This Statement of Work (SOW) outlines the triennial maintenance requirements for two 15KW portable diesel generators located at the Nuclear Regional Maintenance Department Point Loma (NRMD-PL). The SOW specifies detailed maintenance tasks for Generator A (Serial #7DC5521MZM04633) and Generator B (Serial #7DC3574MZM0634), including replacing fuel pipes, clamp bands, and intake air lines, as well as checking fuel injector nozzle injection pressure, turbo charger, and injection pump. All replacement parts must be new OEM parts.

The maintenance period is scheduled once every three years, starting January 1, 2027, and ending December 31, 2030. The government will provide escorts and electrical connections for operational checks, while the contractor must perform all work on-site at NRMD-PL. The SOW does not include applicable documents or general notes, focusing solely on the specific maintenance requirements for these two generators.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (Triennial)

1. SCOPE:

1.1. This specification provides the minimum triennial requirements for service of Portsmouth’s Portable 15KW Diesel Generators A and B at Nuclear Regional Maintenance Department Point Loma (NRMD-PL).

2. APPLICABLE DOCUMENTS: None

3. REQUIREMENTS:

3.1. 15KW Generator A #7DC5521*MZM04633

3.1.1. Replace fuel pipes and clamp bands

3.1.2. Replace intake air line.

3.1.3. Check fuel injector nozzle injection pressure.

3.1.4. Check turbo charger.

3.1.5. Check injection pump.

3.1.6. All replacement parts shall be New OEM replacement parts.

3.2. 15KW Generator B #7DC3574*MZM0634.

3.2.1. Replace fuel pipes and clamp bands

3.2.2. Replace intake air line.

3.2.3. Check fuel injector nozzle injection pressure.

3.2.4. Check turbo charger.

3.2.5. Check injection pump.

3.2.6. All replacement parts shall be New OEM replacement parts.

4. RESPONSIBILITIES:

4.1. Government:

4.1.1. Provide escorts as required to allow vendor to service equipment.

4.1.2. Electrically Connect equipment as required to support post service operational checks.

4.2. Contractor:

4.2.1. All work shall be performed on site at NRMD-PL.

5. DELIVERY/PERIOD OF PERFORMANCE: Once every three years starting 1/1/27 and ending 12/31/30.