Amendment 0005.pdf

PDF 409 KB Posted

Attached to
DESIGN-BUILD, STEAM B BOILER REPLACEMENT, NAVAL SUPPORT FACILITY, INDIAN HEAD, MARYLAND
Solicitation number
N4008023R0010
Issued by

About this file

This solicitation requests design-build proposals to replace boilers at the Steam B Plant located at the Naval Support Facility in Indian Head, Maryland. Proposals are due by June 30, 2023 and the contract is for a 1037 calendar day period. Offerors must provide pricing for primary facilities including Buildings 712 and 712R, supporting facilities, and an optional reverse osmosis system. The Navy will evaluate offers based on total price. The scope includes replacing aging boilers and infrastructure to rehabilitate the steam system.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see SF30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 27

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008023R0010

X 9B. DATED (SEE ITEM 11)

28-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jun-2023

CODE

NAVAL FACILITIES ENGINEERING SYS COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008023R0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to:

1. Extend Phase II Proposals Due Date to 30 June 2023 by 2PM EST

2. Provide Responses to Pre-Proposal Inquiries (PPIs)

3. Provide New Wage Determination - General Decision Number: MD20230041 06/02/2023

4. Add FAR Clause 52.204-27 Prohibition on a Bytedance Covered Application All other terms and conditions remain unchanged.

PRE-PROPOSAL INQUIRIES

Questio n No.

REFERE

NCE

QUESTION GOVERNMENT RESPONSE

Posted on Amend No.

Page Section Para.

Drawin g C‐101

Please provide the “property lines” as they pertain to the Building 712 site.

Do the “proposed site limits” shown on sheet C‐101 constitute the property lines?

Building 712 has no real property lines. However, a Building Code Site plan shall be provided as required by FC 1‐300‐09N,§7‐6.1. The site plan shall be prepared by the fire protection designer of record and must show the line of encroachment identifying minimum separation distances from adjacent buildings and assumed property lines (movable imaginary lines for the purpose of fire separation between buildings) of the new construction and of the adjacent structures."

The existing plant has a propane tank used for the oil burner pilots prior to the introduction of gas to the site.

Does the Government desire to maintain the propane service for use during gas interruptions?

Refer to “1374726_Steam B_Amendment 0001”

The existing gas meter appears that it will be too close to the building to meet AT/FP requirements. Does the Government anticipate or expect Contractor action to correct the location?

Per 2.3.6 Antiterrorism Criteria This Facility will have an occupancy designated as low occupancy and UFC 4‐010‐01, (19 August 20), does not apply.

Attachment K, D301001 OIL SUPPLY SYSTEM, p.

410 of 1730; and drawing

MEP‐602

The truck loading and unloading stations show the use of “self priming centrifugal pumps”. Fuel pumps are typically positive displacement. Are centrifugal pumps an absolute requirement, or can positive displacement pumps be used?

Refer to “1374726_Steam B_Amendment 0001”

5 Various

The RFP makes specific references to code editions. Please clarify if the stated sections are to be used, or if versions are selected based on the current version per UFC 1‐200‐01, Change 1, dated 24 Feb 2023.

Refer to 1374726_Steam B_Amendment 0001”

Attachment K, para2.3.5 Accessibility Requirements, p. 333 of

Part 3, Paragraph 2.3.5 has a statement that the plant does not need to be accessible. This overlooks the possibility of supervisory or regulatory personnel who are mobility impaired visiting the plant.

Previous DoD plants have been built with limited accessibility to the firing floor, office, and toilet rooms. Please clarify the accessibility requirements.

Agree that ABA compliance is not required given the understanding that this is a temporarily occupied building for occasional monitoring of equipment. The RFP notes the user’s invoking of the able bodied exclusion under Article 3 of the SECDEF memo. Note that using this requirement does have a memo component that needs to be filled out and signed off on by the Installation Commander. ‐That said, the conceptual plan in the RFP appears to show an accessible path to the Control Room and the Toilet. I do think we could get the ABA 5’‐0” diameter turning radius in both spaces as well. So where it is not required, if we can provide accessibility with minimal effort, we should do so. The SECDEF Memo does state in Article 3 Exclusions:

“Nevertheless, since the intended use of such excluded facilities may change with time or in emergencies, compliance with these DoD Standards is recommended to the maximum extent that is reasonable and practicable without degrading the military utility.”

