous polyurethane grout wall and crack injection and architectural repairs.

0001I 1 JB $___________

Stair to Lower Basement (East) Repairs - All work associated with providing stair to lower basement (east)repairs to include providing concrete trench and sump, sump pump, piping and electrical connections, FRP ramp and miscellaneous polyurethane grout wall crack injection and architectural repairs.

0001J 1 JB $___________

Lower Basement Level South Elevation Wall Repairs - All work associated with providing lower basement level south elevation wall repairs to include providing polyurethane grout wall crack injection.

0001K 1 JB $___________

Stair to Lower Basement (west) & Open Storage Landing Repairs - All work associated with providing stair to lower basement (west) and open storage landing repairs to include providing polyurethane grout wall crack injection.

0001L 1 JB $___________

Lower Basement Level Floor Repairs - All work associated with providing lower basement level floor repairs to include concrete trench and sump installation, sump pump installation; including piping and electrical connections, masonry wall removal and replacement, concrete floor topping slab and repairs miscellaneous polyurethane grout wall crack injection and architectural repairs.

0001M 1 JB $___________

Coal Vault/Chiller Tank Area Repairs - All work associated with coal vault/chiller tank area repairs to include providing polyurethane grout floor and wall crack injection and miscellaneous concrete floor and architectural repairs.

0001N 1 JB $___________

Architectural Repairs - All work associated with providing miscellaneous architectural repairs to include the removal/replacement of custom hollow metal doors, condenser table as well as preparing and painting wall surfaces.

0001O 1 JB $___________

Main Building Sump Repairs - All work associated with providing main building sump repairs to include the removal and replacement of the existing main building sump and associated platform and covers and provide platform, sump pumps, piping, controls and electrical connections.

0001P 1 JB $___________

Miscellaneous Plumbing Repairs - All work associated with providing miscellaneous plumbing repairs to include the removal and replacement of deteriorated steam meter, piping and floor drain.

Total Price for CLIN 0001: $

CLIN 0002 Seawall Option 1 Remove, Store and Reinstall Floating Dock

Remove, Store and Reinstall Floating Dock System - includes the removal and storage of the floating dock system, to include three (3) spud pile; the reinstallation of the floating dock system prior to the Contractor leaving the site. If awarded, the floating dock shall not be removed prior to July 5, 2017.

Total Price for CLIN 0002: $

CLIN 0003 Seawall Option 2 Replace Lighting Fixtures on Elevated Platform

Replace Lighting Fixtures on Elevated Platform - includes the cost of material to replace nine lighting fixtures located on the elevated platform.

Total Price for CLIN 0003: $

CLIN 0004 Seawall Option 3: Repair Northern Return Concrete Wall Pile Cap

Repair Northern Return Concrete Wall Pile Cap - includes the removal of deteriorated concrete, installation of steel reinforcement and placement of new concrete pile cap.

Total Price for CLIN 0004: $

CLIN 0005 Building Option 4: Provide Stainless Steel Sump Pump Platform

Provide Stainless Steel Sump Pump Platform - includes the cost of material to provide a stainless steel main building sump pump platform.

Total Price for CLIN 0005: $

CLIN 0006 Building Option 5: Replace Lower Stair Run

Replace Lower Stair Run - includes all work associated with removing existing lower stair run and providing galvanized steel stair to match the existing.

Total Price for CLIN 0006: $

CLIN 0007 Building Option 6: Prep and Paint Existing Walls

Prep and Paint Existing Walls - includes all work associated with preparation and painting of existing walls.

Total Price for CLIN 0007: $

CLIN 0008 Building Option 7: Masonry Repairs/Replacement

Masonry Repairs/Replacement - includes all work associated with removing and replacing deteriorated brick and cmu.

Total Price for CLIN 0008: $

CLIN 0009 Building Option 8: Additional Crack Repairs

Additional Crack Repairs - includes all work associated with the injection of cracks with polyurethane grout.

Total Price for CLIN 0009: $

TOTAL PRICE FOR ALL CLINs (0001 – 0009): $

1.2 CONTRACT LINE ITEM NOTES

a. Submit offers using this Price Proposal Form and these Contract Line Item Notes.

b. The Government reserves the unilateral right to award CLINs 0002 through 0009 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains the same. All work can be performed concurrently (i.e. work on the base and any option exercised is expected to be performed at the same time).

c. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If CLINs 0002 through 0009 are exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all CLINs.

1.3 UNIT PRICES

Complete the following unit prices, to be used in the event an adjustment needs to be made to the contract price after contract award. The quantities listed are estimates only. Should the actual quantity of any of these items required to complete the work vary from that listed, the unit price will be used to adjust the total contract price in accordance with the contract clause entitled FAR 52.211-18,Variation in Estimated Quantity.

Description Estimated Quantity

Unit Price Unit Amount

Replace Granite Seawall Blocks

3 $_________ EA $_____________

Northern Return Concrete Wall Removal 15 $_________ CY $_____________

Cut-out and Prepare Wall and Floor Cracks and Provide Polyurethane Grout Injection

150 $_________ LF $_____________

Prepare Concrete Slab and Provide Concrete Topping Slab

700 $_________ CF $_____________