This document is Amendment 0005 to a solicitation for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) for mechanical projects primarily in the NAVFAC Washington Area of Responsibility. The key updates in this amendment include:
- Revisions to the corporate experience evaluation factor, lowering the minimum construction project size from $15 million to $10 million.
- Revisions to certain specification sections, including adding phasing requirements for the work.
- Responses to pre-proposal inquiries, providing clarification on issues such as existing building controls, ceiling tile replacement, and work hour requirements.
The solicitation is being issued under NAICS code 238220 with a size standard of $19 million. The proposal due date of July 31, 2024 is not extended by this amendment. The seed project for this MACC is estimated to be between $10-$25 million.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see SF30 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008024R2396
X 9B. DATED (SEE ITEM 11)
23-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2024
CODE
NAVAL FACILITIES ENGINEERING SYS COMMAND
NAVAL FACILITIES ENGINEERING SYS COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008024R2396
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of this amendment is to:
1. Revise RFP, Section 00 21 16 - Instructions to Proposers, 4 EVALUATION FACTORS FOR AWARD, b.
Non-cost/price factors, (2) Factor 2, Corporate Experience, a) Construction Experience and b) Design Experience
2. Revise noted solicitation Specification sections
3. Respond to pre-proposal inquiries (PPIs)
4. The current Proposal due date of 31 July 2024 is NOT extended with this amendment.
1) RFP, Section 00 21 16 - Instructions to Proposers, 4 EVALUATION FACTORS FOR AWARD, b.
Non-cost/price factors, (2) Factor 2, Corporate Experience
Construction:
Size: A final construction cost of at least $2,000,000. At least one (1) project, however, must have a final construction cost of at least $10,000,000 or greater.
Submitted projects shall collectively demonstrate relevant experience with the following:
‐ Experience with one project with a construction value of at least $10,000,000 or greater, Design:
Size: A final construction cost of at least $2,000,000. At least one (1) project, however, must have a final construction cost of at least $10,000,000 or greater.
Submitted projects shall collectively demonstrate relevant experience with the following:
‐ Experience with one project with a construction value of at least $10,000,000 or greater,
2) Revises USU -70 HVAC Specifications as issued:
SECTION 01 30 00: ADDS:
Phasing is required as follows:
• Work done at the air handling unit shall occur with only one AHU being down at a time.
• Work done at the terminal units shall be phased by its associated air handling unit. For example, terminal units fed by AHU 5&6 will be done as a single phase, terminal units fed by AHU 2&3 will be done as a separate phase.
SECTION 01 50 00: REMOVES:
3.4 Plant Communications: telephone or other suitable devices and make available for use by Government personnel.
3) Revises USU -70 HVAC DESIGN FOR HVAC as issued
SHEET KEYNOTES 1 and 5
REMOVE AND STORE EXISTING ACT CEILING TILES, GRIDS AND HANGER WIRES AS NEEDED TO
COMPLETE NEW WORK. REINSTALL EXISTING CEILING TILES, GRIDS AND HANGER WIRES.
REPAIR AND REPLACE ANY DAMAGED CEILING TILES AND GRIDS. ACCOUNT FOR REPLACEMENT
OF 80% OF CEILING TILES AND GRIDS WITHIN AREA OF WORK. 20% OF CEILING TILES AND GRIDS
WITHIN AREA OF WORK.
3. Responses to PPIS
REFERENCE QUESTION GOVERNMENT RESPONSE Posted on Amend No.
Page Section Para
27 10 of
Factor 2.
Corporat e Experien ce
(2)(i ) a)
The Construction Experience section of the solicitation requests project size to be: A final construction cost of at least $2,000,000. At least one (1) project, however, must have a final construction cost of at least $15,000,000 or greater. The most recent solicitation from NAVFAC Washington for the 8(a) MACC requested projects from $1M to $5M for NAICS code 236220.
As this solicitation is being issued under NAICS code 238220 with a size standard of $19M, it would seem more appropriate to follow the previous 8(a) MACC solicitation requirements. Can you change the solicitation so that the experience requirements for construction and design projects size be in the $1M - $5M range?
This would allow for more relevant projects to be submitted.
See Amendment 0005. 5
General Please confirm if Phasing is required, if so, please identify.
