This document is an Extended Scope of Work (SOW) for Preventative Maintenance on two Kubota 15KW Diesel Generators, solicited by Portsmouth Naval Shipyard. The detailed spreadsheet outlines comprehensive preventative maintenance tasks for two specific generators (Generator A #7DC5521MZM04633 and Generator B #7DC3574MZM00634) across a base period and four option periods from September 2025 to September 2030. Maintenance tasks include yearly services such as replacing fuel and oil filters, air cleaner elements, and fan belts, as well as 24-month and 36-month comprehensive maintenance like replacing radiator coolant, batteries, hoses, checking valve clearances, fuel injector nozzle pressures, and inspecting turbo chargers and injection pumps.

The solicitation (N3904025Q1050) is a full and open competition seeking commercial services under NAICS code 811310, with a small business standard of $12.5 million. The place of performance is Point Loma Shipyard in San Diego, California, and the solicitation closes on July 31, 2024, at 4:00 PM EST. All replacement parts must be OEM parts, and vendors are required to submit firm, fixed prices for each maintenance task across different option periods. Interested vendors should contact Chuck Chase at Charles.e.chase23.civ@us.navy.mil for technical questions or data requests.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM Tasks

Scope of Work
1. Preventative Maintenance. Vendors shall submit firm, fixed prices for all Preventative Maintenance (PM) tasks on the PM Tab in Attachment 1 - Extended SOW. Provide Unit and Extended prices on each Extended Line Item (ELIN) for each Option period. Prices shall include all labor, parts and other charges necessary to perform the listed PM task. The Government will incorporate Attachment 1 into the contract and will use these prices to order and pay for PM tasks under the contract. Please change "Quantity" as needed and "Unit Type", such as (Each, Job, Liter etc.). All replacement parts shall be OEM replacement parts.
ITEMBASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD 4
1.0Portable 15KW Diesel Generator A - #7DC5521*MZM04633; IAW Attachment 2 SOW and Attachment 3 TC:ELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
0001Type1001Type2001Type3001Type4001Type
1.1Every 1-Year$0.00$0.00$0.00$0.00
1.1.1Replace fuel filter cartridge-(To Be Done in Base Year)1$0.00$0.001$0.00$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
1.1.2Replace oil and oil filter cartridge-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
1.1.3Replace air cleaner element-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
1.1.4Replace fan belt-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
1.1.5Clean water separator-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
1.1.6Clean water jacket (radiator interior)-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
BASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD 4
2.0Portable 15KW Diesel Generator B - #7DC3574*MZM00634; IAW Attachment 2 SOW and Attachment 4 TC:ELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
0002Type1002Type2002Type3002Type4002Type
2.1Every 1-Year$0.00$0.00$0.00$0.00
2.1.1Replace fuel filter cartridge-(To Be Done in Base Year)1$0.00$0.001$0.00$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
2.1.2Replace oil and oil filter cartridge-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
2.1.3Replace air cleaner element-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
2.1.4Replace fan belt-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
2.1.5Clean water separator-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
2.1.6Clean water jacket (radiator interior)-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00
BASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD 4
3.0Portable 15KW Diesel Generator A - #7DC5521*MZM04633; IAW Attachment 5 SOW and Attachment 3 TCELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
0003Type2003Type4003Type
3.1Every 24-Months$0.00$0.00$0.00
3.1.1Replace radiator coolant-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
3.1.2Replace battery-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
3.1.3Replace radiator hoses and clamp bands-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
3.1.4Check of valve clearances-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
BASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD 4
4.0Portable 15KW Diesel Generator B - #7DC3574*MZM00634; IAW Attachment 5 SOW and Attachment 4 TCELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
0004Type2004Type4004Type
4.1Every 24-Months$0.00$0.00$0.00
4.1.1Replace radiator coolant-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
4.1.2Replace battery-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
4.1.3Replace radiator hoses and clamp bands-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
4.1.4Check of valve clearances-(To Be Done in Base Year)1$0.00$0.001$0.00$0.001$0.00$0.00
BASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD4
5.0Portable 15KW Diesel Generator A - #7DC5521*MZM04633; IAW Attachment 6 SOW and Attachmet 3 TCELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
1003Type4005Type
5.1Every 36-Months$0.00$0.00
5.1.1Replace fuel pipes and clamp bands-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
5.1.2Replace intake air line-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
5.1.3Check fuel injector nozzle injection pressure-(To Be Done in 1st Option Year)1$0.00$0.002$0.00$0.00
5.1.4Check turbo charger-(To Be Done in 1st Option Year)1$0.00$0.002$0.00$0.00
5.1.5Check injection pump-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
BASE PERIODOPTION PERIOD 1OPTION PERIOD 2OPTION PERIOD 3OPTION PERIOD 4
6.0Portable 15KW Diesel Generator B - #7DC3574*MZM00634; IAW Attachment 6 SOW and Attachment 4 TCELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended PriceELIN No.QuantityUnitUnit PriceExtended Price
1004Type4006Type$0.00
6.1Every 36-Months$0.00$0.00
6.1.1Replace fuel pipes and clamp bands-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
6.1.2Replace intake air line-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
6.1.3Check fuel injector nozzle injection pressure-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
6.1.4Check turbo charger-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00
6.1.5Check injection pump-(To Be Done in 1st Option Year)1$0.00$0.001$0.00$0.00

BASE PERIOD GRAND TOTAL $0.00 OPTION PERIOD 1 GRAND TOTAL $0.00 OPTION PERIOD 2 GRAND TOTAL $0.00 OPTION PERIOD 3 GRAND TOTAL $0.00 OPTION PERIOD 4 GRAND TOTAL $0.00

Total PM Cost (Inclusive of All Options) $0.00

File details come from the government source that posted it. Updated .