Attachment K, para 2.3.6 Antiterrorism Criteria, p.

Part 3, Paragraph 2.3.5 Is ATFP required? There are conflicting paragraphs. Please clarify project intent.

Per 2.3.6 Antiterrorism Criteria This Facility will have an occupancy designated as low occupancy and UFC 4‐010‐01, (19 August 20), does not apply.

Attachment K, para 2.4.2 Civil/Site, p. 337 of 1730

Part 3, Paragraph 2.4.2 has a requirement for double wall tanks located inside the containment area.

Use of double wall tanks in conjunction with a containment basin is not required per COMAR. Please clarify project intent.

Storage Tanks shall be in complience with NFPA 30. Stored #2 fuel is classified aws Class II liquid. Provide tanks as specified in the RFP.

Attach ment J

Price Proposal Form

Items 0001A

0001B , 0002

The description for each of the line items appears to be missing the "construction" element of the project. Please advise.

See Revised Price Proposal Form 0005

Attach ment J

Price Proposal Form

Items 0001A

0001B

Please define "Primary Facilities" and "Supporting Facilities". We have not been able to determine what facilities make up the "Primary" and what facilities make up the "Supporting".

Section 01 20 00 Page 2 defines Primary Facilities and Supporting Facilities. Building 712 and 712R are the Primary Facilities.

Amend ment #

1 | PPI

Form

Question # 1

Please confirm the government period of performance as Amendment # 1 states 1022 calendar days and Amendment # 2 ‐ Phase II states 1037 calendar days.

1037 calendar days is correct. 1022 calendar days is the Construction Duration, the additional 15 days includes time permitted for bonds approvals

12 D302001 1.10.3

1.10.4

In review of the transmitter requirements for the project, is inclusion of HART protocol for two‐ way communication desired?

Refer to “1374726_Steam B_Amendment 0001”

367; 1;

Part 3, Section 5;

MEP‐701;

D3020

101.1 1;

Sched ule:

Deaer ator;

Paragr aph 2

Attachment K, Part 3, Section 5, 101, #11 sizes the deaerator for an 80,000 PPH load and requires 30 minutes of storage at full load. However, the deaerator schedule on drawing MEP‐ 701 specifies a rating of 75,000 PPH, a storage volume of 1,850 gallons, and a storage capacity of 10 minutes.

D3020 further specifies full plant capacity deaerators with common 30 minute capacity storage tank. If the load is 75,000 PPH (~150 GPM), 10 mins of storage would be 1500 GPM.

For 80,000 PPH (~160 GPM), 10 mins of storage would be 1,600 gallons. If the boilers are rated for 34,526 pph, full plant capacity would be ~69,000 PPH (~138 GPM) and 30 minutes of storage would be ~4,141 gallons. We are requesting clarification on the desired rated capacity of the deaerator and the required storage in minutes for that rating.

Provide deaerator based on RFP Part 3 D3020 requirements.

14 6 D302001 1.7

What is the basis for providing a blowdown tank of a minimum of 1,200 gallons? This tank seems larger than should be required for the boiler plant size.

Provide a 1200 gallon blowdown tank.

15 1; 4

MEP‐701;

D3020

Sched ule:

Boiler;

Paragr aph 1

The boiler schedule on drawing MEP‐ 701 specifies a "Nominal HP" of 1,000 for each boiler with an output of 33,500 MBH and 34,526 PPH. This contradicts D3020 which requires a capacity of 34,600 MBH at 200 psig operating pressure. Boiler ratings are from and at 212 °F and 0 psig. The output capacity of a 1,000 HP boiler at 200 psig will only be 33,475 MBH and 33,304 PPH. Is the intent to receive 1,000 HP boilers or 1,100 HP boilers? An 1,1100 HP boiler will provide a capacity of 36,822 MBH and 36,635 PPH.

Provide boilers based on RFP Part 3 D3020 requirements.

16 11 & 12 Factor 6 Para.

