The scope of work includes rebalancing and reconfiguring the building's second and third floor HVAC system, replacing VAV and CAV terminal units and associated ductwork, installing VFDs on exhaust fans, and replacing cooling coils. The total contract duration is 518 calendar days from notice to proceed. The total price for the entire work is to be provided by the offeror. The government may reject an offer if it is deemed materially unbalanced.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

PRICE PROPOSAL FORM

SOLICITATION: N40080-24-R-2396

N-USU-70 Perform Study/Design of HVAC Naval Support Activity, Bethesda, MD

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
0001
BASE PRICE: Total Price for the entire work for USU-Bldg. 70 Repair HVAC. To meet the load, pressurization, and thermal comfort for the 2nd and 3rd floor of building 70, the following scope will

be executed:

1. The building spaces will be rebalanced and reconfigured based on current utilization.

a. On the second floor, two (2) VAV boxes and associated supply air ductwork and diffusers will be replaced, so loads are efficiently met in the corresponding spaces.

b. On the third floor, two (2) VAV boxes, ten (10) CAV boxes and associated supply air ductwork and diffusers will be replaced, so loads are efficiently met in the corresponding spaces.

c. On the third floor, new ductwork will be installed in room A3020, but the existing VAV boxes will be retained. This will allow for higher airflow to the space.

2. Classrooms, offices, and conference rooms currently utilizing CAV terminal units will be converted to VAV terminal units. The existing terminal units will be retained and only controls will be modified. Exhaust lines that do not currently have manual balancing dampers will be provided with them.

3. Variable frequency drives (VFDs) will be installed on exhaust fans EF 1 through 8. The speed of these fans will be programmed to track with the fans’ respective air handling unit (AHU) fan.

4. The existing cooling coils for all AHUs serving the second and third levels will be replaced with new coils that provide a lower coil outlet temperature. TAB of the HVAC system and commission in accordance with the drawings and specifications will be performed.

1
EA

TOTAL PRICE (CLIN 0001) $__________________________

General Note:

1. In case of a discrepancy between the CLIN(s) price and the total price, the CLIN(s) price will be presumed to be correct and the total price will be recalculated accordingly; in case of a discrepancy between the SLIN(s) prices and the price for the CLIN, the SLIN(s) price will be presumed to be correct and the CLIN price will be recalculated accordingly; in case of a discrepancy between a unit price and an extended price, the unit price will be presumed to be correct and the extended price will be recalculated accordingly; subject, however, to correction to the same extent and in the same manner as any other mistake.

2. Total Contract duration for Base Bid is 518 calendar days from Notice to Proceed (NTP).

3. Failure to enter a price for any CLIN will result in a proposal being rejected as unacceptable.

4. The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.