ATTACH 1_3rd Govt Response to RFIs_N4008420T2002.pdf

PDF 66 KB Posted

Attached to
Fire Protection System Maintenance, Repair Services and Hood & Duct Services for MCB Butler Okinawa, Japan
Solicitation number
N4008420T2002
Issued by

View the file

Other files

File Type Posted
SF30_N4008420T2002_Amend 0002.pdf PDF
SF30_N4008420T2002_Amend 0005.pdf PDF
ATTACH 2_Rev. Fire Suppression 1502000 dated 24Jun20.pdf PDF
ATTACH 1_4th Govt Response to RFI_N4008420T2002.pdf PDF
SF30_N4008420T2002_Amend 0003.pdf PDF
ATTACH 1_Rev. Fire Suppression 1502000.pdf PDF
SF30_N4008420T2002_Amend 0004.pdf PDF
ATTACH 2_Rev. Fire Suppression 1502000.pdf PDF
ATTACH 1_2nd Govt Response to RFIs_N4008420T2002.pdf PDF
ATTACH 2_Fire Suppression 1502000.pdf PDF
ATTACH 1_Govt Response to RFIs_N4008420T2002.pdf PDF
ATTACH 6_Rev. J-0200000-05 ELINs dated June 18 2020.pdf PDF
ATTACH 5_Rev. J-502000-03 FACILITY PROPERTY INVENTORY.pdf PDF
ATTACH 4_Rev. PWS 1502000.pdf PDF
ATTACH 3_Rev. PWS 0200000.pdf PDF
ATTACH 8_N4008420T2002_Amendment 0001.pdf PDF
ATTACH 7_Rev. PAP_FAP for N4008420T2002 dated 18 May 2020.pdf PDF
ATTACH 6_Rev. J-0200000-05 ELINs dated June 18 2020.xls XLS spreadsheet
ATTACH 2_Rev. PWS 0100000.pdf PDF
N4008420T2002_SF1449_RFQ.pdf PDF
ATTACH 8_Inquiry Form_N40084-20-T-2002.xls XLS spreadsheet
ATTACH 9_Site Visit_Request_Form.xlsx XLSX spreadsheet
ATTACH 7_Past Performance Questionnaire.docx DOCX document
ATTACH 6_Experience Project Data Sheet.docx DOCX document
ATTACH 5_Authorized Use and NDA_OPSEC Cert_N4008420T2002_MCB.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE PROPOSAL INQUIRY FORM

DATE: 23 June 2020

Question No.

Reference (Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

1 1502000, Spec Item 3.4.1

1502000, Spec Item 3.4.1 states “Work shall include the hoods, plenums, fans, fan housing, grease removal devices, weatherproof covers and the full length of ventilationg ducts and other appurtenances."

With repect to cleaning, and if the contractor is expected to clean the entire length of the duct line, is contractor to include the cost to clean the entire length of ventilating duct for this bid, even though access hatches are not yet installed? Since as-built drawing are now being made available upon request (as of 22-June), we would like to request an extension for the bid due date to allow time to estimate the costs of cleaning the duct system, based on the currently unknown design, location, size and length of ducts.

See revised Spec Item 3.4.1.

2 N/A For informational purposes, refer to the attached photos which provide an example of a similar cleaning/ replacement project our company has recently performed, showing the conditions the ducts may possibly have.

The severity of the grease build-up can be clearly seen. Does the government understand the full request/ requirements needed to clean the current duct systems, such as the number of hatches that will be required and the cost/benefit of cleaning versus replacing the ducts?

3 Solicitation, Page 13 Please advise if bound binder with 2 holes is acceptable instead of three-ring binder for proposal submission.

Yes, we accept bond binder with 2 holes.

EMAIL:

SOLICITATION NO.: N40084-20-T-2002

ADDRESS:

PHONE NUMBER:

OFFEROR NAME: FIRE PROTECTION SYSTEM MAINTENANCE, REPAIR SERVICES AND HOOD & DUCT SERVICES FOR MCB BUTLER OKINAWA, JAPAN

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104