About this file

Amendment 0003 - PPI

View the file

Other files

File Type Posted
N4008516R3034_0007.pdf PDF
MACC_PPI_-_Amend_0007.pdf PDF
N4008516R3034_0006.pdf PDF
MACC_PPI_-_Amend_0006.pdf PDF
MACC_PPI_-_Amend_0005.pdf PDF
N4008516R3034_0005.pdf PDF
N4008516R3034_0004.pdf PDF
macc_site_visit_1.pdf PDF
MACC_PPI_-_Amend_0004.pdf PDF
N4008516R3034_0003.pdf PDF
N4008516R3034_0002.pdf PDF
MACC_PPI_-_Amend_0002.pdf PDF
Appendix_B_GEI_HBM_Report.pdf PDF
Appendix_A_GEI_Subsurface_Explorations_Report.pdf PDF
N4008516R3034_0001.pdf PDF
02_82_16_Asbestos_Abatement.pdf PDF
No_12731020_SD-101.pdf PDF
Attachment A - Experience Data Sheet.pdf PDF
Attachment D -One Day Pass.xls XLS spreadsheet
Williams Bldg Drawings Part 1.pdf PDF
Project Specifications.pdf PDF
N4008516R3034_RFP.pdf PDF
Attachment C - PPI Log form.doc DOC document
Williams Bldg Drawings Part 2.pdf PDF
Williams Bldg Price Proposal Form.pdf PDF
Attachment B - Past Performance Questionairre.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI#

Section of RFP or Page Number

Paragraph Reference Drawing Number Question Response

1 Page 9 and 11 of 79.

Factor 1 Construction and Design Experience

N/A

The RFP stipulates that for projects to be considered relevant that they must be completed within the past 5 years. It also states that solely horizontal or civil projects will NOT be considered. In light of the fact that this is a Small Business set-a-side contract with a unique civil component (seawall repair) would the government reconsider the time frame to include the past 7 years so that Small business offerors can submit their most relevant qualifying projects for consideration.

Seven (7 ) years is acceptable for both design and construction (See Amendment 0003 for changes).

Specifications

p. 34 of 547

Will US Harbor & Longshoreman insurance be required? The insurance requirements are identified in the Project Specifications document (Item 1.4, Pgs 34 & 35). Any coverage requirements in excess of what is stated, will be identified with the issuance of individual task orders.

Specifications

p. 34 of 547

Will pollution liability insurance be required? See response above.

Specifications

p. 34 of 547

Will builder’s risk insurance be required? See response above.