4 & (a)

The requirement for Attachment F states in part: "Small Business utilization will be evaluated on past performance projects that required the use of a Small Business Subcontracting Plan (SBSP)" and ."Attachment F shall be provided for each project submitted under Factor 2, Experience". None of our projects featured in Factor 2, Experience required SBSPs as the projects were set aside for small businesses already. As this is the case, Small Business goals and data were not tracked. Please advise if Attachment F is only to be completed for projects that required SBSPs and goals, or if it is to be completed for every project submitted under Factor 2, regardless of required SBSPs and goals. Also, please advise if Attachment F is just to be completed for the projects pertaining only to the Offeror, or for projects pertaining to both the Offeror and the Offeror's chosen Design Firm. If the latter, there could be as many as 10 projects for which the Offeror has to provide this data in Factor 6.

Attachment F is required for all projects that required Small Business Subcontracting Plan (SBSP).

If a SBSP was not required due to the project being a small business set‐aside please indicate that.

Attach ment G

SBPCD

2.a & 2.b

Attachment G ‐ 2.a asks for the total contract value (the offeror's proposed price for the project, as we understand it). We are not accustomed to providing our "price" in the technical proposal. Please advise that the offeror is to provide their proposed price in 2.a. If not, please confirm it is acceptable to leave this section blank. (Normally for this type of form, we are used to providing percentages for each of the Small Business categories, but not dollar values.)

There are no changes, please complete Attachment G as indicated.

Site Visit | After contract award and during the Design Period will the contractor be responsible for existing government assets and temporary equipment? If yes, provide the governments expectations.

Contractor shall strictly follow NSF Indian Head safety and security regulations, protecting of Government assests during entire project process, from the early stages of site visits in pre‐contract award phase, to design phase after Contract award, and during construction phase. Protection of Government assets is a primary Contractor's duty.

Attachment K;

Page 871/1730

Please confirm that the new Liquid Fuel Oil Tanks shall be UL 2085 rated.

Refer to RFP Part 3 for tanks requirements.

Page 367/1730

Marlo Dealkalizer/softener | Based on the overall condition of the existing Marlow system could the government amend scope to replace the existing with a new. This would allow the government and contractor to manage the warranty of all new assets. If replacement is not an option, will any maintenance, repairs and salt be provided by the government?

The dealkilizer will be a government furnished equipment. From the 101‐ Boiler Room Data sheet: "Relocate existing Marlo dealkalyzer in its entirety from shelter northeast of existing Building 712, temporarily store and protect, service and place into operation in approximate location indicated on concept plans."

Page 743/1730

DX HVAC Units | Please confirm that the government is requiring copper/copper air cooled condensers or a 2000 hour salt spray coating.

Per RFP Part 3 D30 General System Requirements. From the B101 Boiler room data sheet: "Provide all mechanical equipment HVAC cooling/heating and condenser coils with a manufacturer approved coating system. The heat transfer rating must be as installed".

Page 463/1730

Non‐Potable Water | RO water extension from existing PNP to new Building 712R is just under 0.9 miles.

Providing electric heat trace will be difficult due to the lack of power in the proposed routing system. Would the government consider changing scope to have the contractor install a RO Skid sized for the new B‐712R boiler plant?

A packaged RO skid may be proposed as a design solution post award.

Site Visit | Will the new Steam Plant HVAC systems be required to integrate into a BAS system or will these assets be controlled stand‐ alone. If yes, please provide the preferred BAS vendor and contact information that services NSF.

Part 3 D302001 1.10.1 Boiler Controls details the plant control system requirements.

Attachment K;

Page 327/1730 &

MEP‐602

Fuel Oil | RFP states provide a minimum of 115,000 gallons of fuel oil . However, MEP‐602 references

(2) 45,000 gallon horizontal ASTs.

Please provide clarification on the actual number of tanks and sizing (the RFP makes reference to (3) new tanks). Is the contractor expected to fill the new tanks with fuel oil? Is the contractor expected to refill the tanks after boiler plant start‐up, testing and commissioning?

From Part 3 2.4.2 "minimum 115,000 gallons of usable fuel oil storage in three (3) double‐wall above ground storage tanks…" DM to Coordinate with NAVFAC Utility Department for refilling of tanks.

25 1 1.2

Project description identifies new #2 storage tanks at a capacity of 115,000 gallons. The drawing, sheet MEP602, indicates 2 tanks at 45,000 gallons (90,000 gallons total). Confirm quantity and sizing of tanks required.

