Specifications for Mechanical Projects.pdf
PDF 94 KB Posted
- Solicitation number
- N4008021R0002
About this file
This document contains specifications for mechanical projects and a related federal contract opportunity. The specifications outline generic unified facilities guide specification sections for regional mechanical project task orders, covering areas such as demolition, concrete, thermal and moisture protection, finishes, fire suppression, plumbing, HVAC, electrical, and electronic safety and security.
The federal contract opportunity is a solicitation for an HVAC and mechanical IDIQ contract to provide labor, materials, equipment and incidentals for repair of mechanical and HVAC systems at Naval Air Station Patuxent River in Maryland, Naval Support Facility Indian Head in Maryland, and Naval Support Facility Dahlgren in Virginia. The estimated value is $125 million over one base year and four option years. This procurement is set aside for eligible 8(a) small businesses and proposals are due by October 7, 2021. The NAICS code is 238220 and size standard is $16.5 million. The selection method will be lowest price technically acceptable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NRDE HVAC Summary.pdf | ||
| HVAC Inventoy List.xlsx | XLSX spreadsheet | |
| N4008021R0002 Amendment 0003 POSTING.pdf | ||
| N4008021R0002 Amendment 0002 POSTING.pdf | ||
| ATTACHMENT 3 - PPQ.docx | DOCX document | |
| ATTACHMENT 2-Safety Data Sheet.docx | DOCX document | |
| ATTACHMENT 5 - RFI Form.docx | DOCX document | |
| ATTACHMENT 1 - Project Data Sheet.docx | DOCX document | |
| ATTACHMENT 4 - Teaming Partng Consent Form.docx | DOCX document | |
| N4008021R0002 Solicitation Posting.pdf | ||
| N4008021R0002 Exhibit_K_Coefficient_Breakdown_Form.docx | DOCX document | |
| Blank COEFFICIENT WORKSHEET PAX-IH-DAHL N40080-21-R-0002.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERIC UFGS SPEC SECTIONS FOR REGIONAL MECHANICAL PROJECTS
TASK ORDERS STATEMENT(S) OF WORK WILL EDITED AS REQUIRED, TO INCLUDE ANY
ADDITIONAL APPLICABLE SECTION(S)
Full Guides can be found at: http://www.wbdg.org/ccb/browse_cat.php?c=3
TITLE
Division 01 - General Requirements UFGS 01 11 00 Summary of Work UFGS 01 14 00 Work Restrictions UFGS 01 20 00.00 20 Price & Payment Procedures UFGS 01 30 00 Administrative Requirements UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System UFGS 01 32 16.00 20 Small Project Construction Progress Schedules UFGS 01 33 00 Submittal Procedures UFGS 01 35 26 Governmental Safety Requirements UFGS 01 42 00 Sources for Reference Publications UFGS 01 45 00.10 20 Quality Control for Minor Construction UFGS 01 50 00 Temporary Construction Facilities & Controls UFGS 01 57 19 Temporary Environmental Controls UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls UFGS 01 74 19 Construction & Demolition Waste Management UFGS 01 78 00 Closeout Submittals UFGS 01 78 23 Operation & Maintenance Data UFGS 01 78 24.00 20 Facility Electronic Operation & Maintenance Support Information (eOMSI) Division 02- Existing Conditions UFGS 02 41 00 Demolition UFGS 02 42 19 Removal and Salvage of Historic Construction Materials UFGS 02 82 00 Asbestos Remediation UFGS 02 83 00 Lead Remediation Division 03- Concrete UFGS 03 30 00 Cast In Place Concrete Division 07- Thermal And Moisture Protection UFGS 07 92 00 Joint Sealants Division 09- Finishes UFGS 09 90 00 Paints and Coatings Division 21- Fire Suppression UFGS 21 13 13.00 20 Wet Pipe Sprinkler System, Fire Protection UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems Division 22- Plumbing UFGS 22 00 00 Plumbing, General Purpose UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Controls UFGS 22 13 29 Sanitary Sewerage Pumps Division 23- Heating, Ventilating, and Air Conditioning (HVAC) UFGS 23 00 00 Air Supply , Distribution, Ventilation, and Exhaust Systems UFGS 23 01 30.41 HVAC System Cleaning UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods UFGS 23 05 15 Common Piping for HVAC UFGS 23 05 48.19 Seismic Bracing for HVAC UFGS 23 05 93 Testing, Adjusting, And Balancing for HVAC UFGS 23 07 00 Thermal Insulation For Mechanical Systems UFGS 23 08 01.00 20 Testing Industrial Ventilation Systems UFGS 23 09 00 Instrumentation and Control HVAC
TITLE
UFGS 23 09 13 Instrumentation and Control Devices for HVAC UFGS 23 09 23.02 Bacnet Direct Digital Control for HVAC and other Building Control Systems UFGS 23 09 53.00 20 Space Temperature Control Systems UFGS 23 09 93 Sequences of Operation for HVAC Control UFGS 23 11 25 Facility Gas Piping UFGS 23 21 13. 00 20 Low Temperature Water(LTW) Heating System
UFGS 23 21 13. 23 20 High or Medium Temperature Water System Within Buildings Hydronic Pumps
UFGS 23 22 26. 00 20 Steam System and Terminal Units UFGS 23 23 00 Refrigerant Piping UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems UFGS 23 30 00 HVAC Air Distribution System UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust UFGS 23 52 00 Heating Boilers UFGS 23 52 33.03 20 Water Tube Boilers, Oil/Gas or Oil UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers( Under 800,000 BTU/HR Output) UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers( Over 800,000 BTU/HR Output) UFGS 23 52 49.00 20 Steam Boilers and Equipment( 500,000-18,000,000 BTU/HR) UFGS 23 52 53.00 20 Steam Boilers and Equipment(18,000,000-60,000,000 BTU/HR) UFGS 23 54 19 Building Heating Systems, Warm Air UFGS 23 64 10 Water Chillers, Vapor Compression Type UFGS 23 64 26 Chilled, Chilled-Hot, And Condenser Piping Systems UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers UFGS 23 76 00.20 Evaporative Cooling System UFGS 23 81 00 Decentralized Unitary HVAC Equipment UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment UFGS 23 81 23.00 20 Computer Room Air Conditioning Units UFGS 23 81 29 Variable Refrigerant Flow HVAC Systems UFGS 23 82 00.00 20 Terminal Heating Units UFGS 23 82 46.00 40 Electric Unit Heaters UFGS 23 83 00.00 20 Electric Space Heating Equipment UFGS 23 84 19.00 Desiccant Colling Systems Division 25- Integrated Automation UFGS 25 05 11 Cyber Security For Facility- Related Control Systems UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration Division 26- Electrical UFGS 26 00 00.20 Basic Electrical Materials And Methods UFGS 26 20 00 Interior Distribution System UFGS 26 29 23 Adjustable Speed Drive (ASD) Systems Under 600 Volts Division 28- Electronic Safety And Security UFGS 28 31 76 Interior Fire Alarm And Mass Notification System
NOTE: Additional applicable sections may be added on task orders.
File details come from the government source that posted it. Updated .