N40085-14-R-1302_Amendment_0004.pdf
PDF 22 KB Posted
- Attached to
- MINI MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), GENERAL CONSTRUCTION PROJECTS, NORTH CAROLINA AREA Federal contract opportunity
- Solicitation number
- N4008514R1302
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-501_12647515_REV_3-7-2014.pdf | ||
| A-201_12647513_REV_3-7-2014.pdf | ||
| N40085-14-R-1302_Amendment_0006.pdf | ||
| B486_ASBESTOS_REPORT.pdf | ||
| N40085-14-R-1302_Amendment_0005.pdf | ||
| Amendment_0003.pdf | ||
| N40085-14-R-1302_Amendment_0002.pdf | ||
| N40085-14-R-1302_Amendment_0001.pdf | ||
| DrawingsAsOne.pdf | ||
| N40085-14-R-1302_(with_attachments_B-H).pdf | ||
| SpecsAsOne.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-14-R-1302, Mini General Construction Multiple Aw ard Construction Contract (MACC) North Carolina Area
The purpose of this amendment is to provide responses to RFIs submitted.
See Attached
This amendment should be acknow ledged w hen your proposal is submitted. Failure to acknow ledge the amendment may constitute grounds for rejection of proposal.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Feb-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N40085-14-R-1302
X 9B. DATED (SEE ITEM 11)
10-Feb-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Feb-2014
CODE
NAVFAC MID ATLANTIC
ROICC CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N40085-14-R-1302
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Amendment 0004, RFI Questions & Answers
1. For question 18 [Amendment 0003], the answer states to refer back to question #6, however question
#6 has nothing to do with the Corporate Experience. Please clarify.
A: Refer to answer 12 in lieu of answer 6. Answer 12 is as follows:
Submit two (2) general construction projects.
2. Also make the following corrections to Amendment 0003. Questions #17 and #19 should refer to answers #15 & #16 in lieu of #9 
.
Question 17: We would like to attend the site visit but we only have passes to Camp Lejeune. Can we be added to a list to get access the morning of the site visit?
Question 19: Can you please advise on the steps we need to take to ensure our representative(s) may enter the base facilities to attend the site visit.
Answer 15: MCAS Cherry Point is located off of Highway 70 in Havelock, NC (Craven County).
Contractors shall report to Marine Corps Air Station Cherry Point Main Gate located on Hwy 101.
The Pass & ID office will provide you with a temporary pass to gain access to B-163. Contractors will be escorted to the site from B-163. The Pass & ID office can be extremely busy at times so it is recommended you arrive early and allow plenty of time at Pass & ID.
Answer 16: To obtain access to the base, contractors will need a valid driver’s license, current registration, and proof of insurance.
3. Factor 3, Past Performance states that if the is a CPARS available then we do not need to turn in the attached Past Performance Questionnaires, I understand that however, how many Past Performance Questionnaires is the solicitation calling for? I do not see anywhere in the solicitation that states the number that is needed.
A: Past performance questionnaires are used in lieu of CPARS evaluations when CPARS evaluations are not available. Two are required Refer to pages 11, 18 and paragraph 2 of Attachment C.
4. Noticed that the solicitation requires past performance PPQ. Instead of using the PPQ, may we submit a completed DD 2626, CCASS for one of our past performance?
A: Yes.
5. Page 4 of the solicitation documents states:
Technical Proposal: Submit an original and four (4) copies of the technical proposal (Evaluation Factors 1 through 4) in three-ring binders.
N40085-14-R-1302
I only find 3 factors listed – Corporate Experience (Factor 1), Past Performance (Factor 2), and Safety (Factor 3). Can you provide the 4th factor?
Are all of the factors (1-4) to be submitted in a separate binder?
A: There are only 3 factors. The entire technical proposal shall be submitted in one three-ring binder, there shall be 4 copies submitted.
6. It states on Page 4 of 64 under Proposal Requirements, that the Technical Proposal should include Evaluation Factors 1-4. All I see are 3 factors: Corporate Experience, Safety, and Past Performance.
What is the 4th Evaluation Factor?
A: There are only three evaluation factors: Corporate Experience (Factor 1), Past Performance (Factor 2), and Safety (Factor 3)