Schedule of Estimated Price
| Schedule of Total Estimated Price | |
| Solicitation: N39430-21-R-2311 | |
| ESS NAVFAC EXWC | IDIQ SUMMARY SCHEDULE OF ESTIMATED PRICE BY YEAR AND GRAND TOTAL |
COMPANY NAME:
| Instructions: Fill in YELLOW HIGHLIGHTED CELLS WITH PROPOSED PROFIT | | |
| Element | BASE YEAR Ordering Period Total Amount | Ordering Period 2 |
| Total Amount | Ordering Period | | |
Total Amount Ordering Period Total Amount Ordering Period Total Amount 6 Month Option Period Total Amount
| Direct Labor Combined Port Hueneme, CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Direct Labor Combined Gulfport, MS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Direct Labor Combined San Diego, CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Direct Labor Combined Little Creek, VA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor, F/B, OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Oil Analysis subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Direct Material | $ 7,640,000.00 | $ 7,792,800.00 | $ 7,948,656.00 | $ 8,107,629.12 | $ 8,269,781.70 | $ 8,435,177.34 |
| Shipping and Transportation | $ 181,000.00 | $ 184,620.00 | $ 188,312.40 | $ 192,078.65 | $ 195,920.22 | $ 199,838.63 |
| General and Administrative Expense (G&A) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal Material, Transportation, and G&A | $ 7,821,000.00 | $ 7,977,420.00 | $ 8,136,968.40 | $ 8,299,707.77 | $ 8,465,701.92 | $ 8,635,015.96 |
| PROFIT PERCENTAGE (For Proposal Use Only) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Total Profit: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Expense (specify) | | | | | | |
| Total Price | $ 7,821,000.00 | $ 7,977,420.00 | $ 8,136,968.40 | $ 8,299,707.77 | $ 8,465,701.92 | $ 8,635,015.96 |
| CLIN 001 60 MONTHS and 6 MONTH OPTION TOTAL PRICE | | | | | | $ 49,335,814.05 |
Base Year Pricing Schedule
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR BASE YEAR | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,000,000.00 | | Direct Material | | | | $ 1,820,000.00 |
| A004 | Shipping and Transportation | | | | $ 50,000.00 | A004 | Shipping and Transportation | | | | $ 30,000.00 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,050,000.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,850,000.00 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 1,820,000.00 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 25,000.00 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,845,000.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |
Ordering Period 2
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR ORDERING PERIOD 2 | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,040,000.00 | | Direct Material | | | | $ 1,856,400.00 |
| A004 | Shipping and Transportation | | | | $ 51,000.00 | A004 | Shipping and Transportation | | | | $ 30,600.00 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,091,000.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,887,000.00 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 1,856,400.00 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 25,500.00 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,881,900.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |
Ordering Period 3
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR ORDERING PERIOD 3 | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,080,800.00 | | Direct Material | | | | $ 1,893,528.00 |
| A004 | Shipping and Transportation | | | | $ 52,020.00 | A004 | Shipping and Transportation | | | | $ 31,212.00 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,132,820.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,924,740.00 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 1,893,528.00 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 26,010.00 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,919,538.00 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |
Ordering Period 4
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR ORDERING PERIOD 4 | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,122,416.00 | | Direct Material | | | | $ 1,931,398.56 |
| A004 | Shipping and Transportation | | | | $ 53,060.40 | A004 | Shipping and Transportation | | | | $ 31,836.24 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,175,476.40 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,963,234.80 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 1,931,398.56 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 26,530.20 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,957,928.76 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |
Ordering Period 5
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR ORDERING PERIOD 5 | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,164,864.32 | | Direct Material | | | | $ 1,970,026.53 |
| A004 | Shipping and Transportation | | | | $ 54,121.61 | A004 | Shipping and Transportation | | | | $ 32,472.96 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,218,985.93 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,002,499.50 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | $ - 0 | | Subtotal Direct Labor | | | | $ - 0 |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 1,970,026.53 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 27,060.80 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 1,997,087.34 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |
6 Month Option
| N39430-21-R-2312 EXHIBIT LINE ITEMS - MAKE UP THE AGGREGATE PRICE FOR 6 MONTH OPTION PERIOD | | | | | | | | | | | |
| Instructions: Fill in YELLOW CELLS with PROPOSED LABOR RATES | | | | | | | | | | | |
| Port Hueneme, CA | | | | | | San Diego, CA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 270 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | | | Subtotal Direct Labor | | | | |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,208,161.61 | | Direct Material | | | | $ 2,009,427.06 |
| A004 | Shipping and Transportation | | | | $ 55,204.04 | A004 | Shipping and Transportation | | | | $ 33,122.42 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,263,365.65 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,042,549.49 |
| Gulfport, MS | | | | | | Little Creek, VA | | | | | |
| ELIN | Description | Est Qty | | U/Price | Est Amount | ELIN | Description | Est Qty | | U/Price | Est Amount |
| A001 | Direct Labor - Inspection* | | | | | A001 | Direct Labor - Inspection* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 800 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic - Helper | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic - Helper | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| A002 | Direct Labor - Repair* | | | | | A002 | Direct Labor - Repair* | | | | |
| Project Manager | 270 | $ - 0 | HR | $ - 0 | | Project Manager | 0 | $ - 0 | HR | $ - 0 |
| Scheduler Maintenance | 40 | $ - 0 | HR | $ - 0 | | Scheduler Maintenance | 0 | $ - 0 | HR | $ - 0 |
| Body Repair and Paint | 720 | $ - 0 | HR | $ - 0 | | Body Repair and Paint | 0 | $ - 0 | HR | $ - 0 |
| Motor Vehicle Mechanic | 640 | $ - 0 | HR | $ - 0 | | Motor Vehicle Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Operator | 640 | $ - 0 | HR | $ - 0 | | Heavy Equipment Operator | 0 | $ - 0 | HR | $ - 0 |
| Heavy Equipment Mechanic | 1600 | $ - 0 | HR | $ - 0 | | Heavy Equipment Mechanic | 0 | $ - 0 | HR | $ - 0 |
| Optional | | | | $ - 0 | | Optional | | | HR | $ - 0 |
| Optional | | | HR | $ - 0 | | Optional | | | HR | $ - 0 |
| Subtotal | | | | $ - 0 | | Subtotal | | | | $ - 0 |
| Subtotal Direct Labor | | | | | | Subtotal Direct Labor | | | | |
| A003 | Oil Analysis and Report | 300 | $ - 0 | EA | $ - 0 | A003 | Oil Analysis and Report | 60 | $ - 0 | EA | $ - 0 |
| Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | | | Price should include drawing samples, performing oil and fluid analysis, generating and providing the report. | | | | |
| Direct Material | | | | $ 2,009,427.06 | | Direct Material | | | | $ - 0 |
| A004 | Shipping and Transportation | | | | $ 27,602.02 | A004 | Shipping and Transportation | | | | $ - 0 |
| A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 | A005 | General Adminstrative Expense (G&A XX%) | | | 0.00% | $ - 0 |
| TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ 2,037,029.08 | TOTAL PRICE (FOR EVALUATION PURPOSES ONLY): | | | | | $ - 0 |
| Notes: | | | | | | | | | | | |
| *For Labor Rates, provide FULLY BURDENED rates that include hourly rates of pay, all applicable burdens (e.g., fringe benefit, overhead), and profit. | | | | | | | | | | | |
| ** Estimated quantities are utilized solely for purposes of this solicitation, actual quantities will vary per task order depending on the needs of the Navy; the direct material and shipping & transportation prices on this sheet are for evaluation purposes and are estimations based on quantities by location and type of equipment. | | | | | | | | | | | |