Part 3 D302001 1.10.1 Boiler Controls details the plant control system requirements.

Part 3, Chapter 1, Page

Confirm that the building insulation requirements and focus on building energy efficiency are applicable considering the space is ventilated. It is understood that insulation and efficiency should be considered for conditioned areas.

Mech. ‐ Confirmed. 0005

Part 3, Chapter 1, Page

Provide a copy of the Indian Head Installation Appearance Plan (IAP) as mentioned in the project program.

This is provided in Part 6 of the RFP 0005

Site Visit

Do any of the existing steam supports located outside of the plant need to be evaluated or replaced?

Existing steam supports between the existing plant and utility bridge adjacent to building 1646 shall be replaced, primary valve at the utility bridge and warm up valves should be included as well.

During the site visit it appeared that the sanitary structures downstream of the blowdown tank were emitting steam and showed signs of deterioration. None of these are indicated to be replaced. Confirm these are to remain as‐is.

Project scope includes the blowdown tank per the RFP, sanitary lines downstream of blowdown tank are outside of scope.

32 Permits Confirm no DNR approvals are needed. Project program notes this site is not in a wetland.

DNR approvals are not required. 0005

Certific ation

Confirm LEED certification is not required.

Provide design and construction in accordance with UFC 1‐200‐02 High Performance and Sustainable Building Requirements, in accordance with Part 3 ‐ Chapter 2 ‐ Section 2.8

As‐ Builts

Confirm that existing as‐built drawings of all site area, buildings, and utilities within the project scope will be made available, including electronic versions.

All availible existing drawings have been provided as attachments in Part 6

Bid

Docum ents

Confirm bid drawings will be made available to successful bidder, including electronic versions.

We have Autocad files for all of the concept drawings, except CD101.

These can be made availible to the contractor post award. However, note that these are only a preliminary concepts and not a complete design. The contractor is fully responsible for the design and construction to meet all requirements of the RFP and contract. Note the order of precedence in Section 01 33 10.05 20, 3.3.2.

36 Permits Confirm no forest stand delineation or conservation plans are required.

From the Maryland DNR Website, "Any activity requiring an application for a subdivision, grading permit or sediment control permit on areas 40,000 square feet (approximately 1 acre) or greater is subject to the Forest Conservation Act and will require a Forest Conservation Plan prepared by a licensed forester, licensed landscape architect, or other qualified professional UNLESS you are subject to exemptions". The proposed site limits are approximately 47,000 SF, and the area being disturbed appears to be below 40,000 SF (refer to the RFP page 1214, Part 6, Attachment 4, Drawing C‐101). No Forests will be disturbed as a part of this project, therefore no forest conservation is required.

37 Traffic Confirm a traffic impact study is not required.

Traffic Impact Study is not required for this project.

Part 3, Chapter 2, Page

Section 2.3.6 notes a Risk Analysis and Vulnerability Assessment is not available. Is one required?

Per 2.3.6 Antiterrorism Criteria This Facility will have an occupancy designated as low occupancy and UFC 4‐010‐01, (19 August 20), does not apply.

Are any existing geotechnical reports available for the site?

The Geotechnical Report is provided in Part 6 of the RFP. See the paragraph on page 446 titled "Government Provided Geotechnical Information", PART 3 ‐ CHAPTER 6 / ESR G10 ‐ Page 2.

Are up to date survey files (pdf and CAD) available for use on this site?

Information regarding the survey data is provided on page 446 of the RFP. The concept drawings in Part 6 of the RFP were developed using the survey file. We have a DWG file for concept drawing C‐101 which can be made available to the contractor post‐award. The existence, size, and location of the utilities are not guaranteed by the surveys provided.

Survey data and utility locations must be verified by the contractor in accordance with the RFP.

Page 343/1730

Provide two (2) fully independent deaerator sections – Is the government's intent for full N+1 redundancy with (2) spray Head sections and (2) storage tanks or is the government's intent to provide

(2) Spray Heads connected to a single storage tank? Please provide clarification.

Part 3 2.4.5 states: "Note the deaerator package must be provided with two fully independent deaerator sections with separate water inlet and steam controls such that full plant capacity is maintained with one deaerating section completely out of service."

Will the government confirm that Cathodic protection will be required for underground electrical, piping, and aboveground piping?