See Amendment 0005 5
RFI's Upon completion the Site Visit, please confirm that there will be an additional RFI period to submit questions.
See Amendment 0004 5
30 7 01 50 00 3.4 PLANT COMMUNICATIONS -
telephone or other suitable devices and make available for use by Government personnel.
Please clarify.
See Amendment 0005 5
31 General Is there any anticipated phasing to occur?
See Amendment 0005 5
32 10 Factor 2 Construc tion Experien ce
The RFP states that projects for the MACC have an estimated construction cost of $250K and $15M. Given that projects are not anticipated to exceed $15M, may the government consider lowering the value to $10M or greater?
See Amendment 0005. 5
33 12 Factor 2 Construc tion Experien ce
For design projects submitted as relevant Design experience can just the Design be completed?
Yes, bid per RFP. 5
34 10 Factor 2 Construc tion Experien ce
For Design Build relevant construction projects, can the design phase be complete with construction ongoing?
Bid per RFP. A project submitted under design experience will meet the recency requirement if (a) the construction effort was completed within seven (7) years immediately preceding the RFP issuance date, regardless of the design completion date, OR (b) the construction effort is ongoing, but the design completion date was reached within the seven (7) years immediately preceding the RFP issuance date. Each relevant completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet.
35 1 230900 1.1.1 For the building management system work within the seed project, it is our understanding, the work needs to be completed by Pritchett controls, please confirm.
Confirmed. 5
36 N/A N/A N/A For the seed project does the existing building management system by Pritchett Controls interface with a basewide building management system? If so please provide make model of the existing basewide building management system and please clarify if any integration work to the basewide system shall be priced as part of the see project.
No, the existing building management system by Pritchett Controls does NOT interface with a basewide building management system.
37 1 230923.0
1.1 Please advise what the
manufacturer (make / model) of the existing building management system HVAC controllers line in the building is.
Reliable Controls BACnet MACH PRO 2 controllers
38 Am d.
1, Page
1 Can the bid date please be adjusted until two weeks after issue of RFI answers?
Bid per RFP. Current Proposal due is 31 July 2024 NLT 1400.
39 Atta chm ent F., Dwg
MI7
Detail A4
Regarding the seed project on drawing MI701, for detail A1, please clarify which VAV boxes will require new controls for the project.
Bid per RFP-Please refer to drawings M603-M604 Air Terminal Unit Schedule Note 1
40 Atta chm ent F., Dwg
MI7
Detail A4
Regarding the seed project on drawing MI701, for detail A2, please clarify which CAV boxes will require new controls for the project.
Bid per RFP-Please refer to drawings M603-M604 Air Terminal Unit Schedule Note 1
41 Atta chm ent F., Dwg
MI7
Detail A4
Regarding the seed project on drawing MI701, for detail A4, please clarify if the existing exhaust fan controls are existing to remain or are these new exhaust fan controls to be priced as part of the project?
New exhaust fan controls 5
42 Atta chm ent F., Dwg
MI7
Detail A1
Regarding the seed project on drawing MI702, for detail A1, for the existing air handler controls please clarify if there is any new controls scope to be priced as part of the project?
Bid per RFP-Please refer to MI702 note 3.2.2 EXISTING
DDC HARDWARE SHALL
PERFORM THIS SEQUENCE
OF OPERATION AND
PROVIDE INPUTS AND
OUTPUTS AS SPECIFIED
AND SHOWN ON THE
POINTS SCHEDULE
43 Soli citat ion Page of
Factor 2, Corporat e Experien ce, Section B - Design Experien ce
Please confirm if the offeror can submit strictly design projects, where build was not part of the contract i.e. Design-Build.
Confirmed. Bid per RFP. 5
44 Soli citat ion Page of
Factor 2, Corporat e Experien ce, Section B - Design Experien ce
Please confirm if the offeror can submit design-build projects where the offeror performed the design part but not the construction part of the contract.
Confirmed. Bid per RFP. 5
45 Gen eral
Can the government verify how many areas, if any, will require cutting into hard ceilings to access VAV's & ductwork. All areas shown on the site visit were drop ceilings.
None, all areas have drop ceilings.
46 Gen eral
Please verify the government will remove all laboratory equipment, furniture, etc. in rooms/labs that require HVAC replacement/modifications.
