Price_Schedule.pdf

PDF 94 KB Posted

Attached to
Repair or Alteration Federal contract opportunity
Solicitation number
N40085-14-R-0004
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Attachment A - Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair or Alteration, newest first.
File Type Posted
Amendment_0005.pdf PDF
Section_10_22_13_WIRE_MESH_PARTITIONS.PDF PDF
Amendment_0004.pdf PDF
Amend_0003.pdf PDF
14R0004_Amendment_0002.pdf PDF
01-General.pdf PDF
03-Structural.pdf PDF
05-Fire_Protection.pdf PDF
Volume_1_of_2_(Revised_02-26-14).pdf PDF
Volume_2_of_2.pdf PDF
04-Architectural_16-30.pdf PDF
04-_Architectural_31-46.pdf PDF
07-Mechanical.pdf PDF
02-Civil.pdf PDF
08-Electrical.pdf PDF
04-Architectural_1-15.pdf PDF
CT140021_Wage_Determination.pdf PDF
06-Plumbing.pdf PDF
Amendment_0001.pdf PDF
Attachment_A.pdf PDF
N40085-14-R-0004.pdf PDF
Attachment_B.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 GENERAL - NOSC WHOLE CENTER REPAIR PLAINVILLE

BASIS OF OFFERS

The low offeror for purposes of award will be determined as in Clause "FAR 52.217-5, Evaluation of Options". The sum total of items 0001 through 0005 will be evaluated to determine the low offeror.

The minimum bid guarantee shall be in a penal sum equal to 20 percent of the largest amount for which award can be made but not more than $3,000,000.00 (aggregate amount of Items

0001- 0005below). Refer to clauses 52.228-1 and 5252.228-9305.

PART 1 GENERAL

1.1 OPTIONS AND UNIT PRICES

This contract will be awarded with options and unit prices required for specifically selected work. A description of the options and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer and

Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys."

(i) Basis of Bid for Item 0001 shall be the Total Amount for Item 1 (Items 0001a through 0001b), complete in accordance with the drawings and specifications, but not including the work indicated or specified to be under any

Bid Options.

0001a- Base Item – all work associated with base bid with the exception of item 0001b

0001b- Removal and disposal of 800 LF of asbestos containing expansion joint caulking at interior vertical joints in Drill Halls.

(ii) Basis of Bid for Item 0002: Option 1

This option may be exercised by the Contracting Officer at the time of award or within 60 calendar days after award. If Option 1 is exercised, the contract completion date remains the same.

Option 1 - Provision of all work for removal of existing exterior window systems and provision of exterior window systems and associated wall infill.

(iii) Basis of Bid for Item 0003: Option 2

This option may be exercised by the Contracting Officer at the time of award or within 60 calendar days after award. If Option 2 is exercised, the contract completion date remains the same.

Item 0003 shall be the total amount for Item 0003aand 0003b, for the addition of the following work:

0003a - Provision of all work for repairs to existing pavement and additional bituminous paving (parking) complete in accordance with the drawings and specifications but not including the work indicated or specified under 0003b.

0003b- 300 CY of unsuitable soil (fill) excavation, disposal and replacement with base course.

(iv) Basis of Bid Item 0004: Option 3

This option may be exercised by the Contracting Officer at the time of award or within 60 calendar days after award. If Option 3 is exercised, the contract completion date remains the same.

Option 3 - Provision of all work for interior finish materials accordance with the drawings and specifications.

(v) Basis of Bid Item 0005: Option 4

This option may be exercised by the Contracting Officer at the time of award or within 60 calendar days after award. If Option 4 is exercised, the contract completion date remains the same.

Item 0005 shall be the Total Amount for Item 0005a and 0005b, for the addition of the following work:

0005a - Provision of all work for a solar photo- voltaic system, including a roof mounted array, complete in accordance with the drawings and specifications but not including the work indicated or specified under

0005b.

0005b - Addition of single photovoltaic panel to system as noted in 0005a.

BID SCHEDULE

In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

Any bid price for items indicated below which is unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

Item Description Qty U/I Unit Price Total Price

0001a

Base Item – all work associated with base bid with the exception of item

0001b 1 LS $ $

0001b

Removal and disposal of asbestos containing expansion joint caulking at interior vertical joints in Drill Halls 800 LF $ $

0001 Total Base Item 0001 $ $

OPTION 1. Removal of existing exterior window systems and provision of exterior window systems and associated wall infill. 1 LS $ $

0003a

Option 2. Repairs to existing pavement and additional bituminous paving (parking) complete in accordance with the drawings and specifications but not including the work indicated or specified under

0003b. 1 LS $ $

0003b

Option 2. Unsuitable soil (fill) excavation, disposal and replacement with base course 300 CY $ $

0003 Total Option 2 Item 0003 $ $

Option 3. Work for interior finish materials as indicated. 1 LS $ $

0005a

Option 4. Solar photo- voltaic system including a roof mounted array complete in accordance with the drawings and specifications but not including the work indicated or specified under 0005b. 1 LS $ $

0005b

Option 4. Addition of single photovoltaic panel to system as noted in 0005a 1 EA $ $

0005 Total Option 4 Item 0005

File details come from the government source that posted it. Updated .