Part 3 G401010 indicates cathodic protection systems are not required.

Will the government provide clarification of the percentage of welds that will be required for non‐ destructive testing (NDT)?

Perform NDT in accordance with the requirements of ASME BPVC SEC V.

Fully examine no less than 10 percent of all butt welds by random radiography. Select welds to be examined to ensure that the work product of each welder or welding operator doing the production welding is included. If any of the butt welds examined reveals an unacceptable indication, examine and accept by radiography, all butt welds welded by those welders.

1374726_Steam B_Amendment 0001

Amendment 0001 eProjects Work Order Number: 1374726 Construction Contract Number: TBD Project Title: Replace Boilers at Steam B Location: NSF Indian Head, MD Date: June 15, 2023

Designers, refer to FC 1-300-09N Table 19-1 for how to word the Change Description depending on what type of change you’re making (like adding a section, or just changing words, etc)

Making Word Changes Changed Item Change Description PPI

Part 3 – Chapter 2 –

2.4.5 Mechanical

After the first paragraph add:

“The existing plant has a propane tank used for the oil burner pilots for use during Natural Gas Outages.

The system needs capability for propane to fuel the pilot during Natural Gas Outages or Curtailments.”

Part 3 – Chapter 6 – D301001 Oil Supply System

In the first bullet point, delete the text “, rotary self-priming centrifugal type.” from the sentence “Pumps shall conform to API Std 676, rotary self-priming centrifugal type.”

Part 3 – Chapter 2 –

2.8 Applicable Codes

and Standards

In the first paragraph, change the last sentence to say “The edition dates listed below were the latest as of the writing of this RFP. However, use the UFC, codes and criteria effective upon issuance from the date of the last step of RFP issuance, which was May 15, 2023 for this RFP.“

UFGS section 01 14 00, Paragraph 1.3.1 Activity Regulations

After the last text paragraph add:

“Contractor shall strictly follow NSF Indian Head's safety and security regulations, protecting Government’s assets during entire project process, from early stages of site visits in pre-contract award phase, following the design phase during after Contract award, and during the construction phase.

Protection of Government’s asset is a primary Contractor’s responsibility.”

PRICE PROPOSAL FORM

N40080-23-R-0010

Steam B Boiler Replacement Indian Head Naval Support Facility, Indian Head, MD

ITEM DESCRIPTION PRICE

0001A BASE BID: Primary Facilities - Building 712 and 712R $___________________

All costs in connection with proposal preparation, design, permitting, construction, regulatory, and NOSSA/DDESB reviews & approvals related to Primary Facilities and the FY19 Replace Building and Boilers at Steam B Plant, Indian Head MD, complete as specified in this Request for Proposal

(RFP).

0001B BASE BID: Supporting Facilities $___________________

All costs in connection with proposal preparation, design, permitting, construction, regulatory, and NOSSA/DDESB reviews & approvals related to Supporting Facilities and the FY19 Replace Building and Boilers at Steam B Plant, Indian Head MD, complete as specified in this Request for Proposal

(RFP).

TOTAL PRICE FOR BASE BID ITEMS 0001A through 0001B $________________________

0002 OPTION 1: Reverse Osmosis System $_________________________

All costs in connection with proposal preparation, design, permitting, construction, regulatory, and NOSSA/DDESB reviews & approvals related to the Reverse Osmosis piping, pumps, controls, and other appurtenances from the Primary Nodal Plant (PNP) to Steam B., complete as specified in this Request for Proposal (RFP).

TOTAL PRICE FOR BASE BID AND OPTION ITEM 0001 through 0002 $________________________

General Notes:

1. Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based upon the total evaluated price, which is the sum of Items 0001 through 0002.

2. Failure to enter a price for any of the Items will result in the proposal being rejected as unacceptable.

3. Contract Clause 52.211-18, Variation in Estimated Quantity, will be included in the contract.

4. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the

Options will not obligate the Government to execute any or all of the Options.

5. Total Contract duration for Base Bid is 1037 calendar days from Notice to Proceed (NTP) includes 15 days for bond approval. Should the Government choose to exercise any or all options, the contract duration will remain the same.

6. If option items are exercised after award, additional bonding and consent of surety will be required.

Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all items.