See Amendment 0004, PPI Response Question number 4.
47 Gen eral
The specs call for work to be performed during normal working hours but that noise producing work will be performed outside of regular work hours. We would assume any hammer drilling needs to be down off hours, but is regular duct construction and VAV installation deemed noisy?
Please confirm
See Amendment 0004, PPI Response Question number 3.
48 Gen eral
Please confirm coil replacement in the AHU's will need to be performed off hours/weekends.
Confirmed-SECTION 01 14 00
1.3.5 Utility Cutovers and
Interruptions
49 Gen eral
Are contractors required to take pre-balance readings in all spaces?
No,Bid per RFP. Refer to Note 1 on M601 for AHU requirements
50 Gen eral
Please confirm the entire building
- new work and existing is to be Duct Air Leakage Tested
(DALT)?
No, only the new work. 5
51 Gen eral
Please confirm the QC manager needs to be separate from the superintendent.
Bid per RFP - Refer to
SECTION 01 45 00.10 20 1.5.1
QC manager
52 7 Factor 2 Corporat e Experien ce
- The requirement of a $15M construction project is very high for an 8a contractor. Will government consider to remove the requirement?
See Amendment 0005. 5
53 7 Factor 2 Corporat e Experien ce
- Will government extend the recency of past experience to 10 years?
No, Bid per RFP. 5
Is the Commissioning agent retained by the Government or does the contractor need to include the Commissioning agent as part of the proposal?
The Contractor needs to include the Commissioning agent as part of the proposal
55 A90
Shee t Note s 1 and
In one note, it states "account for replacement of 80% of ceiling tiles" and in another it states, " account for replacement of 20% of ceiling tiles". Please clarify.
See Amendment 0005 5
56 M80
VAV-217A and VAV-217B are shown as new on the the riser disagram M805 but is shown as existing to remain on other sheets.
Similarly, CAV-341A and VAV- 334 are shown as existing to remain on M805 but shown as being replaced on the rest of the drawings. Please clarify.
Please refer to air terminal unit schedules M602-M605 for accurate details
57 Is there a specific phasing plan we need to follow for the required schedule or do we just use the drawing sections as phase of work i.e. 2nd floor A, B, C, D followed by 3rd floor A, B, C, D?
See Amendment 0005 5
58 Gen eral
Please verify the present BAS controls contractor in the building.
Pritchett Controls 5
Is hot water balancing to be performed only on the 14 replaced VAV-CAV boxes or on all new and existing boxes on the 2nd and 3rd floors?
Bid per RFP-Refer to M805 for all boxes on the 2nd and 3rd floor
60 Is chilled water balancing to be performed only on the AHU's with the replaced CHW coils?
Bid per RFP-Refer to Air handling unit schedule Note 2 on M601
61 Will the 2nd and 3rd floors be occupied when balancing is performed? What working hours can TAB be performed?
Bid per RFP-Refer to SECTION 01 14 00 1.3.4 Occupied and Existing Building
62 Being an 8(a) Set Aside, requirement of $15,000,000 for 1 project is very discriminatory.
Most 8(a) small businesses do not have $15,000,000 single projects completed. We request NAVY lower the project requirement down to $5,000,000 for any single project.
See Amendment 0005. 5
63 Will they permit mechanical/press fittings or joining method on the piping systems?
No, Bid per RFP. 5
64 Will combination valve kits/flow packs be permitted for equipment connections, as long as they have all of the components shown in the mechanical details?
The Government needs more information to respond to this
PPI.
65 Can you please provide the contact for the current controls contractor in the building?
Ba Kalita Service Sales Manager Pritchett Controls 6980 Muirkirk Meadows Drive Beltsville MD 20705 O-301-470-7300 ext. 1408
66 We have received the PPQ in the standard format form the government, can we use that format in the PPQ submission?
Past Performance Questionnaires submitted should contain the same information as provided in attachment D to this RFP.
67 The seed project estimated range from $10M-$25M, please advise it’s a correct estimate for the seed project.
Confirmed. 5
68 Please advise which VAVs need to be changed and replaced?
The Government needs more information to respond to this
PPI.
69 When will be the tentative Awards date for SEED project?
The Government needs more information to respond to this
PPI.
