CLIN/
ELIN
| Description of Services |
| Unit Price |
| Quantity |
| Unit |
| Total Price |
| 0001AA |
| Demolish and replace existing roof to the concrete deck and replace with Built Up Roof System including insulation at R30, in accordance with Part 3A of the Design-Build specification, Building 2B |
| $ |
| 1 |
| Job |
| $ |
| 0001AB |
| Allowance for Asbestos and Decking repair (over 5%), B2B |
| $ 20,000.00 |
| 1 |
| LS |
| $ 20,000.00 |
| 0001AC |
| Demolish and replace existing roof and replace with Build Up Roof System In accordance with Part 3B of the Design-Build specification, Building 1912 |
| $ |
| 1 |
| Job |
| 0001AD |
| Allowance for Asbestos and Decking repair (over 5%), B1912 |
| $ 5,000.00 |
| 1 |
| LS |
| $ 5,000.00 |
Pre-Priced Unit Pricing, Asbestos, Lead and Hazardous materials abatement and additional decking repair:
| Description of work |
| Unit |
| Unit Price |
| Decking Demolition over 5% |
| SF |
| $ |
| Pipe Lagging Abatement |
| LF |
| $ |
| Glues & Adhesive Abatement |
| SF |
| $ |
| Roofing Insulation Abatement |
| SF |
| $ |
The pricing for Asbestos, Lead and Hazardous materials abatement and additional decking repair will be the total price for performing these services. This price will include all direct and indirect costs including profit, but will not include materials testing, as that should be priced under the fixed price portion of the design-build contract.
Liquidated Damages are calculated from the date of the award of the resulting task order and are calculated as calendar days. The Period of Performance is 120 days, inclusive of both buildings. Liquidated Damages rates for the two locations shall be as follows (also, see FAR Clause 52.211-12 Liquidated Damages for the Task Order):
| Location/Site |
| Liquidated damages rate |