QA1_N4008422R0041_10132022.pdf
PDF 96 KB Posted
- Solicitation number
- N4008422R0041
About this file
This document provides details on a solicitation for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for the U.S. Marine Corps Air Station in Iwakuni, Japan. The solicitation seeks proposals for design-build and design-bid-build construction projects including new construction, renovation, repair, and maintenance work. The response deadline is October 24, 2022 and the contract value is not to exceed $495 million to be allocated across multiple awards. A minimum $500,000 task order will be issued for each awarded contract concurrently with the basic contract award. One seed project is included for repair work to a barracks with a value between $10-25 million to be awarded at the time of contract award. Future task orders will range in value from $50-250 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA2_N4008422R0041_10142022.pdf | ||
| N4008422R0041_RFP.pdf | ||
| EXHIBIT_F_Price Proposal Form_.doc | DOC document | |
| EXHIBIT_B_Construction and Design Experience Project Data Sheet.doc | DOC document | |
| EXHIBIT_D_Past Performance.docx | DOCX document | |
| EXHIBIT_E_Technical Solution Submittal.docx | DOCX document | |
| EXHIBIT_A_Technical Approach Submittal.docx | DOCX document | |
| Attach_1_Pre-Bid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| EXHIBIT_C_Safety Narrative.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//FEDCON [when filled in] Source Selection Information – See FAR 2.101 3.104 [when filled]
Pre‐Bid/Proposal Inquiry Form
Page Section Para.
1 10/11/2022 SF1442 13.
ADDITIO
NAL
SOLICITA
TION
REQUIRE
MENTS
B The bid guarantee is required for this solicitation. We believe that we need to offer the bid guarantee on the Phase 2 proposal, but not on Phase 1. Does it correct?
ビッドボンドが必要となっていますが、こ
れはフェーズ2で必要ということでよろし
いですか?
Yes. Bid guarantee is a part of Price Proposal which shall be submitted for Phase II of this solicitation. Please refer to page 13 of SF1442.
2 10/12/2022 RFP
page.
K.
PREPROP
OSAL
CONFERE
NCE
AND SITE
Are you going to conduct the pre‐proposal conference on the phone?
電話での入札前会議はありますか?
There will be no pre‐proposal conference for Phase I of the solicitation. Site visit / pre‐proposal conference is anticipated to be conducted during Phase II.
3 10/13/2022 RFP
page. 4
C.
DESCRIP
TION
OF SEED
PROJECT
When are we available to obtain the specifications and drawings for the seed project?
シードプロジェクトの仕様書等はいつ頃手
に入りますか?
The specification and drawings for the seed project will be made available when Phase II solicitation is issued.
4 10/14/2022 RFP
page. 4
B.
DESCRIP
TION
OF
ACQUISI
TION
This new MACC project is quite a bigger scale than usual. Are you also planning to issue a MINI MACC project near future? Or does this MACC project combine the current MINI MACC and BIG MACC as a next‐generation version?
今回のMACC案件は規模が大きいように思い
ますが、今後MINI
MACCも発行されますか?それともこのMAC
C案件が既存のMINI MACCやBIG
MACCの次世代版になるのでしょうか?
Plans for a new MINI‐MACC are not known at this time.
SOLICITATION N40084‐22‐R‐0041 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) DESIGN_BUILD (DB)/DESIGN‐BID‐BUILD (DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR
MCAS IWAKUNI OPERATIONAL AREA, JAPAN
REFERENCEQuestion No.
QUESTION GOVERNMENT RESPONSEDate Received Posted on Amend No.
Pre‐Bid/Proposal Inquiry Form
Page Section Para.
REFERENCEQuestion No.
QUESTION GOVERNMENT RESPONSEDate Received Posted on Amend No.
Factor 1 ‐ Technical Approach
(1) is to define that the lines of authority between the proposed primary construction firms and primary design firms for this contract.
However, (2) is to provide signed copies of the agreements between the offeror and the entities included in offeror’s organizational chart.
As for this section, do we have to discribe all of our potential subcontractors' name in the Organization Chart other than AE firm?
If so, do we have to provide all of our potential subcontractors' TA (Teaming Agreement) other than AE firm?
We assume that Factor 1 will consist of a few pages; one for the Organization Chart and the others for TA of DOR and LOC of DOR. In this case, TA & LOC do not include the Organization Cahrt page count, we believe.
3. (a) (1) (a)
(1) & (2)
S1710/12/2022
The Organizational Chart shall include the proposed primary construction firms and primary design firms for this contract.
If claiming the experience of an entity (e.g., subcontractor) under Factor 2, you must include the entity (e.g., subcontractor) name in the organizational chart. Signed copies of the agreements for these entities must be provided.
Submission for Factor 1 will consist of:
One (1) page for the Organizational Chart, which includes brief description of the role and responsibility of each entity identified in the organizational chart.
AND
Signed copies of Agreements (JV, Partnership, Teaming, Approved Mentor Protege) and Letter of Committment (LOC) for all entities listed in the organizational chart.
There are no page limits for the Agreements or LOCs.
File details come from the government source that posted it. Updated .