70 Is this a day time work or night time work?
The Government needs more information to respond to this
PPI.
71 For the existing equipment and furniture, please advise whether it is removed or placed in the same place.
See Amendment 0004, PPI Response Question number 4.
72 Please share the phasing plans for the areas.
See Amendment 0005 5
73 Does the project involve the asbestos?
Bid per RFP-Refer to Hazardous Material Inspection Report in the Specs
74 Arc hitec tural Dra win gs Gen eral
Sheet Note 2 requires …"furniture to be temporarly relocated and or protect furniture ..for demolition and new work activities" To minimize the cost of labor of having to work around furniture it is recommended the furntire be relocated. Please clarify if provisions are to be made to provide rental of onsite storage for the furniture and or if the Government will provide onsite storage for the furniture.
Bid per RFP-Refer to SECTION 01 14 00 1.3.4 Occupied and Existing Building for direction
75 Architectural Drawings/ Second Floor and Third Floor Ceiling Area:
A/B/C
Sheet Key Note 1 requires 80% replacement of ceiling tiles and grid within area of work. Please provide manufacture name/type of ceiling tile required for the replacement.
Refer to PPI 55 5
76 Architectural Drawings/ Second Floor Ceiling Area: A/B/C
Sheet Key Note 5 requires 20% replacement of ceiling tiles and grid within area of work. Please provide manufacture name/type of ceiling tile required for the replacement.
See Amendment 0004, PPI Response Question number 18.
77 Architectural Drawings/ Third Floor Ceiling Area: A/B/C
Sheet Key Note 4 requires demolition of gypsum ceiling complete. For pricing purposes please provide detail of ceiling system to be demolished
No detail will be provided, Bid per RFP.
78 Gen eral
Please clarify what the ICRA level will be under this contract
No ICRA, refer to SECTION 01 14 00 1.3.4 Occupied and Existing Building
79 Gen eral
Please provide the contact name, telephone number and company name for the designated controls contractor for this facility
See PPI 65 Response 5
80 Gen eral
Please clarify if there is a designated sprinkler and fire alarm contractor for this facility.
Please provide the contact name, telephone number and company name
See Amendment 0004, PPI Response Question number 11.
81 Gen eral
Please clarify the work hours for this project
See Amendment 0004, PPI Response Question number 6
82 Gen eral
For scheduling and pricing purposes it is assumed that the second and third floor will be vacant throughout the duration of the contract. If floors will not be vacant please clarify how the Gov't requires phasing of work to be performed. Please provide available information regarding any additional conditions which will require the work to be performed in phases.
See Amendment 0005 5
83 Gen eral
Please confirm that a designated elevator will be accessible for the delivery and disposal of waste and material.
Confirmed 5
84 Gen eral
Please provide name plate data for the AHU’s so we can get coil dimensions for the replacement pricing.
Bid per provided plans. 5
85 Gen eral
Please identify any aspects of work which will require performance during off-hours due to facility requirements.
See Amendment 0004, PPI Response Question number 22.
86 Onsi te Man age men t
Please confirm that the designated SSHO can also perform the duties of the Quality Control Manager and Superintendent.
Refer to PPI 118. 5
87 Tota l Buil ding Com miss ioni ng
Please confirm that the Government will assume the responsibility for providing and performing the Commissioning responsibilities.
Refer to PPI 54 5
88 Fire Prot ectio n Engi neer
Please confirm that the Government will assume the responsibility for providing and performing the Fire Protection Engineer responsibilities.
No 5
89 Sche dule
Please confirm if the scheduling program for this project will be limited to Primavera P6 and or if Microsoft Project will be allowed.
Bid Per RFP-Refer to SECTION
01 32 17.00 20 1.8 SOFTWARE
90 Asb esto s Abat eme nt
The Hazardous Material Report provided within the contract documents identifies fiberglass sealant as being ACM. For pricing purposes please quantify approximately how much fiberglass sealant is expected to be removed as ACM.
Bid per RFP. 5
91 Arc hitec tural Dra win gs - A90
Drawing A-901 provides photos depicting several types of existing devices, including Cord reals Fire alarm devices Plug molding Recessed 20-amp receptacles (ceiling mounted) Stem mounted apparatus (not able to determine device by picture) Surface mount apparatus (not able to determine device by picture) Are these devices to be removed and reinstalled or are they to remain in place throughout the performance of the project.
