ATTACH 1_4th Govt Response to RFI_N4008420T2002.pdf

PDF 65 KB Posted

Attached to
Fire Protection System Maintenance, Repair Services and Hood & Duct Services for MCB Butler Okinawa, Japan
Solicitation number
N4008420T2002
Issued by

View the file

Other files

File Type Posted
SF30_N4008420T2002_Amend 0002.pdf PDF
SF30_N4008420T2002_Amend 0005.pdf PDF
ATTACH 2_Rev. Fire Suppression 1502000 dated 24Jun20.pdf PDF
SF30_N4008420T2002_Amend 0003.pdf PDF
ATTACH 1_Rev. Fire Suppression 1502000.pdf PDF
SF30_N4008420T2002_Amend 0004.pdf PDF
ATTACH 1_3rd Govt Response to RFIs_N4008420T2002.pdf PDF
ATTACH 2_Rev. Fire Suppression 1502000.pdf PDF
ATTACH 1_2nd Govt Response to RFIs_N4008420T2002.pdf PDF
ATTACH 2_Fire Suppression 1502000.pdf PDF
ATTACH 1_Govt Response to RFIs_N4008420T2002.pdf PDF
ATTACH 6_Rev. J-0200000-05 ELINs dated June 18 2020.pdf PDF
ATTACH 5_Rev. J-502000-03 FACILITY PROPERTY INVENTORY.pdf PDF
ATTACH 4_Rev. PWS 1502000.pdf PDF
ATTACH 3_Rev. PWS 0200000.pdf PDF
ATTACH 8_N4008420T2002_Amendment 0001.pdf PDF
ATTACH 7_Rev. PAP_FAP for N4008420T2002 dated 18 May 2020.pdf PDF
ATTACH 6_Rev. J-0200000-05 ELINs dated June 18 2020.xls XLS spreadsheet
ATTACH 2_Rev. PWS 0100000.pdf PDF
N4008420T2002_SF1449_RFQ.pdf PDF
ATTACH 8_Inquiry Form_N40084-20-T-2002.xls XLS spreadsheet
ATTACH 9_Site Visit_Request_Form.xlsx XLSX spreadsheet
ATTACH 7_Past Performance Questionnaire.docx DOCX document
ATTACH 6_Experience Project Data Sheet.docx DOCX document
ATTACH 5_Authorized Use and NDA_OPSEC Cert_N4008420T2002_MCB.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE PROPOSAL INQUIRY FORM

DATE: 23 June 2020

Question No.

Reference (Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

1 1502000, Spec Item 3.4.1

1502000, Spec Item 3.4.1 states “Work shall include the hoods, plenums, fans, grease filter, drips, troughs and removal devices, inside and outside of full length of vertical drain pipes, weatherproof covers and the full length of the vertical ventilating ducts. Horizontal cleaning will limited to that area which is accessible."

As of the current status of the horizontal ducts, access is extremely limited. If/When access hatches are installed, will the contract be modified to included cleaning at each of the access hatches of the horizontal ductwork? Or is the contractor expected to provide a full cost at the time of bid, to assume that the entire ductwork will become accessible for cleaning?

It is our professional opinion that costs will need to be adjusted based on the number of access points/accessible areas, which cannot be determined until the access hatch project is implemented.

See revised Spec Item 3.4.1. (Amendment 5)

EMAIL: ateam@aec-japan.co.jp

SOLICITATION NO.: N40084-20-T-2002

ADDRESS: 7-8-13 Oyama, Ginowan City, Okinawa, Japan 901-2223

PHONE NUMBER: 098-897-6784

OFFEROR NAME: FIRE PROTECTION SYSTEM MAINTENANCE, REPAIR SERVICES AND HOOD & DUCT SERVICES FOR MCB BUTLER OKINAWA, JAPAN