This Statement of Work (SOW) details biennial preventative maintenance requirements for two 15KW Diesel Generators (A and B) located at the Nuclear Regional Maintenance Department Point Loma (NRMD-PL). The maintenance tasks for each generator include replacing radiator coolant, battery, radiator hoses and clamp bands, and checking valve clearances, with all replacement parts specified as new OEM components. The work will be performed on-site, with the government providing escorts and electrical connection support for operational checks.

The period of performance is once every two years, starting upon contract award and ending on 12/31/30. The government's responsibilities include providing site access and electrical connection support, while the contractor is required to perform all work at the NRMD-PL location. No applicable documents are referenced, and no general provisions are specified beyond the detailed maintenance requirements for the two generators.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (Biennial)

1. SCOPE:

1.1. This specification gives the minimum Biennial requirements for service of Portsmouth’s Portable 15KW Diesel Generators A and B at Nuclear Regional Maintenance Department Point Loma (NRMD-PL).

2. APPLICABLE DOCUMENTS: None

3. REQUIREMENTS:

3.1. 15KW Generator A #7DC5521*MZM04633

3.1.1. Replace radiator coolant.

3.1.2. Replace battery.

3.1.3. Replace radiator hoses and clamp bands.

3.1.4. Check of valve clearances

3.1.5. All replacement parts shall be New OEM replacement parts.

3.2. 15KW Generator B #7DC3574*MZM0634.

3.2.1. Replace radiator coolant.

3.2.2. Replace battery.

3.2.3. Replace radiator hoses and clamp bands.

3.2.4. Check of valve clearances

3.2.5. All replacement parts shall be New OEM replacement parts.

4. RESPONSIBILITIES:

4.1. Government:

4.1.1. Provide escorts as required to allow vendor to service equipment.

4.1.2. Electrically Connect equipment as required to support post service operational checks.

4.2. Contractor:

4.2.1. All work shall be performed on site at NRMD-PL.

5. DELIVERY/PERIOD OF PERFORMANCE: Once every 2 years starting upon contract award and ending 12/31/30.