Please refer to architectural sheet notes: PROTECT CEILING
MOUNTED EQUIPMENT TO
REMAIN
DURINGCONSTRUCTION.
REFER TO GENERAL NOTES
AND MEP DRAWINGS
FOREXTENT OF WORK
92 Dra win gs Gen eral
Provided drawings do not depict any existing utilities present which will interfere with the performance of the specified work. For pricing purposes, is it to be assumed that no utilities which will interfere with the work are present or should a value be included for unforseen existing conditions. If provisions for unforseen existing condtions are to be provided in the proposal, please indicate the cost to be alloted as such.
Bid per RFP 5
93 Elec trica l Dra win gs
E-103C Sheet Keynotes #2 states connect VFD to line and load side conductors retained under demolition A3 Roof Plan-Area C-Power Plan is showing typical 30A-3P-3R-NF
a) Is the VFD required or is the NFSS required? Or both?
b) Is the non-fused safety switch being installed alongside the VFD units?
Bid per RFP. Refer to Legend sheet E-001.
94 General Where are the removed 2x4 light fixtures and lighting controls to be stored for reinstallation after the mechanical work is performed?
Refer to architectural notes
CEILING MOUNTED
EQUIPMENT INCLUDING,
LIGHTING, SPEAKERS, ETC.
MUST REMAIN SUSPENDED
AND PROTECTED IN PLACE
IN AREAS OF WORK
SHOWN ON THE
REFLECTED CEILING PLAN.
If notes on Electrical drawings require removal, Contractor to store.
95 General Who is responsible for classroom furniture removal
Refer to architectural notes
TEMPORARILY RELOCATE
OR PROTECT IN PLACE
FURNITURE AND
EQUIPMENT AS REQUIRED
FOR DEMOLITION AND
NEW WORK ACTIVITIES
96 General Is it anticipated that the furniture removal will be within the same room or be move to another location for performance of the work?
Refer to SECTION 01 14 00
1.3.4 Occupied and Existing
Building
97 Mechani cal
Are there O&Ms available on the existing units that can be provided to us?
No 5
98 General Is there a phasing plan? Is GC to provide?
See Amendment 0005 5
99 General Will off hour work be required? Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
Please confirm path to bring the materials into the building for the seed project.
Freight elevator by loading dock.
101 Are there ristrictions on the hours when materials can be brought into the building?
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
Are there any pre tab requirements for the chw coils, cav's or vav's?
No. 5
103 It is our assumption that any precautionary cleaning required for the BSL spaces will be provided by others prior to any onsite work within the spaces.
Please confirm.
Confirmed. 5
104 How long can the AHU's be down for the chilled water coil change outs? Can this work be completed during normal business hours or does it need to be completed during weekend hours?
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
105 Is there any asbestos abatement anticipated as part of the project?
If so please provide specific areas where asbestos abatement is anticipated to be required.
Refer to HAZMAT report. 5
106 Can the bid date please be extended on additional week to July 30, 2024?
See Amendment 0004 5
107 It is our interpretation that all existing terminal units on the drawings are to be rebalanced as part of the project, please confirm.
Confirmed 5
108 It is our interpretation that the balancing contractor does not have to be a 3rd party firm and that Southland can use our internal balancing team, please confirm.
Confirmed 5
Please advise if the equipment and furniture in the labs and classrooms will be moved/relocated to faciliate the work.
Refer to architectural notes
TEMPORARILY RELOCATE
OR PROTECT IN PLACE
FURNITURE AND
EQUIPMENT AS REQUIRED
FOR DEMOLITION AND
NEW WORK ACTIVITIES
110 If yes, please advise who will be responsible for the moving.
Contractor 5
111 Please clarify the daily working works for this project.
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
112 Please clarify if after hours/night work/weekend are allowed.
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
113 Since the building will be occupied, please advise if it is NAVFAC intention to provide access only to certain areas at time for where the work will be performed or if the contractor will have full access to all the work areas.
