About this file

Amendment 0006 - PPI

View the file

Other files

File Type Posted
N4008516R3034_0007.pdf PDF
MACC_PPI_-_Amend_0007.pdf PDF
N4008516R3034_0006.pdf PDF
MACC_PPI_-_Amend_0005.pdf PDF
N4008516R3034_0005.pdf PDF
N4008516R3034_0004.pdf PDF
macc_site_visit_1.pdf PDF
MACC_PPI_-_Amend_0004.pdf PDF
N4008516R3034_0003.pdf PDF
MACC_PPI_-_Amend_0003.pdf PDF
N4008516R3034_0002.pdf PDF
MACC_PPI_-_Amend_0002.pdf PDF
Appendix_B_GEI_HBM_Report.pdf PDF
Appendix_A_GEI_Subsurface_Explorations_Report.pdf PDF
N4008516R3034_0001.pdf PDF
02_82_16_Asbestos_Abatement.pdf PDF
No_12731020_SD-101.pdf PDF
Attachment A - Experience Data Sheet.pdf PDF
Attachment D -One Day Pass.xls XLS spreadsheet
Williams Bldg Drawings Part 1.pdf PDF
Project Specifications.pdf PDF
N4008516R3034_RFP.pdf PDF
Attachment C - PPI Log form.doc DOC document
Williams Bldg Drawings Part 2.pdf PDF
Williams Bldg Price Proposal Form.pdf PDF
Attachment B - Past Performance Questionairre.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI#

Section of RFP or Page Number

Paragraph Reference Drawing Number Question Response

1 RFP Instructions Is 8‐point font acceptable for graphics and tables? No but a minimum of 10 font is acceptable for graphics and tables.

2 S‐503, S‐504

There is no detail in the drawings regarding the scope or limits of work on the southerly limits under the Northern Ave stairs. Section A1 on drawing S‐504 indicates that seawall work may wrap around from the front wall to the south wall but no other drawing show or indicate a scope or limit of work in this area. Further the details of the new work on drawings S‐503 and S‐504 at the stair level do not clearly define the scope or limit of work to that southerly limit for placing lightweight foam concrete fill. Please clarify the scope of work and limits of work at the southerly limits adjacent to the Northern Ave bridge & approach under the Northern Ave stairway area for both the seawall and the stair construction and deconstruction as applicable.

Refer to Palmer Federal 8 & 9 responses. The light weight concrete foam fill will terminate at the interface between the stairs and abutment. Refer to detail C3 on S‐503

Spec Section: 31 23

Regarding excavation behind the sea wall, will the generator certify that the source of the PCBs is non TSCA hazardous?

Refer to “REPAIRS TO CAPTAIN JOHN FOSTER WILLIAMS U.S. COAST GUARD BUILDING AND

SEAWALL SUBSURFACE EXPLORATIONS REPORT, BOSTON, MASSACHUSETTS”, DATED APRIL

2016, PREPARED BY GEI CONSULTANTS, INC.” It was previously determined that PCBs detected in soil are not subject to TSCA.

Spec Section: 31 23

Regarding excavation behind the sea wall, is there a soluble metals laboratory analysis available?

Groundwater testing data is not available. Previous soil testing included total RCRA 8 metals. Soil samples with elevated total lead concentrations were tested by the Toxicity Characteristic Leachate Procedure (TCLP). Based on the TCLP lead concentrations, lead is not leachable. Refer to “REPAIRS TO CAPTAIN JOHN FOSTER WILLIAMS U.S. COAST GUARD

BUILDING AND SEAWALL SUBSURFACE EXPLORATIONS REPORT, BOSTON,

MASSACHUSETTS”, DATED APRIL 2016, PREPARED BY GEI CONSULTANTS, INC.”

Spec Section: 31 23

Regarding excavation behind the sea wall, will it be acceptable to the owner to use an alternate disposal outlet to TREE which is legal and permitted to accept said waste material?

An alternative facility may be determined acceptable. A submittal of their acceptance of the material as well as their permits would be required.

31 60 00 page 3 paragraph 1.3.2

S‐507

The drawings (specifically sheet S‐507; Micropile Detail A1) indicate 9.625” diameter casing and 9” minimum bond zone diameter. The specifications indicate minimum diameter of 8” in the bond zone (spec section 31 60 00 page 3 paragraph 1.3.2). Is 9” required or simply suggested, with 8” the actual minimum?

The minimum bond zone diameter is 8 inches

7 RFP Guidelines Please advise if the General Contractor is subject to paying Tax & Licensing to the State or City

The contractor must coordinate with the appropriate state agency to ascertain that information and the taxes which it must pay. They must comply with all Federal, State and local tax laws/requirements.

8 RFP Guidelines Please advise is there a Use Tax on material and equipment? Or is there a Flat Rate on the total contract?

The contractor must coordinate with the appropriate state agency to ascertain that information and the taxes which it must pay. They must comply with all Federal, State and local tax laws/requirements.

RFP Guidelines page 27‐30 of 79

Please explain the tax liability requirements for the Seed Project.

The contractor must coordinate with the appropriate state agency to ascertain that information and the taxes which it must pay. They must comply with all Federal, State and local tax laws/requirements.

10 RFP Guidelines

In order for the sales to be exempted, the exempt entity or the governmental agency must obtain an exemption certificate from the Department of Revenue, stating its entitlement to exemption and the vendor must keep a record of the exempt sales made.

Will the Government issue such entitlement?

The Government does not provide a tax exempt certificate. However, information about the project requirements that may be needed to secure a tax ruling from the state or local tax authority may be provided.

PRE‐PROPOSAL INQUIRY‐ AMENDMENT 0006

Solicitation Number: N40085‐16‐R‐3034