This amendment modifies a solicitation for a design-build project to replace steam boilers at a Naval Support Facility in Indian Head, Maryland. The amendment provides a sign-in sheet and photos from a site visit to the Steam B Plant, and confirms that all other terms and conditions of the original solicitation remain unchanged. The project involves partially rehabilitating the base steam system by replacing the Steam B boilers located at the southern end of the facility. The Naval Facilities Engineering Command issued the solicitation on behalf of the Department of the Navy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| 1374726_Steam B_Amendment 0002.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Steam B Site Visit Sign-In Sheet.pdf | ||
| Attachment D - Expected Visitor Form Steam B.docx | DOCX document | |
| Attachment F - Historical Small Business Utilization Form.docx | DOCX document | |
| Attachment H - Small Business Subcontracting Plan.docx | DOCX document | |
| Amendment 0002 - Phase II.pdf | ||
| Attachment J - Price Proposal Form.docx | DOCX document | |
| Attachment I - Steam B Site Visit Map.pdf | ||
| Attachment G - Small Business Commitment Participation (SBPCD).docx | DOCX document | |
| Attachment E - SECNAV 5512.pdf | ||
| Amendment 0001.pdf | ||
| Attachment C - Pre-Proposal Inquiry (PPI Form).xlsx | XLSX spreadsheet | |
| Attachment B - Past Performance Questionnaire (PPQ) Form.docx | DOCX document | |
| N4008023R0010 Steam Boiler Replacement - Phase I RFP.pdf | ||
| Attachment A - Construction and Design Experience Project Data Sheet.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40080-23-R-0010, DESIGN-BUILD STEAM BOILER REPLACEMENT, NAVAL SUPPORT FACILITY, INDIAN HEAD MD
SEE SF30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008023R0010
X 9B. DATED (SEE ITEM 11)
28-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2023
CODE
NAVAL FACILITIES ENGINEERING SYS COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008023R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to:
1. Provide Steam B Site Visit Sign-In Sheet
2. Provide Steam B Site Visit Photos
All other terms and conditions remain unchanged.
(End of Summary of Changes)