EXHIBIT_B_Construction and Design Experience Project Data Sheet.doc
DOC document 80 KB Posted
- Solicitation number
- N4008422R0041
About this file
This solicitation is for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for the U.S. Marine Corps Air Station in Iwakuni, Japan. The contract will be used to issue task orders for design and construction projects including office renovation, building demolition, mechanical and electrical work, carpentry, roadwork, and other construction services. The total contract value across all awards is $495 million and individual task order values will range from $50 million to $2.5 billion. A minimum guarantee of $500,000 will be issued to all contractors receiving an award. One seed project titled "Repair to Barracks B#314 Enlisted Quarters" with a value between $100 million and $2.5 billion will also be awarded. The response deadline is 24 October 2022 at 1430 Japan Standard Time. The Naval Facilities Engineering Command will administer the contract in support of construction projects at Marine Corps Air Station Iwakuni and surrounding areas in Japan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA2_N4008422R0041_10142022.pdf | ||
| QA1_N4008422R0041_10132022.pdf | ||
| N4008422R0041_RFP.pdf | ||
| EXHIBIT_F_Price Proposal Form_.doc | DOC document | |
| EXHIBIT_D_Past Performance.docx | DOCX document | |
| EXHIBIT_E_Technical Solution Submittal.docx | DOCX document | |
| EXHIBIT_A_Technical Approach Submittal.docx | DOCX document | |
| Attach_1_Pre-Bid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| EXHIBIT_C_Safety Narrative.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//FEDCON [when filled in]
Source Selection Information – See FAR 2.101 & 3.104 [when filled]
EXHIBIT B – N4008422R0041
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Submit separate Project Data Sheets for construction and design. Individual blocks on this form may be expanded; however, total length should not exceed 1 double-sided (2 single-sided) pages.
Project No. (check one) : FORMCHECKBOX
CON #1 FORMCHECKBOX
CON #2 FORMCHECKBOX
CON #3 FORMCHECKBOX
CON #4 FORMCHECKBOX
CON #5
FORMCHECKBOX
DESIGN #1 FORMCHECKBOX
DESIGN #2 FORMCHECKBOX
DESIGN #3 FORMCHECKBOX
DESIGN #4 FORMCHECKBOX
DESIGN #5
1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain)
Firm Name:
Address:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
FORMCHECKBOX
New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs
FORMCHECKBOX
Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). Include how this project meets the definition of a relevant project (size, scope, complexity). If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
Revised April 2011
PAGE
CUI//FEDCON [when filled in]
Source Selection Information – See FAR 2.101 & 3.104 [when filled]
File details come from the government source that posted it. Updated .