Name of Firm Submitting Offer: ______________________________________________________

Signature: _____________________________________________

Email: ________________________________________________

ACKNOWLEDGEMENT OF AMENDMENT(S): ____________________________________________________

General Decision Number: MD20230041 06/02/2023

Superseded General Decision Number: MD20220041

State: Maryland

Construction Type: Building

County: Charles County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 03/24/2023 3 04/07/2023 4 05/05/2023 5 06/02/2023

ASBE0024-007 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 39.27 18.67+a

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-010 04/01/2021

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 24.46 8.69+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BRMD0001-006 04/30/2023

Rates Fringes

TILE SETTER......................$ 33.41 12.67

BRMD0001-009 04/30/2023

Rates Fringes

TILE FINISHER....................$ 27.68 11.63

BRMD0001-011 04/30/2023

Rates Fringes

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 36.50 13.47

BRMD0001-012 04/30/2023

Rates Fringes

MASON - STONE....................$ 43.16 20.28

BRMD0001-013 04/30/2023

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 33.41 12.67

CARP0197-001 05/01/2022

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 31.40 13.86

CARP0219-001 05/01/2022

Rates Fringes

MILLWRIGHT.......................$ 36.00 14.07

ELEC0026-021 09/07/2020

Rates Fringes

ELECTRICIAN (Communication and Sound Equipment).............$ 29.05 11.39

ELEC0026-022 12/06/2021

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 50.00 20.49+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.

ELEV0010-001 01/01/2023

Rates Fringes

ELEVATOR MECHANIC................$ 52.49 37.335+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0077-017 05/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 33.98 11.07+a Bulldozer...................$ 33.98 11.07+a

a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

* IRON0005-005 06/01/2023

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 36.10 25.19

* IRON0005-014 05/01/2023

Rates Fringes

IRONWORKER, REINFORCING..........$ 30.70 23.33

LABO0011-013 06/15/2020

Rates Fringes

LABORER: Mason Tender - Cement/Concrete..................$ 25.88 8.63 LABORER: Pipelayer..............$ 25.88 8.63

PAIN0051-014 06/01/2022

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 29.92 13.35 Glazing Contracts over $2 million.....................$ 34.16 13.35

PAIN0051-019 06/01/2022

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher/Taper......$ 26.61 11.41 Industrial..................$ 33.05 13.22

PLAS0891-005 07/01/2021

Rates Fringes

PLASTERER (Including Fireproofing)....................$ 30.53 7.93

PLAS0891-006 02/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68

PLUM0005-010 08/01/2022

Rates Fringes

PLUMBER..........................$ 48.00 20.75+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-013 08/01/2022

Rates Fringes

PIPEFITTER (HVAC Pipe and System Installation Only)........$ 47.98 23.12+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 07/01/2022

Rates Fringes

ROOFER...........................$ 32.26 14.71

SFMD0669-001 04/01/2023

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 40.46 25.22

SHEE0100-015 11/01/2021

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 44.37 21.33+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

* SUMD2010-089 08/20/2010

Rates Fringes

LABORERS

Common or General...........$ 11.38 ** Grade Checker...............$ 16.00 ** 2.90 Landscape...................$ 9.23 ** Mason Tender - Brick........$ 13.00 ** Mason Tender - Stone........$ 14.03 ** Mason Tender for Pointing, Caulking and Cleaning.......$ 13.25 ** Mortar Mixer................$ 16.61 9.09

PIPEFITTER (Excluding HVAC Pipe and System Installation)....$ 28.96 11.35

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.17

POWER EQUIPMENT OPERATOR:

Asphalt Roller..............$ 21.35 5.38

Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 Forklift....................$ 16.00 ** 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 ** 5.18 Loader......................$ 22.75 4.91 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88

TRUCK DRIVER

Dump Truck..................$ 15.90 ** 1.12 Tractor Haul Truck..........$ 17.87 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

FAR 52.204-27

Prohibition on a Bytedance Covered Application (June 2023)

(a) Definitions. As used in this clause—

Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.

Information technology, as defined in 40 U.S.C. 11101(6)—

(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—

(i) Of that equipment; or

(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;

(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but

(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.

(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117–328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M–23–13, dated February 27, 2023, ‘‘No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M–23–13.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.

(End of clause)

(End of Summary of Changes)