Full access, but also in line with phasing requirements referenced in PPI 2
114 Please advise if NAVFAC has a construction phasing plan in mind for this project.
See Amendment 0005 5
115 Please advise if the freight elevator connected to the penthouse will be available to the contractor.
There is no elevator connected to the penthouse.
116 Please advise if parking spaces will be provided to the contractor
Only on laydown area 5
117 Please advise if a laydown area will be provided and where it will be located.
A small laydown area may be provided near the baseball field
118 Please advise if the Superintendent can serve as Quality Control and Safety.
Provide two full time personnel.
Superintendent can be QC but not SSHO.
119 Please provide the point of contact information for the Control Contractor, the Fire Alarm and Sprinkler contractor for the building.
Invicta Global LLC 5
Is the Third-Party Commissioning of the HVAC system required for this project? If so, then, who shall hire the Commission Agent - The Govt or The Contractor?
Yes, Contractor 5
121 Shall this project need to be performed in various phasing?
See Amendment 0005 5
122 Is triple hat allowed on the SEED PROJECT? In other words, Can a single person perform all three roles - SSHO, QCM, and Superintendent?
Refer to PPI 118 5
123 Is the Asbestos and Lead Testing required on the SEED PROJECT?
See Hazardous Materials Report in Specs Attachment E
124 Is the Third-Party QFPE Service required, on the SEED Project, for the Fire Alarm & Fire Suppression work? Please confirm.
Confirmed. 5
125 Bid docs do not state that off hours work is required for this project. Please confirm that all work can take place during normal business hours.
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
126 Drawing E-103C shows Exhaust Fans 1-8 to have new NEMA 3R
NF
disconnects installed in place of demolished staters, but Notes #1 & 2 direct to remove existing motor starters and connect the existing line/load conductors to new VFDs. Will VFDs replace the demolished starters? Are the
3R NF
disconnects required?
Refer to PPI 93 5
127 Can the starters for EF 1-8 be demolished and replaced concurrently?
Follow phasing requirements per PPI response.
128 How long can EF 1-8 be down during the outage?
Two weeks. 5
129 Can the outage for EF 1-8 take place during normal business hours?
Bid per RFP-Please refer to Spec section 01 14 00 section 1.3.2- 1.3.5
130 Will any temporary HVAC be required for this project?
No 5
131 Will parking be made available at the USU for this project?
See PPI 117 response 5
132 Some labs have ceiling mounted Wiremold to power equipment.
Will the Wiremold be removed and reinstalled in these areas?
No 5
133 Some of the Classrooms and Labs have ceiling mounted retractable extension cords. Will these be required to be removed and reinstalled in these areas?
No 5
134 Regarding fire sprinkler work, when a situation arises, that we need to remove several sprinklers, armovers and/or branchlines to accommodate the needed HVAC work, can this area/room stay unprotected while under construction without a fire watch or other means of fire protection?
no, area must be protected or contractor supplied fire watch provided.
135 Regarding fire sprinkler work, it appears the only fire sprinkler work necessary will be limited to just removing & reinstalling the existing sprinkler piping to accommodate the HVAC work.
Will this require shop dwgs & submittals? Or can we just do this work as the situation arises?
Submittals will be required. 5
136 Regarding the fire sprinkler work, are we expected to bring the areas where HVAC work is occurring, up to current code? For example;
it was noticed during the bid walk through several Lab’s, which would be considered Ordinary Hazard, but it was noticed the existing sprinklers were over 130 sq.ft. spacing and the existing sprinklers were 5.6k. Whereas UFC would require Ordinary Hazard rooms to have 8.0k sprinklers. Please let us know to what extent we are required to make modifications to the existing sprinkler system.
No. 5
137 Are As-Built fire sprinkler shop drawings available for these areas of construction (2nd & 3rd floors)?
No. 5
138 M60 2- M60
Please advise if VAV Terminals without an (E) or (D) designation are to be newly furnished.
Confirmed 5
139 M60
Please provide dimensions for replacement coils in existing to remain Air Handling Units.
Refer to provided plans. 5
140 Please advise who performs BAS/controls work at this facility and provide a point of contact.
See PPI 65 Response 5
141 MI7
M60
AH
U Sche dule
MI702 indicates Glycol in what appears to be a reheat coil. Please confirm Chilled Water does not contain glycol.
Confirmed, chilled water does not contain glycol